Sunteți pe pagina 1din 2

Pag 1

OBIECTIV:

Proiect

OBIECTUL:

BLOC P+2

STADIUL FIZIC:

Pardoseli

Beneficiar:

________________________________________

Proiectant:

________________________________________

Executant:

________________________________________

Proiect:
Plansa:
Faza:

__________________
__________________
__________________

nr: ___
nr: ___

F3 - LISTA cuprinzand cantitatile de lucrari


- lei -

12.07.2012
SECTIUNEA TEHNICA

Nr.

SECTIUNEA FINANCIARA

Capitolul de lucrari

U.M. Cantitatea
1

Pretul unitar
(exclusiv TVA)
-lei-

TOTALUL
(exclusiv TVA)
-lei-

5=3x4

Pardoseli
CG01D1

ore

manopera
CG03E1

tone

manopera

ore

tone

22.69

manopera

ore

391.95

Plinte si borduri din placi din marmura plinte orizontale, la m


pereti

tone

manopera

ore

CZ0209A1

1,117.53

0.00

0.00

manopera:

3.69

988.45

utilaj:

0.48

129.08

transport:

0.00

0.00

13.89

3,723.73

material:

268.00

6.69

1,792.60

manopera:

7.09

1,898.86

utilaj:

0.12

32.27

transport:

0.00

0.00

195.64

Pardoseli din mozaic turnate pe loc fara coloranti, inclusiv mp


stratul suport de circa 3 cm grosime mortar, M 100T,
inclusiv frecarea si spalarea executate: simplu, n cmp
continuu in grosime de 1,5 cm, fara bordura, cu piatra de
mozaic din marmura, n ncaperi cu suprafete pna la 5 mp
inclusiv ;

greutate materiale

268.00

1.17

greutate materiale
CG16A1

4.17

material:

101.84

Pardoseli din materiale plastice cu covor din policlorura de mp


vinil (PVC) pe suport textil lipit cu prenadez, in ncaperi
cu suprafete pna la 20 m2, cu pervaz din lemn

greutate materiale
CG06C1

mp

Strat suport pentru pardoseli executate din mortar de


ciment marca M 100-T de 3 cm grosime, cu suprafata fin
driscuita ;

47.26

9,500.11

material:

201.00

27.62

5,550.67

manopera:

18.93

3,804.22

utilaj:

0.72

145.21

transport:

0.00

0.00

5.33

1,337.86

251.00
material:

0.89

223.45

manopera:

4.37

1,096.28

utilaj:

0.07

18.13

transport:

0.00

0.00

250.15

2,073.74

212.38

1,760.60

1.61
112.95
mc

Mortar de var - ciment pentru zidarie marca M 100-T


preparat cu ciment M 30, n instalatii centralizate, fara
adaos de var;

8.29
material:
manopera:
utilaj:
transport:

greutate materiale

tone

19.96

manopera

ore

4.31

TRA06A15

Transportul rutier al mortarului cu autobetoniera


de...5,5mc dist. =15km

tona

18.30

Cheltuieli directe:

41.84

32.73

271.30

0.00

0.00

12.12

221.85

material:

0.00

0.00

manopera:

0.00

0.00

utilaj:

0.00

0.00

12.12

221.85

transport:

procent

5.05

material

manopera

utilaj

transport

total

9,327.32

7,829.65

596.00

221.85

17,974.81

Pag 2
STADIUL FIZIC: Pardoseli

0
Recapitulatia:
CAS
Fond de risc
Concedii si indemnizatii
Somaj
Fond de garantare
Sanatate
Comision ITM

1
Recapitulatie 2010
20,800 %
0,694 %
0,850 %
0,500 %
0,250 %
5,200 %
0,750 %

Total Inclusiv Cheltuieli Directe:

Cheltuieli indirecte

10,000 %

Total Inclusiv Cheltuieli indirecte:

Profit
Total Inclusiv Profit:

5,000 %

5=3x4

0.00

1,628.57

0.00

0.00

1,628.57

0.00

54.34

0.00

0.00

54.34

0.00

66.55

0.00

0.00

66.55

0.00

39.15

0.00

0.00

39.15

0.00

19.57

0.00

0.00

19.57

0.00

407.14

0.00

0.00

407.14

0.00

58.72

0.00

0.00

58.72

9,327.32

10,103.69

596.00

221.85

20,248.85

932.73

1,010.37

59.60

22.18

2,024.89

10,260.05

11,114.06

655.60

244.03

22,273.74

513.00

555.70

32.78

12.20

1,113.69

256.23

23,387.43

10,773.06

11,669.76

688.38

TOTAL GENERAL (fara TVA):


TVA:
TOTAL GENERAL:

1 euro = 4.55 lei, curs la data de 7/15/2012