Proiectant

: ING. MARIUS POPESCU


Proiect nr.
din data:
.
, faza:
Beneficiar
:
|
Constructor :
|
Subunitate
:
|
----------------------------------------------------------------Investitie
:522
RETETE DE MORTARE SI BETOANE
Obiect
:522.01 RETETE DE MORTARE SI BETOANE
Stadiu fizic :522011 RETETE DE MORTARE SI BETOANE
----------------------------------------------------------------Categ.lucrari:
0000 A
Cantitate:
1,000 BUC.
DEVIZ ANALITIC PE STADII FIZICE
522011
PAG.: 1
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
A. CHELTUIELI DIRECTE ARTICOLE
1 CZ0201A1
1,000 MC
190,28
190,28
PREPARARE MORTAR VAR CIM PT ZID M10-Z CU
4,45
4,45
CIM F25 IN INSTALATII CENTRALIZATE CU V
51,50
51,50
AR PASTA
0,00
0,00
0,2500
0,2500
Total=
246,23
+------[Reteta normei:CZ0201A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,75000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 106,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,10300
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
2 CZ0201B1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.ZID.M10-Z CU
CIM.F25 1N INSTALATII CENTRALIZATE CU V
AR HIDRATAT
0,1680
0,1680

151,01
4,45
51,50
0,00
Total=

151,01
4,45
51,50
0,00
206,95

+------[Reteta normei:CZ0201B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,75000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 106,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG
61,50000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|

522011 RETETE DE MORTAR


PAG.: 2
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
3 CZ0201E1
1,000 MC
PREPARARE MORTAR VAR-CIMENT PT ZIDARIE M
10-Z CU CIMENT F25,MANUAL,CU VAR PASTA
0,2520

0,2520

191,34
21,38
0,00
0,00
Total=

191,34
21,38
0,00
0,00
212,72

+------[Reteta normei:CZ0201E1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,76000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 107,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,10300
650,00|
|
ii
tip 2
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
4 CZ0201F1
1,000 MC
PREPARARE MORTAR VAR-CIMENT PT.ZIDARIE M
10-Z CU C1MENT F25,MANUAL,CU VAR HIDRATA
T
0,1700
0,1700

152,07
21,38
0,00
0,00
Total=

152,07
21,38
0,00
0,00
173,44

+------[Reteta normei:CZ0201F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,76000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 107,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG
61,50000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
5 CZ0202A1
1,000 MC
PREPARARE MORTAR VAR-CIM PT ZIDARII M25Z CU CIM F25 IN INST CENTRALIZATE CU VAR
PASTA
0,2950
0,2950

210,53
4,45
51,50
0,00
Total=

210,53
4,45
51,50
0,00
266,48

522011 RETETE DE MORTAR


PAG.: 3
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0202A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,75000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 151,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,10300
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
6 CZ0202B1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.ZIDARI2 M25Z CU CIM.F25 IN INST.CENTRALIZATE CU VAR
HIDRATAT
0,2130
0,2130

171,26
4,45
51,50
0,00
Total=

171,26
4,45
51,50
0,00
227,20

+------[Reteta normei:CZ0202B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,75000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 151,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG
61,50000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
7 CZ0202E1
1,000 MC
PREPARARE MORTAR VAR.CIM.PT.ZIDARII M25Z CU CIM.F25 MANUAL CU VAR PASTA
0,2990

0,2990

212,04
21,38
0,00
0,00
Total=

212,04
21,38
0,00
0,00
233,42

+------[Reteta normei:CZ0202E1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,76000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 153,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,10300
650,00|
|
ii
tip 2
|

522011 RETETE DE MORTAR


PAG.: 4
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
8 CZ0202F1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.ZIDARII M25Z CU CIM.F25,MANUAL,CU VAR HIDRATAT
0,2160

0,2160

172,77
21,38
0,00
0,00
Total=

172,77
21,38
0,00
0,00
194,14

+------[Reteta normei:CZ0202F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,76000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 153,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG
61,50000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,50000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
9 CZ0203A1
1,000 MC
PREPARARE MORTAR CIM -VAR PT ZID M50-Z C
U CIM F25 IN INSTALATII CENTRALIZATE CU
VAR PASTA
0,3400
0,3400

227,37
4,45
51,50
0,00
Total=

227,37
4,45
51,50
0,00
283,32

+------[Reteta normei:CZ0203A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,72000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 211,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,09200
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31000
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
10 CZ0203B1
1,000 MC
PREPARARE MORTAR CIM-VAR PT.ZID.M50-Z CU
CIM.F25 1N INSTALATII CENTRALIZATE CU V
AR HIDRATAT
0,2660
0,2660

192,50
4,45
51,50
0,00
Total=

192,50
4,45
51,50
0,00
248,45

522011 RETETE DE MORTAR


PAG.: 5
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0203B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,72000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 211,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG
55,40000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31000
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
11 CZ0203E1
1,000 MC
PREPARARE MORTAR CIM -VAR PT ZID M50-Z C
U CIM F25 MANUAL CU VAR PASTA
0,3450

0,3450

229,33
21,38
0,00
0,00
Total=

229,33
21,38
0,00
0,00
250,71

+------[Reteta normei:CZ0203E1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100713 Var pasta pt construct MC
0,09200
650,00|
|
ii
tip 2
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 214,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200575 Nisip sortat
spalat
MC
0,73000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
12 CZ0203F1
1,000 MC
PREPARARE MORTAR CIM-VAR PT.ZID.M50-Z CU
CIM.F25 MANUAL CU VAR HIDRATAT
0,2720

0,2720

194,46
21,38
0,00
0,00
Total=

194,46
21,38
0,00
0,00
215,84

+------[Reteta normei:CZ0203F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,73000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 214,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG
55,40000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|

522011 RETETE DE MORTAR


PAG.: 6
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 5 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
13 CZ0204A1
1,000 MC
PREPARARE MORTAR CIMENT PT ZID M100-Z CU
CIMENT M30 IN INSTALATII CENTRALIZATE F
ARA ADAOS DE VAR
0,3110
0,3110

212,59
4,45
51,50
0,00
Total=

212,59
4,45
51,50
0,00
268,54

+------[Reteta normei:CZ0204A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 2 Mat. 2100397 Ciment metalurgic cu a KG 311,00000
0,45|
|
daosuri
m
30 vrac
s 1500
|
| 3 Mat. 2200575 Nisip sortat
spalat
MC
0,72000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
14 CZ0204B1
1,000 MC
PREPARARE MORTAR CIMENT PT ZID M100-Z CU
CIM M30 IN INST CENTRALIZATE CU ADAOS D
E VAR PASTA
0,3510
0,3510

231,74
4,45
51,50
0,00
Total=

231,74
4,45
51,50
0,00
287,69

+------[Reteta normei:CZ0204B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,72000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100397 Ciment metalurgic cu a KG 264,00000
0,45|
|
daosuri
m
30 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,06200
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
15 CZ0204C1
1,000 MC
PREPARARE MORTAR CIMENT PT.ZID.M100-Z CU
CIM.M30 1N INST.CENTRALIZATE CU ADAOS D
E VAR HIDRATAT
0,3010
0,3010

208,09
4,45
51,50
0,00
Total=

208,09
4,45
51,50
0,00
264,04

522011 RETETE DE MORTAR


PAG.: 7
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0204C1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,72000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100397 Ciment metalurgic cu a KG 264,00000
0,45|
|
daosuri
m
30 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG
37,00000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 7 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
16 CZ0204G1
1,000 MC
PREPARARE MORTAR DE CIMENT PT.ZIDARIE M1
00-Z CU CIMENT M30 MANUAL FARA ADAOS VAR
0,3180

0,3180

215,00
25,65
0,00
0,00
Total=

215,00
25,65
0,00
0,00
240,65

+------[Reteta normei:CZ0204G1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 2 Mat. 2100402 Ciment metalurgic cu a KG 315,00000
0,45|
|
daosuri
m
30 saci
s 1500
|
| 3 Mat. 2200575 Nisip sortat
spalat
MC
0,73000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,32500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
3,00000
8,55|
+------[Ore manopera:
3,000]---------[Ore utilaj:
0,000]-----+
17 CZ0204H1
1,000 MC
PREPARARE MORTAR CIM VAR PT ZID M100-Z C
U CIMENT M30,MANUAL,CU ADAOS DE VAR PAST
A
0,3570
0,3570

234,15
21,38
0,00
0,00
Total=

234,15
21,38
0,00
0,00
255,53

+------[Reteta normei:CZ0204H1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,73000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100402 Ciment metalurgic cu a KG 268,00000
0,45|
|
daosuri
m
30 saci
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,06200
650,00|
|
ii
tip 2
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,32500
2,00|
|
mortare si betoane dela retea
|

522011 RETETE DE MORTAR


PAG.: 8
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
18 CZ0204I1
1,000 MC
PREPARARE MORTAR CIM-VAR PT.ZID.M100-Z C
U CIMENT M30,MANUAL,CU ADAOS DE VAR HIDR
ATAT
0,3080
0,3080

210,50
21,38
0,00
0,00
Total=

210,50
21,38
0,00
0,00
231,88

+------[Reteta normei:CZ0204I1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
0,73000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100402 Ciment metalurgic cu a KG 268,00000
0,45|
|
daosuri
m
30 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG
37,00000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,48000
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,32500
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
19 CZ0205A1
1,000 MC
PREPARARE MORTAR DE VAR PT TENCUIELI M4T IN INSTALATII CENTRALIZATE
0,5380

0,5380

320,42
4,45
51,50
0,00
Total=

320,42
4,45
51,50
0,00
376,37

+------[Reteta normei:CZ0205A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100713 Var pasta pt construct MC
0,38400
650,00|
|
ii
tip 2
|
| 2 Mat. 2200575 Nisip sortat
spalat
MC
1,17000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 3 Mat. 6202818 Apa industriala pentru MC
0,31000
2,00|
|
mortare si betoane dela retea
|
| 4 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 5 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
20 CZ0205C1
1,000 MC
PREPARARE MORTAR DE VAR PT.TENCUIELI M4T,MANUAL
0,5380

0,5380

321,02
17,53
0,00
0,00
Total=

321,02
17,53
0,00
0,00
338,55

+------[Reteta normei:CZ0205C1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 6202818 Apa industriala pentru MC
0,31000
2,00|
|
mortare si betoane dela retea
|
| 2 Mat. 2100713 Var pasta pt construct MC
0,38400
650,00|
|
ii
tip 2
|

522011 RETETE DE MORTAR


PAG.: 9
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 3 Mat. 2200575 Nisip sortat
spalat
MC
1,18000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 4 Man. 013411 Zidar cat.1
ORA
2,05000
8,55|
+------[Ore manopera:
2,050]---------[Ore utilaj:
0,000]-----+
21 CZ0206A1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.TENCUIELI M1
0-T CU CIM.F25 IN INSTAL.CENTRAL.CU ADAO
S DE VAR PASTA
0,4890
0,4890

298,96
4,45
51,50
0,00
Total=

298,96
4,45
51,50
0,00
354,91

+------[Reteta normei:CZ0206A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,22000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 131,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,25600
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,20500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
22 CZ0206B1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.TENCUIELI M1
0-T CU CIM.F25 IN INSTAL.CENTRAL.CU ADAO
S DE VAR HIDRATAT
0,2590
0,2590

190,16
4,45
51,50
0,00
Total=

190,16
4,45
51,50
0,00
246,11

+------[Reteta normei:CZ0206B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,22000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 131,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG 128,00000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,20500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
23 CZ0206E1
1,000 MC
PREPARARE MORTAR VAR-CIM PT TENCUIELI M1
0-T,CIM F25,MANUAL CU ADAOS DE VAR PASTA
0,4930

0,4930

300,47
21,38
0,00
0,00
Total=

300,47
21,38
0,00
0,00
321,85

522011 RETETE DE MORTAR


PAG.: 10
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0206E1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,23000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 133,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,25600
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,21000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
24 CZ0206F1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.TENCUIELI M1
0-T,CIM.F25,MANUAL,CU ADAOS DE VAR HIDRA
TAT
0,2620
0,2620

191,67
21,38
0,00
0,00
Total=

191,67
21,38
0,00
0,00
213,05

+------[Reteta normei:CZ0206F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,23000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 133,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG 128,00000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,21000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
25 CZ0207A1
1,000 MC
PREPARARE MORTAR VAR-CIM PT TENCUIELI M2
5-T CU CIM F25 IN INSTAL CENTRAL CU VAR
PASTA
0,4530
0,4530

281,62
4,45
51,50
0,00
Total=

281,62
4,45
51,50
0,00
337,57

+------[Reteta normei:CZ0207A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat . 2200575 Nisip sortat
spalat
MC
1,22000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 166,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,20500
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,23500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
26 CZ0207B1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.TENCUIELI M2
5-T CU CIM.F25 IN INSTAL.CENTRAL.CU VAR
HIDRATAT
0,2890
0,2890

203,72
4,45
51,50
0,00
Total=

203,72
4,45
51,50
0,00
259,67

522011 RETETE DE MORTAR


PAG.: 11
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0207B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,22000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 166,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG 123,00000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,23500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
27 CZ0207E1
1,000 MC
PREPARARE MORTAR VAR-CIM PT TENCUIELI M2
5-T CU CIM F25 MANUAL CU VAR PASTA
0,4570

0,4570

283,13
21,38
0,00
0,00
Total=

283,13
21,38
0,00
0,00
304,51

+------[Reteta normei:CZ0207E1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,23000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 168,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,20500
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,24000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
28 CZ0207F1
1,000 MC
PREPARARE MORTAR VAR-CIM.PT.TENCUIELI M2
5-T CU CIM.F25,MANUAL,CU VAR HIDRATAT
0,2930

0,2930

205,23
21,38
0,00
0,00
Total=

205,23
21,38
0,00
0,00
226,61

+------[Reteta normei:CZ0207F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,23000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 168,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG 123,00000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,24000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
29 CZ0208A1
1,000 MC
PREPARARE MORTAR CIM-VAR PT.TENCUIELI M5
0-T CU CIM.F25 IN INSTAL.CENTRALIZATE CU
VAR.PASTA
0,3890
0,3890

250,52
4,45
51,50
0,00
Total=

250,52
4,45
51,50
0,00
306,47

522011 RETETE DE MORTAR


PAG.: 12
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0208A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,22000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 267,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,08700
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
30 CZ0208B1
1,000 MC
PREPARARE MORTAR CIM-VAR PT.TENCUIELI M5
0-T CU CIM.F25 IN INSTAL.CENTRALIZATE CU
VAR HIDRATAT
0,3190
0,3190

217,51
4,45
51,50
0,00
Total=

217,51
4,45
51,50
0,00
273,45

+------[Reteta normei:CZ0208B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,22000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100373 Ciment de furnal cu a KG 267,00000
0,45|
|
daosuri
f
25 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG
52,30000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
31 CZ0208E1
1,000 MC
PREPARARE MORTAR CIM-VAR PT TENCUIELI M5
0-T CU CIM F25 MANUAL CU VAR PASTA
0,3960

0,3960

252,93
21,38
0,00
0,00
Total=

252,93
21,38
0,00
0,00
274,31

+------[Reteta normei:CZ0208E1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,23000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 271,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,08700
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+

522011 RETETE DE MORTAR


PAG.: 13
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
32 CZ0208F1
1,000 MC
219,92
219,92
PREPARARE MORTAR CIM-VAR PT.TENCUIELI M5
21,38
21,38
0-T CU CIM.F25,MANUAL,CU VAR HIDRATAT
0,00
0,00
0,00
0,00
0,3260
0,3260
Total=
241,29
+------[Reteta normei:CZ0208F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,23000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100385 Ciment de furnal cu a KG 271,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG
52,30000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
33 CZ0209A1
1,000 MC
PREPARARE MORTAR PT TENCUIELI M100-T CU
CIMENT M30IN INSTALATII CENTRALIZATE FAR
A ADAOS DE VAR
0,3720
0,3720

244,53
4,45
51,50
0,00
Total=

244,53
4,45
51,50
0,00
300,48

+------[Reteta normei:CZ0209A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100397 Ciment metalurgic cu a KG 372,00000
0,45|
|
daosuri
m
30 vrac
s 1500
|
| 2 Mat. 2200575 Nisip sortat
spalat
MC
1,27500
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 3 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 4 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 5 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
34 CZ0209B1
1,000 MC
PREPARARE MORTAR PT TENCUIELI M100-T CU
CIMENT M30IN INST CENTRAL CU ADAOS DE VA
R PASTA
0,4210
0,4210

267,68
4,45
51,50
0,00
Total=

267,68
4,45
51,50
0,00
323,63

+------[Reteta normei:CZ0209B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,27500
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100397 Ciment metalurgic cu a KG 357,00000
0,45|
|
daosuri
m
30 vrac
s 1500
|
| 3 Mat. 2100713 Var pasta pt construct MC
0,04600
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|

522011 RETETE DE MORTAR


PAG.: 14
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
35 CZ0209C1
1,000 MC
PREPARARE MORTAR PT.TENCUIELI M100-T CU
CIMENT M30 IN INSTAL.CENTRALIZATE CU VAR
HIDRATAT
0,3850
0,3850

250,25
4,45
51,50
0,00
Total=

250,25
4,45
51,50
0,00
306,19

+------[Reteta normei:CZ0209C1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,27500
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100397 Ciment metalurgic cu a KG 357,00000
0,45|
|
daosuri
m
30 vrac
s 1500
|
| 3 Mat. 2100725 Var hidratat pulb.pt.c KG
27,70000
0,45|
|
onst. tip 1
vrac
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,31500
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013421 Zidar cat.2
ORA
0,52000
8,55|
| 6 Uti.
3709 Centrala de beton semi ORA
0,20600
250,00|
|
automatizata 8-20mc/n
|
+------[Ore manopera:
0,520]---------[Ore utilaj:
0,206]-----+
36 CZ0209G1
1,000 MC
PREPARARE MORTAR CU CIMENT M30 PENTRU TE
NCUIELI,MARCA M100-T MANUAL FARA ADAOS V
AR
0,3810
0,3810

247,09
25,65
0,00
0,00
Total=

247,09
25,65
0,00
0,00
272,74

+------[Reteta normei:CZ0209G1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 2 Mat. 2100402 Ciment metalurgic cu a KG 377,00000
0,45|
|
daosuri
m
30 saci
s 1500
|
| 3 Mat. 2200575 Nisip sortat
spalat
MC
1,28000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 4 Man. 013411 Zidar cat.1
ORA
3,00000
8,55|
+------[Ore manopera:
3,000]---------[Ore utilaj:
0,000]-----+
37 CZ0209H1
1,000 MC
PREPARARE MORTAR PT TENCUIELI M100-T MAN
UAL CU ADAOS DE VAR PASTA
0,4300

0,4300

270,24
21,38
0,00
0,00
Total=

270,24
21,38
0,00
0,00
291,62

+------[Reteta normei:CZ0209H1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,28000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100402 Ciment metalurgic cu a KG 362,00000
0,45|
|
daosuri
m
30 saci
s 1500
|

522011 RETETE DE MORTAR


PAG.: 15
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 3 Mat. 2100713 Var pasta pt construct MC
0,04600
650,00|
|
ii
tip 2
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
38 CZ0209I1
1,000 MC
PREPARARE MORTAR PT.TENCUIELI M100-T MAN
UAL CU ADAOS DE VAR HIDRATAT
0,3930

0,3930

252,81
21,38
0,00
0,00
Total=

252,81
21,38
0,00
0,00
274,18

+------[Reteta normei:CZ0209I1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2200575 Nisip sortat
spalat
MC
1,28000
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 2 Mat. 2100402 Ciment metalurgic cu a KG 362,00000
0,45|
|
daosuri
m
30 saci
s 1500
|
| 3 Mat. 2100737 Var hidratat pulb.pt c KG
27,70000
0,45|
|
onst. tip 1
saci
s 9201
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,32000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 013411 Zidar cat.1
ORA
2,50000
8,55|
+------[Ore manopera:
2,500]---------[Ore utilaj:
0,000]-----+
39 CZ0210A1
1,000 MC
PREPARARE VAR PASTA,MECANIZAT,IN INSTALA
TII INDEPENDENTE
0,5000

0,5000

228,00
12,14
162,50
0,00
Total=

228,00
12,14
162,50
0,00
402,64

+------[Reteta normei:CZ0210A1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100696 Var bulgari pt constru KG 500,00000
0,45|
|
ctii
tip 2
vrac
s
146
|
| 2 Mat. 6202818 Apa industriala pentru MC
1,50000
2,00|
|
mortare si betoane dela retea
|
| 3 Man. 013411 Zidar cat.1
ORA
0,45000
8,55|
| 4 Man. 013421 Zidar cat.2
ORA
0,45000
8,55|
| 5 Man. 019921 Muncitor deservire con ORA
0,52000
8,55|
|
structii-montaj cat.2
|
| 6 Uti.
3815 Inst.pt.depozitarea si ORA
0,60000
250,00|
|
sting.varului prod.2,3mc/h
|
| 7 Uti.
7201 Transportor cu banda,m ORA
0,25000
50,00|
|
obil,15m
|
+------[Ore manopera:
1,420]---------[Ore utilaj:
0,850]-----+
40 CZ0210B1
1,000 MC
PREPARARE VAR PASTA,MANUAL

0,5000

0,5000

228,00
68,91
0,00
0,00
Total=

228,00
68,91
0,00
0,00
296,91

522011 RETETE DE MORTAR


PAG.: 16
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0210B1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 6202818 Apa industriala pentru MC
1,50000
2,00|
|
mortare si betoane dela retea
|
| 2 Mat. 2100696 Var bulgari pt constru KG 500,00000
0,45|
|
ctii
tip 2
vrac
s
146
|
| 3 Man. 013411 Zidar cat.1
ORA
1,70000
8,55|
| 4 Man. 019921 Muncitor deservire con ORA
6,36000
8,55|
|
structii-montaj cat.2
|
+------[Ore manopera:
8,060]---------[Ore utilaj:
0,000]-----+
44 CZ0104C1
1,000 MC
PREPARARE BETON B100 CU BALAST,GRANULATI
A<31MM CU CIMENT F25,MANUAL
0,2060

0,2060

155,24
29,93
0,00
0,00
Total=

155,24
29,93
0,00
0,00
185,17

+------[Reteta normei:CZ0104C1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100385 Ciment de furnal cu a KG 204,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 2 Mat. 2200408 Balast sortat nespalat MC
1,20499
45,00|
|
de riu
0-30 mm
|
| 3 Mat. 2200642 Nisip sortat
spalat
MC
0,14800
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 4 M at. 6202818 Apa industriala pentru MC
0,17000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 010211 Betonist cat.1
ORA
2,62000
8,55|
| 6 Man. 010221 Betonist cat.2
ORA
0,88000
8,55|
+------[Ore manopera:
3,500]---------[Ore utilaj:
0,000]-----+
45 CZ0103F1
1,000 MC
PREPARARE BETON B75 CU BALAST GRANULATIA
<71MM CU CIMENT F25,MANUAL
0,1600

0,1600

134,88
29,93
0,00
0,00
Total=

134,88
29,93
0,00
0,00
164,81

+------[Reteta normei:CZ0103F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100385 Ciment de furnal cu a KG 158,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 2 Mat. 2200381 Balast sortat spalat
MC
1,21200
45,00|
|
de riu
0-70 mm
|
| 3 Mat. 2200642 Nisip sortat
spalat
MC
0,14900
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,15000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 010211 Betonist cat.1
ORA
2,62000
8,55|
| 6 Man. 010221 Betonist cat.2
ORA
0,88000
8,55|
+------[Ore manopera:
3,500]---------[Ore utilaj:
0,000]-----+
46 CZ0102F1
1,000 MC
PREPARARE BETON B50 CU BALAST,GRANULATIA
<71MM CU CIMENT F25,MANUAL
0,1290

0,1290

121,38
29,93
0,00
0,00
Total=

121,38
29,93
0,00
0,00
151,31

522011 RETETE DE MORTAR


PAG.: 17
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0102F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100385 Ciment de furnal cu a KG 128,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 2 Mat. 2200381 Balast sortat spalat
MC
1,21200
45,00|
|
de riu
0-70 mm
|
| 3 Mat. 2200642 Nisip sortat
spalat
MC
0,14900
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,15000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 010211 Betonist cat.1
ORA
2,62000
8,55|
| 6 Man. 010221 Betonist cat.2
ORA
0,88000
8,55|
+------[Ore manopera:
3,500]---------[Ore utilaj:
0,000]-----+
47 CZ0101C1
1,000 MC
PREPARARE BETON B25 CU BALAST,GRANULATIA
<31MM,CU CIMENT F25,MANUAL
0,0770

0,0770

99,79
29,93
0,00
0,00
Total=

99,79
29,93
0,00
0,00
129,72

+------[Reteta normei:CZ0101C1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100385 Ciment de furnal cu a KG
76,00000
0,45|
|
daosuri
f
25 saci
s 1500
|
| 2 Mat. 2200408 Balast sortat nespalat MC
1,24600
45,00|
|
de riu
0-30 mm
|
| 3 Mat. 2200642 Nisip sortat
spalat
MC
0,15300
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 4 Mat. 6202818 Apa industriala pentru MC
0,17000
2,00|
|
mortare si betoane dela retea
|
| 5 Man. 010211 Betonist cat.1
ORA
2,62000
8,55|
| 6 Man. 010221 Betonist cat.2
ORA
0,88000
8,55|
+------[Ore manopera:
3,500]---------[Ore utilaj:
0,000]-----+
48 CZ0105E1
1,000 MC
PREPARARE BETON B150,CU AGREGATE GRELE,G
RANULATIA<31MM,CIMENT M30 MANUAL
0,2840

0,2840

207,39
29,93
0,00
0,00
Total=

207,39
29,93
0,00
0,00
237,32

+------[Reteta normei:CZ0105E1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100402 Ciment metalurgic cu a KG 281,00000
0,45|
|
daosuri
m
30 saci
s 1500
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,28300
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200317 Pietris ciuruit
spal MC
0,35800
55,00|
|
at de mal
15-30 mm
|
| 4 Mat. 2200513 Nisip sortat nespalat
MC
0,50999
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,24500
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Mat. 6202818 Apa industriala pentru MC
0,19500
2,00|
|
mortare si betoane dela retea
|

522011 RETETE DE MORTAR


PAG.: 18
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL U TI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 7 Man. 010211 Betonist cat.1
ORA
2,62000
8,55|
| 8 Man. 010221 Betonist cat.2
ORA
0,88000
8,55|
+------[Ore manopera:
3,500]---------[Ore utilaj:
0,000]-----+
49 CZ0106J1
1,000 MC
PREPARARE BETON B200,AGREG.GRELE,SORT.GR
AN.<31MM,CIM.PA35.FUNDATII.BET.SIMPLU,ME
DII AGRESIVE NECEN.
0,3080
0,3080

216,35
9,66
1,90
0,00
Total=

216,35
9,66
1,90
0,00
227,92

+------[Reteta normei:CZ0106J1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100440 Ciment portland
cu a KG 305,00000
0,45|
|
daosuri
pa 35 saci
s 1500
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,29000
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200317 Pietris ciuruit
spal MC
0,40800
55,00|
|
at de mal
15-30 mm
|
| 4 Mat. 2200513 Nisip sortat nespalat
MC
0,42600
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,24600
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Mat. 6202818 Apa industriala pentru MC
0,19500
2,00|
|
mortare si betoane dela retea
|
| 7 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 8 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 9 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+
50 CZ0107L1
1,000 MC
PREPARARE BETON B250 AGREG.GRELE <31MM C
IMENT PA35 IN FUNDATII,STRUCT.BET.ARMAT,
IN INST.NECENTRALIZ
0,3330
0,3330

227,82
9,66
1,90
0,00
Total=

227,82
9,66
1,90
0,00
239,39

+------[Reteta normei:CZ0107L1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100440 Ciment portland
cu a KG 330,00000
0,45|
|
daosuri
pa 35 saci
s 1500
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,27700
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200317 Pietris ciuruit
spal MC
0,35100
55,00|
|
at de mal
15-30 mm
|
| 4 Mat. 2200513 Nisip sortat nespalat
MC
0,49800
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,24200
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Mat. 6202818 Apa industriala pentru MC
0,19000
2,00|
|
mortare si betoane dela retea
|
| 7 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 8 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 9 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|

522011 RETETE DE MORTAR


PAG.: 19
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+
51 CZ0108F1
1,000 MC
PREPARARE BETON B300 AGREG.GRELE <16MM C
IMENT PA35 IN STRUCTURI,IN INSTALATII NE
CENTRALIZATE
0,4200
0,4200

261,84
9,66
1,90
0,00
Total=

261,84
9,66
1,90
0,00
273,41

+------[Reteta normei:CZ0108F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100440 Ciment portland
cu a KG 416,00000
0,45|
|
daosuri
pa 35 saci
s 1500
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,41200
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200513 Nisip sortat nespalat
MC
0,55200
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,30700
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,22000
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 7 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 8 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+
52 CZ0108H1
1,000 MC
PREPARARE BETON B300 AGREG.GRELE <31MM C
IMENT PA35 IN STRUCTURI,IN INSTALATII NE
CENTRALIZATE
0,3800
0,3800

244,23
9,66
1,90
0,00
Total=

244,23
9,66
1,90
0,00
255,80

+------[Reteta normei:CZ0108H1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100440 Ciment portland
cu a KG 376,00000
0,45|
|
daosuri
pa 35 saci
s 1500
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,27700
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200317 Pietris ciuruit
spal MC
0,38500
55,00|
|
at de mal
15-30 mm
|
| 4 Mat. 2200513 Nisip sortat nespalat
MC
0,40600
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,23100
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Mat. 6202818 Apa industriala pentru MC
0,20000
2,00|
|
mortare si betoane dela retea
|
| 7 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 8 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 9 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+
53 CZ0109F1
1,000 MC
PREPARARE BETON B400 AGREG.GRELE <16MM C
IMENT P45 IN STRUCTURI,IN INST.NECENTRAL
IZATE
0,4300
0,4300

266,12
9,66
1,90
0,00
Total=

266,12
9,66
1,90
0,00
277,69

522011 RETETE DE MORTAR


PAG.: 20
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
+------[Reteta normei:CZ0109F1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100048 Ciment portland
KG 426,00000
0,45|
|
p
45 saci
s
388
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,40800
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200513 Nisip sortat nespalat
MC
0,55200
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,30700
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,22000
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 7 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 8 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+
54 CZ0109H1
1,000 MC
PREPARARE BETON B400 AGREG.GRELE <31MM C
IMENT P45 IN STRUCTURI,IN INST.NECENTRAL
IZATE
0,3900
0,3900

248,49
9,66
1,90
0,00
Total=

248,49
9,66
1,90
0,00
260,06

+------[Reteta normei:CZ0109H1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100048 Ciment portland
KG 386,00000
0,45|
|
p
45 saci
s
388
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,27700
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200317 Pietris ciuruit
spal MC
0,38500
55,00|
|
at de mal
15-30 mm
|
| 4 Mat. 2200513 Nisip sortat nespalat
MC
0,40200
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 5 Mat . 2200642 Nisip sortat
spalat
MC
0,23100
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Mat. 6202818 Apa industriala pentru MC
0,20000
2,00|
|
mortare si betoane dela retea
|
| 7 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 8 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 9 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+
55 CZ0110J1
1,000 MC
PREPARARE BETON B500,AGREG.GRELE<31MM,CI
MENT P45 PT.ELEMENTE SPECIALE,IN INST.NE
CENTRALIZATE
0,5530
0,5530
+------[Reteta normei:CZ0110J1
| 1 Mat. 2100048 Ciment portland
|
p
45 saci
s

313,02
9,66
1,90
0,00
Total=

313,02
9,66
1,90
0,00
324,59

]--[U.M]-[ Consum ]-[ Pret ]-+


KG 548,00000
0,45|
388
|

522011 RETETE DE MORTAR


PAG.: 21
=================================================================
=
A R T I C O L E:
PU MAT
VAL MAT =
=NR.
SIMBOL
DENUMIRE
PU MAN
VAL MAN =
=
U.M.
PU UTI
VAL UTI =
=
PU TRA
VAL TRA =
=SPOR: MAT. MAN. UTI.
GR./ART.
GR.TOT.
T O T A L=
========================================================[ Lei ]==
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,24900
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200317 Pietris ciuruit
spal MC
0,38700
55,00|
|
at de mal
15-30 mm
|
| 4 Mat. 2200513 Nisip sortat nespalat
MC
0,33400
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 5 Mat. 2200642 Nisip sortat
spalat
MC
0,18300
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 6 Mat. 6202818 Apa industriala pentru MC
0,21000
2,00|
|
mortare si betoane dela retea
|
| 7 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 8 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 9 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+
56 CZ0110H1
1,000 MC
PREPARARE BETON B500,AGREG.GRELE<16MM,CI
MENT P50 PT.MONOLITIZARI,ELEM.SPECIALE,I
NST.NECENTRALIZATE
0,5380
0,5380

307,90
9,66
1,90
0,00
Total=

307,90
9,66
1,90
0,00
319,47

+------[Reteta normei:CZ0110H1
]--[U.M]-[ Consum ]-[ Pret ]-+
| 1 Mat. 2100062 Ciment portland
KG 533,00000
0,45|
|
p
50 saci
s
388
|
| 2 Mat. 2200288 Pietris ciuruit
spal MC
0,43800
55,00|
|
at de mal
7-15 mm
|
| 3 Mat. 2200513 Nisip sortat nespalat
MC
0,47300
60,00|
|
de riu si lacuri 0,0-3,0 mm
|
| 4 Mat. 2200642 Nisip sortat
spalat
MC
0,25200
60,00|
|
de riu si lacuri 3,0-7,0 mm
|
| 5 Mat. 6202818 Apa industriala pentru MC
0,23000
2,00|
|
mortare si betoane dela retea
|
| 6 Man. 010211 Betonist cat.1
ORA
0,85000
8,55|
| 7 Man. 010221 Betonist cat.2
ORA
0,28000
8,55|
| 8 Uti.
3702 Betoniera cu cadere li ORA
0,29299
6,50|
|
bera act.electric 101-250l
|
+------[Ore manopera:
1,130]---------[Ore utilaj:
0,292]-----+

522011 RETETE DE MORTAR


PAG.: 22
-----------------------------------------------------69/522------RECAPITULATIE DEVIZ OFERTA
PE CATEGORIA DE LUCRARI
--------------------------------------------------------[ Lei ] --CHELTUIELI DIRECTE
I:
GREUTATE
MATERIAL
MANOPERA
UTILAJ
TRANSPORT
T O T A L
(Tone)
M
m
U
t
T
18,123
11937,32
803,27
1156,23
-=B. DETALIERE ALTE CHELTUIELI DIRECTE:

0,00

13896,83

- C.A.S. (Contrib. Asig. Sociale):


803,27*0,19500
156,63
- Ajutor somaj:
803,27*0,02000

156,63

16,06

16,06

- F.A.S. (Fond asig. sociale de sanatate):


(803,27)* 0,06000
48,19

48,19

- Fond solidaritate handicapati:


803,27*0,01329
10,67

10,67

- Comision camera munca:


803,27*0,00750

6,02

6,02

- Contrib. concedii si indemnizatii:


803,27*0,00850
6,82

6,82

- Fondul de garantare a salariilor:


803,27*0,00250
2,00

2,00

==================================================================
TOTAL CHELTUIELI DIRECTE
Mo
mo
Uo
to
To
11937,32
1049,71
1156,23
0,00
14143,27
==================================================================
Cheltueli indirecte:
14143 * 0,1250
1767,90
Profit:
(14143 + 1767)* 0,0650
1034,22
Cheltuieli indirecte + profit:
Cip % = 19,81 % din 14143
2802,13
==================================================================
TOTAL GENERAL DEVIZ
16.945,41
PE CATEGORIA DE
----------------LUCRARI "522011"
T.V.A.
19,00 %
TOTAL CU T. V. A. :

PROIECTANT:
ING. MARIUS POPESCU

3.219,62
20.165,04
==================
CONTRACTANT: