SPECIFICATION FOR THERMAL INSULATION OF

PIPELINES/

SPECIFICATIE PENTRU IZOLATIE TERMICA LA


CONDUCTE

Issued for construction/


03 02.2017 Nicoleta Marina Paraschiv
Emis pentru construire
Gavrila Dobroiu Mihai
Revised with Petrom Comments/ Nicoleta Marina Paraschiv
02 12.2016
Revizuit cu comentarii Petrom Gavrila Dobroiu Mihai
Issued for review / Nicoleta Marina Paraschiv
01 11.2016 Mihai
Emis pentru verificare Gavrila Dobroiu
Rev. Prepared Checked Approved
Date Description
No. Intocmit Verificat Aprobat
Data Descriere
Originator/Autori
SPECIFICATION FOR THERMAL INSULATION OF PIPELINES/
SPECIFICATIE PENTRU IZOLATIE TERMICA LA CONDUCTE

Doc. No.: PE-D-A011642221521-PP-SPC-006-03-B Rev.: 03

Project no. / Page no. /


Project Title / Titlul proiectului:
Proiect nr. : Pagina nr.:

CPFO PARK 16 SUPLAC/


A011642221521
OPTIMIZAREA FACILITATILOR DE 1 of 11
233/4964
PRODUCTIE PARC 16 SUPLAC
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 2 of 11
Doc. nr. :

Revision No. / Reason for Revision / Date /


Revizia nr. Motivul reviziei Data

01 Issued for review / Emis pentru verificare 11.2016

Revised according to VN 22705_22_11_2016/


02 12.2016
Revizuit conform VN 22705_22_11_2016
Issued for construction/
03 02.2017
Emis pentru construire
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 3 of 11
Doc. nr. :

TABLE OF CONTENTS / CUPRINS

1. GENERAL / GENERALITATI .................................................................................................................. 4


1.1. PROCESS LINE TO BE THERMALLY INSULATED IS: / CONDUCTA TEHNOLOGICA
CARE SE IZOLEAZĂ TERMIC........................................................................................................... 4
2. TECHNICAL PARAMETERS FOR INSULATION / PARAMETRII TEHNICI PENTRU IZOLATIE ....... 4
2.1. MAIN TECHNICAL FEATURES OF THERMAL INSULATION / PRINCIPALELE
CARACTERISTICI TEHNICE ALE IZOLATIEI TERMICE ................................................................. 4
2.2. COMPONENT PARTS OF THERMAL INSULATION STRUCTURE / COMPONENŢA
STRUCTURII DE IZOLAŢIE TERMICĂ............................................................................................. 5
2.3. BASIC REQUIREMENTS TO BE MET BY THERMAL INSULATION / CONDIŢIILE DE BAZĂ
PE CARE TREBUIE SĂ LE SATISFACĂ IZOLAŢIA TERMICĂ......................................................... 5
2.4. FACILITY RELIABILITY / FIABILITATEA INSTALAŢIEI.................................................................... 5
2.5. COMPANY WHO PERFORMS THERMAL INSULATION WORKS / UNITATEA CARE
EXECUTĂ LUCRĂRILE DE IZOLAŢII TERMICE .............................................................................. 5
3. DESCRIPTION OF WORKS, ASSEMBLING, ORDER OF OPERATIONS, TRIALS, TESTS,
VERIFICATIONS / DESCRIEREA EXECUŢIEI LUCRĂRILOR, MONTAJUL, ORDINEA DE
EXECUŢIE, PROBE, TESTE, VERIFICĂRI ............................................................................................ 6
3.1. CORROSION PROTECTION / PROTECŢIA ANTICOROZIVĂ ........................................................ 6
3.2. THERMAL INSULATION LAYER / STRATUL TERMOIZOLATOR................................................... 6
3.3. PROTECTION OF THERMAL INSULATION / PROTECŢIA IZOLAŢIEI TERMICE.......................... 6
3.4. CONDITIONS IMPOSED TO ELEMENTS OF FACILITIES TO BE THERMALLY INSULATED –
INSULATION CONTINUITY / CONDIŢII CE SE IMPUN ELEMENTELOR DE INSTALAŢII CARE
TERMOIZOLEAZĂ - CONTINUITATEA IZOLAŢIILOR...................................................................... 7
3.5. FIXED THERMAL INSULATION, APPLIED IN THREE LAYERS / IZOLAŢII TERMICE, FIXE,
APLICATE IN TREI STRATURI.......................................................................................................... 7
4. STANDARDS, REGULATIONS AND PRESCRIPTIONS GOVERNING OVERALL EXECUTION
OF THE WORK / STANDARDE, NORMATIVE ŞI PRESCRIPŢII CARE GUVERNEAZĂ EXECUŢIA
DE ANSAMBLU A LUCRĂRII ................................................................................................................. 8
4.1. NORMS, STANDARDS AND PRESCRIPTIONS APPLICABLE TO THE PROJECT / NORME,
NORMATIVE SI PRESCRIPTII APLICABILE PROIECTULUI........................................................... 8
5. LIABILITIES FOR THE TESTS, VERIFICATIONS, TRIALS / RESPONSABILITĂŢILE PENTRU
TESTE, VERIFICĂRI, PROBE................................................................................................................. 8
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 4 of 11
Doc. nr. :

1. GENERAL / GENERALITATI
The scope of this specification is the thermal Obiectul acestei specificatii este constituit de catre
insulation for the new steam and condensate izolatia termica pentru conductele de abur si
lines of Park 16 Suplac. condens proiectate la Parc 16 Suplac.
The thermal insulation is carried out to reduce Izolaţia termică se realizează pentru reducerea
heat flow from the line to the outside, in order to fluxului de căldură de la conducta spre mediul
maintain the required temperature of steam and exterior, în scopul menţinerii temperaturii necesare
condensate for the process. a aburului si condensului in procesul tehnologic.

1.1. PROCESS LINE TO BE THERMALLY INSULATED IS: / CONDUCTA TEHNOLOGICA CARE SE


IZOLEAZĂ TERMIC ESTE :
Steam pipeline : Conducta de abur :
• 2”-SMS-008-SCD3D-HC • 2”-SMS-008-SCD3D-HC
• fluid: steam ; • fluidul : abur ;
• operating pressure (bar) : 4/14 ; • presiune de operare (bar) : 4/14 ;
• operating temperature (°C) : 150/280 ; • temperatură de operare (°C) : 150/280 ;
• outer diameter (mm) : 60.3 ; • diametru exterior (mm) : 60.3 ;
• thickness (mm) : 4.5 ; • grosime (mm) : 4.5 ;
Condensat pipeline : Conducta de condens :
• 2”-SMR-010-SCD3D-HC • 2”-SMR-010-SCD3D-HC
• fluid: condensate • fluidul : condens ;
• operating pressure (bar) : 0,1 ; • presiune de operare (bar) : 0,1 ;
• operating temperature (°C) : 70/100 ; • temperatură de operare (°C) : 70/100 ;
• outer diameter (mm) : 60.3 ; • diametru exterior (mm) : 60.3 ;
• thickness (mm) : 4.5 ; • grosime (mm) : 4.5 ;

2. TECHNICAL PARAMETERS FOR INSULATION / PARAMETRII TEHNICI PENTRU IZOLATIE

2.1. MAIN TECHNICAL FEATURES OF THERMAL INSULATION / PRINCIPALELE


CARACTERISTICI TEHNICE ALE IZOLATIEI TERMICE

2.1.1. Thermal insulation for pipes / Izolatii termice pentru conducte


- basic materials for thermal insulation in three - Materiale de bază pentru izolaţia termica in trei
layers: straturi :
• mineral wool shells, thickness 40 mm; • Cochilii vată minerală, grosime 40 mm ;
• mineral wool mattresses on aluminum foil, • Saltele vată minerală pe folie de aluminium,
thickness 50 mm; grosime 50 mm ;
• polyurethane shells, thickness 20 mm; • Cochilii din poliuretan, grosime 20 mm ;
- protective material of thermal insulation: - Materialul de protecţie a izolaţiei termice :
• zinc coated sheet: thickness 0.4 mm. • tablă zincata : grosime 0,4 mm.
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 5 of 11
Doc. nr. :

2.2. COMPONENT PARTS OF THERMAL INSULATION STRUCTURE / COMPONENŢA


STRUCTURII DE IZOLAŢIE TERMICĂ
Component parts of thermal insulation structure Elementele componente ale structurii de izolaţie
are: termică sunt :
• corrosion protection performed over the entire • Protecţia anticorozivă executată pe întreaga
surface of the line according to the project; suprafaţă a conductei conform proiect ;
• insulating layers of high resistance heat • Straturile termoizolatoare din materiale cu
transfer materials: mineral wool shells, rezistenţă mare la transferul de căldură: cochilii
mineral wool mattress and polyurethane din vata minerala, saltele din vata minerala si
shells; cochilii din poliuretan ;
• protective insulation layer for mechanical and • Stratul de protecţie a termoizolaţiei cu rol de
waterproof protection: zinc coated sheet. protecţie mecanică şi hidrofugă a termoizolaţiei:
tabla zincata.

2.3. BASIC REQUIREMENTS TO BE MET BY THERMAL INSULATION / CONDIŢIILE DE BAZĂ PE


CARE TREBUIE SĂ LE SATISFACĂ IZOLAŢIA TERMICĂ
• To ensure heat loss reduction (low • Sa asigure reducerea pierderilor de caldură
thermal conductivity). (conductivitate termică scăzută).
• To ensure the fully safe operation of the • Sa asigure functionarea instalatiilor in conditii
facility with regard to: de siguranta deplina privind :
• flammability features of materials: non- • caracteristicile de combustibilitate ale
combustible; materialelor folosite: incombustibile ;
• fire behavior of materials • comportarea la foc a materialelor
euro-class for fire reaction, A1 ; euroclasa de reactie la foc, A1 ;
• safety against fires transmission. • securitate impotriva transmiterii incendiilor.
• to be easy to install, non-toxic; • Să fie uşor de montat, netoxic;
• to not allow rain water ingress - • Să nu permită pătrunderea apei de
hydrophobic; ploaie - hidrofobizat;
• to be stable, to withstand wind, • Să fie stabilă, să reziste la vânt etc.,
etc., long service life (to not durată lungă de viaţă (să nu îşi
change the properties in time); schimbe proprietăţile în timp);
• to be not agreed by insects, • Să nu fie agreată de insecte,
rodents, parasites. rozătoare, paraziţi.

2.4. FACILITY RELIABILITY / FIABILITATEA INSTALAŢIEI


Thermal insulation elements shall be made of Izolaţiile termice se vor executa din elemente
reliable, certified, standardized and verified for fiabile, omologate, tipizate şi verificate în
long-term operation. funcţionarea de lungă durată.

2.5. COMPANY WHO PERFORMS THERMAL INSULATION WORKS / UNITATEA CARE EXECUTĂ
LUCRĂRILE DE IZOLAŢII TERMICE
The company who performs such works must be Unitatea care executa trebuie să fie o unitate
a specialized company for such works, with a specializată în astfel de lucrări, cu o tehnologie bine
well established and tested technology, with well- stabilită şi verificată, cu personal bine pregătit,
trained, experienced and adequately endowed experimentat şi dotat corespunzător.
personnel.
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 6 of 11
Doc. nr. :

3. DESCRIPTION OF WORKS, ASSEMBLING, ORDER OF OPERATIONS, TRIALS, TESTS,


VERIFICATIONS / DESCRIEREA EXECUŢIEI LUCRĂRILOR, MONTAJUL, ORDINEA DE
EXECUŢIE, PROBE, TESTE, VERIFICĂRI

3.1. CORROSION PROTECTION / PROTECŢIA ANTICOROZIVĂ


Corrosion protection of the line is performed Protecţia anticorozivă a conductei se execută in
depending on material quality, operating funcţie de calitatea materialului, temperatura de
temperature and environmental factors. regim şi factorii de mediu.
Materials used for corrosion protection and Materialele cu care se execută protecţia
number of layers are written in the technical anticorozivă şi numărul de straturi se precizează în
specification of the project PE-D-A01162221521- specificatia tehnica a proiectului PE-D-
PP-SPC-001. A011642221521-PP-SPC-001.

3.2. THERMAL INSULATION LAYER / STRATUL TERMOIZOLATOR


Materials used for thermal insulation in three Materialele destinate realizării izolatiei termice in
layers have the following features: trei straturi au următoarele caracteristici :
LAYER 1 : MINERAL WOOL SHELLS STRATUL 1 : COCHILII DIN VATA MINERALA
THICKNESS 40 MM GROSIME 40 MM
• Density : 120 kg/m3 • Densitate : 120 kg/m3
• conductivity coefficient at 50 oC: max. • Coeficient de conductivitate la 50 oC: max.
0,045 W/mK; 0,045 W/mK;
• Temperature: +15...+250 oC • Temperatura de utilizare : +15...+250 oC
• Combustibility: heavy combustible. • Combustibilitate : incombustibil.
LAYER 2 : MATTRESSES OF MINERAL WOOL STRATUL 2 : SALTELE DIN VATA MINERALA
ON ALUMINUM FOIL, THICKNESS 50 MM PE FOLIE DIN ALUMINIU, GROSIME 50 MM
• Density : 120 kg/m3 • Densitate : 120 kg/m3
• conductivity coefficient at 50 oC : max. 0,045 • Coeficient de conductivitate la 50 oC : max.
W/mK; 0,045 W/mK;
• Temperature: +15...+250 oC • Temperatura de utilizare : +15...+250 oC
• Combustibility: heavy combustible. • Combustibilitate : incombustibil.
LAYER 3 : POLYURETHANE FOAM SHELLS, STRATUL 3 : COCHILII DIN SPUMA
THICKNESS 20 MM POLIURETANICA GROSIME 20 MM
• Density: 35 kg/m3 • Densitate: 35 kg/m3
• conductivity coefficient at 50 oC: max. 0,023 • Coeficient de conductivitate la 50 oC: max.
W/mK; 0,023 W/mK;
• Temperature: -40...+140 oC • Temperatura de utilizare : -40...+140 oC
• Combustibility: heavy combustible. • Combustibilitate : incombustibil.

3.3. PROTECTION OF THERMAL INSULATION / PROTECŢIA IZOLAŢIEI TERMICE


Material for thermal insulation protection is zinc Materialul destinat protectiei termoizolatiei este
plated sheet. tabla zincata.
Thickness of zinc plated sheet shall be: 0.4 mm. Grosimea tablei zincate va fi : 0.4 mm
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 7 of 11
Doc. nr. :

Fixing of protective sheet is made by zinc plated Fixarea protectiei din tabla se realizeaza cu
screws for sheet, Ø4 mm. suruburi din otel zincat pentru tabla, Ø4 mm.

3.4. CONDITIONS IMPOSED TO ELEMENTS OF FACILITIES TO BE THERMALLY INSULATED–


INSULATION CONTINUITY / CONDIŢII CE SE IMPUN ELEMENTELOR DE INSTALAŢII CARE
TERMOIZOLEAZĂ - CONTINUITATEA IZOLAŢIILOR
Process line to be insulated shall meet the Conducta tehnologica prevăzuta a se izola trebuie
following requirements: sa îndeplinească următoarele condiţii :
• to be installed on final position; • sa fie montata in stare definitivă;
• pressure and leakage tests to be already • probele de presiune şi etanşeitate să fie
carried out; efectuate;
• spacing between the line to be insulated and • spaţiile dintre conducta ce se izolează şi
various construction elements to allow the diversele elemente de construcţii să permită
execution of thermal insulation to the execuţia termoizolatiei la grosimea indicata in
thickness indicated in project documentation; proiectul de executie;
• to be corrosion protected • să fie protejata anticoroziv
• continuity of thermal insulation • continuitatea izolaţiilor termice
• any traces of moisture in the heat insulating • se va urmari eliminarea oricaror urme de
layer shall be eliminated. umiditate din stratul termoizolator.

3.5. FIXED THERMAL INSULATION, APPLIED IN THREE LAYERS / IZOLAŢII TERMICE, FIXE,
APLICATE IN TREI STRATURI

THERMAL INSULATION ITSELF IZOLATIA TERMICA PROPRIU-ZISA


At the execution of multilayer thermal insulation La executia izolatiei termice in mai multe straturi la
of lines it shall take into account the following: conducte se va tine seama de urmatoarele :
• mineral wool shells shall have the inside • cochiliile din vata minerala vor avea diametrul
diameter equal to the outer diameter of the interior egal cu diametrul exterior al conductei,
pipe and the other layers of insulation shall iar celelalte straturi de izolatie vor avea
have the inside diameter equal to the outer diametrul interior egal cu diametrul exterior al
diameter of mounted layer; stratului montat
• rigid polyurethane foam supports shall be • pe conductele orizontale se vor monta suporturi
mounted on horizontal lines (half-rings with din spuma poliuretanica rigida (semiinele cu
spacers of 50 mm), at every 500 mm, distantieri de 50 mm), la 500 mm distanta, intre
between the insulating layers 2 and 3; straturile de izolatie 2 si 3 ;
• rigid polyurethane foam supports shall be • pe conductele verticale se vor monta suporturi
mounted on vertical lines (rings with spacers din spuma poliuretanica rigida (inele cu
of 50 mm), at every 500 mm, between the distantieri de 50 mm), la 500 mm distanta, intre
insulating layers 2 and 3; straturile de izolatie 2 si 3 ;
• adhesive tape of aluminum reinforced with • pentru imbinarea si strangerea fiecarui strat de
glass fibers shall be used for joining and izolatie termica se va utiliza banda adeziva din
clamping of each layer of thermal insulation. aluminiu armata cu fibre de sticla.
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 8 of 11
Doc. nr. :

PROTECTION OF THERMAL INSULATION PROTECTIA IZOLATIEI TERMICE


The following shall be achieved at the metallic La execuţia protecţiei metalice la conducte se va
protection of lines: urmări :
• cutting-on the parts at the required sizes and • croirea pieselor la dimensiunile şi formele
shapes, providing contour reserves (excess) necesare, cu asigurarea de rezerve pe contur
for 50 mm overlapping; pentru o suprapunere de 50 mm ;
• at assembly the overlapping of parts shall be • la montaj suprapunerile pieselor se vor face în
made so that the water resulted from the aşa fel incât apa rezultată din intemperii să nu
weather does not enter the insulation patrundă în structura de izolare.
structure.
• sealing of joints with butyl mastic sealing • etanşarea îmbinărilor cu şnur de etansare din
cord, ROMTIX equivalent mastic butilic echivalent ROMTIX
• clamping of sheet protection shall be • fixarea protectiei din tabla se va realiza cu
achieved with zinc plated screws; suruburi din otel zincat;
In the case of vertical lines, the installation of In cazul conductelor verticale, montarea virolelor
parts shall start from the bottom, in order to incepe de la partea inferioară, pentru a elimina
eliminate the possibility of water ingress in the posibilitatea pătrunderii apei în termoizolaţie.
thermal insulation.

4. STANDARDS, REGULATIONS AND PRESCRIPTIONS GOVERNING OVERALL EXECUTION OF


THE WORK / STANDARDE, NORMATIVE ŞI PRESCRIPŢII CARE GUVERNEAZĂ EXECUŢIA DE
ANSAMBLU A LUCRĂRII

4.1. NORMS, STANDARDS AND PRESCRIPTIONS APPLICABLE TO THE PROJECT / NORME,


NORMATIVE SI PRESCRIPTII APLICABILE PROIECTULUI
• C 142 -1985 - Standard for execution and • C 142 -1985 - Normativ pentru executarea si
acceptance of thermal insulation of facility receptionarea termoizolatiilor la elementele de
items; instalatii;
• C 56 - 2002 - Standard for quality checking • C 56 - 2002 - Normativ pentru verificarea calitatii si
and acceptance of construction works and receptia lucrarilor de constructii si instalatii
their facilities; aferente;
• Law 10 -1995 – on quality in construction; • Legea 10 -1995 - privind calitatea in constructii;
• P 118 - 1999 - Fire safety standard of • P 118 - 1999 - Normativ de siguranţă la foc a
construction. construcţiilor.

4.2. OMV PETROM NORMS AND PHILOSOPHIES / PETROM OMV-NORME SI FILOZOFII


EP FA MP 01 TS - Technical specification. EP FA MP 01 TS - Technical specification.
Thermal insulation for steam and hot water piping Thermal insulation for steam and hot water piping
5. LIABILITIES FOR THE TESTS, VERIFICATIONS, TRIALS / RESPONSABILITĂŢILE PENTRU
TESTE, VERIFICĂRI, PROBE
According to Law 10 on quality in construction, Conform Legii 10 privind calitatea în construcţii, şi a
and "Rules of verification and quality technical "Regulamentului de verificare şi expertiză tehnică
expertise of projects, construction works and de calitate a proiectelor, a execuţiei lucrărilor şi a
construction" approved by Romanian construcţiilor ”aprobat prin HGR nr. 925/1995
Government Decision no. 925/1995 on responsabilităţile pentru teste, verificări şi probe
responsibilities for tests, verifications and trials revin, în conformitate cu "Programul de control al
are as follows, in compliance with "Quality control calităţii pe timpul execuţiei".
program during execution".
Project Title/ CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE
Titlu Proiect PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 9 of 11
Doc. nr. :

• Contractor represented by : • Executantului reprezentat prin :


• quality control officer in charge for the • responsabilul CTC de lucrare;
project;
• Metrology Officer; • responsabilul cu metrologia;
• Beneficiary (investor) represented by: • Beneficiarului (investitorului) reprezentat prin :
• site managers or specialized • diriginţi de şantier sau agenţi economici
consultancy companies. de consultanţă specializaţi.
• Designer, represented by : • Proiectantului, reprezentat prin :
• complex project leader; • şeful de proiect complex;
• specialist engineers. • proiectanţii de specialitate.
• Supplier, represented by: • Furnizorului reprezentat prin:
• specialist delegated by supplying • specialistul delegat de firma furnizoare;
company;
• project verifier certified by MECMA • Verificatorului de proiecte atestat MECMA
• Quality technical expert certified by • Expertului tehnic de calitate atestat
MECMA (if applicable). MECMA (după caz).
Project Title/ Titlu Proiect CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 02 Page 10 of 11
Doc. nr. :

ANEXA 1

PROGRAMUL DE CONTROL AL CALITATII LUCRARILOR PE TIMPUL EXECUTIEI


Categoria de lucrari: IZOLATII TERMICE LA CONDUCTE

Nr. Faza de executie supusa Participanti Documente de atestare a


crt.
Metoda de control Parametri de acceptanta
controlului (*) calitatii

0 1 2 3 4 5

1. Predare - primire a frontului de Verificarea terminarii montajului, Conform cu proiectul: - P.V. de predare –
lucru masuratori: − specificatii materiale E, B primire a frontului de
− cote amplasamente − specificatie tehnica pentru lucru
− locatii izolatii termice conducte - P.V. de receptie
− diametre, lungimi, trasee − toate operatiunile de montare calitativa a lucrarilor
conducte conducte, care se izoleaza de montaj conducte.
terminate

2. Montaj, calitatea materialelor Verificare calitate materiale: Conform cu proiectul - P.V. de receptie
folosite inainte de punerea in materiale izolatoare, materiale − specificatii de materiale E, B calitativa
opera de protectia izolatiei, chituri, − specificatie tehnica pentru - Buletine de calitate
masticuri, materiale marunte, izolatii termice conducte - Certificate de
accesorii de montaj − standarde de executie conformitate
− buletine de calitate − conditii de calitate din
− certificate de conformitate certificate sau agremente
− agremente tehnice − Normativ C 142 / 1985
Project Title/ Titlu Proiect CPFO PARK 16 SUPLAC/ OPTIMIZAREA FACILITATILOR DE PRODUCTIE PARC 16 SUPLAC

Doc. Title / Specification for Thermal Insulation of Pipelines/


Titlu Doc. : Specificatie pentru Izolatie Termica la Conducte
Doc. No. /
PE-D-A011642221521-PP-SPC-006-03-B Rev. 03 Page 11 of 11
Doc. nr. :

4. Montaj, calitatea executiei tuturor Verificare calitate lucrari: Conform cu proiectul: - P.V. de lucrari
operatiunilor care devin ascunse − respectare solutii tehnice − Specificatie tehnica pentru E, B ascunse
− respectare specificatie tehnica izolatii termice conducte
pentru izolatii termice − Normativ C 56 / 2002
conducte − Normativ C 142 / 1985
− elemente sustinere
− respectare grosime izolatii
− fixare corespunzatoare

5. Proba de ansamblu de eficacitate − Verificare functionare − Conform proiect E, B - P.V. de proba


de ansamblu instalatie
− Verificarea eficacitatii
functionarii
6. Terminarea montajului − Verificari documente de − Conform proiect E, B, P - P.V. de receptie
Receptie calitate − Conform HG 273 / 1994 calitativa
− Verificari fizice, examinare modificat si completat cu
generala si prin sondaj HG 940 / 2006
− Acolo unde exista dubii se vor
practica sectionari ale
izolatiei, pana la suprafata
suport pentru verificarea
intregii structuri

( * ) - B - Beneficiar E - Executant P – Proiectant