Sunteți pe pagina 1din 501

Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0001 45000000 DRUM JUDETEAN DJ 658 -LUCRARI PREGATITOARE
Lista cu cantitatile de lucrari
Deviz oferta 39101 DESFACERE STRUCTURA RUTIERA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 98.070 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 39762
2 0.00 0 39762

002 TSC02B1 100 MC. 98.070 0.00 0


SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC.DEP.TER.CAT. 373.15 36595
2 0.00 0 36595

003 TRA01A02 TONA 15891.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 17798 17798

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 76357.30 17797.92 94155.22
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 76357.30

Detaliere transporturi:
-Articole TRA 17 797.92

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 76357.30 17797.92 94155.22

Cheltuieli indirecte:
94155.22 * 0.03000 = 2 824.66
Profit:
96979.88 * 0.02000 = 1 939.60

TOTAL GENERAL DEVIZ: 98 919.48


TVA 98919.48 * 19.0% = 18 794.70
TOTAL cu TVA 117 714.18

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39103 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0001 45000000 DRUM JUDETEAN DJ 658 -LUCRARI PREGATITOARE
Lista cu cantitatile de lucrari
Deviz oferta 39103 FREZARE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 AUT1146 ORA 214.000 0.00 0
ORA FREZA 0.00 0
250.00 53500
0.00 0 53500

002 TRA01A07 TONA 9626.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 7 KM. 3.92 37734 37734

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 53500.00 37733.92 91233.92
Din care:
Valoare aferenta utilaje termice = 53500.00
Valoare aferenta utilaje electrice = 0.00

Detaliere transporturi:
-Articole TRA 37 733.92

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 53500.00 37733.92 91233.92

Cheltuieli indirecte:
91233.92 * 0.03000 = 2 737.02
Profit:
93970.94 * 0.02000 = 1 879.42

TOTAL GENERAL DEVIZ: 95 850.36


TVA 95850.36 * 19.0% = 18 211.57
TOTAL cu TVA 114 061.92

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39100 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0001 45000000 DRUM JUDETEAN DJ 658 -LUCRARI PREGATITOARE
Lista cu cantitatile de lucrari
Deviz oferta 39100 TERASAMENTE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 15.000 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 6082
2 0.00 0 6082

002 TRA01A02 TONA 2700.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 3024 3024

003 TSD03C1 100 MC. 12.000 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 507
TER.CAT.1 SAU 2 0.00 0 507

004 TSD07C1 100 MC. 12.000 0.00 0


COMPACTAREA UMPLUT.CU RULOU COMPRESOR 10 101.38 1217
-12T.EXCL.UDAREA PAM.NECOEZ.GRAD.COMACT. 523.38 6281
97-98 % 0.00 0 7497

005 TSD17B1 M.C. 1200.000 0.01 6


UMPLUT.COMPACTATE LA PROFIL.TALUZ.PE 0, 33.20 39840
5M GROS.EXECUT.MAN.ODATA CU EXEC.MEC.A 0.00 0
RAMBL.PAM.COEZIV 0.00 0 39846

006 TSD11A1 100 MC. 12.000 0.00 0


COMPACT.UMPLUT.DIN PAM.PRIN 6 TRECERI IN 20.12 241
STRATURI L40CM CU RULOU COMP.VIBR.TRACT. 82.60 991
DE 81-150CP 0.00 0 1233

007 TSD14A1 M.C. 120.000 0.05 6


UDAREA CU AUTOCIST.DE 5-8T CU DISP.DE 0.00 0
STROP.STR. 4.00 480
0.00 0 486

008 TRA05A02 TONA 120.000 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0
ETC)PE DIST.DE 2 1.27 152 152

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 12.00 41298.00 14340.39 3176.40 58826.79
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 14340.39

Detaliere transporturi:
-Articole TRA 3 176.40

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 41298.00 + 14340.39 * 0.000 +
3176.40 * 0.000) * 0.003375 = 139.38

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 12.00 41437.38 14340.39 3176.40 58966.17

Cheltuieli indirecte:
58966.17 * 0.03000 = 1 768.99
Profit:
60735.15 * 0.02000 = 1 214.70
39100 pag 2
======================================================================================================================

TOTAL GENERAL DEVIZ: 61 949.86


TVA 61949.86 * 19.0% = 11 770.47
TOTAL cu TVA 73 720.33

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39102 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0001 45000000 DRUM JUDETEAN DJ 658 -LUCRARI PREGATITOARE
Lista cu cantitatile de lucrari
Deviz oferta 39102 PREGATIRE PLATFORMA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSE05B1 100 MP. 1490.660 0.00 0
NIVELAREA CU AUTOGREDER PINA 175 CP A 0.00 0
SUPR.TEREN SI PLATF.DE TERASAMENTE 17.01 25356
EXECUTATA IN TEREN CAT 0.00 0 25356

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 25356.13 0.00 25356.13
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 25356.13

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 25356.13 0.00 25356.13

Cheltuieli indirecte:
25356.13 * 0.03000 = 760.68
Profit:
26116.81 * 0.02000 = 522.34

TOTAL GENERAL DEVIZ: 26 639.15


TVA 26639.15 * 19.0% = 5 061.44
TOTAL cu TVA 31 700.58

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39104 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39104 STRAT DE FUNDATIE DIN BALAST-30 CM GROSIME

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DH03A1 100 MP. 818.100 0.00 0
REPROF PARTII CAROS A DRUMURILOR 0.00 0
IMPIETRUITE EXECUTATA MECANIC CU 5.67 4639
AUTOGREDER 0.00 0 4639

002 TSE06A1 100 MP. 818.100 0.05 41


PREGATIREA PLATF.PAM.PT.STRAT IZOLATOR 180.68 147814
SI REPARTITIE DIN NISIP SAU BALAST EXEC. 66.00 53995
IN PAM.NECOEZ. 0.00 0 201850

003 DA06B1 M.C. 19003.000 26.24 498579


STRAT AGREG NAT CILINDRATE CU FUNC 7.37 140140
REZIST FILTRANTIZOLAT AERISIRE SI 12.12 230411
ANTICAP CU ASTER MEC BALAST 0.00 0 869130

006 DA06A1 M.C. 2112.000 26.24 55412


STRAT AGREG NAT(BALAST)CILINDR CU FUNCT 23.07 48734
REZIST FILTRANT IZOL AERISIRE ANTCAP CU 7.80 16484
ASTERNERE MANUAL 0.00 0 120630

004 TRA01A17 TONA 47057.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 447983 447983

005 TRA05A02 TONA 4898.000 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0
ETC)PE DIST.DE 2 1.27 6220 6220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 554031.87 336687.39 305528.76 454203.10 1650451.12
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 305528.76

Detaliere transporturi:
-Articole TRA 454 203.10

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 336687.39 + 305528.76 * 0.000 +
454203.10 * 0.000) * 0.003375 = 1 136.32

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 554031.87 337823.71 305528.76 454203.10 1651587.44

Cheltuieli indirecte:
1651587.44 * 0.03000 = 49 547.62
Profit:
1701135.06 * 0.02000 = 34 022.70

TOTAL GENERAL DEVIZ: 1 735 157.76


TVA 1735157.76 * 19.0% = 329 679.97
TOTAL cu TVA 2 064 837.73

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39104 pag 2
======================================================================================================================
39105 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39105 PIATRA SPARTA - 25 CM GROSIME

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DA12B1 M.C. 23602.500 49.78 1174873
STRAT FUND REPROF P SPARTA PT DRUM CU 12.00 283221
ASTERNERE MECANICA EXEC CU IMPANARE FARA 15.99 377404
INNOROIRE 0.00 0 1835498

004 DA11B1 M.C. 2622.500 49.78 130541


STRAT FUND REPROF P SPARTA PT DRUM CU 33.00 86541
ASTERNERE MANUALA EXEC CU IMPANARE FARA 9.91 26002
INNOROIRE 0.00 0 243085

002 TRA01A34 TONA 55938.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1065060 1065060

003 TRA05A02 TONA 3934.000 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0
ETC)PE DIST.DE 2 1.27 4996 4996

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1305414.94 369762.01 403406.06 1070055.70 3148638.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 403406.06

Detaliere transporturi:
-Articole TRA 1 070 055.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 369762.01 + 403406.06 * 0.000 +
1070055.70 * 0.000) * 0.003375 = 1 247.95

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1305414.94 371009.96 403406.06 1070055.70 3149886.66

Cheltuieli indirecte:
3149886.66 * 0.03000 = 94 496.60
Profit:
3244383.25 * 0.02000 = 64 887.66

TOTAL GENERAL DEVIZ: 3 309 270.92


TVA 3309270.92 * 19.0% = 628 761.47
TOTAL cu TVA 3 938 032.39

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39106 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39106 STRAT DE BAZA DIN BADPC20 DE 6 CM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB12B1 TONA 10890.000 0.29 3131
STRAT LEGAT BINDER DE CRIB EXEC LA CALD 8.24 89771
CU ASTERNERE MECANICA 10.12 110207
0.00 0 203108

002 DB12A1 TONA 1210.000 0.29 348


STRAT LEGAT BINDER DE CRIB EXEC LA CALD 20.92 25318
CU ASTERNERE MANUALA 5.62 6806
0.00 0 32472

003 2100094 TONA 12100.000 260.00 3146048


BADPC20 0.00 0
0.00 0
0.00 0 3146048

004 TRA01A35 TONA 12100.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 237160 237160

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


29041.4 3149527.15 115088.42 117013.05 237160.00 3618788.62
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 117013.05

Detaliere transporturi:
-Articole TRA 237 160.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 115088.42 + 117013.05 * 0.000 +
237160.00 * 0.000) * 0.003375 = 388.42

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


29041.4 3149527.15 115476.85 117013.05 237160.00 3619177.05

Cheltuieli indirecte:
3619177.05 * 0.03000 = 108 575.31
Profit:
3727752.36 * 0.02000 = 74 555.05

TOTAL GENERAL DEVIZ: 3 802 307.40


TVA 3802307.40 * 19.0% = 722 438.41
TOTAL cu TVA 4 524 745.81

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39107 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39107 AMORSARE CU EMULSIE BITUMINOASA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB01B1 MP. 163616.000 0.00 41
CURATIREA PT APLIC IMBRAC SAU TRATAM 0.00 0
BITUM A STRATSUPORT DIN MACAD SAU PAV 0.06 9443
NEBITUM EXEC MECANI 0.00 0 9484

002 DB02B1 100 MP. 1636.160 0.00 3


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 65446
IN VEDER APLIC STRAT UZ MIX ASF CU SUSP 0.00 0
BIT FIL LA STR 0.00 0 65449

003 TRA05A49 TONA 74.500 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2987 2987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 43.93 65446.07 9443.26 2986.70 77919.97
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 9443.26

Detaliere transporturi:
-Articole TRA 2 986.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 65446.07 + 9443.26 * 0.000 +
2986.70 * 0.000) * 0.003375 = 220.88

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 43.93 65666.95 9443.26 2986.70 78140.85

Cheltuieli indirecte:
78140.85 * 0.03000 = 2 344.23
Profit:
80485.08 * 0.02000 = 1 609.70

TOTAL GENERAL DEVIZ: 82 094.78


TVA 82094.78 * 19.0% = 15 598.01
TOTAL cu TVA 97 692.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39108 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39108 STRAT DE UZURA BA16 (BAR16) DE 4

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB19E1 MP. 73043.100 0.03 2009
IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 76388
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 89040
MECANICA 0.00 0 167437

002 DB19A1 MP. 8115.900 0.03 223


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 2.32 18834
CALD IN GROSIME DE 4 CM CU ASTERN 0.51 4127
MANUALA 0.00 0 23184

003 2600293 TONA 7791.000 300.00 2337300


PROCURARE BETON ASFALTIC BA16 0.00 0
0.00 0
0.00 0 2337300

004 TRA01A35 TONA 7791.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 152704 152704

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7791.89 2339531.87 95222.23 93166.47 152703.60 2680624.18
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 93166.47

Detaliere transporturi:
-Articole TRA 152 703.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 95222.23 + 93166.47 * 0.000 +
152703.60 * 0.000) * 0.003375 = 321.38

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7791.89 2339531.87 95543.61 93166.47 152703.60 2680945.55

Cheltuieli indirecte:
2680945.55 * 0.03000 = 80 428.36
Profit:
2761373.92 * 0.02000 = 55 227.48

TOTAL GENERAL DEVIZ: 2 816 601.40


TVA 2816601.40 * 19.0% = 535 154.27
TOTAL cu TVA 3 351 755.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39109 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39109 GEOCOMPOZIT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DI19F1 ORA 64.000 0.00 0
UTILAJE MIJ TRANSP REP INTR DE 0.00 0
AUTOVEHICOL SPECIALREP INTR DR CU 47.42 3035
CAROSERIE LEA DE 5,5 T 0.00 0 3035

002 NMB109921 ORA 64.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 1280
0.00 0
0.00 0 1280

003 7323526 MP. 19210.000 3.60 69156


GEOCOMPOZIT ANTIFISURA 0.00 0
0.00 0
0.00 0 69156

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


96.050 69156.00 1280.00 3034.88 0.00 73470.88
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 3034.88

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1280.00 + 3034.88 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.32

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


96.050 69156.00 1284.32 3034.88 0.00 73475.20

Cheltuieli indirecte:
73475.20 * 0.03000 = 2 204.26
Profit:
75679.46 * 0.02000 = 1 513.59

TOTAL GENERAL DEVIZ: 77 193.05


TVA 77193.05 * 19.0% = 14 666.68
TOTAL cu TVA 91 859.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39110 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39110 ACOSTAMENT PIATRA SPARTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DH01C1 M.C. 690.000 0.00 0
ASTERNEREA PE PLAT DRUMULUI A MAT DE 26.40 18216
INTRETINERE PIETRIS,NISIP SAU P SPARTA 0.00 0
MANUAL 0.00 0 18216

002 2205941 M.C. 690.000 38.00 26220


PIATRA SPARTA 0.00 0
0.00 0
0.00 0 26220

003 TRA01A34 TONA 1315.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 25038 25038

004 TRA05A02 TONA 35.000 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0
ETC)PE DIST.DE 2 1.27 44 44

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.690 26220.00 18215.86 0.00 25082.05 69517.91

Detaliere transporturi:
-Articole TRA 25 082.05

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 18215.86 + 0.00 * 0.000 +
25082.05 * 0.000) * 0.003375 = 61.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.690 26220.00 18277.34 0.00 25082.05 69579.39

Cheltuieli indirecte:
69579.39 * 0.03000 = 2 087.38
Profit:
71666.77 * 0.02000 = 1 433.34

TOTAL GENERAL DEVIZ: 73 100.11


TVA 73100.11 * 19.0% = 13 889.02
TOTAL cu TVA 86 989.13

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39111 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0002 45000000 DRUM JUDETEAN DJ 658-SUPRASTRUCTURA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39111 ADUCERE CAMINE LA COTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB27B1# BUC. 45.000 98.49 4432
Rid.la nivelul straz.si dr.a capacelor 29.00 1305
la caminele de vizit.ptr.apa si canal,cu 29.57 1330
inaltimea medie 0.00 0 7067

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.082 4431.95 1305.00 1330.48 0.00 7067.43
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1330.48

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1305.00 + 1330.48 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.082 4431.95 1309.40 1330.48 0.00 7071.83

Cheltuieli indirecte:
7071.83 * 0.03000 = 212.15
Profit:
7283.99 * 0.02000 = 145.68

TOTAL GENERAL DEVIZ: 7 429.67


TVA 7429.67 * 19.0% = 1 411.64
TOTAL cu TVA 8 841.30

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39112 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0003 45000000 DRUM JUDETEAN DJ 658-DRUMURI LATERALE 56 BUC
Lista cu cantitatile de lucrari
Deviz oferta 39112 STRAT DE FUNDATIE DIN BALAST 30 CM GROSIME

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DH03A1 100 MP. 33.400 0.00 0
REPROF PARTII CAROS A DRUMURILOR 0.00 0
IMPIETRUITE EXECUTATA MECANIC CU 5.67 189
AUTOGREDER 0.00 0 189

002 DA06B1 M.C. 901.800 26.24 23660


STRAT AGREG NAT CILINDRATE CU FUNC 7.37 6650
REZIST FILTRANTIZOLAT AERISIRE SI 12.12 10934
ANTICAP CU ASTER MEC BALAST 0.00 0 41245

003 DA06A1 M.C. 100.200 26.24 2629


STRAT AGREG NAT(BALAST)CILINDR CU FUNCT 23.07 2312
REZIST FILTRANT IZOL AERISIRE ANTCAP CU 7.80 782
ASTERNERE MANUAL 0.00 0 5723

004 TRA01A17 TONA 2233.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 21258 21258

005 TRA05A02 TONA 232.500 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0
ETC)PE DIST.DE 2 1.27 295 295

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 26289.32 8962.49 11905.76 21553.44 68711.01
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 11905.76

Detaliere transporturi:
-Articole TRA 21 553.44

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8962.49 + 11905.76 * 0.000 +
21553.44 * 0.000) * 0.003375 = 30.25

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 26289.32 8992.74 11905.76 21553.44 68741.25

Cheltuieli indirecte:
68741.25 * 0.03000 = 2 062.24
Profit:
70803.49 * 0.02000 = 1 416.07

TOTAL GENERAL DEVIZ: 72 219.56


TVA 72219.56 * 19.0% = 13 721.72
TOTAL cu TVA 85 941.28

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39113 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0003 45000000 DRUM JUDETEAN DJ 658-DRUMURI LATERALE 56 BUC
Lista cu cantitatile de lucrari
Deviz oferta 39113 PIATRA SPARTA-25 CM GROSIME

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DA12B1 M.C. 692.100 49.78 34451
STRAT FUND REPROF P SPARTA PT DRUM CU 12.00 8305
ASTERNERE MECANICA EXEC CU IMPANARE FARA 15.99 11067
INNOROIRE 0.00 0 53823

002 DA11B1 M.C. 76.900 49.78 3828


STRAT FUND REPROF P SPARTA PT DRUM CU 33.00 2538
ASTERNERE MANUALA EXEC CU IMPANARE FARA 9.91 762
INNOROIRE 0.00 0 7128

003 TRA01A34 TONA 1640.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 31226 31226

004 TRA05A02 TONA 115.000 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0
ETC)PE DIST.DE 2 1.27 146 146

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 38278.90 10842.59 11829.14 31371.65 92322.28
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 11829.14

Detaliere transporturi:
-Articole TRA 31 371.65

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 10842.59 + 11829.14 * 0.000 +
31371.65 * 0.000) * 0.003375 = 36.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 38278.90 10879.19 11829.14 31371.65 92358.88

Cheltuieli indirecte:
92358.88 * 0.03000 = 2 770.77
Profit:
95129.64 * 0.02000 = 1 902.59

TOTAL GENERAL DEVIZ: 97 032.24


TVA 97032.24 * 19.0% = 18 436.12
TOTAL cu TVA 115 468.36

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39114 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0003 45000000 DRUM JUDETEAN DJ 658-DRUMURI LATERALE 56 BUC
Lista cu cantitatile de lucrari
Deviz oferta 39114 STRAT DE BAZA DIN BADPC20 DE 6 CM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB12B1 TONA 396.900 0.29 114
STRAT LEGAT BINDER DE CRIB EXEC LA CALD 8.24 3272
CU ASTERNERE MECANICA 10.12 4017
0.00 0 7403

002 DB12A1 TONA 44.100 0.29 13


STRAT LEGAT BINDER DE CRIB EXEC LA CALD 20.92 923
CU ASTERNERE MANUALA 5.62 248
0.00 0 1183

003 2100094 TONA 441.000 260.00 114662


BADPC20 0.00 0
0.00 0
0.00 0 114662

004 TRA01A35 TONA 441.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 8644 8644

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1058.45 114788.55 4194.55 4264.69 8643.60 131891.39
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 4264.69

Detaliere transporturi:
-Articole TRA 8 643.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4194.55 + 4264.69 * 0.000 +
8643.60 * 0.000) * 0.003375 = 14.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1058.45 114788.55 4208.70 4264.69 8643.60 131905.54

Cheltuieli indirecte:
131905.54 * 0.03000 = 3 957.17
Profit:
135862.71 * 0.02000 = 2 717.25

TOTAL GENERAL DEVIZ: 138 579.96


TVA 138579.96 * 19.0% = 26 330.19
TOTAL cu TVA 164 910.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39115 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0003 45000000 DRUM JUDETEAN DJ 658-DRUMURI LATERALE 56 BUC
Lista cu cantitatile de lucrari
Deviz oferta 39115 AMORSARE CU EMULSIE BITUMINOASA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB01B1 MP. 5823.000 0.00 1
CURATIREA PT APLIC IMBRAC SAU TRATAM 0.00 0
BITUM A STRATSUPORT DIN MACAD SAU PAV 0.06 336
NEBITUM EXEC MECANI 0.00 0 338

002 DB02D1 100 MP. 58.230 70.98 4133


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 2329
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 333
EMULSIE CATIONICA 0.00 0 6796

003 TRA05A49 TONA 2.700 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 108 108

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.914 4134.75 2329.19 669.39 108.24 7241.57
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 669.39

Detaliere transporturi:
-Articole TRA 108.24

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2329.19 + 669.39 * 0.000 +
108.24 * 0.000) * 0.003375 = 7.86

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.914 4134.75 2337.05 669.39 108.24 7249.43

Cheltuieli indirecte:
7249.43 * 0.03000 = 217.48
Profit:
7466.92 * 0.02000 = 149.34

TOTAL GENERAL DEVIZ: 7 616.25


TVA 7616.25 * 19.0% = 1 447.09
TOTAL cu TVA 9 063.34

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39116 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0003 45000000 DRUM JUDETEAN DJ 658-DRUMURI LATERALE 56 BUC
Lista cu cantitatile de lucrari
Deviz oferta 39116 STRAT DE UZURA BA16 DE 4 CM GROSI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB19E1 MP. 2664.000 0.03 73
IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 2786
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 3247
MECANICA 0.00 0 6107

002 DB19A1 MP. 296.000 0.03 8


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 2.32 687
CALD IN GROSIME DE 4 CM CU ASTERN 0.51 151
MANUALA 0.00 0 846

003 2600293 TONA 284.000 300.00 85200


PROCURARE BETON ASFALTIC BA16 0.00 0
0.00 0
0.00 0 85200

004 TRA01A35 TONA 284.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 5566 5566

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


284.033 85281.40 3472.91 3397.93 5566.40 97718.64
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 3397.93

Detaliere transporturi:
-Articole TRA 5 566.40

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3472.91 + 3397.93 * 0.000 +
5566.40 * 0.000) * 0.003375 = 11.72

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


284.033 85281.40 3484.63 3397.93 5566.40 97730.36

Cheltuieli indirecte:
97730.36 * 0.03000 = 2 931.91
Profit:
100662.27 * 0.02000 = 2 013.25

TOTAL GENERAL DEVIZ: 102 675.52


TVA 102675.52 * 19.0% = 19 508.35
TOTAL cu TVA 122 183.87

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39117 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0003 45000000 DRUM JUDETEAN DJ 658-DRUMURI LATERALE 56 BUC
Lista cu cantitatile de lucrari
Deviz oferta 39117 ACOSTAMENT PIATRA SPARTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DH01C1 M.C. 56.000 0.00 0
ASTERNEREA PE PLAT DRUMULUI A MAT DE 26.40 1478
INTRETINERE PIETRIS,NISIP SAU P SPARTA 0.00 0
MANUAL 0.00 0 1478

002 2205941 M.C. 56.000 38.00 2128


PIATRA SPARTA 0.00 0
0.00 0
0.00 0 2128

003 TRA01A34 TONA 107.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 2037 2037

004 TRA05A02 TONA 3.000 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0
ETC)PE DIST.DE 2 1.27 4 4

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.056 2128.00 1478.39 0.00 2041.09 5647.48

Detaliere transporturi:
-Articole TRA 2 041.09

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1478.39 + 0.00 * 0.000 +
2041.09 * 0.000) * 0.003375 = 4.99

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.056 2128.00 1483.38 0.00 2041.09 5652.47

Cheltuieli indirecte:
5652.47 * 0.03000 = 169.57
Profit:
5822.04 * 0.02000 = 116.44

TOTAL GENERAL DEVIZ: 5 938.48


TVA 5938.48 * 19.0% = 1 128.31
TOTAL cu TVA 7 066.80

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39118 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39118 SANT PEREAT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 15.420 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 6252
2 0.00 0 6252

002 TRA01A02 TONA 2623.500 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 2938 2938

003 IFB09A1 MP. 7446.000 1.61 12003


STRAT DRENANT GROSIME 5 CM DIN NISIP 2.20 16380
0.00 0
0.00 0 28383

004 TRA01A17 TONA 596.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 5674 5674

005 IFA03C1 MP. 9375.000 0.00 14


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 262500
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 262514

006 2100969 M.C. 945.000 230.00 217350


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 217350

007 TRA06A17 TONA 2362.500 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 24972 24972

008 IFA07D1 M 794.000 0.03 23


ROSTUIRE PEREU DALE MORTAR CIMENT ADINC 0.96 762
4 CM SI NISIP PE REST ADINC. PT DALE 10 0.00 0
CM. 0.00 0 786

009 2101145 M.C. 0.500 190.00 95


MORTAR DE ZIDARIE M 100 NISIP S 1030 0.00 0
0.00 0
0.00 0 95

010 TRA06A17 TONA 1.300 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 14 14

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 229485.40 279641.95 6252.04 33597.61 548976.99
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 6252.04

Detaliere transporturi:
-Articole TRA 33 597.61

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 279641.95 + 6252.04 * 0.000 +
33597.61 * 0.000) * 0.003375 = 943.79
39118 pag 2
======================================================================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 229485.40 280585.74 6252.04 33597.61 549920.79

Cheltuieli indirecte:
549920.79 * 0.03000 = 16 497.62
Profit:
566418.41 * 0.02000 = 11 328.37

TOTAL GENERAL DEVIZ: 577 746.78


TVA 577746.78 * 19.0% = 109 771.89
TOTAL cu TVA 687 518.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39119 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39119 SANT RANFORT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02C1 100 MC. 5.800 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR.DESC AUT.TER.CAT. 349.35 2026
1 0.00 0 2026

002 TSA02F1 M.C. 145.000 0.00 0


SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ 45.00 6525
VERT.NESPR.IN PAM.COEZ.MIJ.SI F.COEZ. 0.00 0
ADINC.<1,5M T.TARE 0.00 0 6525

003 TSC35A31 100 MC. 7.250 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 1 LA DIST. 11-20 151.20 1096
M 0.00 0 1096

004 TRA01A02 TONA 1233.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 1381 1381

005 TSD02A1 100 MC. 7.250 0.00 0


IMPRAST.PAMINT AFINAT PROVENIT DIN TER. 0.00 0
CAT.1 SAU 2 CU BULD.DE 65-80CP IN STRAT. 92.65 672
CU GROS.DE 15-20C 0.00 0 672

006 PB01A1 M.C. 142.000 0.01 1


TURNARE BETON SIMPLU B50 IN COMPLETARI 62.48 8872
NIVELARI UMPLUTURI SI BET.PANTA EXEC.IN 0.00 0
STRAT DE 5-20CM. 0.00 0 8873

007 3270001 M.C. 143.000 180.00 25740


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 25740

008 PC02A1 MP. 1217.200 4.62 5622


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 23174
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 28796

009 PB01A1 M.C. 440.000 0.01 2


TURNARE BETON SIMPLU B50 IN COMPLETARI 62.48 27491
NIVELARI UMPLUTURI SI BET.PANTA EXEC.IN 0.00 0
STRAT DE 5-20CM. 0.00 0 27493

010 2100969 M.C. 444.000 230.00 102120


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 102120

011 TRA06A17 TONA 1468.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 15517 15517

012 2100093 M 54.000 4.09 221


TUB PVC D=110MM 0.00 0
0.00 0
0.00 0 221

013 IFF30F1 100 M. 3.440 0.00 0


MONT.MAN.TUB MAT.PLASTIC O70MM TEREN 960.00 3302
IMBIB. APA 0.00 0
0.00 0 3302
39119 pag 2
======================================================================================================================
014 6704660 M 344.000 32.06 11029
TUB RIFLAT PVC D 110 NI.4571 0.00 0
0.00 0
0.00 0 11029

015 PF10A1 MP. 49.000 12.00 588


ROST VERTICAL DE SEPAR. INTRE DOUA 5.84 286
ZIDARII ALATUR 0.00 0
0.00 0 874

016 IFB09B1 MP. 580.000 3.19 1852


STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 2320
NISIP 0.00 0
0.00 0 4172

017 TRA01A17 TONA 186.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 1771 1771

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


348.791 147174.04 71970.36 3794.14 18668.44 241606.98
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 3794.14

Detaliere transporturi:
-Articole TRA 18 668.44

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 71970.36 + 3794.14 * 0.000 +
18668.44 * 0.000) * 0.003375 = 242.90

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


348.791 147174.04 72213.26 3794.14 18668.44 241849.88

Cheltuieli indirecte:
241849.88 * 0.03000 = 7 255.50
Profit:
249105.37 * 0.02000 = 4 982.11

TOTAL GENERAL DEVIZ: 254 087.48


TVA 254087.48 * 19.0% = 48 276.62
TOTAL cu TVA 302 364.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39120 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39120 RIGOLA DE ACOSTAMENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC17B1 100 M. 15.900 0.00 0
SAPATURA LA RIGOLE SECT.TRIUNGHI.0,4M 34.40 547
ADINC.CU AUTOGREDER PINA LA 175CP IN 85.50 1359
TEREN CAT 2 0.00 0 1906

002 IFB09A1 MP. 2624.000 1.61 4230


STRAT DRENANT GROSIME 5 CM DIN NISIP 2.20 5772
0.00 0
0.00 0 10002

003 TRA01A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 1999 1999

004 IFA03C1 MP. 2624.000 0.00 4


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 73472
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 73476

005 2100898 M.C. 265.000 200.00 53001


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 53001

006 TRA06A17 TONA 661.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 6987 6987

007 IFA07D1 M 1415.000 0.03 42


ROSTUIRE PEREU DALE MORTAR CIMENT ADINC 0.96 1358
4 CM SI NISIP PE REST ADINC. PT DALE 10 0.00 0
CM. 0.00 0 1400

008 2101145 M.C. 0.900 190.00 171


MORTAR DE ZIDARIE M 100 NISIP S 1030 0.00 0
0.00 0
0.00 0 171

010 TRA06A17 TONA 2.300 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 24 24

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


636.000 57447.56 81149.64 1359.45 9010.28 148966.92
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1359.45

Detaliere transporturi:
-Articole TRA 9 010.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 81149.64 + 1359.45 * 0.000 +
9010.28 * 0.000) * 0.003375 = 273.88

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


636.000 57447.56 81423.52 1359.45 9010.28 149240.80
39120 pag 2
======================================================================================================================

Cheltuieli indirecte:
149240.80 * 0.03000 = 4 477.22
Profit:
153718.03 * 0.02000 = 3 074.36

TOTAL GENERAL DEVIZ: 156 792.39


TVA 156792.39 * 19.0% = 29 790.55
TOTAL cu TVA 186 582.94

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39121 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39121 RIGOLA CAROSABILA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC14A1 100 MC. 38.660 0.00 0
SAP.PAM.CU EXC.60-80CP GREIF.0,5-0,6MC 0.00 0
IN T.NECOEZ.UMIDIT.NAT.DISL.IN SPATI 364.50 14092
PINA LA 8M DESC.IN A 0.00 0 14092

002 TRI1AA01C1 TONA 6959.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 48713
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 48713

003 2100095 BUC. 23430.000 29.00 679470


PLACUTA RIGOLA CAROSABILA 0.00 0
0.00 0
0.00 0 679470

004 2100220 BUC. 20897.000 50.00 1044850


RIGOLA CAROSABILA 0.00 0
0.00 0
0.00 0 1044850

005 PB06A1 M.C. 387.000 0.01 2


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 18514
ZID,TIMPAN MANUAL 2.50 967
0.00 0 19483

006 2100957 M.C. 387.000 190.00 73530


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 73530

007 TRA06A17 TONA 967.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 10221 10221

008 AUT3521 ORA 100.000 0.00 0


EXCAVATOR PE PNEURI MOTOR TERMIC 0.00 0
(BULDOEXCAVATOR)0,21-0,39MC 85.00 8500
0.00 0 8500

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4635.97 1797851.94 67226.77 23558.68 10221.19 1898858.58
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 23558.68

Detaliere transporturi:
-Articole TRA 10 221.19

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 67226.77 + 23558.68 * 0.000 +
10221.19 * 0.000) * 0.003375 = 226.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4635.97 1797851.94 67453.66 23558.68 10221.19 1899085.47

Cheltuieli indirecte:
1899085.47 * 0.03000 = 56 972.56
Profit:
1956058.03 * 0.02000 = 39 121.16
39121 pag 2
======================================================================================================================

TOTAL GENERAL DEVIZ: 1 995 179.19


TVA 1995179.19 * 19.0% = 379 084.05
TOTAL cu TVA 2 374 263.24

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39122 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39122 PODET TUBULAR D=500, L=10M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PI08A1 BUC. 24.000 0.00 0
ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT 0.00 0
0.00 0 0

002 2100201 BUC. 24.000 500.00 12000


TUB D=500, L=5M 0.00 0
0.00 0
0.00 0 12000

003 TRA04A17 TONA 47.160 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 561 561

004 PI06B1 BUC. 24.000 47.42 1138


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 40.00 960
MACARAUA PE PNEURI DE 10-14,9 TF 168.00 4032
0.00 0 6130

005 TSC14A1 100 MC. 3.100 0.00 0


SAP.PAM.CU EXC.60-80CP GREIF.0,5-0,6MC 0.00 0
IN T.NECOEZ.UMIDIT.NAT.DISL.IN SPATI 364.50 1130
PINA LA 8M DESC.IN A 0.00 0 1130

006 TSA02G1 M.C. 77.520 0.00 0


SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ 56.00 4341
VERT.NESPR.IN PAM.COEZ.MIJ.SI F.COEZ. 0.00 0
ADINC.<1,5M T.F.TAR 0.00 0 4341

007 TSC35B1 100 MC. 0.780 0.00 0


EXC.TRA.INC.IN AUT.CU INC.FRONT.PE 0.00 0
SENILE 0,5-0,99MC.IN PAM.TER.CAT.2 LA 352.95 275
DIST.<10M 0.00 0 275

008 TRA01A02 TONA 698.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 782 782

009 TSD03H1 100 MC. 3.880 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 50-100CM 13.38 52
TER.CAT.3 SAU 4 0.00 0 52

010 TSD07A1 100 MC. 0.770 0.00 0


COMPACTAREA UMPLUT.CU RULOU COMPRESOR 10 101.38 78
-12T,EXCL.UDAREA PAM.NECOEZ.GRAD 478.61 369
COMPACT.92-94 % 0.00 0 447

011 TRI1AA01A3 TONA 140.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 10.00 1400
MARUNTE,PRIN ARUNCARE RAMPA-VAGON CATEG. 0.00 0
3 0.00 0 1400

015 IFB09D2 MP. 189.600 4.10 777


STRAT DRENANT CU GROSIMEA:20 CM DIN 7.60 1441
BALAST 0.00 0
0.00 0 2218

016 TRA01A17 TONA 64.500 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 614 614
39122 pag 2
======================================================================================================================
017 PC02A1 MP. 232.080 4.62 1072
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 4419
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 5490

018 PB06A1 M.C. 82.680 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 3955
ZID,TIMPAN MANUAL 2.50 207
0.00 0 4162

019 2100969 M.C. 41.610 230.00 9570


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 9570

020 2100957 M.C. 41.760 190.00 7934


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 7934

021 TRA06A17 TONA 207.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2188 2188

022 CZ0302G1 KG 190.000 2.77 526


CONFECT ARMAT PT PERETI GRINZI STILPI 0.92 175
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER OB 37 D=6-8MM 0.00 0 701

023 CZ0302H1 KG 402.000 2.77 1114


CONFECT ARMAT PT PERETI GRINZI STILPI 0.52 209
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER OB 37 D=10-16M 0.00 0 1323

024 PD01A1 KG 593.000 0.04 22


MONT.ARMATURI PT.BETON ARMAT IN FUND. 0.44 259
RADIERE ELEV.INFRASTR.SUPRASTR.POD 0.00 0
GRINZI DREPTE,CADRE ETC. 0.00 0 281

025 PF05A1 MP. 166.000 1.56 259


HIDROIZOLATII LA LUCRARI DE ARTA DIN 1.00 166
BITUM FILERIZAT APLICATA LA RECE IN DOUA 0.00 0
STRATURI 0.00 0 425

026 PF07B1 MP. 166.000 4.87 808


SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 975
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 48
4CM GROS LA POD 0.00 0 1831

027 PE01D1 M.C. 33.170 34.80 1154


ZIDARIE USCATA IN DREN.LA CULEI SI ZID. 50.00 1658
SPRIJ.DIN BOLOVANI DE RIU 0.00 0
0.00 0 2813

028 TRA01A17 TONA 50.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 476 476

030 DA06A1 M.C. 3.000 26.24 79


STRAT AGREG NAT(BALAST)CILINDR CU FUNCT 23.07 69
REZIST FILTRANT IZOL AERISIRE ANTCAP CU 7.80 23
ASTERNERE MANUAL 0.00 0 171

031 TRA01A17 TONA 6.500 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 62 62

032 PC02A1 MP. 114.000 4.62 527


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 2170
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 2697

033 PB06A1 M.C. 12.240 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 586
ZID,TIMPAN MANUAL 2.50 31
0.00 0 616

034 2100969 M.C. 12.330 230.00 2836


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 2836
39122 pag 3
======================================================================================================================
035 TRA06A17 TONA 31.000 0.00 0
TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 328 328

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


41.575 39817.43 22861.62 6166.69 5010.54 73856.28
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 6166.69

Detaliere transporturi:
-Articole TRA 5 010.54

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 22861.62 + 6166.69 * 0.000 +
5010.54 * 0.000) * 0.003375 = 77.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


41.575 39817.43 22938.78 6166.69 5010.54 73933.44

Cheltuieli indirecte:
73933.44 * 0.03000 = 2 218.00
Profit:
76151.44 * 0.02000 = 1 523.03

TOTAL GENERAL DEVIZ: 77 674.47


TVA 77674.47 * 19.0% = 14 758.15
TOTAL cu TVA 92 432.62

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39123 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39123 PODET TUBULAR D=1000, L=10 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PI08A1 BUC. 20.000 0.00 0
ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT 0.00 0
0.00 0 0

002 2100063 BUC. 20.000 1800.00 36000


TUB PREMO DN1000, L=5M 0.00 0
0.00 0
0.00 0 36000

003 TRA04A17 TONA 128.500 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 1529 1529

004 PI06B1 BUC. 20.000 47.42 948


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 40.00 800
MACARAUA PE PNEURI DE 10-14,9 TF 168.00 3360
0.00 0 5108

005 TSC14A1 100 MC. 5.010 0.00 0


SAP.PAM.CU EXC.60-80CP GREIF.0,5-0,6MC 0.00 0
IN T.NECOEZ.UMIDIT.NAT.DISL.IN SPATI 364.50 1826
PINA LA 8M DESC.IN A 0.00 0 1826

006 TSA02G1 M.C. 125.000 0.00 0


SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ 56.00 7000
VERT.NESPR.IN PAM.COEZ.MIJ.SI F.COEZ. 0.00 0
ADINC.<1,5M T.F.TAR 0.00 0 7000

007 TSC35B1 100 MC. 1.250 0.00 0


EXC.TRA.INC.IN AUT.CU INC.FRONT.PE 0.00 0
SENILE 0,5-0,99MC.IN PAM.TER.CAT.2 LA 352.95 441
DIST.<10M 0.00 0 441

008 TRA01A02 TONA 627.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 702 702

009 TSD03H1 100 MC. 6.270 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 50-100CM 13.38 84
TER.CAT.3 SAU 4 0.00 0 84

011 TRI1AA01A3 TONA 226.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 10.00 2260
MARUNTE,PRIN ARUNCARE RAMPA-VAGON CATEG. 0.00 0
3 0.00 0 2260

015 IFB09D2 MP. 191.000 4.10 783


STRAT DRENANT CU GROSIMEA:20 CM DIN 7.60 1452
BALAST 0.00 0
0.00 0 2235

016 TRA01A17 TONA 65.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 619 619

017 PC02A1 MP. 268.000 4.62 1238


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5102
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6340
39123 pag 2
======================================================================================================================
018 PB06A1 M.C. 78.300 0.01 0
TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 3746
ZID,TIMPAN MANUAL 2.50 196
0.00 0 3942

019 2100969 M.C. 30.030 230.00 6907


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 6907

020 2100957 M.C. 49.000 190.00 9310


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 9310

021 TRA06A17 TONA 197.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2082 2082

022 CZ0302G1 KG 200.000 2.77 554


CONFECT ARMAT PT PERETI GRINZI STILPI 0.92 184
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER OB 37 D=6-8MM 0.00 0 738

023 CZ0302H1 KG 413.000 2.77 1144


CONFECT ARMAT PT PERETI GRINZI STILPI 0.52 215
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER OB 37 D=10-16M 0.00 0 1359

025 PD01A1 KG 613.000 0.04 23


MONT.ARMATURI PT.BETON ARMAT IN FUND. 0.44 268
RADIERE ELEV.INFRASTR.SUPRASTR.POD 0.00 0
GRINZI DREPTE,CADRE ETC. 0.00 0 291

026 PF05A1 MP. 251.000 1.56 392


HIDROIZOLATII LA LUCRARI DE ARTA DIN 1.00 251
BITUM FILERIZAT APLICATA LA RECE IN DOUA 0.00 0
STRATURI 0.00 0 642

027 PF07B1 MP. 251.000 4.87 1222


SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 1474
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 73
4CM GROS LA POD 0.00 0 2769

028 IFF33A2 MP. 251.000 1.04 260


FILTRU MAT.SINT.NETESUT DREN CU/FARA 1.42 356
SPRIJ AD 5 M 0.00 0
0.00 0 617

029 PE01D1 M.C. 50.240 34.80 1748


ZIDARIE USCATA IN DREN.LA CULEI SI ZID. 50.00 2512
SPRIJ.DIN BOLOVANI DE RIU 0.00 0
0.00 0 4260

030 TRA01A17 TONA 9.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 86 86

034 DA06A1 M.C. 3.130 26.24 82


STRAT AGREG NAT(BALAST)CILINDR CU FUNCT 23.07 72
REZIST FILTRANT IZOL AERISIRE ANTCAP CU 7.80 24
ASTERNERE MANUAL 0.00 0 179

035 TRA01A17 TONA 7.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 67 67

040 PC02A1 MP. 147.200 4.62 680


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 2803
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 3482

037 PB06A1 M.C. 16.200 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 775
ZID,TIMPAN MANUAL 2.50 40
0.00 0 816

037 2100969 M.C. 16.330 230.00 3756


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 3756
39123 pag 3
======================================================================================================================
038 TRA06A17 TONA 41.000 0.00 0
TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 433 433

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


74.659 65048.11 29269.48 6044.96 5518.17 105880.72
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 6044.96

Detaliere transporturi:
-Articole TRA 5 518.17

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 29269.48 + 6044.96 * 0.000 +
5518.17 * 0.000) * 0.003375 = 98.78

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


74.659 65048.11 29368.26 6044.96 5518.17 105979.50

Cheltuieli indirecte:
105979.50 * 0.03000 = 3 179.38
Profit:
109158.89 * 0.02000 = 2 183.18

TOTAL GENERAL DEVIZ: 111 342.06


TVA 111342.06 * 19.0% = 21 154.99
TOTAL cu TVA 132 497.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39124 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39124 AMENAJARE PODETE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07C1 M.C. 113.000 0.00 0
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 45.80 5175
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.0,0-2M,T.TARE 0.00 0 5175

002 TRB01C11 TONA 61.000 0.00 0


`RANSPORTUL MATERIALELOR CU ROABA PE 9.60 586
PNEURI INC ARUNCARE DESC RASTURNARE 0.00 0
GRUP1-3 DISTANTA 10M 0.00 0 586

003 PB01A1 M.C. 68.000 0.01 0


TURNARE BETON SIMPLU B50 IN COMPLETARI 62.48 4249
NIVELARI UMPLUTURI SI BET.PANTA EXEC.IN 0.00 0
STRAT DE 5-20CM. 0.00 0 4249

004 2100969 M.C. 68.340 230.00 15718


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 15718

005 PC02A1 MP. 281.400 4.62 1300


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5358
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6657

006 PB06A1 M.C. 84.400 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 4038
ZID,TIMPAN MANUAL 2.50 211
0.00 0 4249

007 2100969 M.C. 84.400 230.00 19412


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 19412

008 TRA06A17 TONA 385.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 4069 4069

009 TSA07C1 M.C. 342.000 0.00 0


SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 45.80 15664
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.0,0-2M,T.TARE 0.00 0 15664

010 IFB09C1 MP. 228.000 4.80 1096


STRAT DRENANT CU GROSIMEA:15 CM DIN 5.80 1322
NISIP 0.00 0
0.00 0 2418

011 TRA01A17 TONA 55.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 524 524

012 PB01A1 M.C. 68.370 0.01 0


TURNARE BETON SIMPLU B50 IN COMPLETARI 62.48 4272
NIVELARI UMPLUTURI SI BET.PANTA EXEC.IN 0.00 0
STRAT DE 5-20CM. 0.00 0 4272

014 PC02A1 MP. 282.000 4.62 1302


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5369
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6671
39124 pag 2
======================================================================================================================
015 PB06A1 M.C. 85.000 0.01 0
TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 4066
ZID,TIMPAN MANUAL 2.50 212
0.00 0 4279

016 2100969 M.C. 155.000 230.00 35650


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 35650

017 TRA06A17 TONA 386.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 4080 4080

018 DH16A1 M.C. 134.000 0.00 0


DESFUNDAREA SI CURATIREA CAMERELOR DE 81.00 10854
CADERE SI A ALBIEI SUB PODETE DE POTMOL 0.00 0
BUSTENI ETC 0.00 0 10854

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.025 74479.36 60951.67 423.33 8673.07 144527.43
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 423.33

Detaliere transporturi:
-Articole TRA 8 673.07

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 60951.67 + 423.33 * 0.000 +
8673.07 * 0.000) * 0.003375 = 205.71

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.025 74479.36 61157.38 423.33 8673.07 144733.14

Cheltuieli indirecte:
144733.14 * 0.03000 = 4 341.99
Profit:
149075.13 * 0.02000 = 2 981.50

TOTAL GENERAL DEVIZ: 152 056.63


TVA 152056.63 * 19.0% = 28 890.76
TOTAL cu TVA 180 947.39

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39125 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39125 PODETE ACCES PROPRIETATI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 1.570 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 637
2 0.00 0 637

002 TSA02D1 M.C. 39.200 0.00 0


SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ 53.00 2078
VERT.NESPR.IN PAM.NECOEZ.SI SL.COEZ. 0.00 0
ADINC.<0,75M T.F.TAR 0.00 0 2078

003 TSC35A3 100 MC. 0.390 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 1 LA DIST. < 10 M 134.40 52
0.00 0 52

004 TRA01A02 TONA 353.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 395 395

005 PB02A1 M.C. 196.000 0.01 1


TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 8464
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 521
MANUAL 0.00 0 8987

006 2100957 M.C. 198.000 190.00 37620


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 37620

007 TRA06A17 TONA 494.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 5222 5222

008 PC02A1 MP. 525.000 4.62 2425


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 9995
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 12420

009 CZ0302G1 KG 3388.000 2.77 9388


CONFECT ARMAT PT PERETI GRINZI STILPI 0.92 3117
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER OB 37 D=6-8MM 0.00 0 12505

010 CZ0302H1 KG 1456.000 2.77 4035


CONFECT ARMAT PT PERETI GRINZI STILPI 0.52 757
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER OB 37 D=10-16M 0.00 0 4792

011 CZ0302L1 KG 12824.000 2.77 35535


CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 6925
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D> 16MM 0.00 0 42460

012 PD01A1 KG 17668.000 0.04 652


MONT.ARMATURI PT.BETON ARMAT IN FUND. 0.44 7732
RADIERE ELEV.INFRASTR.SUPRASTR.POD 0.00 0
GRINZI DREPTE,CADRE ETC. 0.00 0 8383

013 TRA04A17 TONA 17.668 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 210 210
39125 pag 2
======================================================================================================================
014 PB11A1 M.C. 105.000 0.01 1
TURN.BET.ARMAT B200 IN TABL.PLACI 49.84 5233
PLATELAJE CORONAMENTE,ETC.MANUAL 2.26 237
0.00 0 5471

015 2100969 M.C. 106.000 230.00 24380


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 24380

016 TRA06A17 TONA 265.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2801 2801

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


19.997 114035.33 44301.10 1447.74 8628.24 168412.41
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1447.74

Detaliere transporturi:
-Articole TRA 8 628.24

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 44301.10 + 1447.74 * 0.000 +
8628.24 * 0.000) * 0.003375 = 149.52

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


19.997 114035.33 44450.62 1447.74 8628.24 168561.92

Cheltuieli indirecte:
168561.92 * 0.03000 = 5 056.86
Profit:
173618.78 * 0.02000 = 3 472.38

TOTAL GENERAL DEVIZ: 177 091.16


TVA 177091.16 * 19.0% = 33 647.32
TOTAL cu TVA 210 738.48

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39126 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0004 45000000 DRUM JUDETEAN DJ658 - SANTURI SI PODETE
Lista cu cantitatile de lucrari
Deviz oferta 39126 AMENAJARI TORENTI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 24.810 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 10059
2 0.00 0 10059

002 TRA01A02 TONA 4475.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 5012 5012

003 TSD03H1 100 MC. 0.730 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 50-100CM 13.38 10
TER.CAT.3 SAU 4 0.00 0 10

004 PB02A1 M.C. 2480.000 0.01 12


TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 107101
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 6597
MANUAL 0.00 0 113710

005 2100898 M.C. 2500.000 200.00 500010


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 500010

006 TRA06A17 TONA 6250.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 66062 66062

007 PC02A1 MP. 3951.000 4.62 18248


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 75222
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 93470

008 CZ0301K1 KG 2355.000 2.77 6526


CONFECT.ARMAT.FASONARE BARE PT.FUNDATII 0.58 1366
IZOL.CONTINUI SI RADIERE IN ATEL.SANT.PC 0.00 0
52 D=10- 16 MM 0.00 0 7891

009 PD01A1 KG 2355.000 0.04 87


MONT.ARMATURI PT.BETON ARMAT IN FUND. 0.44 1031
RADIERE ELEV.INFRASTR.SUPRASTR.POD 0.00 0
GRINZI DREPTE,CADRE ETC. 0.00 0 1117

010 TRA04A17 TONA 2.360 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 28 28

011 PB06B1 M.C. 2280.000 0.00 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 8.97 20449
ZID,TIMPAN CU POMPA 10.09 23003
0.00 0 43452

012 2100914 M.C. 2280.000 215.00 490205


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 490205

013 TRA06A17 TONA 5700.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 60249 60249
39126 pag 2
======================================================================================================================
014 IFB08B1 MP. 504.000 6.32 3186
PEREU GROS.24 CM PE FUNDATIE 8-12 CM 36.00 18144
BET.100 CU BOLOVANI DE RIU 0.00 0
0.00 0 21330

018 IFB09C1 MP. 504.000 4.80 2422


STRAT DRENANT CU GROSIMEA:15 CM DIN 5.80 2923
NISIP 0.00 0
0.00 0 5345

015 2100957 M.C. 74.000 190.00 14060


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 14060

016 TRA06A17 TONA 185.300 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1959 1959

017 TRA01A17 TONA 121.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 1152 1152

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11490.7 1034754.88 226236.35 39668.70 134462.12 1435122.05
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 39668.70

Detaliere transporturi:
-Articole TRA 134 462.12

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 226236.35 + 39668.70 * 0.000 +
134462.12 * 0.000) * 0.003375 = 763.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11490.7 1034754.88 226999.89 39668.70 134462.12 1435885.60

Cheltuieli indirecte:
1435885.60 * 0.03000 = 43 076.57
Profit:
1478962.16 * 0.02000 = 29 579.24

TOTAL GENERAL DEVIZ: 1 508 541.41


TVA 1508541.41 * 19.0% = 286 622.87
TOTAL cu TVA 1 795 164.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39127 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0005 45000000 DRUM JUDETEAN DJ 658 - CONSOLIDARE TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39127 ZID DE SPRIJIN He=3M,L=975 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 70.000 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 28382
2 0.00 0 28382

002 TRA01A02 TONA 12601.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 14113 14113

003 TSD03H1 100 MC. 70.000 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 50-100CM 13.38 936
TER.CAT.3 SAU 4 0.00 0 936

004 TSF03A1 MP. 9263.000 4.60 42580


SPRIJIN.MAL.CU DULAPI FAG ASEZ.ORIZ., 22.20 205639
LAT.INTRE MAL.>2,5M,LA ADINC.0,0-4M;0,0- 0.00 0
0,2M INTRE DULAPI 0.00 0 248219

005 PB02B1 M.C. 2925.000 0.00 0


TURNARE BETON SIMPLU B75 IN FUNDATII 6.83 19969
OBISNUITE ZIDDE SPRIJIN,PEREURI ETC.CU 9.26 27086
POMPA 0.00 0 47054

006 2100898 M.C. 2925.000 200.00 585012


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 585012

007 TRA06A17 TONA 7313.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 77298 77298

008 PF10A1 MP. 1386.000 12.00 16632


ROST VERTICAL DE SEPAR. INTRE DOUA 5.84 8094
ZIDARII ALATUR 0.00 0
0.00 0 24726

009 PC02A1 MP. 6714.000 4.62 31009


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 127827
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 158835

010 CZ0302K1 KG 5195.000 2.77 14395


CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 2805
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 17200

011 PD01A1 KG 5195.000 0.04 192


MONT.ARMATURI PT.BETON ARMAT IN FUND. 0.44 2273
RADIERE ELEV.INFRASTR.SUPRASTR.POD 0.00 0
GRINZI DREPTE,CADRE ETC. 0.00 0 2465

012 TRA04A17 TONA 5.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 62 62

013 PB06B1 M.C. 4075.500 0.00 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 8.97 36553
ZID,TIMPAN CU POMPA 10.09 41118
0.00 0 77671
39127 pag 2
======================================================================================================================
014 2100914 M.C. 4108.000 215.00 883228
BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 883228

015 TRA06A17 TONA 10270.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 108554 108554

016 PF05A1 MP. 2925.000 1.56 4563


HIDROIZOLATII LA LUCRARI DE ARTA DIN 1.00 2924
BITUM FILERIZAT APLICATA LA RECE IN DOUA 0.00 0
STRATURI 0.00 0 7487

017 PE01C1 M.C. 1170.000 39.44 46145


ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 58500
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 104645

018 TRA01A34 TONA 1755.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 33415 33415

019 IFF33A2 MP. 2002.000 1.04 2077


FILTRU MAT.SINT.NETESUT DREN CU/FARA 1.42 2842
SPRIJ AD 5 M 0.00 0
0.00 0 4919

020 PK13B1 BUC. 1243.000 9.58 11909


TUBURI PT. EVAC. VAPORILOR DE APA DIN 25.40 31571
HIDROIZ. LA PODURI. DE SOSEA CONFEC. DIN 0.00 0
MATERIAL PLASTIC 0.00 0 43480

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


16987.7 1637741.17 498996.91 97521.04 233442.51 2467701.63
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 97521.04

Detaliere transporturi:
-Articole TRA 233 442.51

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 498996.91 + 97521.04 * 0.000 +
233442.51 * 0.000) * 0.003375 = 1 684.11

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


16987.7 1637741.17 500681.02 97521.04 233442.51 2469385.74

Cheltuieli indirecte:
2469385.74 * 0.03000 = 74 081.57
Profit:
2543467.31 * 0.02000 = 50 869.35

TOTAL GENERAL DEVIZ: 2 594 336.66


TVA 2594336.66 * 19.0% = 492 923.97
TOTAL cu TVA 3 087 260.62

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39128 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0005 45000000 DRUM JUDETEAN DJ 658 - CONSOLIDARE TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39128 ZID DE SPRIJIN He=4M, L=365 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 44.790 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 18160
2 0.00 0 18160

002 TRA01A02 TONA 8062.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 9029 9029

003 TSD03H1 100 MC. 44.790 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 50-100CM 13.38 599
TER.CAT.3 SAU 4 0.00 0 599

004 TSF03A1 MP. 4804.000 4.60 22083


SPRIJIN.MAL.CU DULAPI FAG ASEZ.ORIZ., 22.20 106649
LAT.INTRE MAL.>2,5M,LA ADINC.0,0-4M;0,0- 0.00 0
0,2M INTRE DULAPI 0.00 0 128732

005 PB02A1 M.C. 2197.000 0.01 11


TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 94880
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 5844
MANUAL 0.00 0 100735

006 2100898 M.C. 2197.000 200.00 439409


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 439409

007 TRA06A17 TONA 5493.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 58061 58061

008 PF10A1 MP. 883.500 12.00 10602


ROST VERTICAL DE SEPAR. INTRE DOUA 5.84 5159
ZIDARII ALATUR 0.00 0
0.00 0 15761

009 PC02A1 MP. 3378.000 4.62 15601


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 64313
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 79914

010 CZ0301K1 KG 1945.000 2.77 5389


CONFECT.ARMAT.FASONARE BARE PT.FUNDATII 0.58 1128
IZOL.CONTINUI SI RADIERE IN ATEL.SANT.PC 0.00 0
52 D=10- 16 MM 0.00 0 6518

011 PD01A1 KG 1945.000 0.04 72


MONT.ARMATURI PT.BETON ARMAT IN FUND. 0.44 851
RADIERE ELEV.INFRASTR.SUPRASTR.POD 0.00 0
GRINZI DREPTE,CADRE ETC. 0.00 0 923

012 TRA04A17 TONA 1.950 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 23 23

013 PB06B1 M.C. 2281.500 0.00 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 8.97 20463
ZID,TIMPAN CU POMPA 10.09 23018
0.00 0 43481
39128 pag 2
======================================================================================================================
014 2100914 M.C. 2281.500 215.00 490527
BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 490527

015 TRA06A17 TONA 5703.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 60281 60281

016 PF05A1 MP. 1460.000 1.56 2278


HIDROIZOLATII LA LUCRARI DE ARTA DIN 1.00 1459
BITUM FILERIZAT APLICATA LA RECE IN DOUA 0.00 0
STRATURI 0.00 0 3737

017 PE01C1 M.C. 931.000 39.44 36719


ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 46550
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 83269

018 TRA01A34 TONA 1396.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 26580 26580

019 IFF33A2 MP. 1720.000 1.04 1784


FILTRU MAT.SINT.NETESUT DREN CU/FARA 1.42 2442
SPRIJ AD 5 M 0.00 0
0.00 0 4226

020 PK13B1 BUC. 463.000 9.58 4436


TUBURI PT. EVAC. VAPORILOR DE APA DIN 25.40 11760
HIDROIZ. LA PODURI. DE SOSEA CONFEC. DIN 0.00 0
MATERIAL PLASTIC 0.00 0 16196

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


10804.4 1028910.80 355653.93 47621.29 153974.20 1586160.23
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 47621.29

Detaliere transporturi:
-Articole TRA 153 974.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 355653.93 + 47621.29 * 0.000 +
153974.20 * 0.000) * 0.003375 = 1 200.33

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


10804.4 1028910.80 356854.27 47621.29 153974.20 1587360.57

Cheltuieli indirecte:
1587360.57 * 0.03000 = 47 620.82
Profit:
1634981.38 * 0.02000 = 32 699.63

TOTAL GENERAL DEVIZ: 1 667 681.01


TVA 1667681.01 * 19.0% = 316 859.39
TOTAL cu TVA 1 984 540.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39129 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0005 45000000 DRUM JUDETEAN DJ 658 - CONSOLIDARE TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39129 DREN

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04G1 100 MC. 17.126 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.3 177.37 3038
0.00 0 3038

002 TSC35B32 100 MC. 17.126 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 21-30 195.30 3345
M 0.00 0 3345

003 TRA01A02 TONA 3083.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 3453 3453

004 2200434 M.C. 1713.000 20.00 34262


MATERIAL PT.UMPLUTURI (REFUZ DE CIUR D> 0.00 0
70 MM) 0.00 0
0.00 0 34262

005 TRA01A17 TONA 3818.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 36347 36347

006 IFF33A2 MP. 8564.000 1.04 8883


FILTRU MAT.SINT.NETESUT DREN CU/FARA 1.42 12157
SPRIJ AD 5 M 0.00 0
0.00 0 21040

007 IFF30E1 100 M. 17.840 0.00 0


MONT.MAN TUB MAT PLASTIC TEREN UMID 640.00 11418
NATURALA. . 0.00 0
0.00 0 11418

008 6704660 M 1873.200 32.06 60055


TUB RIFLAT PVC D 110 NI.4571 0.00 0
0.00 0
0.00 0 60055

009 IFF36A1 BUC. 1.000 22.34 22


GURA DE DESCARCARE IN CANALE DESCHISE A 39.40 39
DRENURILOR AGRICOLE,ABSORBANT CU DN 70 0.00 0
MM 0.00 0 62

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.336 103221.59 23614.45 6382.40 39800.32 173018.76
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 6382.40

Detaliere transporturi:
-Articole TRA 39 800.32

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 23614.45 + 6382.40 * 0.000 +
39800.32 * 0.000) * 0.003375 = 79.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.336 103221.59 23694.15 6382.40 39800.32 173098.46
39129 pag 2
======================================================================================================================

Cheltuieli indirecte:
173098.46 * 0.03000 = 5 192.95
Profit:
178291.42 * 0.02000 = 3 565.83

TOTAL GENERAL DEVIZ: 181 857.24


TVA 181857.24 * 19.0% = 34 552.88
TOTAL cu TVA 216 410.12

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39130 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0005 45000000 DRUM JUDETEAN DJ 658 - CONSOLIDARE TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39130 FUNDATII ADANCITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC02D1 100 MC. 63.135 0.00 0
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0
MC PAMINT UMIDIT.NATUR DESC AUT.TER.CAT. 405.45 25598
2 0.00 0 25598

002 TRA01A02 TONA 2904.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 3252 3252

003 TSD03H1 100 MC. 63.130 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 50-100CM 13.38 844
TER.CAT.3 SAU 4 0.00 0 844

004 TSF02D1 MP. 7015.000 1.94 13586


SPRIJ.MAL.CU DULAPI FAG.ASEZ.ORIZ.LAT. 9.40 65941
INTRE MAL.1,51-2,5M LA ADINC.2,01-4M;0, 0.00 0
21-0,6M INTRE DULAP 0.00 0 79527

005 PB02B1 M.C. 3929.000 0.00 0


TURNARE BETON SIMPLU B75 IN FUNDATII 6.83 26823
OBISNUITE ZIDDE SPRIJIN,PEREURI ETC.CU 9.26 36383
POMPA 0.00 0 63206

006 2100969 M.C. 3929.000 230.00 903670


BETON DE CIMENT C25/30 0.00 0
0.00 0
0.00 0 903670

007 TRA06A17 TONA 9821.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 103808 103808

008 PC02A1 MP. 2385.000 4.62 11015


COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 45408
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 56423

009 CZ0301A1 KG 23009.000 2.76 63443


CONFECT.ARMAT.FASONARE BARE PT.FUNDATII 0.66 15186
IZOL.CONTINUI SI RADIERE IN ATEL.CENT.OB 0.16 3746
37 D=6-8MM 0.00 0 82375

010 PD01A1 KG 23009.000 0.04 849


MONT.ARMATURI PT.BETON ARMAT IN FUND. 0.44 10069
RADIERE ELEV.INFRASTR.SUPRASTR.POD 0.00 0
GRINZI DREPTE,CADRE ETC. 0.00 0 10918

011 TRA04A17 TONA 23.000 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 274 274

012 PF10A1 MP. 784.000 12.00 9408


ROST VERTICAL DE SEPAR. INTRE DOUA 5.84 4578
ZIDARII ALATUR 0.00 0
0.00 0 13986

013 PF05A1 MP. 3788.000 1.56 5909


HIDROIZOLATII LA LUCRARI DE ARTA DIN 1.00 3786
BITUM FILERIZAT APLICATA LA RECE IN DOUA 0.00 0
STRATURI 0.00 0 9696

Cheltuieli directe din articole:


39130 pag 2
======================================================================================================================

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


56.325 1007880.57 171791.39 66571.29 107334.15 1353577.40
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 66571.29

Detaliere transporturi:
-Articole TRA 107 334.15

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 171791.39 + 66571.29 * 0.000 +
107334.15 * 0.000) * 0.003375 = 579.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


56.325 1007880.57 172371.18 66571.29 107334.15 1354157.19

Cheltuieli indirecte:
1354157.19 * 0.03000 = 40 624.71
Profit:
1394781.91 * 0.02000 = 27 895.64

TOTAL GENERAL DEVIZ: 1 422 677.54


TVA 1422677.54 * 19.0% = 270 308.73
TOTAL cu TVA 1 692 986.28

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39131 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0005 45000000 DRUM JUDETEAN DJ 658 - CONSOLIDARE TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39131 GABIOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC03C1 100 MC. 15.000 0.00 0
SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN PAM. 0.00 0
CU UMIDITATE.NATURAL DESC.DEP.TEREN CAT 213.59 3204
3 0.00 0 3204

002 IFB09D1 MP. 5000.000 6.36 31775


STRAT DRENANT CU GROSIMEA:20 CM DIN 7.60 38000
NISIP 0.00 0
0.00 0 69775

003 TRA01A17 TONA 1600.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 15232 15232

004 IFI03D1 KG 47162.000 0.30 13945


CONFECT.CADRE METAL.EXEC.COS.DIN 2.60 122621
IMPLETITURI SIRMA CU OTEL DIAM.12 MM 0.00 0
0.00 0 136566

005 2000145 KG 48577.000 2.73 132615


OTEL BETON PROFIL NETED OB37-1K STAS 438 0.00 0
D=12MM 0.00 0
0.00 0 132615

006 IFI04A1 MP. 23875.000 9.72 231948


MONTAREA IMPLET. SIRMA DN 2,8 MM PE 6.00 143245
CADRE METALICELA COSURI FOLOSITE PTR 0.00 0
LUCR. DE ZIDARIE,GABIOA 0.00 0 375193

007 IFB13A2 M.C. 7000.000 30.30 212100


UMPLUTURI IN:GABIOANE CU BOLOVANI DE RIU 64.00 447997
0.00 0
0.00 0 660097

008 TRI1AA01C3 TONA 11200.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 78400
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 78400

009 TRA01A17 TONA 11200.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 106624 106624

010 TRA04A17 TONA 100.000 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 1190 1190

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


104.729 622383.08 830263.62 3203.86 123046.00 1578896.57
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 3203.86

Detaliere transporturi:
-Articole TRA 123 046.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 830263.62 + 3203.86 * 0.000 +
123046.00 * 0.000) * 0.003375 = 2 802.14
39131 pag 2
======================================================================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


104.729 622383.08 833065.76 3203.86 123046.00 1581698.71

Cheltuieli indirecte:
1581698.71 * 0.03000 = 47 450.96
Profit:
1629149.67 * 0.02000 = 32 582.99

TOTAL GENERAL DEVIZ: 1 661 732.66


TVA 1661732.66 * 19.0% = 315 729.21
TOTAL cu TVA 1 977 461.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39132 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0005 45000000 DRUM JUDETEAN DJ 658 - CONSOLIDARE TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39132 PROTECTIE TALUZ CU GEOCELULE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFF33B2 MP. 1300.000 1.65 2148
FILTRU MATERIAL TEXTIL NETESIN.SUPRAF. 1.24 1612
INCLINATE AD.5M 0.00 0
0.00 0 3759

002 TSH05A1 MP. 1300.000 0.00 0


ASTERNEREA PAM.VEGETAL PE TEREN CU PANTA 2.20 2860
<20%,IN STRAT.UNIFORME CU GROSIMEA DE 0.00 0
10CM 0.00 0 2860

003 TSH09C1 100 MP. 13.000 19.66 256


SEMANAREA GAZONULUI PE SUPRAFETE 104.00 1352
TALUZURILOR CU 1KG SAMINTA PE 100 MP 0.00 0
0.00 0 1608

004 TSH24C1 BUC. 5200.000 1.21 6297


PLANTARI PUIETI DE ARBORI FOIOSI FARA 15.80 82156
BALOT 0.00 0
0.00 0 88453

005 7201603 BUC. 5408.000 8.00 43264


PUIETI ARBORI FOIOSI.DIOSPYROSVIRGINIANA 0.00 0
1 H/D=275/3,0 0.00 0
0.00 0 43264

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


36.270 51963.87 87979.58 0.00 0.00 139943.45

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 87979.58 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 296.93

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


36.270 51963.87 88276.51 0.00 0.00 140240.38

Cheltuieli indirecte:
140240.38 * 0.03000 = 4 207.21
Profit:
144447.59 * 0.02000 = 2 888.95

TOTAL GENERAL DEVIZ: 147 336.54


TVA 147336.54 * 19.0% = 27 993.94
TOTAL cu TVA 175 330.49

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39133 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0006 45000000 DRUM JUDETEAN DJ658 - SIGURANTA RUTIERA
Lista cu cantitatile de lucrari
Deviz oferta 39133 PARAPET CAPACITATE RIDICATA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 8815.000 2.23 19653
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 182735
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 202388

002 2100215 KG 772194.000 4.66 3600741


PARAPET TIP H2B 0.00 0
0.00 0
0.00 0 3600741

003 2100957 M.C. 732.000 190.00 139080


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 139080

004 TRA06A17 TONA 1830.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 19343 19343

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


777.461 3759473.68 182734.95 0.00 19343.10 3961551.73

Detaliere transporturi:
-Articole TRA 19 343.10

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 182734.95 + 0.00 * 0.000 +
19343.10 * 0.000) * 0.003375 = 616.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


777.461 3759473.68 183351.68 0.00 19343.10 3962168.46

Cheltuieli indirecte:
3962168.46 * 0.03000 = 118 865.05
Profit:
4081033.51 * 0.02000 = 81 620.67

TOTAL GENERAL DEVIZ: 4 162 654.18


TVA 4162654.18 * 19.0% = 790 904.29
TOTAL cu TVA 4 953 558.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39134 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0007 45000000 DRUM JUDETEA DJ 658 - SEMNALIZARE SI MARCAJE
Lista cu cantitatile de lucrari
Deviz oferta 39134 MARCAJE RUTIERE LONGITUDINALE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF16A1 KM. 39.510 789.34 31187
MARCAJE RUTIERE LONGIT SIMPLE DUBLE CU 66.30 2619
INTRERUPERISAU CONTINUE EXEC MEC VOP 17.82 704
EMAIL,MICROBILE STIC 0.00 0 34511

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.027 31186.84 2619.50 704.20 0.00 34510.54
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 704.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2619.50 + 704.20 * 0.000 +
0.00 * 0.000) * 0.003375 = 8.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.027 31186.84 2628.34 704.20 0.00 34519.38

Cheltuieli indirecte:
34519.38 * 0.03000 = 1 035.58
Profit:
35554.97 * 0.02000 = 711.10

TOTAL GENERAL DEVIZ: 36 266.07


TVA 36266.07 * 19.0% = 6 890.55
TOTAL cu TVA 43 156.62

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39135 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0007 45000000 DRUM JUDETEA DJ 658 - SEMNALIZARE SI MARCAJE
Lista cu cantitatile de lucrari
Deviz oferta 39135 MARCAJE RUTIERE TRANSVERSALE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF17A1 MP. 624.000 11.69 7297
MARCAJE LONGIT TRANSV SI DIVERSE 9.60 5990
EXECUTATE MECANIZCU VOPSEA PE SUPRAFETE 2.95 1841
CAROSABILE 0.00 0 15128

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.836 7296.88 5989.78 1840.85 0.00 15127.51
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1840.85

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5989.78 + 1840.85 * 0.000 +
0.00 * 0.000) * 0.003375 = 20.22

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.836 7296.88 6009.99 1840.85 0.00 15147.72

Cheltuieli indirecte:
15147.72 * 0.03000 = 454.43
Profit:
15602.15 * 0.02000 = 312.04

TOTAL GENERAL DEVIZ: 15 914.20


TVA 15914.20 * 19.0% = 3 023.70
TOTAL cu TVA 18 937.89

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39136 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0007 45000000 DRUM JUDETEA DJ 658 - SEMNALIZARE SI MARCAJE
Lista cu cantitatile de lucrari
Deviz oferta 39136 MONTAJ STALPI SI TABLE INDICATOARE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 150.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 3264
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 3264

002 6301793 BUC. 150.000 54.24 8136


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 8136

003 3270001 M.C. 15.000 180.00 2700


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 2700

004 TRA06A17 TONA 38.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 402 402

005 DF19A1 BUC. 150.000 2.14 321


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 1320
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 1641

006 7100835 BUC. 75.000 63.28 4746


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1200X500MM F 5 S1848 0.00 0
0.00 0 4746

007 7100017 BUC. 75.000 74.50 5588


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
TRIUNGHI LUNGIME= 700MM F 1 S1848 0.00 0
0.00 0 5588

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


39.042 21490.50 4583.91 0.00 401.66 26476.07

Detaliere transporturi:
-Articole TRA 401.66

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4583.91 + 0.00 * 0.000 +
401.66 * 0.000) * 0.003375 = 15.47

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


39.042 21490.50 4599.38 0.00 401.66 26491.54

Cheltuieli indirecte:
26491.54 * 0.03000 = 794.75
Profit:
27286.29 * 0.02000 = 545.73

TOTAL GENERAL DEVIZ: 27 832.01


TVA 27832.01 * 19.0% = 5 288.08
TOTAL cu TVA 33 120.10

PROIECTANT CONTRACTANT (OFERTANT)


39136 pag 2
======================================================================================================================

DEVIZIER
39137 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0007 45000000 DRUM JUDETEA DJ 658 - SEMNALIZARE SI MARCAJE
Lista cu cantitatile de lucrari
Deviz oferta 39137 BORNE KILOMETRICE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF02A1 BUC. 13.000 39.38 512
PLANT INDIC KM INCL VOPS SCRIERE EXEC 238.70 3103
MOV LA RAMB INALT MAI MICA DE 1M PEREERE 0.00 0
MOV LA DR IMPIETR 0.00 0 3615

002 2100203 BUC. 13.000 400.00 5200


BORNE KILOMETRICE 0.00 0
0.00 0
0.00 0 5200

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.323 5711.97 3103.08 0.00 0.00 8815.06

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3103.08 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 10.47

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.323 5711.97 3113.56 0.00 0.00 8825.53

Cheltuieli indirecte:
8825.53 * 0.03000 = 264.77
Profit:
9090.30 * 0.02000 = 181.81

TOTAL GENERAL DEVIZ: 9 272.10


TVA 9272.10 * 19.0% = 1 761.70
TOTAL cu TVA 11 033.80

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39138 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0007 45000000 DRUM JUDETEA DJ 658 - SEMNALIZARE SI MARCAJE
Lista cu cantitatile de lucrari
Deviz oferta 39138 BORNE HECTOMETRICE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF01B1 BUC. 118.000 1.44 170
CONFECTIONAREA PE SANTIER DIN BETON A 13.97 1649
INDICATOR. HECTOMETRICI 0.08 10
0.00 0 1828

002 2100204 BUC. 118.000 80.00 9440


BORNE HECTOMETRICE 0.00 0
0.00 0
0.00 0 9440

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.201 9609.85 1648.60 9.91 0.00 11268.36
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 9.91

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1648.60 + 9.91 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.56

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.201 9609.85 1654.17 9.91 0.00 11273.93

Cheltuieli indirecte:
11273.93 * 0.03000 = 338.22
Profit:
11612.14 * 0.02000 = 232.24

TOTAL GENERAL DEVIZ: 11 844.39


TVA 11844.39 * 19.0% = 2 250.43
TOTAL cu TVA 14 094.82

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39139 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0008 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 39139 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 1143.000 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 3498
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 3498

002 TRA01A02 TONA 165.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 185 185

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3497.58 0.00 184.80 3682.38

Detaliere transporturi:
-Articole TRA 184.80

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3497.58 + 0.00 * 0.000 +
184.80 * 0.000) * 0.003375 = 11.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3509.38 0.00 184.80 3694.18

Cheltuieli indirecte:
3694.18 * 0.03000 = 110.83
Profit:
3805.01 * 0.02000 = 76.10

TOTAL GENERAL DEVIZ: 3 881.11


TVA 3881.11 * 19.0% = 737.41
TOTAL cu TVA 4 618.52

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39140 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0008 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 39140 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 24.000 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 1622
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 1160
FUND DRUM 0.00 0 2783

002 TRI1AA02C3 TONA 60.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 540
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 540

003 TRA01A02 TONA 60.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 67 67

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2162.40 1160.50 67.20 3390.09
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1160.50

Detaliere transporturi:
-Articole TRA 67.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2162.40 + 1160.50 * 0.000 +
67.20 * 0.000) * 0.003375 = 7.30

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2169.69 1160.50 67.20 3397.39

Cheltuieli indirecte:
3397.39 * 0.03000 = 101.92
Profit:
3499.31 * 0.02000 = 69.99

TOTAL GENERAL DEVIZ: 3 569.30


TVA 3569.30 * 19.0% = 678.17
TOTAL cu TVA 4 247.46

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39141 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0008 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 39141 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 12.340 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 2532
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 2532

002 TSC19C1 100 MC. 6.170 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 1010
0.00 0 1010

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2532.17 1009.91 0.00 3542.07
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1009.91

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2532.17 + 1009.91 * 0.000 +
0.00 * 0.000) * 0.003375 = 8.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2540.71 1009.91 0.00 3550.62

Cheltuieli indirecte:
3550.62 * 0.03000 = 106.52
Profit:
3657.14 * 0.02000 = 73.14

TOTAL GENERAL DEVIZ: 3 730.28


TVA 3730.28 * 19.0% = 708.75
TOTAL cu TVA 4 439.03

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39142 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39142 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 137.200 0.60 83
MONTAREA SI DEMONTARE SCHELEI MET 9.60 1317
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1400

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.105 82.79 1317.12 320.00 0.00 1719.91
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1317.12 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.45

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.105 82.79 1321.57 320.00 0.00 1724.35

Cheltuieli indirecte:
1724.35 * 0.03000 = 51.73
Profit:
1776.08 * 0.02000 = 35.52

TOTAL GENERAL DEVIZ: 1 811.60


TVA 1811.60 * 19.0% = 344.20
TOTAL cu TVA 2 155.81

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39143 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39143 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 107.800 2.20 237
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 6503
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 6740

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.079 237.38 6502.56 0.00 0.00 6739.94

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6502.56 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 21.95

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.079 237.38 6524.51 0.00 0.00 6761.89

Cheltuieli indirecte:
6761.89 * 0.03000 = 202.86
Profit:
6964.74 * 0.02000 = 139.29

TOTAL GENERAL DEVIZ: 7 104.04


TVA 7104.04 * 19.0% = 1 349.77
TOTAL cu TVA 8 453.81

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39144 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39144 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 269.500 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 825
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 825

002 RPCT40B1 MP. 269.500 0.00 0


DESFACEREA SAPEI DE PROT LA IZOL 7.04 1897
HIDROFUGE DE 4-5 CM GROSIME INCLUSIV 0.00 0
ARMATURA DIN PLASA * 0.00 0 1897

003 RPCT41A1 MP. 269.500 0.00 0


DESFACEREA IZOLATIEI HIDROFUGE VECHI IN 6.60 1779
VEDEREA REFACERII * 0.00 0
0.00 0 1779

004 TRI1AA02C3 TONA 34.710 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 312
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 312

005 TSC35C3 100 MC. 0.560 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC ROCI TARI SI F.TARI<25KG/BUC 165.90 93
LA D. < 10M 0.00 0 93

006 TRA01A02 TONA 174.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 195 195

007 CZ0302K1 [ 1] KG 1620.000 0.00 0


CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 875
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 875

008 PD02A1 KG 1620.000 0.06 90


MONT.ARMATURI PT.BETON ARMAT IN 0.50 816
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 905

009 2100205 KG 1620.000 2.90 4700


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 4700

010 TRA04A17 TONA 1.620 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 19 19

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.644 4789.29 6503.46 92.90 214.16 11599.81
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 92.90

Detaliere transporturi:
-Articole TRA 214.16

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6503.46 + 92.90 * 0.000 +
214.16 * 0.000) * 0.003375 = 21.95
39144 pag 2
======================================================================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.644 4789.29 6525.41 92.90 214.16 11621.75

Cheltuieli indirecte:
11621.75 * 0.03000 = 348.65
Profit:
11970.41 * 0.02000 = 239.41

TOTAL GENERAL DEVIZ: 12 209.82


TVA 12209.82 * 19.0% = 2 319.86
TOTAL cu TVA 14 529.68

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39145 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39145 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 36.790 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 358
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 395
0.00 0 753

002 3270091 M.C. 36.790 255.00 9381


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 9381

003 TRA06A17 TONA 92.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 972 972

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


91.975 9381.45 358.11 394.79 972.44 11106.79
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 394.79

Detaliere transporturi:
-Articole TRA 972.44

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 358.11 + 394.79 * 0.000 +
972.44 * 0.000) * 0.003375 = 1.21

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


91.975 9381.45 359.32 394.79 972.44 11108.00

Cheltuieli indirecte:
11108.00 * 0.03000 = 333.24
Profit:
11441.24 * 0.02000 = 228.82

TOTAL GENERAL DEVIZ: 11 670.06


TVA 11670.06 * 19.0% = 2 217.31
TOTAL cu TVA 13 887.38

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39146 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39146 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 510.380 0.05 27
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 2450
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 2476

002 PF04A1 MP. 510.380 6.36 3247


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 480
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 3726

003 PF05B1 MP. 510.380 9.98 5092


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 1837
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 919
STRAT MASTIC. 0.00 0 7847

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.673 8365.62 4765.83 918.68 0.00 14050.13
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 918.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4765.83 + 918.68 * 0.000 +
0.00 * 0.000) * 0.003375 = 16.08

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.673 8365.62 4781.91 918.68 0.00 14066.22

Cheltuieli indirecte:
14066.22 * 0.03000 = 421.99
Profit:
14488.20 * 0.02000 = 289.76

TOTAL GENERAL DEVIZ: 14 777.97


TVA 14777.97 * 19.0% = 2 807.81
TOTAL cu TVA 17 585.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39147 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39147 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 267.540 4.87 1302
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 1571
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 78
4CM GROS LA POD 0.00 0 2951

002 2100047 TONA 19.260 310.00 5971


BA 8 0.00 0
0.00 0
0.00 0 5971

003 TRA01A35 TONA 19.260 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 377 377

004 DB02D1 100 MP. 2.670 70.98 190


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 107
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 15
EMULSIE CATIONICA 0.00 0 312

005 DB19E1 MP. 267.540 0.03 7


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 280
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 326
MECANICA 0.00 0 613

006 2100207 TONA 26.210 315.00 8256


BAP16 0.00 0
0.00 0
0.00 0 8256

007 TRA01A35 TONA 26.210 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 514 514

008 DB02D1 100 MP. 2.670 70.98 190


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 107
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 15
EMULSIE CATIONICA 0.00 0 312

009 DB16H1 MP. 267.540 0.03 7


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 280
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 326
0.00 0 613

010 2100051 TONA 25.140 320.00 8045


MAS16 0.00 0
0.00 0
0.00 0 8045

011 TRA01A35 TONA 25.140 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 493 493

012 TRA05A49 TONA 0.240 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 10 10

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


126.262 23967.90 2344.02 760.85 1393.58 28466.35
Din care:
Valoare aferenta utilaje termice = 0.00
39147 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 760.85

Detaliere transporturi:
-Articole TRA 1 393.58

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2344.02 + 760.85 * 0.000 +
1393.58 * 0.000) * 0.003375 = 7.91

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


126.262 23967.90 2351.93 760.85 1393.58 28474.26

Cheltuieli indirecte:
28474.26 * 0.03000 = 854.23
Profit:
29328.49 * 0.02000 = 586.57

TOTAL GENERAL DEVIZ: 29 915.06


TVA 29915.06 * 19.0% = 5 683.86
TOTAL cu TVA 35 598.92

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39148 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39148 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 68.600 3.19 219
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 2023
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 2241

002 2100202 KG 4802.000 6.44 30939


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 30939

003 3270091 M.C. 8.300 255.00 2116


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 2116

004 TRA06A17 TONA 20.750 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 219 219

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


25.618 33274.30 2022.53 0.00 219.33 35516.16

Detaliere transporturi:
-Articole TRA 219.33

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2022.53 + 0.00 * 0.000 +
219.33 * 0.000) * 0.003375 = 6.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


25.618 33274.30 2029.36 0.00 219.33 35522.98

Cheltuieli indirecte:
35522.98 * 0.03000 = 1 065.69
Profit:
36588.67 * 0.02000 = 731.77

TOTAL GENERAL DEVIZ: 37 320.45


TVA 37320.45 * 19.0% = 7 090.89
TOTAL cu TVA 44 411.33

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39149 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39149 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 53.900 22.95 1237
BORDURI PREFABRICATE DIN BETON PT 11.80 636
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1873

002 PF01A1 MP. 8.080 3.15 25


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 115
MARCA 100 DRISCUITA 0.19 1
0.00 0 142

003 PF09A1 M 107.800 41.21 4443


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 647
SAPEI HIDR 0.00 0
0.00 0 5090

004 PB06A1 M.C. 20.000 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 957
ZID,TIMPAN MANUAL 2.50 50
0.00 0 1007

005 2100898 M.C. 20.000 200.00 4000


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 4000

006 TRA06A17 TONA 50.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 528 528

007 DB02D1 100 MP. 0.720 70.98 51


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 29
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 4
EMULSIE CATIONICA 0.00 0 84

008 TRA05A49 TONA 0.033 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 73.000 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 118
DE 2,5 CM CU ASTERNERE MANUALA 0.32 23
0.00 0 142

010 2100047 TONA 5.200 310.00 1612


BA 8 0.00 0
0.00 0
0.00 0 1612

011 TRA01A35 TONA 5.200 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 102 102

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.990 11370.15 2501.52 78.60 631.74 14582.01
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 78.60

Detaliere transporturi:
-Articole TRA 631.74
39149 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2501.52 + 78.60 * 0.000 +
631.74 * 0.000) * 0.003375 = 8.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.990 11370.15 2509.96 78.60 631.74 14590.45

Cheltuieli indirecte:
14590.45 * 0.03000 = 437.71
Profit:
15028.16 * 0.02000 = 300.56

TOTAL GENERAL DEVIZ: 15 328.73


TVA 15328.73 * 19.0% = 2 912.46
TOTAL cu TVA 18 241.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39150 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39150 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 2090.000 8.30 17355
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 17355

002 PK31A1 TONA 2.090 201.46 421


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1878
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 2299

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.419 17776.42 1878.28 0.00 0.00 19654.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1878.28 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 6.34

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.419 17776.42 1884.62 0.00 0.00 19661.03

Cheltuieli indirecte:
19661.03 * 0.03000 = 589.83
Profit:
20250.87 * 0.02000 = 405.02

TOTAL GENERAL DEVIZ: 20 655.88


TVA 20655.88 * 19.0% = 3 924.62
TOTAL cu TVA 24 580.50

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39151 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39151 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.520 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 22
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 22

002 PC05A1 MP. 11.300 2.20 25


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 682
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 707

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 24.800 1813.50 44975


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 44975

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.134 46378.57 1063.32 60.37 0.00 47502.25
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1063.32 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.134 46378.57 1066.91 60.37 0.00 47505.84

Cheltuieli indirecte:
47505.84 * 0.03000 = 1 425.18
Profit:
48931.02 * 0.02000 = 978.62

TOTAL GENERAL DEVIZ: 49 909.64


TVA 49909.64 * 19.0% = 9 482.83
TOTAL cu TVA 59 392.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39152 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0009 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39152 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 910.910 0.60 550
MONTAREA SI DEMONTARE SCHELEI MET 9.60 8745
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 9294

002 AUT1303 ORA 240.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 240
0.00 0 240

003 RPCB12A1 MP. 273.270 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 5192
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 5192

004 IZA01A1 MP. 273.270 0.49 133


CURATIREA PRIN SABLARE PT PROT 7.20 1968
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 4143
0.00 0 6243

005 PK48C1 [ 1] TONA 0.300 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 26
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 26

006 YC01RON LEI. 17705.000 1.00 17705


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 17705

007 2100211 KG 273.000 20.75 5665


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 5665

008 NMB109921 ORA 320.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 6400
0.00 0
0.00 0 6400

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.925 24052.47 22330.70 4382.77 0.00 50765.94
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 4382.77

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 22330.70 + 4382.77 * 0.000 +
0.00 * 0.000) * 0.003375 = 75.37

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.925 24052.47 22406.06 4382.77 0.00 50841.31

Cheltuieli indirecte:
50841.31 * 0.03000 = 1 525.24
Profit:
52366.55 * 0.02000 = 1 047.33

TOTAL GENERAL DEVIZ: 53 413.88


TVA 53413.88 * 19.0% = 10 148.64
39152 pag 2
======================================================================================================================
TOTAL cu TVA 63 562.52

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39153 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39153 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 60.000 3.40 204
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 1116
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 1320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.145 204.21 1115.94 0.00 0.00 1320.15

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1115.94 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.145 204.21 1119.71 0.00 0.00 1323.91

Cheltuieli indirecte:
1323.91 * 0.03000 = 39.72
Profit:
1363.63 * 0.02000 = 27.27

TOTAL GENERAL DEVIZ: 1 390.90


TVA 1390.90 * 19.0% = 264.27
TOTAL cu TVA 1 655.18

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39154 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39154 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 72.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 3109
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 192
MANUAL 0.00 0 3301

002 2100914 M.C. 72.000 215.00 15480


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 15480

003 TRA06A17 TONA 180.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1903 1903

004 TSA24B1 ORA 36.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 574
DE 8,1-14KW 0.00 0 574

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


172.800 15480.50 3109.39 765.72 1902.60 21258.22
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 765.72

Detaliere transporturi:
-Articole TRA 1 902.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3109.39 + 765.72 * 0.000 +
1902.60 * 0.000) * 0.003375 = 10.49

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


172.800 15480.50 3119.89 765.72 1902.60 21268.71

Cheltuieli indirecte:
21268.71 * 0.03000 = 638.06
Profit:
21906.77 * 0.02000 = 438.14

TOTAL GENERAL DEVIZ: 22 344.91


TVA 22344.91 * 19.0% = 4 245.53
TOTAL cu TVA 26 590.44

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39155 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39155 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 180.000 4.62 831
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 3427
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 4258

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3426.98 0.00 0.00 4258.32

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3426.98 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3438.55 0.00 0.00 4269.89

Cheltuieli indirecte:
4269.89 * 0.03000 = 128.10
Profit:
4397.98 * 0.02000 = 87.96

TOTAL GENERAL DEVIZ: 4 485.94


TVA 4485.94 * 19.0% = 852.33
TOTAL cu TVA 5 338.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39156 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39156 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 5600.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 3024
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 3024

002 PD02A1 KG 5600.000 0.06 310


MONT.ARMATURI PT.BETON ARMAT IN 0.50 2820
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 3130

003 2100205 KG 5600.000 2.90 16246


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 16246

004 TRA04A17 TONA 5.600 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 67 67

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.684 16555.56 5844.16 0.00 66.64 22466.36

Detaliere transporturi:
-Articole TRA 66.64

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5844.16 + 0.00 * 0.000 +
66.64 * 0.000) * 0.003375 = 19.72

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.684 16555.56 5863.88 0.00 66.64 22486.08

Cheltuieli indirecte:
22486.08 * 0.03000 = 674.58
Profit:
23160.67 * 0.02000 = 463.21

TOTAL GENERAL DEVIZ: 23 623.88


TVA 23623.88 * 19.0% = 4 488.54
TOTAL cu TVA 28 112.42

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39157 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39157 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 27.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 263
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 388
EXISTENTE CU POMPA 0.00 0 650

002 2101004 M.C. 27.000 255.00 6885


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 6885

003 TRA06A17 TONA 68.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 719 719

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6885.00 262.81 387.64 718.76 8254.21
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 387.64

Detaliere transporturi:
-Articole TRA 718.76

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 262.81 + 387.64 * 0.000 +
718.76 * 0.000) * 0.003375 = 0.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6885.00 263.70 387.64 718.76 8255.10

Cheltuieli indirecte:
8255.10 * 0.03000 = 247.65
Profit:
8502.75 * 0.02000 = 170.06

TOTAL GENERAL DEVIZ: 8 672.81


TVA 8672.81 * 19.0% = 1 647.83
TOTAL cu TVA 10 320.64

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39158 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39158 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 360.000 0.60 217
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3456
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3673

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 108.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2052
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2052

004 IZA01A1 MP. 108.000 0.49 53


CURATIREA PRIN SABLARE PT PROT 7.20 778
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1637
0.00 0 2467

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 108.000 20.75 2241


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2241

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.06 8936.58 2024.83 0.00 14812.47
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2024.83

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8936.58 + 2024.83 * 0.000 +
0.00 * 0.000) * 0.003375 = 30.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.06 8966.74 2024.83 0.00 14842.63

Cheltuieli indirecte:
14842.63 * 0.03000 = 445.28
39158 pag 2
======================================================================================================================
Profit:
15287.91 * 0.02000 = 305.76

TOTAL GENERAL DEVIZ: 15 593.67


TVA 15593.67 * 19.0% = 2 962.80
TOTAL cu TVA 18 556.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39159 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39159 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 33.750 39.44 1331
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 1688
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 3019

002 TRA01A34 TONA 66.500 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1266 1266

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1687.50 0.00 1266.16 4284.76

Detaliere transporturi:
-Articole TRA 1 266.16

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1687.50 + 0.00 * 0.000 +
1266.16 * 0.000) * 0.003375 = 5.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1693.20 0.00 1266.16 4290.46

Cheltuieli indirecte:
4290.46 * 0.03000 = 128.71
Profit:
4419.17 * 0.02000 = 88.38

TOTAL GENERAL DEVIZ: 4 507.55


TVA 4507.55 * 19.0% = 856.43
TOTAL cu TVA 5 363.99

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39160 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0010 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39160 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 14.500 22.95 333
BORDURI PREFABRICATE DIN BETON PT 11.80 171
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 504

002 2100898 M.C. 0.700 200.00 140


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 140

003 TRA06A17 TONA 1.650 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 17 17

004 PB06A1 M.C. 6.000 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 287
ZID,TIMPAN MANUAL 2.50 15
0.00 0 302

005 2100898 M.C. 6.000 200.00 1200


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 1200

006 TRA06A17 TONA 14.500 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 153 153

007 DB02D1 100 MP. 0.210 70.98 15


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 8
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 25

008 DB18A1 MP. 20.920 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 34
DE 2,5 CM CU ASTERNERE MANUALA 0.32 7
0.00 0 41

009 2100047 TONA 1.500 310.00 465


BA 8 0.00 0
0.00 0
0.00 0 465

010 TRA01A35 TONA 1.500 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 29 29

011 TRA05A49 TONA 0.010 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.740 2153.15 500.44 22.79 200.51 2876.87
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 22.79

Detaliere transporturi:
-Articole TRA 200.51
39160 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 500.44 + 22.79 * 0.000 +
200.51 * 0.000) * 0.003375 = 1.69

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.740 2153.15 502.12 22.79 200.51 2878.56

Cheltuieli indirecte:
2878.56 * 0.03000 = 86.36
Profit:
2964.92 * 0.02000 = 59.30

TOTAL GENERAL DEVIZ: 3 024.22


TVA 3024.22 * 19.0% = 574.60
TOTAL cu TVA 3 598.82

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39161 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39161 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 14.000 472.87 6620
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 6620

002 TRA04A17 TONA 24.080 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 287 287

003 PI06A1 BUC. 14.000 30.98 434


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 350
MACARAUA PE PNEURI DE 9,9 TF 45.75 640
0.00 0 1424

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 350.00 640.50 286.55 8330.99
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 640.50

Detaliere transporturi:
-Articole TRA 286.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 350.00 + 640.50 * 0.000 +
286.55 * 0.000) * 0.003375 = 1.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 351.18 640.50 286.55 8332.18

Cheltuieli indirecte:
8332.18 * 0.03000 = 249.97
Profit:
8582.14 * 0.02000 = 171.64

TOTAL GENERAL DEVIZ: 8 753.78


TVA 8753.78 * 19.0% = 1 663.22
TOTAL cu TVA 10 417.00

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39162 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39162 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.245 70.98 17
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

002 DB19E1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 26
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 30
MECANICA 0.00 0 56

003 2100207 TONA 2.400 315.00 756


BAP16 0.00 0
0.00 0
0.00 0 756

004 TRA01A35 TONA 2.400 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 47 47

005 DB02D1 100 MP. 0.245 70.98 17


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

006 DB16H1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 26
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 30
0.00 0 56

007 2100051 TONA 2.300 320.00 736


MAS16 0.00 0
0.00 0
0.00 0 736

008 TRA01A35 TONA 2.300 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 45 45

009 TRA05A49 TONA 0.023 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 70.84 62.54 93.04 1754.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 62.54

Detaliere transporturi:
-Articole TRA 93.04

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 70.84 + 62.54 * 0.000 +
93.04 * 0.000) * 0.003375 = 0.24

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 71.08 62.54 93.04 1754.80
39162 pag 2
======================================================================================================================

Cheltuieli indirecte:
1754.80 * 0.03000 = 52.64
Profit:
1807.44 * 0.02000 = 36.15

TOTAL GENERAL DEVIZ: 1 843.59


TVA 1843.59 * 19.0% = 350.28
TOTAL cu TVA 2 193.88

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39163 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39163 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 14.400 0.65 9
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 1014
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 1023

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2916.16 0.00 0.00 3473.38

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2916.16 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2926.00 0.00 0.00 3483.22

Cheltuieli indirecte:
3483.22 * 0.03000 = 104.50
Profit:
3587.72 * 0.02000 = 71.75

TOTAL GENERAL DEVIZ: 3 659.47


TVA 3659.47 * 19.0% = 695.30
TOTAL cu TVA 4 354.77

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39164 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39164 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 164.000 4.62 757
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 3122
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 3880

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.590 757.44 3122.36 0.00 0.00 3879.80

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3122.36 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 10.54

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.590 757.44 3132.90 0.00 0.00 3890.34

Cheltuieli indirecte:
3890.34 * 0.03000 = 116.71
Profit:
4007.05 * 0.02000 = 80.14

TOTAL GENERAL DEVIZ: 4 087.19


TVA 4087.19 * 19.0% = 776.57
TOTAL cu TVA 4 863.76

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39165 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39165 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 1520.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 821
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 821

002 PD02A1 KG 1520.000 0.06 84


MONT.ARMATURI PT.BETON ARMAT IN 0.50 765
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 850

003 2100205 KG 1520.000 2.90 4410


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 4410

004 TRA04A17 TONA 1.520 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 18 18

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.543 4493.65 1586.27 0.00 18.09 6098.01

Detaliere transporturi:
-Articole TRA 18.09

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1586.27 + 0.00 * 0.000 +
18.09 * 0.000) * 0.003375 = 5.35

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.543 4493.65 1591.63 0.00 18.09 6103.37

Cheltuieli indirecte:
6103.37 * 0.03000 = 183.10
Profit:
6286.47 * 0.02000 = 125.73

TOTAL GENERAL DEVIZ: 6 412.20


TVA 6412.20 * 19.0% = 1 218.32
TOTAL cu TVA 7 630.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39166 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39166 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 8.750 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 1319
0.00 0 1319

002 TRA01A02 TONA 1575.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 1764 1764

003 TSD01D1 M.C. 175.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 1992
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 1992

004 TSD05B1 100 MC. 8.750 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 1544
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 1403
STRAT DIN PAM.COEZI 0.00 0 2946

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3535.00 2721.41 1764.00 8020.41
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2721.41

Detaliere transporturi:
-Articole TRA 1 764.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3535.00 + 2721.41 * 0.000 +
1764.00 * 0.000) * 0.003375 = 11.93

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3546.93 2721.41 1764.00 8032.34

Cheltuieli indirecte:
8032.34 * 0.03000 = 240.97
Profit:
8273.31 * 0.02000 = 165.47

TOTAL GENERAL DEVIZ: 8 438.77


TVA 8438.77 * 19.0% = 1 603.37
TOTAL cu TVA 10 042.14

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39167 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39167 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 280.000 3.19 894
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 1120
NISIP 0.00 0
0.00 0 2014

002 TRA01A17 TONA 47.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 453 453

003 IFA03C1 MP. 280.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 7840
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 7840

004 2100957 M.C. 28.000 190.00 5320


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 5320

005 TRA06A17 TONA 70.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 740 740

006 TRI1AA01C1 TONA 70.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 490
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 490

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9450.00 0.00 1193.05 16857.51

Detaliere transporturi:
-Articole TRA 1 193.05

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9450.00 + 0.00 * 0.000 +
1193.05 * 0.000) * 0.003375 = 31.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9481.89 0.00 1193.05 16889.41

Cheltuieli indirecte:
16889.41 * 0.03000 = 506.68
Profit:
17396.09 * 0.02000 = 347.92

TOTAL GENERAL DEVIZ: 17 744.01


TVA 17744.01 * 19.0% = 3 371.36
TOTAL cu TVA 21 115.37

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39168 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39168 SCARI PE TALUZ INCLUSIV MANA CURENTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK29A1 M 16.000 29.31 469
SCARI PE TALUZ DIN TREPTE DE BETON 55.87 894
PREFABRICATE PE SANTIER 1.34 21
0.00 0 1384

002 PK18A1 M 16.000 148.48 2376


MINA CURENTA SI UMPLUT. TEVI OTEL CONF. 192.21 3075
SANTIER SI STILPI B. A. MONOLIT SAU 0.00 0
PREFABRICAT 0.00 0 5451

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.864 2844.68 3969.23 21.37 0.00 6835.28
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 21.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3969.23 + 21.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 13.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.864 2844.68 3982.62 21.37 0.00 6848.68

Cheltuieli indirecte:
6848.68 * 0.03000 = 205.46
Profit:
7054.14 * 0.02000 = 141.08

TOTAL GENERAL DEVIZ: 7 195.22


TVA 7195.22 * 19.0% = 1 367.09
TOTAL cu TVA 8 562.31

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39169 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0011 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39169 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 200.000 2.23 446
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 4146
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 4592

002 6306339 KG 4142.000 4.66 19302


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 19302

003 2100957 M.C. 17.000 190.00 3230


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 3230

004 TRA06A17 TONA 43.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 455 455

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.261 22977.62 4146.00 0.00 454.51 27578.13

Detaliere transporturi:
-Articole TRA 454.51

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4146.00 + 0.00 * 0.000 +
454.51 * 0.000) * 0.003375 = 13.99

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.261 22977.62 4159.99 0.00 454.51 27592.12

Cheltuieli indirecte:
27592.12 * 0.03000 = 827.76
Profit:
28419.89 * 0.02000 = 568.40

TOTAL GENERAL DEVIZ: 28 988.28


TVA 28988.28 * 19.0% = 5 507.77
TOTAL cu TVA 34 496.06

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39170 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0012 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA- KM. LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 39170 SAPAT. PENTRU PROF ALBIEI AMONTE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.500 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 82
0.00 0 82

002 TSC35B31 100 MC. 0.500 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 86
M 0.00 0 86

003 TRA01A02 TONA 90.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 101 101

004 TSD03C1 100 MC. 0.600 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 25
TER.CAT.1 SAU 2 0.00 0 25

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 192.76 100.80 293.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 192.76

Detaliere transporturi:
-Articole TRA 100.80

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 192.76 100.80 293.56

Cheltuieli indirecte:
293.56 * 0.03000 = 8.81
Profit:
302.37 * 0.02000 = 6.05

TOTAL GENERAL DEVIZ: 308.41


TVA 308.41 * 19.0% = 58.60
TOTAL cu TVA 367.01

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39171 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0013 45000000 POD KM. 1+750 PESTE PARAUL MUEREASCA- LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 39171 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 2100910 M.C. 0.800 180.00 144


BETON MARFA CLASA C 10/8 (BC 10/B 150) 0.00 0
0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
39171 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39172 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0014 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 39172 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 1143.300 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 3498
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 3498

002 TRA01A02 TONA 165.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 185 185

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3498.50 0.00 184.80 3683.30

Detaliere transporturi:
-Articole TRA 184.80

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3498.50 + 0.00 * 0.000 +
184.80 * 0.000) * 0.003375 = 11.81

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3510.31 0.00 184.80 3695.11

Cheltuieli indirecte:
3695.11 * 0.03000 = 110.85
Profit:
3805.96 * 0.02000 = 76.12

TOTAL GENERAL DEVIZ: 3 882.08


TVA 3882.08 * 19.0% = 737.59
TOTAL cu TVA 4 619.67

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39173 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0014 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 39173 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 31.850 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 2153
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 1540
FUND DRUM 0.00 0 3693

002 TRI1AA02C3 TONA 80.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 720
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 720

003 TRA01A02 TONA 80.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 90 90

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2873.05 1540.07 89.60 4502.73
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1540.07

Detaliere transporturi:
-Articole TRA 89.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2873.05 + 1540.07 * 0.000 +
89.60 * 0.000) * 0.003375 = 9.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2882.75 1540.07 89.60 4512.43

Cheltuieli indirecte:
4512.43 * 0.03000 = 135.37
Profit:
4647.80 * 0.02000 = 92.96

TOTAL GENERAL DEVIZ: 4 740.75


TVA 4740.75 * 19.0% = 900.74
TOTAL cu TVA 5 641.50

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39174 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0014 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 39174 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 12.130 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 2489
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 2489

002 TSC19C1 100 MC. 6.070 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 994
0.00 0 994

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2489.08 993.54 0.00 3482.61
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 993.54

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2489.08 + 993.54 * 0.000 +
0.00 * 0.000) * 0.003375 = 8.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2497.48 993.54 0.00 3491.01

Cheltuieli indirecte:
3491.01 * 0.03000 = 104.73
Profit:
3595.74 * 0.02000 = 71.91

TOTAL GENERAL DEVIZ: 3 667.66


TVA 3667.66 * 19.0% = 696.86
TOTAL cu TVA 4 364.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39175 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39175 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 168.500 0.60 102
MONTAREA SI DEMONTARE SCHELEI MET 9.60 1618
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1719

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.129 101.67 1617.60 320.00 0.00 2039.27
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1617.60 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.46

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.129 101.67 1623.06 320.00 0.00 2044.73

Cheltuieli indirecte:
2044.73 * 0.03000 = 61.34
Profit:
2106.07 * 0.02000 = 42.12

TOTAL GENERAL DEVIZ: 2 148.20


TVA 2148.20 * 19.0% = 408.16
TOTAL cu TVA 2 556.35

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39176 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39176 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 120.250 2.20 265
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 7254
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 7518

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.088 264.80 7253.55 0.00 0.00 7518.35

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 7253.55 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 24.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.088 264.80 7278.03 0.00 0.00 7542.83

Cheltuieli indirecte:
7542.83 * 0.03000 = 226.28
Profit:
7769.11 * 0.02000 = 155.38

TOTAL GENERAL DEVIZ: 7 924.50


TVA 7924.50 * 19.0% = 1 505.65
TOTAL cu TVA 9 430.15

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39177 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39177 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 259.740 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 795
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 795

002 RPCT40B1 MP. 259.740 0.00 0


DESFACEREA SAPEI DE PROT LA IZOL 7.04 1828
HIDROFUGE DE 4-5 CM GROSIME INCLUSIV 0.00 0
ARMATURA DIN PLASA * 0.00 0 1828

003 RPCT41A1 MP. 259.740 0.00 0


DESFACEREA IZOLATIEI HIDROFUGE VECHI IN 6.60 1714
VEDEREA REFACERII * 0.00 0
0.00 0 1714

004 TRI1AA02C3 TONA 33.450 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 301
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 301

005 TSC35C3 100 MC. 0.540 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC ROCI TARI SI F.TARI<25KG/BUC 165.90 90
LA D. < 10M 0.00 0 90

006 TRA01A02 TONA 167.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 187 187

007 CZ0302K1 [ 1] KG 1920.000 0.00 0


CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 1037
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 1037

008 PD02A1 KG 1920.000 0.06 106


MONT.ARMATURI PT.BETON ARMAT IN 0.50 967
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 1073

009 2100205 KG 1920.000 2.90 5570


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 5570

010 TRA04A17 TONA 1.920 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 23 23

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.949 5676.19 6642.21 89.59 209.89 12617.88
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 89.59

Detaliere transporturi:
-Articole TRA 209.89

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6642.21 + 89.59 * 0.000 +
209.89 * 0.000) * 0.003375 = 22.42
39177 pag 2
======================================================================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.949 5676.19 6664.63 89.59 209.89 12640.30

Cheltuieli indirecte:
12640.30 * 0.03000 = 379.21
Profit:
13019.50 * 0.02000 = 260.39

TOTAL GENERAL DEVIZ: 13 279.89


TVA 13279.89 * 19.0% = 2 523.18
TOTAL cu TVA 15 803.07

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39178 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39178 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 32.830 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 320
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 352
0.00 0 672

002 3270091 M.C. 32.830 255.00 8372


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 8372

003 TRA06A17 TONA 82.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 867 867

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


82.075 8371.65 319.56 352.30 866.74 9910.25
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 352.30

Detaliere transporturi:
-Articole TRA 866.74

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 319.56 + 352.30 * 0.000 +
866.74 * 0.000) * 0.003375 = 1.08

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


82.075 8371.65 320.64 352.30 866.74 9911.33

Cheltuieli indirecte:
9911.33 * 0.03000 = 297.34
Profit:
10208.67 * 0.02000 = 204.17

TOTAL GENERAL DEVIZ: 10 412.84


TVA 10412.84 * 19.0% = 1 978.44
TOTAL cu TVA 12 391.28

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39179 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39179 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 501.460 0.05 26
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 2407
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 2433

002 PF04A1 MP. 501.460 6.36 3190


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 471
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 3661

003 PF05B1 MP. 501.460 9.98 5003


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 1805
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 903
STRAT MASTIC. 0.00 0 7710

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.556 8219.42 4682.53 902.63 0.00 13804.58
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 902.63

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4682.53 + 902.63 * 0.000 +
0.00 * 0.000) * 0.003375 = 15.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.556 8219.42 4698.34 902.63 0.00 13820.38

Cheltuieli indirecte:
13820.38 * 0.03000 = 414.61
Profit:
14234.99 * 0.02000 = 284.70

TOTAL GENERAL DEVIZ: 14 519.69


TVA 14519.69 * 19.0% = 2 758.74
TOTAL cu TVA 17 278.43

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39180 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39180 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 262.860 4.87 1280
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 1543
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 77
4CM GROS LA POD 0.00 0 2900

002 2100047 TONA 18.920 310.00 5865


BA 8 0.00 0
0.00 0
0.00 0 5865

003 TRA01A35 TONA 18.920 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 371 371

004 DB02D1 100 MP. 2.630 70.98 187


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 105
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 15
EMULSIE CATIONICA 0.00 0 307

005 DB19E1 MP. 262.860 0.03 7


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 275
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 320
MECANICA 0.00 0 603

006 2100207 TONA 25.760 315.00 8114


BAP16 0.00 0
0.00 0
0.00 0 8114

007 TRA01A35 TONA 25.760 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 505 505

008 DB02D1 100 MP. 2.630 70.98 187


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 105
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 15
EMULSIE CATIONICA 0.00 0 307

009 DB16H1 MP. 262.860 0.03 7


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 275
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 320
0.00 0 603

010 2100051 TONA 24.700 320.00 7904


MAS16 0.00 0
0.00 0
0.00 0 7904

011 TRA01A35 TONA 24.700 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 484 484

012 TRA05A49 TONA 0.240 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 10 10

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


124.073 23551.23 2303.55 747.61 1369.47 27971.87
Din care:
Valoare aferenta utilaje termice = 0.00
39180 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 747.61

Detaliere transporturi:
-Articole TRA 1 369.47

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2303.55 + 747.61 * 0.000 +
1369.47 * 0.000) * 0.003375 = 7.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


124.073 23551.23 2311.33 747.61 1369.47 27979.64

Cheltuieli indirecte:
27979.64 * 0.03000 = 839.39
Profit:
28819.03 * 0.02000 = 576.38

TOTAL GENERAL DEVIZ: 29 395.41


TVA 29395.41 * 19.0% = 5 585.13
TOTAL cu TVA 34 980.54

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39181 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39181 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 67.400 3.19 215
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 1987
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 2202

002 2100202 KG 4718.000 6.44 30398


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 30398

003 3270091 M.C. 8.100 255.00 2066


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 2066

004 TRA06A17 TONA 20.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 216 216

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


25.033 32678.26 1987.15 0.00 215.63 34881.04

Detaliere transporturi:
-Articole TRA 215.63

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1987.15 + 0.00 * 0.000 +
215.63 * 0.000) * 0.003375 = 6.71

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


25.033 32678.26 1993.86 0.00 215.63 34887.75

Cheltuieli indirecte:
34887.75 * 0.03000 = 1 046.63
Profit:
35934.38 * 0.02000 = 718.69

TOTAL GENERAL DEVIZ: 36 653.07


TVA 36653.07 * 19.0% = 6 964.08
TOTAL cu TVA 43 617.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39182 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39182 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 48.100 22.95 1104
BORDURI PREFABRICATE DIN BETON PT 11.80 568
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1672

002 PF01A1 MP. 7.210 3.15 23


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 103
MARCA 100 DRISCUITA 0.19 1
0.00 0 127

003 PF09A1 M 96.200 41.21 3965


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 577
SAPEI HIDR 0.00 0
0.00 0 4542

004 PB06A1 M.C. 13.000 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 622
ZID,TIMPAN MANUAL 2.50 32
0.00 0 654

005 2100898 M.C. 13.000 200.00 2600


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 2600

006 TRA06A17 TONA 32.460 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 343 343

007 DB02D1 100 MP. 0.640 70.98 45


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 26
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 4
EMULSIE CATIONICA 0.00 0 75

008 TRA05A49 TONA 0.030 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 64.930 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 105
DE 2,5 CM CU ASTERNERE MANUALA 0.32 20
0.00 0 127

010 2100047 TONA 4.600 310.00 1426


BA 8 0.00 0
0.00 0
0.00 0 1426

011 TRA01A35 TONA 4.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 90 90

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


37.437 9164.31 1999.97 57.94 434.46 11656.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 57.94

Detaliere transporturi:
-Articole TRA 434.46
39182 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1999.97 + 57.94 * 0.000 +
434.46 * 0.000) * 0.003375 = 6.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


37.437 9164.31 2006.72 57.94 434.46 11663.43

Cheltuieli indirecte:
11663.43 * 0.03000 = 349.90
Profit:
12013.33 * 0.02000 = 240.27

TOTAL GENERAL DEVIZ: 12 253.60


TVA 12253.60 * 19.0% = 2 328.18
TOTAL cu TVA 14 581.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39183 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39183 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 2053.000 8.30 17048
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 17048

002 PK31A1 TONA 2.050 201.46 413


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1842
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 2255

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.376 17461.11 1842.33 0.00 0.00 19303.44

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1842.33 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 6.22

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.376 17461.11 1848.55 0.00 0.00 19309.66

Cheltuieli indirecte:
19309.66 * 0.03000 = 579.29
Profit:
19888.95 * 0.02000 = 397.78

TOTAL GENERAL DEVIZ: 20 286.73


TVA 20286.73 * 19.0% = 3 854.48
TOTAL cu TVA 24 141.21

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39184 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39184 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.320 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 21
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 21

002 PC05A1 MP. 10.800 2.20 24


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 651
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 675

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 24.800 1813.50 44975


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 44975

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.134 46377.46 1032.20 60.37 0.00 47470.02
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1032.20 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.134 46377.46 1035.68 60.37 0.00 47473.50

Cheltuieli indirecte:
47473.50 * 0.03000 = 1 424.21
Profit:
48897.71 * 0.02000 = 977.95

TOTAL GENERAL DEVIZ: 49 875.66


TVA 49875.66 * 19.0% = 9 476.38
TOTAL cu TVA 59 352.04

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39185 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0015 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39185 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 894.180 0.60 540
MONTAREA SI DEMONTARE SCHELEI MET 9.60 8584
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 9124

002 AUT1303 ORA 240.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 240
0.00 0 240

003 RPCB12A1 MP. 268.250 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 5097
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 5097

004 IZA01A1 MP. 268.250 0.49 131


CURATIREA PRIN SABLARE PT PROT 7.20 1931
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 4067
0.00 0 6129

005 PK48C1 [ 1] TONA 0.300 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 26
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 26

006 YC01RON LEI. 17380.000 1.00 17380


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 17380

007 2100211 KG 268.250 20.75 5566


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 5566

008 NMB109921 ORA 320.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 6400
0.00 0
0.00 0 6400

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.890 23616.37 22038.56 4306.67 0.00 49961.61
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 4306.67

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 22038.56 + 4306.67 * 0.000 +
0.00 * 0.000) * 0.003375 = 74.38

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.890 23616.37 22112.94 4306.67 0.00 50035.99

Cheltuieli indirecte:
50035.99 * 0.03000 = 1 501.08
Profit:
51537.07 * 0.02000 = 1 030.74

TOTAL GENERAL DEVIZ: 52 567.81


TVA 52567.81 * 19.0% = 9 987.88
39185 pag 2
======================================================================================================================
TOTAL cu TVA 62 555.69

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39186 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0016 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-IFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39186 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 180.000 4.62 831
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 3427
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 4258

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3426.98 0.00 0.00 4258.32

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3426.98 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3438.55 0.00 0.00 4269.89

Cheltuieli indirecte:
4269.89 * 0.03000 = 128.10
Profit:
4397.98 * 0.02000 = 87.96

TOTAL GENERAL DEVIZ: 4 485.94


TVA 4485.94 * 19.0% = 852.33
TOTAL cu TVA 5 338.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39187 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0016 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-IFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39187 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 3600.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 1944
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 1944

002 PD02A1 KG 3600.000 0.06 199


MONT.ARMATURI PT.BETON ARMAT IN 0.50 1813
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 2012

003 2100205 KG 3600.000 2.90 10444


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 10444

004 TRA04A17 TONA 3.600 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 43 43

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.654 10642.86 3756.96 0.00 42.84 14442.66

Detaliere transporturi:
-Articole TRA 42.84

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3756.96 + 0.00 * 0.000 +
42.84 * 0.000) * 0.003375 = 12.68

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.654 10642.86 3769.64 0.00 42.84 14455.34

Cheltuieli indirecte:
14455.34 * 0.03000 = 433.66
Profit:
14889.00 * 0.02000 = 297.78

TOTAL GENERAL DEVIZ: 15 186.78


TVA 15186.78 * 19.0% = 2 885.49
TOTAL cu TVA 18 072.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39188 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0016 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-IFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39188 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 27.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 263
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 388
EXISTENTE CU POMPA 0.00 0 650

002 2101004 M.C. 27.000 255.00 6885


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 6885

003 TRA06A17 TONA 68.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 719 719

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6885.00 262.81 387.64 718.76 8254.21
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 387.64

Detaliere transporturi:
-Articole TRA 718.76

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 262.81 + 387.64 * 0.000 +
718.76 * 0.000) * 0.003375 = 0.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6885.00 263.70 387.64 718.76 8255.10

Cheltuieli indirecte:
8255.10 * 0.03000 = 247.65
Profit:
8502.75 * 0.02000 = 170.06

TOTAL GENERAL DEVIZ: 8 672.81


TVA 8672.81 * 19.0% = 1 647.83
TOTAL cu TVA 10 320.64

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39189 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0016 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-IFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39189 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 360.000 0.60 217
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3456
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3673

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 108.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2052
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2052

004 IZA01A1 MP. 108.000 0.49 53


CURATIREA PRIN SABLARE PT PROT 7.20 778
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1637
0.00 0 2467

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 108.000 20.75 2241


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2241

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.06 8936.58 2024.83 0.00 14812.47
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2024.83

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8936.58 + 2024.83 * 0.000 +
0.00 * 0.000) * 0.003375 = 30.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.06 8966.74 2024.83 0.00 14842.63

Cheltuieli indirecte:
14842.63 * 0.03000 = 445.28
39189 pag 2
======================================================================================================================
Profit:
15287.91 * 0.02000 = 305.76

TOTAL GENERAL DEVIZ: 15 593.67


TVA 15593.67 * 19.0% = 2 962.80
TOTAL cu TVA 18 556.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39190 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0016 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-IFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 39190 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 19.100 22.95 438
BORDURI PREFABRICATE DIN BETON PT 11.80 225
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 664

002 2100898 M.C. 0.850 200.00 170


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 170

003 TRA06A17 TONA 1.650 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 17 17

004 PB06A1 M.C. 7.000 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 335
ZID,TIMPAN MANUAL 2.50 17
0.00 0 352

005 2100898 M.C. 7.000 200.00 1400


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 1400

006 TRA06A17 TONA 18.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 190 190

007 DB02D1 100 MP. 0.250 70.98 18


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

008 DB18A1 MP. 25.780 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 42
DE 2,5 CM CU ASTERNERE MANUALA 0.32 8
0.00 0 50

009 2100047 TONA 1.850 310.00 574


BA 8 0.00 0
0.00 0
0.00 0 574

010 TRA01A35 TONA 1.850 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 36 36

011 TRA05A49 TONA 0.012 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


21.025 2600.16 612.04 27.04 244.44 3483.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 27.04

Detaliere transporturi:
-Articole TRA 244.44
39190 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 612.04 + 27.04 * 0.000 +
244.44 * 0.000) * 0.003375 = 2.07

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


21.025 2600.16 614.10 27.04 244.44 3485.75

Cheltuieli indirecte:
3485.75 * 0.03000 = 104.57
Profit:
3590.32 * 0.02000 = 71.81

TOTAL GENERAL DEVIZ: 3 662.13


TVA 3662.13 * 19.0% = 695.80
TOTAL cu TVA 4 357.93

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39191 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39191 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 14.000 472.87 6620
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 6620

002 TRA04A17 TONA 24.080 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 287 287

003 PI06A1 BUC. 14.000 30.98 434


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 350
MACARAUA PE PNEURI DE 9,9 TF 45.75 640
0.00 0 1424

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 350.00 640.50 286.55 8330.99
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 640.50

Detaliere transporturi:
-Articole TRA 286.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 350.00 + 640.50 * 0.000 +
286.55 * 0.000) * 0.003375 = 1.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 351.18 640.50 286.55 8332.18

Cheltuieli indirecte:
8332.18 * 0.03000 = 249.97
Profit:
8582.14 * 0.02000 = 171.64

TOTAL GENERAL DEVIZ: 8 753.78


TVA 8753.78 * 19.0% = 1 663.22
TOTAL cu TVA 10 417.00

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39192 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39192 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.245 70.98 17
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

002 DB19E1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 26
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 30
MECANICA 0.00 0 56

003 2100207 TONA 2.400 315.00 756


BAP16 0.00 0
0.00 0
0.00 0 756

004 TRA01A35 TONA 2.400 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 47 47

005 DB02D1 100 MP. 0.245 70.98 17


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

006 DB16H1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 26
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 30
0.00 0 56

007 2100051 TONA 2.300 320.00 736


MAS16 0.00 0
0.00 0
0.00 0 736

008 TRA01A35 TONA 2.300 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 45 45

009 TRA05A49 TONA 0.023 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 70.84 62.54 93.04 1754.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 62.54

Detaliere transporturi:
-Articole TRA 93.04

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 70.84 + 62.54 * 0.000 +
93.04 * 0.000) * 0.003375 = 0.24

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 71.08 62.54 93.04 1754.80
39192 pag 2
======================================================================================================================

Cheltuieli indirecte:
1754.80 * 0.03000 = 52.64
Profit:
1807.44 * 0.02000 = 36.15

TOTAL GENERAL DEVIZ: 1 843.59


TVA 1843.59 * 19.0% = 350.28
TOTAL cu TVA 2 193.88

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39193 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39193 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 14.400 0.65 9
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 1014
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 1023

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2916.16 0.00 0.00 3473.38

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2916.16 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2926.00 0.00 0.00 3483.22

Cheltuieli indirecte:
3483.22 * 0.03000 = 104.50
Profit:
3587.72 * 0.02000 = 71.75

TOTAL GENERAL DEVIZ: 3 659.47


TVA 3659.47 * 19.0% = 695.30
TOTAL cu TVA 4 354.77

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39194 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39194 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 164.000 4.62 757
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 3122
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 3880

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.590 757.44 3122.36 0.00 0.00 3879.80

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3122.36 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 10.54

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.590 757.44 3132.90 0.00 0.00 3890.34

Cheltuieli indirecte:
3890.34 * 0.03000 = 116.71
Profit:
4007.05 * 0.02000 = 80.14

TOTAL GENERAL DEVIZ: 4 087.19


TVA 4087.19 * 19.0% = 776.57
TOTAL cu TVA 4 863.76

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39195 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39195 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 1200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 648
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 648

002 PD02A1 KG 1200.000 0.06 66


MONT.ARMATURI PT.BETON ARMAT IN 0.50 604
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 671

003 2100205 KG 1200.000 2.90 3481


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 3481

004 TRA04A17 TONA 1.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 14 14

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.218 3547.62 1252.32 0.00 14.28 4814.22

Detaliere transporturi:
-Articole TRA 14.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1252.32 + 0.00 * 0.000 +
14.28 * 0.000) * 0.003375 = 4.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.218 3547.62 1256.55 0.00 14.28 4818.45

Cheltuieli indirecte:
4818.45 * 0.03000 = 144.55
Profit:
4963.00 * 0.02000 = 99.26

TOTAL GENERAL DEVIZ: 5 062.26


TVA 5062.26 * 19.0% = 961.83
TOTAL cu TVA 6 024.09

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39196 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39196 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 5.250 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 791
0.00 0 791

002 TRA01A02 TONA 945.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 1058 1058

003 TSD01D1 M.C. 105.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 1195
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 1195

004 TSD05B1 100 MC. 5.250 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 926
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 842
STRAT DIN PAM.COEZI 0.00 0 1768

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2121.00 1632.84 1058.40 4812.24
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1632.84

Detaliere transporturi:
-Articole TRA 1 058.40

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2121.00 + 1632.84 * 0.000 +
1058.40 * 0.000) * 0.003375 = 7.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2128.16 1632.84 1058.40 4819.40

Cheltuieli indirecte:
4819.40 * 0.03000 = 144.58
Profit:
4963.98 * 0.02000 = 99.28

TOTAL GENERAL DEVIZ: 5 063.26


TVA 5063.26 * 19.0% = 962.02
TOTAL cu TVA 6 025.28

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39197 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39197 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 280.000 3.19 894
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 1120
NISIP 0.00 0
0.00 0 2014

002 TRA01A17 TONA 47.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 453 453

003 IFA03C1 MP. 280.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 7840
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 7840

004 2100957 M.C. 28.000 190.00 5320


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 5320

005 TRA06A17 TONA 70.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 740 740

006 TRI1AA01C1 TONA 70.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 490
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 490

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9450.00 0.00 1193.05 16857.51

Detaliere transporturi:
-Articole TRA 1 193.05

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9450.00 + 0.00 * 0.000 +
1193.05 * 0.000) * 0.003375 = 31.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9481.89 0.00 1193.05 16889.41

Cheltuieli indirecte:
16889.41 * 0.03000 = 506.68
Profit:
17396.09 * 0.02000 = 347.92

TOTAL GENERAL DEVIZ: 17 744.01


TVA 17744.01 * 19.0% = 3 371.36
TOTAL cu TVA 21 115.37

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39198 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39198 SCARI PE TALUZ INCLUSIV MANA CURENTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK29A1 M 10.000 29.31 293
SCARI PE TALUZ DIN TREPTE DE BETON 55.87 559
PREFABRICATE PE SANTIER 1.34 13
0.00 0 865

002 PK18A1 M 10.000 148.48 1485


MINA CURENTA SI UMPLUT. TEVI OTEL CONF. 192.21 1922
SANTIER SI STILPI B. A. MONOLIT SAU 0.00 0
PREFABRICAT 0.00 0 3407

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.165 1777.93 2480.77 13.36 0.00 4272.05
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 13.36

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2480.77 + 13.36 * 0.000 +
0.00 * 0.000) * 0.003375 = 8.37

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.165 1777.93 2489.14 13.36 0.00 4280.42

Cheltuieli indirecte:
4280.42 * 0.03000 = 128.41
Profit:
4408.84 * 0.02000 = 88.18

TOTAL GENERAL DEVIZ: 4 497.01


TVA 4497.01 * 19.0% = 854.43
TOTAL cu TVA 5 351.45

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
39199 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0017 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 39199 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 96.000 2.23 214
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 1990
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2204

002 6306339 KG 1988.000 4.66 9264


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 9264

003 2100957 M.C. 8.000 190.00 1520


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1520

004 TRA06A17 TONA 20.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 211 211

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.045 10998.11 1990.08 0.00 211.40 13199.59

Detaliere transporturi:
-Articole TRA 211.40

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1990.08 + 0.00 * 0.000 +
211.40 * 0.000) * 0.003375 = 6.72

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.045 10998.11 1996.80 0.00 211.40 13206.31

Cheltuieli indirecte:
13206.31 * 0.03000 = 396.19
Profit:
13602.50 * 0.02000 = 272.05

TOTAL GENERAL DEVIZ: 13 874.55


TVA 13874.55 * 19.0% = 2 636.16
TOTAL cu TVA 16 510.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391100 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0018 45000000 POD KM. 2+700 PESTE PARAUL MUEREASCA - LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391100 SAPATURA PT. PROFILARE ALBIE AMONTE SI AVAL

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.600 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 98
0.00 0 98

002 TSC35B31 100 MC. 0.600 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 103
M 0.00 0 103

003 TRA01A02 TONA 108.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 121 121

004 TSD03A1 100 MC. 0.720 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 15-20 CM 57.20 41
TER.CAT.1 SAU 2 0.00 0 41

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 242.08 120.96 363.04
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 242.08

Detaliere transporturi:
-Articole TRA 120.96

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 242.08 120.96 363.04

Cheltuieli indirecte:
363.04 * 0.03000 = 10.89
Profit:
373.93 * 0.02000 = 7.48

TOTAL GENERAL DEVIZ: 381.41


TVA 381.41 * 19.0% = 72.47
TOTAL cu TVA 453.88

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391101 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0019 45000000 POD KM. 2+700 PESTE PARAUL MUEREASACA-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391101 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 2100910 M.C. 0.800 180.00 144


BETON MARFA CLASA C 10/8 (BC 10/B 150) 0.00 0
0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391101 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391102 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0020 45000000 POD KM. 5+300 PESTE PARAU - DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391102 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 415.500 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 1271
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 1271

002 TRA01A02 TONA 60.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 67 67

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1271.43 0.00 67.20 1338.63

Detaliere transporturi:
-Articole TRA 67.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1271.43 + 0.00 * 0.000 +
67.20 * 0.000) * 0.003375 = 4.29

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1275.72 0.00 67.20 1342.92

Cheltuieli indirecte:
1342.92 * 0.03000 = 40.29
Profit:
1383.21 * 0.02000 = 27.66

TOTAL GENERAL DEVIZ: 1 410.87


TVA 1410.87 * 19.0% = 268.07
TOTAL cu TVA 1 678.94

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391103 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0020 45000000 POD KM. 5+300 PESTE PARAU - DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391103 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 8.530 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 577
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 412
FUND DRUM 0.00 0 989

002 TRI1AA02C3 TONA 21.320 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 192
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 192

003 TRA01A02 TONA 21.320 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 24 24

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 768.51 412.46 23.88 1204.84
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 412.46

Detaliere transporturi:
-Articole TRA 23.88

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 768.51 + 412.46 * 0.000 +
23.88 * 0.000) * 0.003375 = 2.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 771.10 412.46 23.88 1207.44

Cheltuieli indirecte:
1207.44 * 0.03000 = 36.22
Profit:
1243.66 * 0.02000 = 24.87

TOTAL GENERAL DEVIZ: 1 268.53


TVA 1268.53 * 19.0% = 241.02
TOTAL cu TVA 1 509.56

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391104 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0020 45000000 POD KM. 5+300 PESTE PARAU - DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391104 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 3.980 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 817
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 817

002 TSC19C1 100 MC. 2.000 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 327
0.00 0 327

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 816.70 327.36 0.00 1144.06
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 327.36

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 816.70 + 327.36 * 0.000 +
0.00 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 819.45 327.36 0.00 1146.81

Cheltuieli indirecte:
1146.81 * 0.03000 = 34.40
Profit:
1181.22 * 0.02000 = 23.62

TOTAL GENERAL DEVIZ: 1 204.84


TVA 1204.84 * 19.0% = 228.92
TOTAL cu TVA 1 433.76

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391105 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391105 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 44.320 0.60 27
MONTAREA SI DEMONTARE SCHELEI MET 9.60 425
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 452

002 AUT1303 ORA 80.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 80
0.00 0 80

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.034 26.74 425.47 80.00 0.00 532.21
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 80.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 425.47 + 80.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 1.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.034 26.74 426.91 80.00 0.00 533.65

Cheltuieli indirecte:
533.65 * 0.03000 = 16.01
Profit:
549.66 * 0.02000 = 10.99

TOTAL GENERAL DEVIZ: 560.65


TVA 560.65 * 19.0% = 106.52
TOTAL cu TVA 667.18

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391106 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391106 GAURI IN FASII LA PARTEA INFERIOARA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 RPCB12A1 MP. 10.400 0.00 0
INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 198
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 198

002 PJ09B1 M 2.240 0.00 0


GAURI SI STRAPUNG. D MAXIM 50MM PT. 22.00 49
INTRODUC. BUL.SI ANCOR. PT. REPAR. 41.38 93
CAMASUIELI CU FORARE MECA 0.00 0 142

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 246.88 92.69 0.00 339.57
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 92.69

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 246.88 + 92.69 * 0.000 +
0.00 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 247.71 92.69 0.00 340.40

Cheltuieli indirecte:
340.40 * 0.03000 = 10.21
Profit:
350.61 * 0.02000 = 7.01

TOTAL GENERAL DEVIZ: 357.63


TVA 357.63 * 19.0% = 67.95
TOTAL cu TVA 425.57

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391107 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391107 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 106.370 2.20 234
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 6416
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 6651

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.078 234.23 6416.30 0.00 0.00 6650.53

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6416.30 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 21.66

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.078 234.23 6437.96 0.00 0.00 6672.19

Cheltuieli indirecte:
6672.19 * 0.03000 = 200.17
Profit:
6872.35 * 0.02000 = 137.45

TOTAL GENERAL DEVIZ: 7 009.80


TVA 7009.80 * 19.0% = 1 331.86
TOTAL cu TVA 8 341.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391108 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391108 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 58.500 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 179
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 179

002 RPCT40B1 MP. 58.500 0.00 0


DESFACEREA SAPEI DE PROT LA IZOL 7.04 412
HIDROFUGE DE 4-5 CM GROSIME INCLUSIV 0.00 0
ARMATURA DIN PLASA * 0.00 0 412

003 RPCT41A1 MP. 58.500 0.00 0


DESFACEREA IZOLATIEI HIDROFUGE VECHI IN 6.60 386
VEDEREA REFACERII * 0.00 0
0.00 0 386

004 TRI1AA02C3 TONA 7.530 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 68
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 68

005 TSC35C3 100 MC. 0.120 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC ROCI TARI SI F.TARI<25KG/BUC 165.90 20
LA D. < 10M 0.00 0 20

006 TRA01A02 TONA 38.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 43 43

007 CZ0302K1 [ 1] KG 1630.000 0.00 0


CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 880
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 880

008 PD02A1 KG 1630.000 0.06 90


MONT.ARMATURI PT.BETON ARMAT IN 0.50 821
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 911

009 2100205 KG 1630.000 2.90 4729


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 4729

010 TRA04A17 TONA 1.630 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 19 19

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.654 4818.85 2745.74 19.91 61.96 7646.46
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 19.91

Detaliere transporturi:
-Articole TRA 61.96

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2745.74 + 19.91 * 0.000 +
61.96 * 0.000) * 0.003375 = 9.27
391108 pag 2
======================================================================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.654 4818.85 2755.01 19.91 61.96 7655.72

Cheltuieli indirecte:
7655.72 * 0.03000 = 229.67
Profit:
7885.40 * 0.02000 = 157.71

TOTAL GENERAL DEVIZ: 8 043.10


TVA 8043.10 * 19.0% = 1 528.19
TOTAL cu TVA 9 571.29

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391109 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391109 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 16.120 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 157
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 173
0.00 0 330

002 3270091 M.C. 16.120 255.00 4111


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 4111

003 TRA06A17 TONA 40.300 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 426 426

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


40.300 4110.60 156.91 172.98 425.97 4866.46
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 172.98

Detaliere transporturi:
-Articole TRA 425.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 156.91 + 172.98 * 0.000 +
425.97 * 0.000) * 0.003375 = 0.53

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


40.300 4110.60 157.44 172.98 425.97 4866.99

Cheltuieli indirecte:
4866.99 * 0.03000 = 146.01
Profit:
5013.00 * 0.02000 = 100.26

TOTAL GENERAL DEVIZ: 5 113.26


TVA 5113.26 * 19.0% = 971.52
TOTAL cu TVA 6 084.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391110 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391110 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 164.870 0.05 9
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 791
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 800

002 PF04A1 MP. 164.870 6.36 1049


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 155
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 1204

003 PF05B1 MP. 164.870 9.98 1645


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 593
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 297
STRAT MASTIC. 0.00 0 2535

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.155 2702.38 1539.52 296.77 0.00 4538.67
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 296.77

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1539.52 + 296.77 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.20

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.155 2702.38 1544.72 296.77 0.00 4543.86

Cheltuieli indirecte:
4543.86 * 0.03000 = 136.32
Profit:
4680.18 * 0.02000 = 93.60

TOTAL GENERAL DEVIZ: 4 773.78


TVA 4773.78 * 19.0% = 907.02
TOTAL cu TVA 5 680.80

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391111 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391111 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 86.420 4.87 421
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 507
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 25
4CM GROS LA POD 0.00 0 953

002 2100047 TONA 6.220 310.00 1928


BA 8 0.00 0
0.00 0
0.00 0 1928

003 TRA01A35 TONA 6.220 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 122 122

004 DB02D1 100 MP. 0.860 70.98 61


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 34
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 5
EMULSIE CATIONICA 0.00 0 100

005 DB19E1 MP. 86.420 0.03 2


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 90
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 105
MECANICA 0.00 0 198

006 2100207 TONA 8.470 315.00 2668


BAP16 0.00 0
0.00 0
0.00 0 2668

007 TRA01A35 TONA 8.470 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 166 166

008 DB02D1 100 MP. 0.860 70.98 61


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 34
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 5
EMULSIE CATIONICA 0.00 0 100

009 DB16H1 MP. 86.420 0.03 2


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 90
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 105
0.00 0 198

010 2100051 TONA 8.120 320.00 2598


MAS16 0.00 0
0.00 0
0.00 0 2598

011 TRA01A35 TONA 8.120 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 159 159

012 TRA05A49 TONA 0.070 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 3 3

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


40.792 7742.25 756.96 245.74 449.88 9194.84
Din care:
Valoare aferenta utilaje termice = 0.00
391111 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 245.74

Detaliere transporturi:
-Articole TRA 449.88

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 756.96 + 245.74 * 0.000 +
449.88 * 0.000) * 0.003375 = 2.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


40.792 7742.25 759.52 245.74 449.88 9197.39

Cheltuieli indirecte:
9197.39 * 0.03000 = 275.92
Profit:
9473.31 * 0.02000 = 189.47

TOTAL GENERAL DEVIZ: 9 662.78


TVA 9662.78 * 19.0% = 1 835.93
TOTAL cu TVA 11 498.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391112 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391112 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 22.160 3.19 71
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 653
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 724

002 2100202 KG 1551.000 6.44 9993


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 9993

003 3270091 M.C. 2.680 255.00 683


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 683

004 TRA06A17 TONA 6.700 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 71 71

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.272 10747.08 653.34 0.00 70.82 11471.24

Detaliere transporturi:
-Articole TRA 70.82

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 653.34 + 0.00 * 0.000 +
70.82 * 0.000) * 0.003375 = 2.21

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.272 10747.08 655.55 0.00 70.82 11473.45

Cheltuieli indirecte:
11473.45 * 0.03000 = 344.20
Profit:
11817.65 * 0.02000 = 236.35

TOTAL GENERAL DEVIZ: 12 054.00


TVA 12054.00 * 19.0% = 2 290.26
TOTAL cu TVA 14 344.26

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391113 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391113 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 12.000 22.95 275
BORDURI PREFABRICATE DIN BETON PT 11.80 142
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 417

002 PF01A1 MP. 1.800 3.15 6


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 26
MARCA 100 DRISCUITA 0.19 0
0.00 0 32

003 PF09A1 M 24.000 41.21 989


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 144
SAPEI HIDR 0.00 0
0.00 0 1133

004 PB06A1 M.C. 4.440 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 212
ZID,TIMPAN MANUAL 2.50 11
0.00 0 224

005 2100898 M.C. 4.440 200.00 888


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 888

006 TRA06A17 TONA 11.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 116 116

007 DB02D1 100 MP. 0.220 70.98 16


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 9
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 26

008 TRA05A49 TONA 0.010 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

009 DB18A1 MP. 22.200 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 36
DE 2,5 CM CU ASTERNERE MANUALA 0.32 7
0.00 0 43

010 2100047 TONA 1.600 310.00 496


BA 8 0.00 0
0.00 0
0.00 0 496

011 TRA01A35 TONA 1.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 31 31

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


12.216 2670.31 568.34 19.68 148.03 3406.36
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 19.68

Detaliere transporturi:
-Articole TRA 148.03
391113 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 568.34 + 19.68 * 0.000 +
148.03 * 0.000) * 0.003375 = 1.92

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


12.216 2670.31 570.26 19.68 148.03 3408.28

Cheltuieli indirecte:
3408.28 * 0.03000 = 102.25
Profit:
3510.53 * 0.02000 = 70.21

TOTAL GENERAL DEVIZ: 3 580.74


TVA 3580.74 * 19.0% = 680.34
TOTAL cu TVA 4 261.08

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391114 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391114 APLICARE BENZI DE CARBON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100212 MP. 0.900 269.70 243
BANDA CARBON 0.00 0
0.00 0
0.00 0 243

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.045 242.73 0.00 0.00 0.00 242.73

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.045 242.73 0.00 0.00 0.00 242.73

Cheltuieli indirecte:
242.73 * 0.03000 = 7.28
Profit:
250.01 * 0.02000 = 5.00

TOTAL GENERAL DEVIZ: 255.01


TVA 255.01 * 19.0% = 48.45
TOTAL cu TVA 303.46

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391115 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391115 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 20 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.920 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 24
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 24

002 PC05A1 MP. 12.300 2.20 27


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 742
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 769

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 24.800 1813.50 44975


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 44975

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.135 46380.79 1125.56 60.37 0.00 47566.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1125.56 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.135 46380.79 1129.36 60.37 0.00 47570.51

Cheltuieli indirecte:
47570.51 * 0.03000 = 1 427.12
Profit:
48997.63 * 0.02000 = 979.95

TOTAL GENERAL DEVIZ: 49 977.58


TVA 49977.58 * 19.0% = 9 495.74
TOTAL cu TVA 59 473.32

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391116 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0021 45000000 POD KM. 5+300 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391116 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 109.200 0.60 66
MONTAREA SI DEMONTARE SCHELEI MET 9.60 1048
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1114

002 AUT1303 ORA 40.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 40
0.00 0 40

003 RPCB12A1 MP. 33.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 627
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 627

004 IZA01A1 MP. 33.000 0.49 16


CURATIREA PRIN SABLARE PT PROT 7.20 238
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 500
0.00 0 754

005 PK48C1 [ 1] TONA 0.070 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 6
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 6

006 YC01RON LEI. 2123.000 1.00 2123


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 2123

007 2100211 KG 33.000 20.75 685


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 685

008 NMB109921 ORA 80.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 1600
0.00 0
0.00 0 1600

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.232 2889.71 3519.06 540.28 0.00 6949.05
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 540.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3519.06 + 540.28 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.88

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.232 2889.71 3530.94 540.28 0.00 6960.93

Cheltuieli indirecte:
6960.93 * 0.03000 = 208.83
Profit:
7169.76 * 0.02000 = 143.40

TOTAL GENERAL DEVIZ: 7 313.15


TVA 7313.15 * 19.0% = 1 389.50
391116 pag 2
======================================================================================================================
TOTAL cu TVA 8 702.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391117 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391117 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 86.400 3.40 294
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 1607
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 1901

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.209 294.06 1606.95 0.00 0.00 1901.01

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1606.95 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.42

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.209 294.06 1612.38 0.00 0.00 1906.44

Cheltuieli indirecte:
1906.44 * 0.03000 = 57.19
Profit:
1963.63 * 0.02000 = 39.27

TOTAL GENERAL DEVIZ: 2 002.90


TVA 2002.90 * 19.0% = 380.55
TOTAL cu TVA 2 383.45

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391118 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391118 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 72.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 3109
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 192
MANUAL 0.00 0 3301

002 2100914 M.C. 72.000 215.00 15480


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 15480

003 TRA06A17 TONA 180.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1903 1903

004 TSA24B1 ORA 36.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 574
DE 8,1-14KW 0.00 0 574

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


172.800 15480.50 3109.39 765.72 1902.60 21258.22
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 765.72

Detaliere transporturi:
-Articole TRA 1 902.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3109.39 + 765.72 * 0.000 +
1902.60 * 0.000) * 0.003375 = 10.49

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


172.800 15480.50 3119.89 765.72 1902.60 21268.71

Cheltuieli indirecte:
21268.71 * 0.03000 = 638.06
Profit:
21906.77 * 0.02000 = 438.14

TOTAL GENERAL DEVIZ: 22 344.91


TVA 22344.91 * 19.0% = 4 245.53
TOTAL cu TVA 26 590.44

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391119 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391119 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 180.000 4.62 831
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 3427
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 4258

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3426.98 0.00 0.00 4258.32

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3426.98 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3438.55 0.00 0.00 4269.89

Cheltuieli indirecte:
4269.89 * 0.03000 = 128.10
Profit:
4397.98 * 0.02000 = 87.96

TOTAL GENERAL DEVIZ: 4 485.94


TVA 4485.94 * 19.0% = 852.33
TOTAL cu TVA 5 338.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391120 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391120 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 5000.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 2700
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 2700

002 PD02A1 KG 5000.000 0.06 277


MONT.ARMATURI PT.BETON ARMAT IN 0.50 2518
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 2795

003 2100205 KG 5000.000 2.90 14505


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 14505

004 TRA04A17 TONA 5.000 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 60 60

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.075 14781.75 5218.00 0.00 59.50 20059.25

Detaliere transporturi:
-Articole TRA 59.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5218.00 + 0.00 * 0.000 +
59.50 * 0.000) * 0.003375 = 17.61

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.075 14781.75 5235.61 0.00 59.50 20076.86

Cheltuieli indirecte:
20076.86 * 0.03000 = 602.31
Profit:
20679.17 * 0.02000 = 413.58

TOTAL GENERAL DEVIZ: 21 092.75


TVA 21092.75 * 19.0% = 4 007.62
TOTAL cu TVA 25 100.37

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391121 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391121 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 57.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 555
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 818
EXISTENTE CU POMPA 0.00 0 1373

002 2101004 M.C. 57.000 255.00 14535


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 14535

003 TRA06A17 TONA 143.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1512 1512

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 14535.00 554.83 818.35 1511.51 17419.69
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 818.35

Detaliere transporturi:
-Articole TRA 1 511.51

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 554.83 + 818.35 * 0.000 +
1511.51 * 0.000) * 0.003375 = 1.87

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 14535.00 556.70 818.35 1511.51 17421.56

Cheltuieli indirecte:
17421.56 * 0.03000 = 522.65
Profit:
17944.20 * 0.02000 = 358.88

TOTAL GENERAL DEVIZ: 18 303.09


TVA 18303.09 * 19.0% = 3 477.59
TOTAL cu TVA 21 780.68

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391192 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391192 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 360.000 0.60 217
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3456
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3673

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 108.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2052
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2052

004 IZA01A1 MP. 108.000 0.49 53


CURATIREA PRIN SABLARE PT PROT 7.20 778
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1637
0.00 0 2467

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 108.000 20.75 2241


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2241

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.06 8936.58 2024.83 0.00 14812.47
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2024.83

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8936.58 + 2024.83 * 0.000 +
0.00 * 0.000) * 0.003375 = 30.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.06 8966.74 2024.83 0.00 14842.63

Cheltuieli indirecte:
14842.63 * 0.03000 = 445.28
391192 pag 2
======================================================================================================================
Profit:
15287.91 * 0.02000 = 305.76

TOTAL GENERAL DEVIZ: 15 593.67


TVA 15593.67 * 19.0% = 2 962.80
TOTAL cu TVA 18 556.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391193 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391193 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 45.000 39.44 1775
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 2250
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 4025

002 TRA01A34 TONA 88.740 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1690 1690

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1774.80 2250.00 0.00 1689.61 5714.41

Detaliere transporturi:
-Articole TRA 1 689.61

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2250.00 + 0.00 * 0.000 +
1689.61 * 0.000) * 0.003375 = 7.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1774.80 2257.59 0.00 1689.61 5722.00

Cheltuieli indirecte:
5722.00 * 0.03000 = 171.66
Profit:
5893.66 * 0.02000 = 117.87

TOTAL GENERAL DEVIZ: 6 011.54


TVA 6011.54 * 19.0% = 1 142.19
TOTAL cu TVA 7 153.73

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391194 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0022 45000000 POD KM. 5+300 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391194 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 10.000 22.95 230
BORDURI PREFABRICATE DIN BETON PT 11.80 118
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 348

002 2100898 M.C. 0.450 200.00 90


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 90

003 TRA06A17 TONA 1.650 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 17 17

004 PB06A1 M.C. 3.700 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 177
ZID,TIMPAN MANUAL 2.50 9
0.00 0 186

005 2100898 M.C. 3.700 200.00 740


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 740

006 TRA06A17 TONA 9.250 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 98 98

007 DB02D1 100 MP. 0.185 70.98 13


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 7
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 22

008 DB18A1 MP. 18.500 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 30
DE 2,5 CM CU ASTERNERE MANUALA 0.32 6
0.00 0 36

009 2100047 TONA 1.330 310.00 412


BA 8 0.00 0
0.00 0
0.00 0 412

010 TRA01A35 TONA 1.330 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 26 26

011 TRA05A49 TONA 0.008 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.108 1485.32 332.37 16.13 141.60 1975.42
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 16.13

Detaliere transporturi:
-Articole TRA 141.60
391194 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 332.37 + 16.13 * 0.000 +
141.60 * 0.000) * 0.003375 = 1.12

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.108 1485.32 333.49 16.13 141.60 1976.54

Cheltuieli indirecte:
1976.54 * 0.03000 = 59.30
Profit:
2035.84 * 0.02000 = 40.72

TOTAL GENERAL DEVIZ: 2 076.56


TVA 2076.56 * 19.0% = 394.55
TOTAL cu TVA 2 471.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391195 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391195 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 14.000 472.87 6620
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 6620

002 TRA04A17 TONA 24.080 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 287 287

003 PI06A1 BUC. 14.000 30.98 434


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 350
MACARAUA PE PNEURI DE 9,9 TF 45.75 640
0.00 0 1424

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 350.00 640.50 286.55 8330.99
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 640.50

Detaliere transporturi:
-Articole TRA 286.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 350.00 + 640.50 * 0.000 +
286.55 * 0.000) * 0.003375 = 1.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 351.18 640.50 286.55 8332.18

Cheltuieli indirecte:
8332.18 * 0.03000 = 249.97
Profit:
8582.14 * 0.02000 = 171.64

TOTAL GENERAL DEVIZ: 8 753.78


TVA 8753.78 * 19.0% = 1 663.22
TOTAL cu TVA 10 417.00

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391196 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391196 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.245 70.98 17
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

002 DB19E1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 26
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 30
MECANICA 0.00 0 56

003 2100207 TONA 2.400 315.00 756


BAP16 0.00 0
0.00 0
0.00 0 756

004 TRA01A35 TONA 2.400 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 47 47

005 DB02D1 100 MP. 0.245 70.98 17


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

006 DB16H1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 26
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 30
0.00 0 56

007 2100051 TONA 2.300 320.00 736


MAS16 0.00 0
0.00 0
0.00 0 736

008 TRA01A35 TONA 2.300 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 45 45

009 TRA05A49 TONA 0.023 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 70.84 62.54 93.04 1754.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 62.54

Detaliere transporturi:
-Articole TRA 93.04

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 70.84 + 62.54 * 0.000 +
93.04 * 0.000) * 0.003375 = 0.24

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 71.08 62.54 93.04 1754.80
391196 pag 2
======================================================================================================================

Cheltuieli indirecte:
1754.80 * 0.03000 = 52.64
Profit:
1807.44 * 0.02000 = 36.15

TOTAL GENERAL DEVIZ: 1 843.59


TVA 1843.59 * 19.0% = 350.28
TOTAL cu TVA 2 193.88

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391197 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391197 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 14.400 0.65 9
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 1014
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 1023

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2916.16 0.00 0.00 3473.38

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2916.16 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2926.00 0.00 0.00 3483.22

Cheltuieli indirecte:
3483.22 * 0.03000 = 104.50
Profit:
3587.72 * 0.02000 = 71.75

TOTAL GENERAL DEVIZ: 3 659.47


TVA 3659.47 * 19.0% = 695.30
TOTAL cu TVA 4 354.77

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391198 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391198 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 84.000 4.62 388
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 1599
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 1987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1599.26 0.00 0.00 1987.22

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1599.26 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1604.66 0.00 0.00 1992.61

Cheltuieli indirecte:
1992.61 * 0.03000 = 59.78
Profit:
2052.39 * 0.02000 = 41.05

TOTAL GENERAL DEVIZ: 2 093.44


TVA 2093.44 * 19.0% = 397.75
TOTAL cu TVA 2 491.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391199 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391199 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 1200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 648
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 648

002 PD02A1 KG 1200.000 0.06 66


MONT.ARMATURI PT.BETON ARMAT IN 0.50 604
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 671

003 2100205 KG 1200.000 2.90 3481


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 3481

004 TRA04A17 TONA 1.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 14 14

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.218 3547.62 1252.32 0.00 14.28 4814.22

Detaliere transporturi:
-Articole TRA 14.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1252.32 + 0.00 * 0.000 +
14.28 * 0.000) * 0.003375 = 4.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.218 3547.62 1256.55 0.00 14.28 4818.45

Cheltuieli indirecte:
4818.45 * 0.03000 = 144.55
Profit:
4963.00 * 0.02000 = 99.26

TOTAL GENERAL DEVIZ: 5 062.26


TVA 5062.26 * 19.0% = 961.83
TOTAL cu TVA 6 024.09

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391200 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391200 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 60.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 2591
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 160
MANUAL 0.00 0 2751

002 2100899 M.C. 60.000 210.00 12600


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 12600

003 TRA06A17 TONA 150.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1586 1586

004 TSA24B1 ORA 30.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 478
DE 8,1-14KW 0.00 0 478

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2591.16 638.10 1585.50 17415.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 638.10

Detaliere transporturi:
-Articole TRA 1 585.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2591.16 + 638.10 * 0.000 +
1585.50 * 0.000) * 0.003375 = 8.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2599.91 638.10 1585.50 17424.05

Cheltuieli indirecte:
17424.05 * 0.03000 = 522.72
Profit:
17946.77 * 0.02000 = 358.94

TOTAL GENERAL DEVIZ: 18 305.70


TVA 18305.70 * 19.0% = 3 478.08
TOTAL cu TVA 21 783.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391201 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391201 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 84.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 818
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1206
EXISTENTE CU POMPA 0.00 0 2024

002 2101004 M.C. 84.000 255.00 21420


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 21420

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 817.64 1205.99 2219.70 25663.33
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1205.99

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 817.64 + 1205.99 * 0.000 +
2219.70 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 820.40 1205.99 2219.70 25666.09

Cheltuieli indirecte:
25666.09 * 0.03000 = 769.98
Profit:
26436.07 * 0.02000 = 528.72

TOTAL GENERAL DEVIZ: 26 964.79


TVA 26964.79 * 19.0% = 5 123.31
TOTAL cu TVA 32 088.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391202 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391202 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 3.500 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 527
0.00 0 527

002 TRA01A02 TONA 630.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 706 706

003 TSD01D1 M.C. 70.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 797
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 797

004 TSD05B1 100 MC. 3.500 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 617
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 561
STRAT DIN PAM.COEZI 0.00 0 1178

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1414.00 1088.56 705.60 3208.16
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1088.56

Detaliere transporturi:
-Articole TRA 705.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1414.00 + 1088.56 * 0.000 +
705.60 * 0.000) * 0.003375 = 4.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1418.77 1088.56 705.60 3212.93

Cheltuieli indirecte:
3212.93 * 0.03000 = 96.39
Profit:
3309.32 * 0.02000 = 66.19

TOTAL GENERAL DEVIZ: 3 375.51


TVA 3375.51 * 19.0% = 641.35
TOTAL cu TVA 4 016.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391203 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391203 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 280.000 3.19 894
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 1120
NISIP 0.00 0
0.00 0 2014

002 TRA01A17 TONA 47.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 453 453

003 IFA03C1 MP. 280.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 7840
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 7840

004 2100957 M.C. 28.000 190.00 5320


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 5320

005 TRA06A17 TONA 70.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 740 740

006 TRI1AA01C1 TONA 70.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 490
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 490

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9450.00 0.00 1193.05 16857.51

Detaliere transporturi:
-Articole TRA 1 193.05

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9450.00 + 0.00 * 0.000 +
1193.05 * 0.000) * 0.003375 = 31.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9481.89 0.00 1193.05 16889.41

Cheltuieli indirecte:
16889.41 * 0.03000 = 506.68
Profit:
17396.09 * 0.02000 = 347.92

TOTAL GENERAL DEVIZ: 17 744.01


TVA 17744.01 * 19.0% = 3 371.36
TOTAL cu TVA 21 115.37

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391204 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391204 SCARI PE TALUZ INCLUSIV MANA CURENTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK29A1 M 10.000 29.31 293
SCARI PE TALUZ DIN TREPTE DE BETON 55.87 559
PREFABRICATE PE SANTIER 1.34 13
0.00 0 865

002 PK18A1 M 10.000 148.48 1485


MINA CURENTA SI UMPLUT. TEVI OTEL CONF. 192.21 1922
SANTIER SI STILPI B. A. MONOLIT SAU 0.00 0
PREFABRICAT 0.00 0 3407

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.165 1777.93 2480.77 13.36 0.00 4272.05
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 13.36

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2480.77 + 13.36 * 0.000 +
0.00 * 0.000) * 0.003375 = 8.37

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.165 1777.93 2489.14 13.36 0.00 4280.42

Cheltuieli indirecte:
4280.42 * 0.03000 = 128.41
Profit:
4408.84 * 0.02000 = 88.18

TOTAL GENERAL DEVIZ: 4 497.01


TVA 4497.01 * 19.0% = 854.43
TOTAL cu TVA 5 351.45

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391205 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0023 45000000 POD KM. 5+300 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391205 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 100.000 2.23 223
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

002 6306339 KG 2071.000 4.66 9651


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 9651

003 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

004 TRA06A17 TONA 20.750 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 219 219

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2073.00 0.00 219.33 13743.14

Detaliere transporturi:
-Articole TRA 219.33

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2073.00 + 0.00 * 0.000 +
219.33 * 0.000) * 0.003375 = 7.00

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2080.00 0.00 219.33 13750.13

Cheltuieli indirecte:
13750.13 * 0.03000 = 412.50
Profit:
14162.64 * 0.02000 = 283.25

TOTAL GENERAL DEVIZ: 14 445.89


TVA 14445.89 * 19.0% = 2 744.72
TOTAL cu TVA 17 190.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391206 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0024 45000000 POD KM. 5+300 PESTE PARAU-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391206 SAPAT. PENTRU PROF ALBIEI AMONTE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.800 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 131
0.00 0 131

002 TSC35B31 100 MC. 0.800 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 137
M 0.00 0 137

003 TRA01A02 TONA 144.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 161 161

004 TSD03C1 100 MC. 0.960 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 41
TER.CAT.1 SAU 2 0.00 0 41

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 308.41 161.28 469.69
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 308.41

Detaliere transporturi:
-Articole TRA 161.28

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 308.41 161.28 469.69

Cheltuieli indirecte:
469.69 * 0.03000 = 14.09
Profit:
483.79 * 0.02000 = 9.68

TOTAL GENERAL DEVIZ: 493.46


TVA 493.46 * 19.0% = 93.76
TOTAL cu TVA 587.22

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391207 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0025 45000000 POD KM. 5+300 PESTE PARAU-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391207 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 2100910 M.C. 0.800 180.00 144


BETON MARFA CLASA C 10/8 (BC 10/B 150) 0.00 0
0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391207 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391208 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0026 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391208 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 923.660 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 2826
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 2826

002 TRA01A02 TONA 133.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 149 149

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2826.40 0.00 148.96 2975.36

Detaliere transporturi:
-Articole TRA 148.96

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2826.40 + 0.00 * 0.000 +
148.96 * 0.000) * 0.003375 = 9.54

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 2835.94 0.00 148.96 2984.90

Cheltuieli indirecte:
2984.90 * 0.03000 = 89.55
Profit:
3074.45 * 0.02000 = 61.49

TOTAL GENERAL DEVIZ: 3 135.93


TVA 3135.93 * 19.0% = 595.83
TOTAL cu TVA 3 731.76

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391209 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0026 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391209 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 16.340 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 1105
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 790
FUND DRUM 0.00 0 1895

002 TRI1AA02C3 TONA 41.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 369
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 369

003 TRA01A02 TONA 41.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 46 46

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1473.58 790.10 45.92 2309.61
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 790.10

Detaliere transporturi:
-Articole TRA 45.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1473.58 + 790.10 * 0.000 +
45.92 * 0.000) * 0.003375 = 4.97

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1478.55 790.10 45.92 2314.58

Cheltuieli indirecte:
2314.58 * 0.03000 = 69.44
Profit:
2384.02 * 0.02000 = 47.68

TOTAL GENERAL DEVIZ: 2 431.70


TVA 2431.70 * 19.0% = 462.02
TOTAL cu TVA 2 893.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391210 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0026 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391210 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 7.308 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 1500
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 1500

002 TSC19C1 100 MC. 3.650 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 597
0.00 0 597

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1499.60 597.43 0.00 2097.03
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 597.43

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1499.60 + 597.43 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.06

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1504.66 597.43 0.00 2102.09

Cheltuieli indirecte:
2102.09 * 0.03000 = 63.06
Profit:
2165.16 * 0.02000 = 43.30

TOTAL GENERAL DEVIZ: 2 208.46


TVA 2208.46 * 19.0% = 419.61
TOTAL cu TVA 2 628.07

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391211 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391211 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 81.200 0.60 49
MONTAREA SI DEMONTARE SCHELEI MET 9.60 780
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 829

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.062 49.00 779.52 320.00 0.00 1148.52
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 779.52 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 2.63

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.062 49.00 782.15 320.00 0.00 1151.15

Cheltuieli indirecte:
1151.15 * 0.03000 = 34.53
Profit:
1185.68 * 0.02000 = 23.71

TOTAL GENERAL DEVIZ: 1 209.40


TVA 1209.40 * 19.0% = 229.79
TOTAL cu TVA 1 439.18

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391212 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391212 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 284.200 2.20 626
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 17143
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 17769

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.207 625.82 17143.11 0.00 0.00 17768.94

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 17143.11 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 57.86

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.207 625.82 17200.97 0.00 0.00 17826.80

Cheltuieli indirecte:
17826.80 * 0.03000 = 534.80
Profit:
18361.60 * 0.02000 = 367.23

TOTAL GENERAL DEVIZ: 18 728.83


TVA 18728.83 * 19.0% = 3 558.48
TOTAL cu TVA 22 287.31

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391213 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391213 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 169.520 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 519
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 519

002 RPCT40B1 MP. 169.520 0.00 0


DESFACEREA SAPEI DE PROT LA IZOL 7.04 1193
HIDROFUGE DE 4-5 CM GROSIME INCLUSIV 0.00 0
ARMATURA DIN PLASA * 0.00 0 1193

003 RPCT41A1 MP. 169.520 0.00 0


DESFACEREA IZOLATIEI HIDROFUGE VECHI IN 6.60 1119
VEDEREA REFACERII * 0.00 0
0.00 0 1119

004 TRI1AA02C3 TONA 21.830 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 196
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 196

005 TSC35C3 100 MC. 0.350 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC ROCI TARI SI F.TARI<25KG/BUC 165.90 58
LA D. < 10M 0.00 0 58

006 TRA01A02 TONA 109.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 122 122

007 CZ0302K1 [ 1] KG 4080.000 0.00 0


CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 2203
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 2203

008 PD02A1 KG 4080.000 0.06 226


MONT.ARMATURI PT.BETON ARMAT IN 0.50 2055
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 2281

009 2100205 KG 4080.000 2.90 11836


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 11836

010 TRA04A17 TONA 4.080 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 49 49

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.141 12061.91 7285.21 58.06 170.63 19575.81
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 58.06

Detaliere transporturi:
-Articole TRA 170.63

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 7285.21 + 58.06 * 0.000 +
170.63 * 0.000) * 0.003375 = 24.59
391213 pag 2
======================================================================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.141 12061.91 7309.79 58.06 170.63 19600.40

Cheltuieli indirecte:
19600.40 * 0.03000 = 588.01
Profit:
20188.41 * 0.02000 = 403.77

TOTAL GENERAL DEVIZ: 20 592.18


TVA 20592.18 * 19.0% = 3 912.51
TOTAL cu TVA 24 504.69

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391214 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391214 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 50.530 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 492
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 542
0.00 0 1034

002 3270091 M.C. 50.530 255.00 12885


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 12885

003 TRA06A17 TONA 126.330 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1335 1335

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


126.325 12885.15 491.85 542.24 1335.31 15254.54
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 542.24

Detaliere transporturi:
-Articole TRA 1 335.31

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 491.85 + 542.24 * 0.000 +
1335.31 * 0.000) * 0.003375 = 1.66

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


126.325 12885.15 493.51 542.24 1335.31 15256.20

Cheltuieli indirecte:
15256.20 * 0.03000 = 457.69
Profit:
15713.89 * 0.02000 = 314.28

TOTAL GENERAL DEVIZ: 16 028.17


TVA 16028.17 * 19.0% = 3 045.35
TOTAL cu TVA 19 073.52

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391215 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391215 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 302.060 0.05 16
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 1450
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 1466

002 PF04A1 MP. 302.060 6.36 1922


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 284
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 2205

003 PF05B1 MP. 302.060 9.98 3014


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 1087
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 544
STRAT MASTIC. 0.00 0 4644

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.949 4951.06 2820.58 543.71 0.00 8315.34
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 543.71

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2820.58 + 543.71 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.52

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.949 4951.06 2830.10 543.71 0.00 8324.86

Cheltuieli indirecte:
8324.86 * 0.03000 = 249.75
Profit:
8574.61 * 0.02000 = 171.49

TOTAL GENERAL DEVIZ: 8 746.10


TVA 8746.10 * 19.0% = 1 661.76
TOTAL cu TVA 10 407.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391216 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391216 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 158.340 4.87 771
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 930
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 46
4CM GROS LA POD 0.00 0 1747

002 2100047 TONA 11.400 310.00 3534


BA 8 0.00 0
0.00 0
0.00 0 3534

003 TRA01A35 TONA 11.400 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 223 223

004 DB02D1 100 MP. 1.580 70.98 112


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 63
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 9
EMULSIE CATIONICA 0.00 0 184

005 DB19E1 MP. 158.340 0.03 4


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 166
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 193
MECANICA 0.00 0 363

006 2100207 TONA 15.520 315.00 4889


BAP16 0.00 0
0.00 0
0.00 0 4889

007 TRA01A35 TONA 15.520 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 304 304

008 DB02D1 100 MP. 1.580 70.98 112


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 63
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 9
EMULSIE CATIONICA 0.00 0 184

009 DB16H1 MP. 158.340 0.03 4


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 166
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 193
0.00 0 363

010 2100051 TONA 14.880 320.00 4762


MAS16 0.00 0
0.00 0
0.00 0 4762

011 TRA01A35 TONA 14.880 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 292 292

012 TRA05A49 TONA 0.140 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 6 6

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


74.748 14188.34 1387.26 450.29 824.89 16850.78
Din care:
Valoare aferenta utilaje termice = 0.00
391216 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 450.29

Detaliere transporturi:
-Articole TRA 824.89

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1387.26 + 450.29 * 0.000 +
824.89 * 0.000) * 0.003375 = 4.68

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


74.748 14188.34 1391.94 450.29 824.89 16855.47

Cheltuieli indirecte:
16855.47 * 0.03000 = 505.66
Profit:
17361.13 * 0.02000 = 347.22

TOTAL GENERAL DEVIZ: 17 708.35


TVA 17708.35 * 19.0% = 3 364.59
TOTAL cu TVA 21 072.94

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391217 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391217 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 40.600 3.19 129
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 1197
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 1326

002 2100202 KG 2842.000 6.44 18311


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 18311

003 3270091 M.C. 4.910 255.00 1252


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 1252

004 TRA06A17 TONA 12.280 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 130 130

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


15.156 19692.38 1197.01 0.00 129.80 21019.19

Detaliere transporturi:
-Articole TRA 129.80

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1197.01 + 0.00 * 0.000 +
129.80 * 0.000) * 0.003375 = 4.04

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


15.156 19692.38 1201.05 0.00 129.80 21023.23

Cheltuieli indirecte:
21023.23 * 0.03000 = 630.70
Profit:
21653.93 * 0.02000 = 433.08

TOTAL GENERAL DEVIZ: 22 087.00


TVA 22087.00 * 19.0% = 4 196.53
TOTAL cu TVA 26 283.53

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391218 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391218 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 32.600 22.95 748
BORDURI PREFABRICATE DIN BETON PT 11.80 385
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1133

002 PF01A1 MP. 4.890 3.15 15


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 70
MARCA 100 DRISCUITA 0.19 1
0.00 0 86

003 PF09A1 M 65.200 41.21 2687


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 391
SAPEI HIDR 0.00 0
0.00 0 3078

004 PB06A1 M.C. 12.060 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 577
ZID,TIMPAN MANUAL 2.50 30
0.00 0 607

005 2100898 M.C. 12.060 200.00 2412


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 2412

006 TRA06A17 TONA 30.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 317 317

007 DB02D1 100 MP. 0.600 70.98 43


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 24
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 70

008 TRA05A49 TONA 0.027 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 60.310 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 98
DE 2,5 CM CU ASTERNERE MANUALA 0.32 19
0.00 0 118

010 2100047 TONA 4.340 310.00 1345


BA 8 0.00 0
0.00 0
0.00 0 1345

011 TRA01A35 TONA 4.340 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 85 85

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


33.183 7252.04 1543.99 53.48 403.25 9252.75
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 53.48

Detaliere transporturi:
-Articole TRA 403.25
391218 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1543.99 + 53.48 * 0.000 +
403.25 * 0.000) * 0.003375 = 5.21

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


33.183 7252.04 1549.20 53.48 403.25 9257.96

Cheltuieli indirecte:
9257.96 * 0.03000 = 277.74
Profit:
9535.69 * 0.02000 = 190.71

TOTAL GENERAL DEVIZ: 9 726.41


TVA 9726.41 * 19.0% = 1 848.02
TOTAL cu TVA 11 574.43

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391219 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391219 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 1237.080 8.30 10273
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 10273

002 PK31A1 TONA 1.237 201.46 249


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1112
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 1361

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.432 10521.92 1111.69 0.00 0.00 11633.61

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1111.69 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.432 10521.92 1115.44 0.00 0.00 11637.36

Cheltuieli indirecte:
11637.36 * 0.03000 = 349.12
Profit:
11986.48 * 0.02000 = 239.73

TOTAL GENERAL DEVIZ: 12 226.21


TVA 12226.21 * 19.0% = 2 322.98
TOTAL cu TVA 14 549.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391220 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391220 APLICARE BENZI DE CARBON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100212 MP. 2.934 269.70 791
BANDA CARBON 0.00 0
0.00 0
0.00 0 791

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.147 791.30 0.00 0.00 0.00 791.30

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.147 791.30 0.00 0.00 0.00 791.30

Cheltuieli indirecte:
791.30 * 0.03000 = 23.74
Profit:
815.04 * 0.02000 = 16.30

TOTAL GENERAL DEVIZ: 831.34


TVA 831.34 * 19.0% = 157.95
TOTAL cu TVA 989.29

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391221 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391221 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 20 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.920 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 24
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 24

002 PC05A1 MP. 12.300 2.20 27


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 742
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 769

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 24.800 1813.50 44975


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 44975

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.135 46380.79 1125.56 60.37 0.00 47566.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1125.56 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.135 46380.79 1129.36 60.37 0.00 47570.51

Cheltuieli indirecte:
47570.51 * 0.03000 = 1 427.12
Profit:
48997.63 * 0.02000 = 979.95

TOTAL GENERAL DEVIZ: 49 977.58


TVA 49977.58 * 19.0% = 9 495.74
TOTAL cu TVA 59 473.32

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391222 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391222 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 296.660 0.60 179
MONTAREA SI DEMONTARE SCHELEI MET 9.60 2848
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3027

002 AUT1303 ORA 80.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 80
0.00 0 80

003 RPCB12A1 MP. 89.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 1691
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 1691

004 IZA01A1 MP. 89.000 0.49 43


CURATIREA PRIN SABLARE PT PROT 7.20 641
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1349
0.00 0 2033

005 PK48C1 [ 1] TONA 0.600 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 53
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 53

006 YC01RON LEI. 5766.000 1.00 5766


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 5766

007 2100211 KG 90.000 20.75 1868


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 1868

008 NMB109921 ORA 240.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 4800
0.00 0
0.00 0 4800

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.628 7855.85 10032.40 1429.24 0.00 19317.49
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1429.24

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 10032.40 + 1429.24 * 0.000 +
0.00 * 0.000) * 0.003375 = 33.86

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.628 7855.85 10066.26 1429.24 0.00 19351.34

Cheltuieli indirecte:
19351.34 * 0.03000 = 580.54
Profit:
19931.88 * 0.02000 = 398.64

TOTAL GENERAL DEVIZ: 20 330.52


TVA 20330.52 * 19.0% = 3 862.80
391222 pag 2
======================================================================================================================
TOTAL cu TVA 24 193.32

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391223 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0027 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391223 GAURI IN FASII LA PARTEA INFERIOA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 RPCB12A1 MP. 26.080 0.00 0
INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 496
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 496

002 PJ09B1 M 2.520 0.00 0


GAURI SI STRAPUNG. D MAXIM 50MM PT. 22.00 55
INTRODUC. BUL.SI ANCOR. PT. REPAR. 41.38 104
CAMASUIELI CU FORARE MECA 0.00 0 160

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 550.95 104.28 0.00 655.23
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 104.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 550.95 + 104.28 * 0.000 +
0.00 * 0.000) * 0.003375 = 1.86

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 552.81 104.28 0.00 657.09

Cheltuieli indirecte:
657.09 * 0.03000 = 19.71
Profit:
676.80 * 0.02000 = 13.54

TOTAL GENERAL DEVIZ: 690.34


TVA 690.34 * 19.0% = 131.16
TOTAL cu TVA 821.50

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391224 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391224 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 89.280 3.40 304
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 1661
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 1964

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.216 303.86 1660.52 0.00 0.00 1964.38

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1660.52 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.60

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.216 303.86 1666.12 0.00 0.00 1969.98

Cheltuieli indirecte:
1969.98 * 0.03000 = 59.10
Profit:
2029.08 * 0.02000 = 40.58

TOTAL GENERAL DEVIZ: 2 069.67


TVA 2069.67 * 19.0% = 393.24
TOTAL cu TVA 2 462.90

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391225 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391225 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 72.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 3109
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 192
MANUAL 0.00 0 3301

002 2100914 M.C. 72.000 215.00 15480


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 15480

003 TRA06A17 TONA 180.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1903 1903

004 TSA24B1 ORA 36.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 574
DE 8,1-14KW 0.00 0 574

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


172.800 15480.50 3109.39 765.72 1902.60 21258.22
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 765.72

Detaliere transporturi:
-Articole TRA 1 902.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3109.39 + 765.72 * 0.000 +
1902.60 * 0.000) * 0.003375 = 10.49

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


172.800 15480.50 3119.89 765.72 1902.60 21268.71

Cheltuieli indirecte:
21268.71 * 0.03000 = 638.06
Profit:
21906.77 * 0.02000 = 438.14

TOTAL GENERAL DEVIZ: 22 344.91


TVA 22344.91 * 19.0% = 4 245.53
TOTAL cu TVA 26 590.44

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391226 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391226 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 180.000 4.62 831
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 3427
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 4258

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3426.98 0.00 0.00 4258.32

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3426.98 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.647 831.34 3438.55 0.00 0.00 4269.89

Cheltuieli indirecte:
4269.89 * 0.03000 = 128.10
Profit:
4397.98 * 0.02000 = 87.96

TOTAL GENERAL DEVIZ: 4 485.94


TVA 4485.94 * 19.0% = 852.33
TOTAL cu TVA 5 338.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391227 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391227 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 5400.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 2916
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 2916

002 PD02A1 KG 5400.000 0.06 299


MONT.ARMATURI PT.BETON ARMAT IN 0.50 2719
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 3018

003 2100205 KG 5400.000 2.90 15665


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 15665

004 TRA04A17 TONA 5.400 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 64 64

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.481 15964.29 5635.44 0.00 64.26 21663.99

Detaliere transporturi:
-Articole TRA 64.26

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5635.44 + 0.00 * 0.000 +
64.26 * 0.000) * 0.003375 = 19.02

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


5.481 15964.29 5654.46 0.00 64.26 21683.01

Cheltuieli indirecte:
21683.01 * 0.03000 = 650.49
Profit:
22333.50 * 0.02000 = 446.67

TOTAL GENERAL DEVIZ: 22 780.17


TVA 22780.17 * 19.0% = 4 328.23
TOTAL cu TVA 27 108.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391228 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391228 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 62.400 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 607
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 896
EXISTENTE CU POMPA 0.00 0 1503

002 2101004 M.C. 62.400 255.00 15912


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 15912

003 TRA06A17 TONA 156.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1649 1649

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 15912.00 607.39 895.88 1648.92 19064.19
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 895.88

Detaliere transporturi:
-Articole TRA 1 648.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 607.39 + 895.88 * 0.000 +
1648.92 * 0.000) * 0.003375 = 2.05

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 15912.00 609.44 895.88 1648.92 19066.24

Cheltuieli indirecte:
19066.24 * 0.03000 = 571.99
Profit:
19638.22 * 0.02000 = 392.76

TOTAL GENERAL DEVIZ: 20 030.99


TVA 20030.99 * 19.0% = 3 805.89
TOTAL cu TVA 23 836.87

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391229 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391229 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 360.000 0.60 217
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3456
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3673

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 108.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2052
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2052

004 IZA01A1 MP. 108.000 0.49 53


CURATIREA PRIN SABLARE PT PROT 7.20 778
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1637
0.00 0 2467

005 PK48C1 TONA 0.150 18.47 3


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 13
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 16

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 108.000 20.75 2241


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2241

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.99 8940.97 2024.83 0.00 14817.79
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2024.83

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8940.97 + 2024.83 * 0.000 +
0.00 * 0.000) * 0.003375 = 30.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.590 3851.99 8971.15 2024.83 0.00 14847.96

Cheltuieli indirecte:
14847.96 * 0.03000 = 445.44
391229 pag 2
======================================================================================================================
Profit:
15293.40 * 0.02000 = 305.87

TOTAL GENERAL DEVIZ: 15 599.27


TVA 15599.27 * 19.0% = 2 963.86
TOTAL cu TVA 18 563.13

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391230 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391230 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 45.000 39.44 1775
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 2250
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 4025

002 TRA01A34 TONA 88.740 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1690 1690

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1774.80 2250.00 0.00 1689.61 5714.41

Detaliere transporturi:
-Articole TRA 1 689.61

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2250.00 + 0.00 * 0.000 +
1689.61 * 0.000) * 0.003375 = 7.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1774.80 2257.59 0.00 1689.61 5722.00

Cheltuieli indirecte:
5722.00 * 0.03000 = 171.66
Profit:
5893.66 * 0.02000 = 117.87

TOTAL GENERAL DEVIZ: 6 011.54


TVA 6011.54 * 19.0% = 1 142.19
TOTAL cu TVA 7 153.73

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391231 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0028 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391231 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 8.000 22.95 184
BORDURI PREFABRICATE DIN BETON PT 11.80 94
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 278

002 2100898 M.C. 0.360 200.00 72


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 72

003 TRA06A17 TONA 0.900 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 10 10

004 PB06A1 M.C. 2.960 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 142
ZID,TIMPAN MANUAL 2.50 7
0.00 0 149

005 2100898 M.C. 2.960 200.00 592


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 592

006 TRA06A17 TONA 7.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 78 78

007 DB02D1 100 MP. 0.148 70.98 11


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 6
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 17

008 DB18A1 MP. 14.800 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 24
DE 2,5 CM CU ASTERNERE MANUALA 0.32 5
0.00 0 29

009 2100047 TONA 1.060 310.00 329


BA 8 0.00 0
0.00 0
0.00 0 329

010 TRA01A35 TONA 1.060 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 21 21

011 TRA05A49 TONA 0.006 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 265.90 12.91 108.75 1574.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 12.91

Detaliere transporturi:
-Articole TRA 108.75
391231 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 265.90 + 12.91 * 0.000 +
108.75 * 0.000) * 0.003375 = 0.90

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 266.79 12.91 108.75 1575.46

Cheltuieli indirecte:
1575.46 * 0.03000 = 47.26
Profit:
1622.73 * 0.02000 = 32.45

TOTAL GENERAL DEVIZ: 1 655.18


TVA 1655.18 * 19.0% = 314.48
TOTAL cu TVA 1 969.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391232 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391232 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 14.000 472.87 6620
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 6620

002 TRA04A17 TONA 24.080 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 287 287

003 PI06A1 BUC. 14.000 30.98 434


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 350
MACARAUA PE PNEURI DE 9,9 TF 45.75 640
0.00 0 1424

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 350.00 640.50 286.55 8330.99
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 640.50

Detaliere transporturi:
-Articole TRA 286.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 350.00 + 640.50 * 0.000 +
286.55 * 0.000) * 0.003375 = 1.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 351.18 640.50 286.55 8332.18

Cheltuieli indirecte:
8332.18 * 0.03000 = 249.97
Profit:
8582.14 * 0.02000 = 171.64

TOTAL GENERAL DEVIZ: 8 753.78


TVA 8753.78 * 19.0% = 1 663.22
TOTAL cu TVA 10 417.00

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391233 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391233 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.245 70.98 17
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

002 DB19E1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 26
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 30
MECANICA 0.00 0 56

003 2100207 TONA 2.400 315.00 756


BAP16 0.00 0
0.00 0
0.00 0 756

004 TRA01A35 TONA 2.400 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 47 47

005 DB02D1 100 MP. 0.245 70.98 17


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 10
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 29

006 DB16H1 MP. 24.500 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 26
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 30
0.00 0 56

007 2100051 TONA 2.300 320.00 736


MAS16 0.00 0
0.00 0
0.00 0 736

008 TRA01A35 TONA 2.300 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 45 45

009 TRA05A49 TONA 0.023 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 70.84 62.54 93.04 1754.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 62.54

Detaliere transporturi:
-Articole TRA 93.04

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 70.84 + 62.54 * 0.000 +
93.04 * 0.000) * 0.003375 = 0.24

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.305 1528.14 71.08 62.54 93.04 1754.80
391233 pag 2
======================================================================================================================

Cheltuieli indirecte:
1754.80 * 0.03000 = 52.64
Profit:
1807.44 * 0.02000 = 36.15

TOTAL GENERAL DEVIZ: 1 843.59


TVA 1843.59 * 19.0% = 350.28
TOTAL cu TVA 2 193.88

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391234 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391234 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 14.400 0.65 9
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 1014
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 1023

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2916.16 0.00 0.00 3473.38

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2916.16 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.653 557.22 2926.00 0.00 0.00 3483.22

Cheltuieli indirecte:
3483.22 * 0.03000 = 104.50
Profit:
3587.72 * 0.02000 = 71.75

TOTAL GENERAL DEVIZ: 3 659.47


TVA 3659.47 * 19.0% = 695.30
TOTAL cu TVA 4 354.77

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391235 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391235 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 84.000 4.62 388
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 1599
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 1987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1599.26 0.00 0.00 1987.22

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1599.26 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1604.66 0.00 0.00 1992.61

Cheltuieli indirecte:
1992.61 * 0.03000 = 59.78
Profit:
2052.39 * 0.02000 = 41.05

TOTAL GENERAL DEVIZ: 2 093.44


TVA 2093.44 * 19.0% = 397.75
TOTAL cu TVA 2 491.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391236 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391236 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 1400.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 756
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 756

002 PD02A1 KG 1400.000 0.06 77


MONT.ARMATURI PT.BETON ARMAT IN 0.50 705
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 783

003 2100205 KG 1400.000 2.90 4061


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 4061

004 TRA04A17 TONA 1.400 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 17 17

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.421 4138.89 1461.04 0.00 16.66 5616.59

Detaliere transporturi:
-Articole TRA 16.66

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1461.04 + 0.00 * 0.000 +
16.66 * 0.000) * 0.003375 = 4.93

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.421 4138.89 1465.97 0.00 16.66 5621.52

Cheltuieli indirecte:
5621.52 * 0.03000 = 168.65
Profit:
5790.17 * 0.02000 = 115.80

TOTAL GENERAL DEVIZ: 5 905.97


TVA 5905.97 * 19.0% = 1 122.13
TOTAL cu TVA 7 028.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391237 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391237 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 60.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 2591
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 160
MANUAL 0.00 0 2751

002 2100899 M.C. 60.000 210.00 12600


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 12600

003 TRA06A17 TONA 150.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1586 1586

004 TSA24B1 ORA 30.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 478
DE 8,1-14KW 0.00 0 478

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2591.16 638.10 1585.50 17415.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 638.10

Detaliere transporturi:
-Articole TRA 1 585.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2591.16 + 638.10 * 0.000 +
1585.50 * 0.000) * 0.003375 = 8.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2599.91 638.10 1585.50 17424.05

Cheltuieli indirecte:
17424.05 * 0.03000 = 522.72
Profit:
17946.77 * 0.02000 = 358.94

TOTAL GENERAL DEVIZ: 18 305.70


TVA 18305.70 * 19.0% = 3 478.08
TOTAL cu TVA 21 783.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391238 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391238 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 84.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 818
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1206
EXISTENTE CU POMPA 0.00 0 2024

002 2101004 M.C. 84.000 255.00 21420


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 21420

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 817.64 1205.99 2219.70 25663.33
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1205.99

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 817.64 + 1205.99 * 0.000 +
2219.70 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 820.40 1205.99 2219.70 25666.09

Cheltuieli indirecte:
25666.09 * 0.03000 = 769.98
Profit:
26436.07 * 0.02000 = 528.72

TOTAL GENERAL DEVIZ: 26 964.79


TVA 26964.79 * 19.0% = 5 123.31
TOTAL cu TVA 32 088.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391239 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391239 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 3.500 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 527
0.00 0 527

002 TRA01A02 TONA 630.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 706 706

003 TSD01D1 M.C. 70.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 797
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 797

004 TSD05B1 100 MC. 3.500 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 617
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 561
STRAT DIN PAM.COEZI 0.00 0 1178

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1414.00 1088.56 705.60 3208.16
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1088.56

Detaliere transporturi:
-Articole TRA 705.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1414.00 + 1088.56 * 0.000 +
705.60 * 0.000) * 0.003375 = 4.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1418.77 1088.56 705.60 3212.93

Cheltuieli indirecte:
3212.93 * 0.03000 = 96.39
Profit:
3309.32 * 0.02000 = 66.19

TOTAL GENERAL DEVIZ: 3 375.51


TVA 3375.51 * 19.0% = 641.35
TOTAL cu TVA 4 016.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391240 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391240 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 280.000 3.19 894
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 1120
NISIP 0.00 0
0.00 0 2014

002 TRA01A17 TONA 47.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 453 453

003 IFA03C1 MP. 280.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 7840
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 7840

004 2100957 M.C. 28.000 190.00 5320


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 5320

005 TRA06A17 TONA 70.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 740 740

006 TRI1AA01C1 TONA 70.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 490
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 490

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9450.00 0.00 1193.05 16857.51

Detaliere transporturi:
-Articole TRA 1 193.05

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9450.00 + 0.00 * 0.000 +
1193.05 * 0.000) * 0.003375 = 31.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9481.89 0.00 1193.05 16889.41

Cheltuieli indirecte:
16889.41 * 0.03000 = 506.68
Profit:
17396.09 * 0.02000 = 347.92

TOTAL GENERAL DEVIZ: 17 744.01


TVA 17744.01 * 19.0% = 3 371.36
TOTAL cu TVA 21 115.37

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391241 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391241 SCARI PE TALUZ INCLUSIV MANA CURENTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK29A1 M 11.000 29.31 322
SCARI PE TALUZ DIN TREPTE DE BETON 55.87 615
PREFABRICATE PE SANTIER 1.34 15
0.00 0 952

002 PK18A1 M 11.000 148.48 1633


MINA CURENTA SI UMPLUT. TEVI OTEL CONF. 192.21 2114
SANTIER SI STILPI B. A. MONOLIT SAU 0.00 0
PREFABRICAT 0.00 0 3748

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.282 1955.72 2728.84 14.69 0.00 4699.26
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 14.69

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2728.84 + 14.69 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.21

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.282 1955.72 2738.05 14.69 0.00 4708.47

Cheltuieli indirecte:
4708.47 * 0.03000 = 141.25
Profit:
4849.72 * 0.02000 = 96.99

TOTAL GENERAL DEVIZ: 4 946.72


TVA 4946.72 * 19.0% = 939.88
TOTAL cu TVA 5 886.59

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391242 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0029 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTELE
Lista cu cantitatile de lucrari
Deviz oferta 391242 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 100.000 2.23 223
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

002 6306339 KG 2071.000 4.66 9651


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 9651

003 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

004 TRA06A17 TONA 20.750 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 219 219

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2073.00 0.00 219.33 13743.14

Detaliere transporturi:
-Articole TRA 219.33

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2073.00 + 0.00 * 0.000 +
219.33 * 0.000) * 0.003375 = 7.00

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2080.00 0.00 219.33 13750.13

Cheltuieli indirecte:
13750.13 * 0.03000 = 412.50
Profit:
14162.64 * 0.02000 = 283.25

TOTAL GENERAL DEVIZ: 14 445.89


TVA 14445.89 * 19.0% = 2 744.72
TOTAL cu TVA 17 190.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391243 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0030 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391243 SAPATURA PENTRU PROFILAREA ALBIEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.750 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 123
0.00 0 123

002 TSC35B31 100 MC. 0.750 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 128
M 0.00 0 128

003 TRA01A02 TONA 135.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 151 151

004 TSD03C1 100 MC. 0.900 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 38
TER.CAT.1 SAU 2 0.00 0 38

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 289.14 151.20 440.34
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 289.14

Detaliere transporturi:
-Articole TRA 151.20

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 289.14 151.20 440.34

Cheltuieli indirecte:
440.34 * 0.03000 = 13.21
Profit:
453.55 * 0.02000 = 9.07

TOTAL GENERAL DEVIZ: 462.62


TVA 462.62 * 19.0% = 87.90
TOTAL cu TVA 550.52

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391244 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0031 45000000 POD KM. 6+450 PESTE PARAUL MUEREASCA-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391244 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 3270001 M.C. 0.800 180.00 144


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391244 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391245 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0032 45000000 POD KM. 6+800 PESTE PARAU-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391245 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 297.830 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 911
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 911

002 TRA01A02 TONA 43.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 48 48

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 911.36 0.00 48.16 959.52

Detaliere transporturi:
-Articole TRA 48.16

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 911.36 + 0.00 * 0.000 +
48.16 * 0.000) * 0.003375 = 3.08

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 914.44 0.00 48.16 962.60

Cheltuieli indirecte:
962.60 * 0.03000 = 28.88
Profit:
991.47 * 0.02000 = 19.83

TOTAL GENERAL DEVIZ: 1 011.30


TVA 1011.30 * 19.0% = 192.15
TOTAL cu TVA 1 203.45

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391246 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0032 45000000 POD KM. 6+800 PESTE PARAU-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391246 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 135.760 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 9177
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 6565
FUND DRUM 0.00 0 15742

002 TRI1AA02C3 TONA 339.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 3051
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 3051

003 TRA01A02 TONA 339.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 380 380

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 12228.35 6564.54 379.68 19172.57
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 6564.54

Detaliere transporturi:
-Articole TRA 379.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 12228.35 + 6564.54 * 0.000 +
379.68 * 0.000) * 0.003375 = 41.27

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 12269.62 6564.54 379.68 19213.84

Cheltuieli indirecte:
19213.84 * 0.03000 = 576.42
Profit:
19790.25 * 0.02000 = 395.81

TOTAL GENERAL DEVIZ: 20 186.06


TVA 20186.06 * 19.0% = 3 835.35
TOTAL cu TVA 24 021.41

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391247 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0032 45000000 POD KM. 6+800 PESTE PARAU-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391247 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 2.480 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 509
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 509

002 TSC19C1 100 MC. 1.240 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 203
0.00 0 203

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 508.90 202.96 0.00 711.86
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 202.96

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 508.90 + 202.96 * 0.000 +
0.00 * 0.000) * 0.003375 = 1.72

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 510.61 202.96 0.00 713.58

Cheltuieli indirecte:
713.58 * 0.03000 = 21.41
Profit:
734.98 * 0.02000 = 14.70

TOTAL GENERAL DEVIZ: 749.68


TVA 749.68 * 19.0% = 142.44
TOTAL cu TVA 892.12

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391248 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391248 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 64.160 0.60 39
MONTAREA SI DEMONTARE SCHELEI MET 9.60 616
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 655

002 AUT1303 ORA 120.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 120
0.00 0 120

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.049 38.71 615.94 120.00 0.00 774.65
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 120.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 615.94 + 120.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 2.08

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.049 38.71 618.01 120.00 0.00 776.73

Cheltuieli indirecte:
776.73 * 0.03000 = 23.30
Profit:
800.03 * 0.02000 = 16.00

TOTAL GENERAL DEVIZ: 816.03


TVA 816.03 * 19.0% = 155.05
TOTAL cu TVA 971.08

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391249 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391249 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 224.560 2.20 494
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 13546
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 14040

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.164 494.49 13545.59 0.00 0.00 14040.09

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 13545.59 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 45.72

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.164 494.49 13591.31 0.00 0.00 14085.80

Cheltuieli indirecte:
14085.80 * 0.03000 = 422.57
Profit:
14508.38 * 0.02000 = 290.17

TOTAL GENERAL DEVIZ: 14 798.54


TVA 14798.54 * 19.0% = 2 811.72
TOTAL cu TVA 17 610.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391250 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391250 APARATE DE REAZAM DIN NEOPREN

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100216 BUC. 28.000 102.00 2856
APARATE REAZAM DIN NEOPREN TIP 3 0.00 0
0.00 0
0.00 0 2856

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.280 2856.00 0.00 0.00 0.00 2856.00

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.280 2856.00 0.00 0.00 0.00 2856.00

Cheltuieli indirecte:
2856.00 * 0.03000 = 85.68
Profit:
2941.68 * 0.02000 = 58.83

TOTAL GENERAL DEVIZ: 3 000.51


TVA 3000.51 * 19.0% = 570.10
TOTAL cu TVA 3 570.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391251 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391251 GRINZI PREF. PRECOMPRIMATE CU ARM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PI08B1 BUC. 14.000 0.00 0
ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT PRECOMPRIMAT 0.00 0
0.00 0 0

002 2100217 BUC. 14.000 5500.00 77000


GRINDA PREFABRICATA PRECOMPRIMATA CU 0.00 0
ARMATURA ADERENTA L=12M, H=0.52 0.00 0
0.00 0 77000

003 PI06A1 BUC. 14.000 30.98 434


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 350
MACARAUA PE PNEURI DE 9,9 TF 45.75 640
0.00 0 1424

004 TRA04A49 TONA 63.000 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.49 KM.* 131.60 8291 8291

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.618 77433.80 350.00 640.50 8290.80 86715.10
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 640.50

Detaliere transporturi:
-Articole TRA 8 290.80

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 350.00 + 640.50 * 0.000 +
8290.80 * 0.000) * 0.003375 = 1.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.618 77433.80 351.18 640.50 8290.80 86716.29

Cheltuieli indirecte:
86716.29 * 0.03000 = 2 601.49
Profit:
89317.77 * 0.02000 = 1 786.36

TOTAL GENERAL DEVIZ: 91 104.13


TVA 91104.13 * 19.0% = 17 309.78
TOTAL cu TVA 108 413.91

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391252 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391252 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
007 CZ0302K1 [ 1] KG 4200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 2268
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 2268

008 PD02A1 KG 4200.000 0.06 232


MONT.ARMATURI PT.BETON ARMAT IN 0.50 2115
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 2348

009 2100205 KG 4200.000 2.90 12184


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 12184

010 TRA04A17 TONA 4.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 50 50

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.263 12416.67 4383.12 0.00 49.98 16849.77

Detaliere transporturi:
-Articole TRA 49.98

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4383.12 + 0.00 * 0.000 +
49.98 * 0.000) * 0.003375 = 14.79

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.263 12416.67 4397.91 0.00 49.98 16864.56

Cheltuieli indirecte:
16864.56 * 0.03000 = 505.94
Profit:
17370.50 * 0.02000 = 347.41

TOTAL GENERAL DEVIZ: 17 717.91


TVA 17717.91 * 19.0% = 3 366.40
TOTAL cu TVA 21 084.31

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391253 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391253 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 73.440 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 715
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 788
0.00 0 1503

002 3270091 M.C. 73.440 255.00 18727


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 18727

003 TRA06A17 TONA 183.600 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1941 1941

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


183.600 18727.20 714.85 788.08 1940.65 22170.79
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 788.08

Detaliere transporturi:
-Articole TRA 1 940.65

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 714.85 + 788.08 * 0.000 +
1940.65 * 0.000) * 0.003375 = 2.41

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


183.600 18727.20 717.26 788.08 1940.65 22173.20

Cheltuieli indirecte:
22173.20 * 0.03000 = 665.20
Profit:
22838.40 * 0.02000 = 456.77

TOTAL GENERAL DEVIZ: 23 295.16


TVA 23295.16 * 19.0% = 4 426.08
TOTAL cu TVA 27 721.24

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391254 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391254 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 175.160 0.05 9
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 841
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 850

002 PF04A1 MP. 175.160 6.36 1114


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 165
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 1279

003 PF05B1 MP. 175.160 9.98 1748


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 630
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 315
STRAT MASTIC. 0.00 0 2693

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.290 2871.04 1635.61 315.29 0.00 4821.94
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 315.29

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1635.61 + 315.29 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.52

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.290 2871.04 1641.13 315.29 0.00 4827.46

Cheltuieli indirecte:
4827.46 * 0.03000 = 144.82
Profit:
4972.28 * 0.02000 = 99.45

TOTAL GENERAL DEVIZ: 5 071.73


TVA 5071.73 * 19.0% = 963.63
TOTAL cu TVA 6 035.36

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391255 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391255 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 88.220 4.87 429
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 518
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 26
4CM GROS LA POD 0.00 0 973

002 2100047 TONA 6.350 310.00 1968


BA 8 0.00 0
0.00 0
0.00 0 1968

003 TRA01A35 TONA 6.350 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 124 124

004 DB02D1 100 MP. 0.880 70.98 62


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 35
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 5
EMULSIE CATIONICA 0.00 0 103

005 DB19E1 MP. 88.220 0.03 2


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 92
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 108
MECANICA 0.00 0 202

006 2100207 TONA 8.650 315.00 2725


BAP16 0.00 0
0.00 0
0.00 0 2725

007 TRA01A35 TONA 8.650 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 170 170

008 DB02D1 100 MP. 0.880 70.98 62


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 35
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 5
EMULSIE CATIONICA 0.00 0 103

009 DB16H1 MP. 88.220 0.03 2


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 92
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 108
0.00 0 202

010 2100051 TONA 8.290 320.00 2653


MAS16 0.00 0
0.00 0
0.00 0 2653

011 TRA01A35 TONA 8.290 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 162 162

012 TRA05A49 TONA 0.080 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 3 3

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


41.652 7905.35 772.90 250.88 459.69 9388.82
Din care:
Valoare aferenta utilaje termice = 0.00
391255 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 250.88

Detaliere transporturi:
-Articole TRA 459.69

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 772.90 + 250.88 * 0.000 +
459.69 * 0.000) * 0.003375 = 2.61

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


41.652 7905.35 775.50 250.88 459.69 9391.43

Cheltuieli indirecte:
9391.43 * 0.03000 = 281.74
Profit:
9673.17 * 0.02000 = 193.46

TOTAL GENERAL DEVIZ: 9 866.64


TVA 9866.64 * 19.0% = 1 874.66
TOTAL cu TVA 11 741.30

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391256 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391256 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 32.080 3.19 102
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 946
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 1048

002 2100202 KG 2245.600 6.44 14468


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 14468

003 3270091 M.C. 3.880 255.00 989


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 989

004 TRA06A17 TONA 9.700 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 103 103

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.977 15559.98 945.81 0.00 102.53 16608.33

Detaliere transporturi:
-Articole TRA 102.53

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 945.81 + 0.00 * 0.000 +
102.53 * 0.000) * 0.003375 = 3.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


11.977 15559.98 949.01 0.00 102.53 16611.52

Cheltuieli indirecte:
16611.52 * 0.03000 = 498.35
Profit:
17109.87 * 0.02000 = 342.20

TOTAL GENERAL DEVIZ: 17 452.06


TVA 17452.06 * 19.0% = 3 315.89
TOTAL cu TVA 20 767.96

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391257 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391257 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 24.000 22.95 551
BORDURI PREFABRICATE DIN BETON PT 11.80 283
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 834

002 PF01A1 MP. 3.600 3.15 11


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 51
MARCA 100 DRISCUITA 0.19 1
0.00 0 63

003 PF09A1 M 48.000 41.21 1978


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 288
SAPEI HIDR 0.00 0
0.00 0 2266

004 PB06A1 M.C. 8.880 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 425
ZID,TIMPAN MANUAL 2.50 22
0.00 0 447

005 2100898 M.C. 8.880 200.00 1776


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 1776

006 TRA06A17 TONA 22.200 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 235 235

007 DB02D1 100 MP. 0.440 70.98 31


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 18
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 51

008 TRA05A49 TONA 0.020 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 44.400 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 72
DE 2,5 CM CU ASTERNERE MANUALA 0.32 14
0.00 0 87

010 2100047 TONA 3.200 310.00 992


BA 8 0.00 0
0.00 0
0.00 0 992

011 TRA01A35 TONA 3.200 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 63 63

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.433 5340.62 1136.68 39.36 298.18 6814.83
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 39.36

Detaliere transporturi:
-Articole TRA 298.18
391257 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1136.68 + 39.36 * 0.000 +
298.18 * 0.000) * 0.003375 = 3.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.433 5340.62 1140.51 39.36 298.18 6818.67

Cheltuieli indirecte:
6818.67 * 0.03000 = 204.56
Profit:
7023.23 * 0.02000 = 140.46

TOTAL GENERAL DEVIZ: 7 163.69


TVA 7163.69 * 19.0% = 1 361.10
TOTAL cu TVA 8 524.80

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391258 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391258 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 977.480 8.30 8117
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 8117

002 PK31A1 TONA 0.977 201.46 197


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 878
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 1075

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.131 8313.82 878.03 0.00 0.00 9191.85

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 878.03 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 2.96

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.131 8313.82 880.99 0.00 0.00 9194.81

Cheltuieli indirecte:
9194.81 * 0.03000 = 275.84
Profit:
9470.66 * 0.02000 = 189.41

TOTAL GENERAL DEVIZ: 9 660.07


TVA 9660.07 * 19.0% = 1 835.41
TOTAL cu TVA 11 495.49

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391259 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391259 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.000 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 19
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 19

002 PC05A1 MP. 10.000 2.20 22


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 603
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 625

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 18.200 1813.50 33006


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 33006

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.968 34406.58 982.40 60.37 0.00 35449.35
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 982.40 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.32

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.968 34406.58 985.72 60.37 0.00 35452.66

Cheltuieli indirecte:
35452.66 * 0.03000 = 1 063.58
Profit:
36516.24 * 0.02000 = 730.32

TOTAL GENERAL DEVIZ: 37 246.57


TVA 37246.57 * 19.0% = 7 076.85
TOTAL cu TVA 44 323.42

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391260 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0033 45000000 POD KM. 6+800 PESTE PARAU- SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391260 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 218.400 0.60 132
MONTAREA SI DEMONTARE SCHELEI MET 9.60 2097
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 2228

002 AUT1303 ORA 56.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 56
0.00 0 56

003 RPCB12A1 MP. 65.520 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 1245
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 1245

004 IZA01A1 MP. 65.520 0.49 32


CURATIREA PRIN SABLARE PT PROT 7.20 472
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 993
0.00 0 1497

005 PK48C1 [ 1] TONA 0.100 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 9

006 YC01RON LEI. 4245.000 1.00 4245


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 4245

007 2100211 KG 65.520 20.75 1360


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 1360

008 NMB109921 ORA 112.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2240
0.00 0
0.00 0 2240

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.462 5768.23 6062.03 1049.28 0.00 12879.54
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1049.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6062.03 + 1049.28 * 0.000 +
0.00 * 0.000) * 0.003375 = 20.46

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.462 5768.23 6082.49 1049.28 0.00 12900.00

Cheltuieli indirecte:
12900.00 * 0.03000 = 387.00
Profit:
13287.00 * 0.02000 = 265.74

TOTAL GENERAL DEVIZ: 13 552.74


TVA 13552.74 * 19.0% = 2 575.02
391260 pag 2
======================================================================================================================
TOTAL cu TVA 16 127.77

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391261 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391261 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 151.200 3.40 515
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 2812
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 3327

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.367 514.60 2812.17 0.00 0.00 3326.77

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2812.17 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.49

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.367 514.60 2821.66 0.00 0.00 3336.26

Cheltuieli indirecte:
3336.26 * 0.03000 = 100.09
Profit:
3436.35 * 0.02000 = 68.73

TOTAL GENERAL DEVIZ: 3 505.08


TVA 3505.08 * 19.0% = 665.96
TOTAL cu TVA 4 171.04

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391262 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391262 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 168.350 0.01 1
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 7270
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 448
MANUAL 0.00 0 7719

002 2100914 M.C. 168.350 215.00 36196


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 36196

003 TRA06A17 TONA 421.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 4450 4450

004 TSA24B1 ORA 84.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 1340
DE 8,1-14KW 0.00 0 1340

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


404.040 36196.43 7270.36 1787.61 4449.97 49704.37
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1787.61

Detaliere transporturi:
-Articole TRA 4 449.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 7270.36 + 1787.61 * 0.000 +
4449.97 * 0.000) * 0.003375 = 24.54

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


404.040 36196.43 7294.90 1787.61 4449.97 49728.91

Cheltuieli indirecte:
49728.91 * 0.03000 = 1 491.87
Profit:
51220.78 * 0.02000 = 1 024.42

TOTAL GENERAL DEVIZ: 52 245.19


TVA 52245.19 * 19.0% = 9 926.59
TOTAL cu TVA 62 171.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391263 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391263 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 271.440 4.62 1254
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5168
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6422

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5167.89 0.00 0.00 6421.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5167.89 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 17.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5185.33 0.00 0.00 6438.99

Cheltuieli indirecte:
6438.99 * 0.03000 = 193.17
Profit:
6632.16 * 0.02000 = 132.64

TOTAL GENERAL DEVIZ: 6 764.80


TVA 6764.80 * 19.0% = 1 285.31
TOTAL cu TVA 8 050.12

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391264 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391264 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 9400.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 5076
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 5076

002 PD02A1 KG 9400.000 0.06 520


MONT.ARMATURI PT.BETON ARMAT IN 0.50 4734
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 5254

003 2100205 KG 9400.000 2.90 27269


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 27269

004 TRA04A17 TONA 9.400 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 112 112

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.541 27789.69 9809.84 0.00 111.86 37711.39

Detaliere transporturi:
-Articole TRA 111.86

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9809.84 + 0.00 * 0.000 +
111.86 * 0.000) * 0.003375 = 33.11

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.541 27789.69 9842.95 0.00 111.86 37744.50

Cheltuieli indirecte:
37744.50 * 0.03000 = 1 132.33
Profit:
38876.83 * 0.02000 = 777.54

TOTAL GENERAL DEVIZ: 39 654.37


TVA 39654.37 * 19.0% = 7 534.33
TOTAL cu TVA 47 188.70

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391265 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391265 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 204.750 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 1993
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 2940
EXISTENTE CU POMPA 0.00 0 4933

002 2101004 M.C. 204.750 255.00 52211


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 52211

003 TRA06A17 TONA 512.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 5412 5412

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1993.00 2939.60 5411.84 62555.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2939.60

Detaliere transporturi:
-Articole TRA 5 411.84

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1993.00 + 2939.60 * 0.000 +
5411.84 * 0.000) * 0.003375 = 6.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1999.72 2939.60 5411.84 62562.41

Cheltuieli indirecte:
62562.41 * 0.03000 = 1 876.87
Profit:
64439.28 * 0.02000 = 1 288.79

TOTAL GENERAL DEVIZ: 65 728.07


TVA 65728.07 * 19.0% = 12 488.33
TOTAL cu TVA 78 216.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391266 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391266 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 377.280 0.60 228
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3622
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3850

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 113.180 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2150
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2150

004 IZA01A1 MP. 113.180 0.49 55


CURATIREA PRIN SABLARE PT PROT 7.20 815
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1716
0.00 0 2586

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 113.000 20.75 2345


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2345

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.626 3967.76 9238.19 2103.36 0.00 15309.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2103.36

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9238.19 + 2103.36 * 0.000 +
0.00 * 0.000) * 0.003375 = 31.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.626 3967.76 9269.36 2103.36 0.00 15340.48

Cheltuieli indirecte:
15340.48 * 0.03000 = 460.21
391266 pag 2
======================================================================================================================
Profit:
15800.70 * 0.02000 = 316.01

TOTAL GENERAL DEVIZ: 16 116.71


TVA 16116.71 * 19.0% = 3 062.18
TOTAL cu TVA 19 178.89

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391267 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391267 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 33.750 39.44 1331
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 1688
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 3019

002 TRA01A34 TONA 67.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1276 1276

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1687.50 0.00 1275.68 4294.28

Detaliere transporturi:
-Articole TRA 1 275.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1687.50 + 0.00 * 0.000 +
1275.68 * 0.000) * 0.003375 = 5.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1693.20 0.00 1275.68 4299.98

Cheltuieli indirecte:
4299.98 * 0.03000 = 129.00
Profit:
4428.97 * 0.02000 = 88.58

TOTAL GENERAL DEVIZ: 4 517.55


TVA 4517.55 * 19.0% = 858.34
TOTAL cu TVA 5 375.89

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391268 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0034 45000000 POD KM. 6+800 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391268 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 8.000 22.95 184
BORDURI PREFABRICATE DIN BETON PT 11.80 94
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 278

002 2100898 M.C. 0.360 200.00 72


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 72

003 TRA06A17 TONA 0.900 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 10 10

004 PB06A1 M.C. 2.960 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 142
ZID,TIMPAN MANUAL 2.50 7
0.00 0 149

005 2100898 M.C. 2.960 200.00 592


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 592

006 TRA06A17 TONA 7.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 78 78

007 DB02D1 100 MP. 0.148 70.98 11


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 6
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 17

008 DB18A1 MP. 14.800 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 24
DE 2,5 CM CU ASTERNERE MANUALA 0.32 5
0.00 0 29

009 2100047 TONA 1.060 310.00 329


BA 8 0.00 0
0.00 0
0.00 0 329

010 TRA01A35 TONA 1.060 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 21 21

011 TRA05A49 TONA 0.006 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 265.90 12.91 108.75 1574.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 12.91

Detaliere transporturi:
-Articole TRA 108.75
391268 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 265.90 + 12.91 * 0.000 +
108.75 * 0.000) * 0.003375 = 0.90

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 266.79 12.91 108.75 1575.46

Cheltuieli indirecte:
1575.46 * 0.03000 = 47.26
Profit:
1622.73 * 0.02000 = 32.45

TOTAL GENERAL DEVIZ: 1 655.18


TVA 1655.18 * 19.0% = 314.48
TOTAL cu TVA 1 969.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391269 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391269 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 10.000 472.87 4729
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 4729

002 TRA04A17 TONA 17.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 205 205

003 PI06A1 BUC. 10.000 30.98 310


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 250
MACARAUA PE PNEURI DE 9,9 TF 45.75 458
0.00 0 1017

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.00 457.50 204.68 5950.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 457.50

Detaliere transporturi:
-Articole TRA 204.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 250.00 + 457.50 * 0.000 +
204.68 * 0.000) * 0.003375 = 0.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.84 457.50 204.68 5951.55

Cheltuieli indirecte:
5951.55 * 0.03000 = 178.55
Profit:
6130.10 * 0.02000 = 122.60

TOTAL GENERAL DEVIZ: 6 252.70


TVA 6252.70 * 19.0% = 1 188.01
TOTAL cu TVA 7 440.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391270 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391270 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.490 70.98 35
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

002 DB19E1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 51
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 60
MECANICA 0.00 0 112

003 2100207 TONA 4.800 315.00 1512


BAP16 0.00 0
0.00 0
0.00 0 1512

004 TRA01A35 TONA 4.800 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 94 94

005 DB02D1 100 MP. 0.490 70.98 35


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

006 DB16H1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 51
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 60
0.00 0 112

007 2100051 TONA 4.600 320.00 1472


MAS16 0.00 0
0.00 0
0.00 0 1472

008 TRA01A35 TONA 4.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 90 90

009 TRA05A49 TONA 0.044 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2 2

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 141.69 125.07 186.00 3509.04
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 125.07

Detaliere transporturi:
-Articole TRA 186.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 141.69 + 125.07 * 0.000 +
186.00 * 0.000) * 0.003375 = 0.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 142.17 125.07 186.00 3509.52
391270 pag 2
======================================================================================================================

Cheltuieli indirecte:
3509.52 * 0.03000 = 105.29
Profit:
3614.81 * 0.02000 = 72.30

TOTAL GENERAL DEVIZ: 3 687.10


TVA 3687.10 * 19.0% = 700.55
TOTAL cu TVA 4 387.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391271 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391271 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 30.000 0.65 19
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 2112
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 2131

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.667 567.35 4014.39 0.00 0.00 4581.74

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4014.39 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 13.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.667 567.35 4027.94 0.00 0.00 4595.29

Cheltuieli indirecte:
4595.29 * 0.03000 = 137.86
Profit:
4733.15 * 0.02000 = 94.66

TOTAL GENERAL DEVIZ: 4 827.81


TVA 4827.81 * 19.0% = 917.28
TOTAL cu TVA 5 745.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391272 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391272 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 84.000 4.62 388
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 1599
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 1987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1599.26 0.00 0.00 1987.22

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1599.26 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1604.66 0.00 0.00 1992.61

Cheltuieli indirecte:
1992.61 * 0.03000 = 59.78
Profit:
2052.39 * 0.02000 = 41.05

TOTAL GENERAL DEVIZ: 2 093.44


TVA 2093.44 * 19.0% = 397.75
TOTAL cu TVA 2 491.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391273 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391273 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 2200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 1188
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 1188

002 PD02A1 KG 2200.000 0.06 122


MONT.ARMATURI PT.BETON ARMAT IN 0.50 1108
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 1230

003 2100205 KG 2200.000 2.90 6382


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 6382

004 TRA04A17 TONA 2.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 26 26

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2295.92 0.00 26.18 8826.07

Detaliere transporturi:
-Articole TRA 26.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2295.92 + 0.00 * 0.000 +
26.18 * 0.000) * 0.003375 = 7.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2303.67 0.00 26.18 8833.82

Cheltuieli indirecte:
8833.82 * 0.03000 = 265.01
Profit:
9098.83 * 0.02000 = 181.98

TOTAL GENERAL DEVIZ: 9 280.81


TVA 9280.81 * 19.0% = 1 763.35
TOTAL cu TVA 11 044.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391274 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391274 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 60.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 2591
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 160
MANUAL 0.00 0 2751

002 2100899 M.C. 60.000 210.00 12600


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 12600

003 TRA06A17 TONA 150.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1586 1586

004 TSA24B1 ORA 30.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 478
DE 8,1-14KW 0.00 0 478

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2591.16 638.10 1585.50 17415.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 638.10

Detaliere transporturi:
-Articole TRA 1 585.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2591.16 + 638.10 * 0.000 +
1585.50 * 0.000) * 0.003375 = 8.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2599.91 638.10 1585.50 17424.05

Cheltuieli indirecte:
17424.05 * 0.03000 = 522.72
Profit:
17946.77 * 0.02000 = 358.94

TOTAL GENERAL DEVIZ: 18 305.70


TVA 18305.70 * 19.0% = 3 478.08
TOTAL cu TVA 21 783.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391275 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391275 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 84.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 818
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1206
EXISTENTE CU POMPA 0.00 0 2024

002 2101004 M.C. 84.000 255.00 21420


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 21420

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 817.64 1205.99 2219.70 25663.33
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1205.99

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 817.64 + 1205.99 * 0.000 +
2219.70 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 820.40 1205.99 2219.70 25666.09

Cheltuieli indirecte:
25666.09 * 0.03000 = 769.98
Profit:
26436.07 * 0.02000 = 528.72

TOTAL GENERAL DEVIZ: 26 964.79


TVA 26964.79 * 19.0% = 5 123.31
TOTAL cu TVA 32 088.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391276 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391276 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 3.500 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 527
0.00 0 527

002 TRA01A02 TONA 630.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 706 706

003 TSD01D1 M.C. 70.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 797
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 797

004 TSD05B1 100 MC. 3.500 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 617
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 561
STRAT DIN PAM.COEZI 0.00 0 1178

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1414.00 1088.56 705.60 3208.16
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1088.56

Detaliere transporturi:
-Articole TRA 705.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1414.00 + 1088.56 * 0.000 +
705.60 * 0.000) * 0.003375 = 4.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1418.77 1088.56 705.60 3212.93

Cheltuieli indirecte:
3212.93 * 0.03000 = 96.39
Profit:
3309.32 * 0.02000 = 66.19

TOTAL GENERAL DEVIZ: 3 375.51


TVA 3375.51 * 19.0% = 641.35
TOTAL cu TVA 4 016.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391277 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391277 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 84.000 3.19 268
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 336
NISIP 0.00 0
0.00 0 604

002 TRA01A17 TONA 14.280 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 136 136

003 IFA03C1 MP. 84.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 2352
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 2352

004 2100957 M.C. 8.400 190.00 1596


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1596

005 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

006 TRI1AA01C1 TONA 21.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 147
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 147

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2835.00 0.00 357.92 5057.25

Detaliere transporturi:
-Articole TRA 357.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2835.00 + 0.00 * 0.000 +
357.92 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2844.57 0.00 357.92 5066.82

Cheltuieli indirecte:
5066.82 * 0.03000 = 152.00
Profit:
5218.83 * 0.02000 = 104.38

TOTAL GENERAL DEVIZ: 5 323.20


TVA 5323.20 * 19.0% = 1 011.41
TOTAL cu TVA 6 334.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391278 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0035 45000000 POD KM. 6+800 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391278 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 50.000 2.23 111
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 1036
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 1148

002 6306339 KG 1035.500 4.66 4825


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 4825

003 2100957 M.C. 4.150 190.00 789


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 789

004 TRA06A17 TONA 10.370 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 110 110

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 5725.41 1036.50 0.00 109.61 6871.52

Detaliere transporturi:
-Articole TRA 109.61

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1036.50 + 0.00 * 0.000 +
109.61 * 0.000) * 0.003375 = 3.50

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 5725.41 1040.00 0.00 109.61 6875.01

Cheltuieli indirecte:
6875.01 * 0.03000 = 206.25
Profit:
7081.26 * 0.02000 = 141.63

TOTAL GENERAL DEVIZ: 7 222.89


TVA 7222.89 * 19.0% = 1 372.35
TOTAL cu TVA 8 595.24

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391279 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0036 45000000 POD KM. 6+800 PASTE PARAU-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391279 SAPATURA PENTRU PROFILAREA ALBIEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.250 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 41
0.00 0 41

002 TSC35B31 100 MC. 0.250 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 43
M 0.00 0 43

003 TRA01A02 TONA 45.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 50 50

004 TSD03C1 100 MC. 0.300 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 13
TER.CAT.1 SAU 2 0.00 0 13

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 96.38 50.40 146.78
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 96.38

Detaliere transporturi:
-Articole TRA 50.40

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 96.38 50.40 146.78

Cheltuieli indirecte:
146.78 * 0.03000 = 4.40
Profit:
151.18 * 0.02000 = 3.02

TOTAL GENERAL DEVIZ: 154.21


TVA 154.21 * 19.0% = 29.30
TOTAL cu TVA 183.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391280 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0037 45000000 POD KM. 6+800 PESTE PARAU-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391280 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 3270001 M.C. 0.800 180.00 144


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391280 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391281 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0037 45000000 POD KM. 6+800 PESTE PARAU-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391281 VARIANTA PROVIZORIE DE CIRCULATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19B1 100 MC. 0.550 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.2 135.52 75
0.00 0 75

002 PI08A1 BUC. 4.000 0.00 0


ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT 0.00 0
0.00 0 0

003 6422963 BUC. 4.028 3745.00 15085


ELEMENT PENTRU POD TRONSON TIP C3 BETON 0.00 0
ARMAT INCARCARE SPALIERA .L=1,6M LUM 3 0.00 0
0.00 0 15085

004 DA06B1 M.C. 150.000 26.24 3936


STRAT AGREG NAT CILINDRATE CU FUNC 7.37 1106
REZIST FILTRANTIZOLAT AERISIRE SI 12.12 1819
ANTICAP CU ASTER MEC BALAST 0.00 0 6860

005 TRA01A17 TONA 334.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 3180 3180

006 DF09B1 M 100.000 2.23 223


PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

007 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

008 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.438 20820.34 3179.19 1893.29 3401.65 29294.46
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1893.29

Detaliere transporturi:
-Articole TRA 3 401.65

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3179.19 + 1893.29 * 0.000 +
3401.65 * 0.000) * 0.003375 = 10.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.438 20820.34 3189.92 1893.29 3401.65 29305.19

Cheltuieli indirecte:
29305.19 * 0.03000 = 879.16
Profit:
30184.35 * 0.02000 = 603.69
391281 pag 2
======================================================================================================================

TOTAL GENERAL DEVIZ: 30 788.04


TVA 30788.04 * 19.0% = 5 849.73
TOTAL cu TVA 36 637.76

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391282 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0038 45000000 POD KM. 7+050 PESTE PARAU-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391282 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 1108.000 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 3390
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 3390

002 TRA01A02 TONA 160.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 179 179

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3390.48 0.00 179.20 3569.68

Detaliere transporturi:
-Articole TRA 179.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3390.48 + 0.00 * 0.000 +
179.20 * 0.000) * 0.003375 = 11.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 3401.92 0.00 179.20 3581.12

Cheltuieli indirecte:
3581.12 * 0.03000 = 107.43
Profit:
3688.56 * 0.02000 = 73.77

TOTAL GENERAL DEVIZ: 3 762.33


TVA 3762.33 * 19.0% = 714.84
TOTAL cu TVA 4 477.17

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391283 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0038 45000000 POD KM. 7+050 PESTE PARAU-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391283 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 19.870 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 1343
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 961
FUND DRUM 0.00 0 2304

002 TRI1AA02C3 TONA 50.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 450
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 450

003 TRA01A02 TONA 50.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 56 56

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1793.21 960.79 56.00 2810.00
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 960.79

Detaliere transporturi:
-Articole TRA 56.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1793.21 + 960.79 * 0.000 +
56.00 * 0.000) * 0.003375 = 6.05

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1799.26 960.79 56.00 2816.05

Cheltuieli indirecte:
2816.05 * 0.03000 = 84.48
Profit:
2900.54 * 0.02000 = 58.01

TOTAL GENERAL DEVIZ: 2 958.55


TVA 2958.55 * 19.0% = 562.12
TOTAL cu TVA 3 520.67

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391284 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0038 45000000 POD KM. 7+050 PESTE PARAU-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391284 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 8.880 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 1822
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 1822

002 TSC19C1 100 MC. 4.440 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 727
0.00 0 727

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1822.18 726.74 0.00 2548.92
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 726.74

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1822.18 + 726.74 * 0.000 +
0.00 * 0.000) * 0.003375 = 6.15

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1828.33 726.74 0.00 2555.07

Cheltuieli indirecte:
2555.07 * 0.03000 = 76.65
Profit:
2631.72 * 0.02000 = 52.63

TOTAL GENERAL DEVIZ: 2 684.35


TVA 2684.35 * 19.0% = 510.03
TOTAL cu TVA 3 194.38

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391285 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391285 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 98.720 0.60 60
MONTAREA SI DEMONTARE SCHELEI MET 9.60 948
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1007

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.075 59.57 947.71 320.00 0.00 1327.28
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 947.71 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.20

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.075 59.57 950.91 320.00 0.00 1330.48

Cheltuieli indirecte:
1330.48 * 0.03000 = 39.91
Profit:
1370.39 * 0.02000 = 27.41

TOTAL GENERAL DEVIZ: 1 397.80


TVA 1397.80 * 19.0% = 265.58
TOTAL cu TVA 1 663.38

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391286 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391286 GAURI IN FASII LA PARTEA INFERIOARA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 RPCB12A1 MP. 26.080 0.00 0
INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 496
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 496

002 PJ09B1 M 2.520 0.00 0


GAURI SI STRAPUNG. D MAXIM 50MM PT. 22.00 55
INTRODUC. BUL.SI ANCOR. PT. REPAR. 41.38 104
CAMASUIELI CU FORARE MECA 0.00 0 160

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 550.95 104.28 0.00 655.23
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 104.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 550.95 + 104.28 * 0.000 +
0.00 * 0.000) * 0.003375 = 1.86

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 552.81 104.28 0.00 657.09

Cheltuieli indirecte:
657.09 * 0.03000 = 19.71
Profit:
676.80 * 0.02000 = 13.54

TOTAL GENERAL DEVIZ: 690.34


TVA 690.34 * 19.0% = 131.16
TOTAL cu TVA 821.50

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391287 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391287 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 224.000 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 685
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 685

002 RPCT40B1 MP. 224.000 0.00 0


DESFACEREA SAPEI DE PROT LA IZOL 7.04 1577
HIDROFUGE DE 4-5 CM GROSIME INCLUSIV 0.00 0
ARMATURA DIN PLASA * 0.00 0 1577

003 RPCT41A1 MP. 224.000 0.00 0


DESFACEREA IZOLATIEI HIDROFUGE VECHI IN 6.60 1478
VEDEREA REFACERII * 0.00 0
0.00 0 1478

004 TRI1AA02C3 TONA 28.850 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 260
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 260

005 TSC35C3 100 MC. 0.460 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC ROCI TARI SI F.TARI<25KG/BUC 165.90 76
LA D. < 10M 0.00 0 76

006 TRA01A02 TONA 144.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 161 161

007 CZ0302K1 [ 1] KG 4500.000 0.00 0


CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 2430
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 2430

008 PD02A1 KG 4500.000 0.06 249


MONT.ARMATURI PT.BETON ARMAT IN 0.50 2266
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 2515

009 2100205 KG 4500.000 2.90 13054


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 13054

010 TRA04A17 TONA 4.500 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 54 54

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.567 13303.58 8696.47 76.31 214.83 22291.19
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 76.31

Detaliere transporturi:
-Articole TRA 214.83

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8696.47 + 76.31 * 0.000 +
214.83 * 0.000) * 0.003375 = 29.35
391287 pag 2
======================================================================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.567 13303.58 8725.82 76.31 214.83 22320.54

Cheltuieli indirecte:
22320.54 * 0.03000 = 669.62
Profit:
22990.16 * 0.02000 = 459.80

TOTAL GENERAL DEVIZ: 23 449.96


TVA 23449.96 * 19.0% = 4 455.49
TOTAL cu TVA 27 905.45

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391288 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391288 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 66.960 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 652
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 719
0.00 0 1370

002 3270091 M.C. 66.960 255.00 17075


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 17075

003 TRA06A17 TONA 167.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1769 1769

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


167.400 17074.80 651.78 718.55 1769.42 20214.54
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 718.55

Detaliere transporturi:
-Articole TRA 1 769.42

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 651.78 + 718.55 * 0.000 +
1769.42 * 0.000) * 0.003375 = 2.20

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


167.400 17074.80 653.97 718.55 1769.42 20216.74

Cheltuieli indirecte:
20216.74 * 0.03000 = 606.50
Profit:
20823.24 * 0.02000 = 416.46

TOTAL GENERAL DEVIZ: 21 239.71


TVA 21239.71 * 19.0% = 4 035.54
TOTAL cu TVA 25 275.25

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391289 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391289 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 367.240 0.05 19
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 1763
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 1782

002 PF04A1 MP. 367.240 6.36 2336


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 345
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 2681

003 PF05B1 MP. 367.240 9.98 3664


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 1322
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 661
STRAT MASTIC. 0.00 0 5647

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.801 6019.42 3429.21 661.03 0.00 10109.67
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 661.03

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3429.21 + 661.03 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.801 6019.42 3440.79 661.03 0.00 10121.24

Cheltuieli indirecte:
10121.24 * 0.03000 = 303.64
Profit:
10424.88 * 0.02000 = 208.50

TOTAL GENERAL DEVIZ: 10 633.37


TVA 10633.37 * 19.0% = 2 020.34
TOTAL cu TVA 12 653.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391290 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391290 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 192.500 4.87 937
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 1130
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 56
4CM GROS LA POD 0.00 0 2124

002 2100047 TONA 13.860 310.00 4297


BA 8 0.00 0
0.00 0
0.00 0 4297

003 TRA01A35 TONA 13.860 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 272 272

004 DB02D1 100 MP. 1.920 70.98 136


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 77
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 11
EMULSIE CATIONICA 0.00 0 224

005 DB19E1 MP. 192.500 0.03 5


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 201
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 235
MECANICA 0.00 0 441

006 2100207 TONA 18.860 315.00 5941


BAP16 0.00 0
0.00 0
0.00 0 5941

007 TRA01A35 TONA 18.860 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 370 370

008 DB02D1 100 MP. 1.920 70.98 136


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 77
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 11
EMULSIE CATIONICA 0.00 0 224

009 DB16H1 MP. 192.500 0.03 5


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 201
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 235
0.00 0 441

010 2100051 TONA 18.090 320.00 5789


MAS16 0.00 0
0.00 0
0.00 0 5789

011 TRA01A35 TONA 18.090 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 355 355

012 TRA05A49 TONA 0.170 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 7 7

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


90.854 17246.70 1686.48 547.43 1002.69 20483.30
Din care:
Valoare aferenta utilaje termice = 0.00
391290 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 547.43

Detaliere transporturi:
-Articole TRA 1 002.69

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1686.48 + 547.43 * 0.000 +
1002.69 * 0.000) * 0.003375 = 5.69

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


90.854 17246.70 1692.17 547.43 1002.69 20488.99

Cheltuieli indirecte:
20488.99 * 0.03000 = 614.67
Profit:
21103.66 * 0.02000 = 422.07

TOTAL GENERAL DEVIZ: 21 525.73


TVA 21525.73 * 19.0% = 4 089.89
TOTAL cu TVA 25 615.62

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391291 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391291 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 49.360 3.19 157
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 1455
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 1613

002 2100202 KG 3455.200 6.44 22262


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 22262

003 3270091 M.C. 6.000 255.00 1530


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 1530

004 TRA06A17 TONA 15.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 159 159

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


18.503 23949.08 1455.28 0.00 158.55 25562.91

Detaliere transporturi:
-Articole TRA 158.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1455.28 + 0.00 * 0.000 +
158.55 * 0.000) * 0.003375 = 4.91

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


18.503 23949.08 1460.19 0.00 158.55 25567.82

Cheltuieli indirecte:
25567.82 * 0.03000 = 767.03
Profit:
26334.86 * 0.02000 = 526.70

TOTAL GENERAL DEVIZ: 26 861.55


TVA 26861.55 * 19.0% = 5 103.70
TOTAL cu TVA 31 965.25

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391292 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391292 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 36.000 22.95 826
BORDURI PREFABRICATE DIN BETON PT 11.80 425
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1251

002 PF01A1 MP. 5.400 3.15 17


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 77
MARCA 100 DRISCUITA 0.19 1
0.00 0 95

003 PF09A1 M 72.000 41.21 2967


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 432
SAPEI HIDR 0.00 0
0.00 0 3399

004 PB06A1 M.C. 9.720 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 465
ZID,TIMPAN MANUAL 2.50 24
0.00 0 489

005 2100898 M.C. 9.720 200.00 1944


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 1944

006 TRA06A17 TONA 24.300 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 257 257

007 DB02D1 100 MP. 0.480 70.98 34


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 19
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 56

008 TRA05A49 TONA 0.022 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 48.600 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 79
DE 2,5 CM CU ASTERNERE MANUALA 0.32 15
0.00 0 95

010 2100047 TONA 3.500 310.00 1085


BA 8 0.00 0
0.00 0
0.00 0 1085

011 TRA01A35 TONA 3.500 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 69 69

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


27.997 6874.80 1496.49 43.35 326.33 8740.97
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 43.35

Detaliere transporturi:
-Articole TRA 326.33
391292 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1496.49 + 43.35 * 0.000 +
326.33 * 0.000) * 0.003375 = 5.05

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


27.997 6874.80 1501.54 43.35 326.33 8746.02

Cheltuieli indirecte:
8746.02 * 0.03000 = 262.38
Profit:
9008.40 * 0.02000 = 180.17

TOTAL GENERAL DEVIZ: 9 188.57


TVA 9188.57 * 19.0% = 1 745.83
TOTAL cu TVA 10 934.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391293 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391293 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 1504.000 8.30 12489
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 12489

002 PK31A1 TONA 1.500 201.46 302


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1348
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 1650

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.740 12791.41 1348.05 0.00 0.00 14139.46

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1348.05 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.740 12791.41 1352.60 0.00 0.00 14144.01

Cheltuieli indirecte:
14144.01 * 0.03000 = 424.32
Profit:
14568.33 * 0.02000 = 291.37

TOTAL GENERAL DEVIZ: 14 859.69


TVA 14859.69 * 19.0% = 2 823.34
TOTAL cu TVA 17 683.04

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391294 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391294 APLICARE BENZI DE CARBON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100212 MP. 3.240 269.70 874
BANDA CARBON 0.00 0
0.00 0
0.00 0 874

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.162 873.83 0.00 0.00 0.00 873.83

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.162 873.83 0.00 0.00 0.00 873.83

Cheltuieli indirecte:
873.83 * 0.03000 = 26.21
Profit:
900.04 * 0.02000 = 18.00

TOTAL GENERAL DEVIZ: 918.04


TVA 918.04 * 19.0% = 174.43
TOTAL cu TVA 1 092.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391295 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391295 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.200 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 20
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 20

002 PC05A1 MP. 10.500 2.20 23


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 633
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 656

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 24.800 1813.50 44975


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 44975

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.133 46376.79 1013.52 60.37 0.00 47450.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1013.52 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.42

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.133 46376.79 1016.95 60.37 0.00 47454.10

Cheltuieli indirecte:
47454.10 * 0.03000 = 1 423.62
Profit:
48877.72 * 0.02000 = 977.55

TOTAL GENERAL DEVIZ: 49 855.28


TVA 49855.28 * 19.0% = 9 472.50
TOTAL cu TVA 59 327.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391296 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391296 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 327.600 0.60 198
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3145
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3343

002 AUT1303 ORA 88.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 88
0.00 0 88

003 RPCB12A1 MP. 98.220 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 1866
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 1866

004 IZA01A1 MP. 98.220 0.49 48


CURATIREA PRIN SABLARE PT PROT 7.20 707
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1489
0.00 0 2244

005 PK48C1 [ 1] TONA 0.150 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 13
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 13

006 YC01RON LEI. 6367.000 1.00 6367


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 6367

007 2100211 KG 98.280 20.75 2039


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2039

008 NMB109921 ORA 264.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 5280
0.00 0
0.00 0 5280

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.692 8651.82 11011.47 1577.02 0.00 21240.31
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1577.02

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 11011.47 + 1577.02 * 0.000 +
0.00 * 0.000) * 0.003375 = 37.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.692 8651.82 11048.64 1577.02 0.00 21277.47

Cheltuieli indirecte:
21277.47 * 0.03000 = 638.32
Profit:
21915.79 * 0.02000 = 438.32

TOTAL GENERAL DEVIZ: 22 354.11


TVA 22354.11 * 19.0% = 4 247.28
391296 pag 2
======================================================================================================================
TOTAL cu TVA 26 601.39

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391297 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0039 45000000 POD KM. 7+050 PESTE PARAU-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391297 COFRAJE PLANE PENTRU SUPRASTRUCTU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 345.520 2.20 761
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 20842
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 21603

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.252 760.85 20841.97 0.00 0.00 21602.83

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 20841.97 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 70.34

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.252 760.85 20912.32 0.00 0.00 21673.17

Cheltuieli indirecte:
21673.17 * 0.03000 = 650.20
Profit:
22323.36 * 0.02000 = 446.47

TOTAL GENERAL DEVIZ: 22 769.83


TVA 22769.83 * 19.0% = 4 326.27
TOTAL cu TVA 27 096.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391298 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391298 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 104.160 3.40 355
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 1937
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 2292

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.253 354.50 1937.27 0.00 0.00 2291.78

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1937.27 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 6.54

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.253 354.50 1943.81 0.00 0.00 2298.31

Cheltuieli indirecte:
2298.31 * 0.03000 = 68.95
Profit:
2367.26 * 0.02000 = 47.35

TOTAL GENERAL DEVIZ: 2 414.61


TVA 2414.61 * 19.0% = 458.78
TOTAL cu TVA 2 873.39

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391299 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391299 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 84.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 3628
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 223
MANUAL 0.00 0 3851

002 2100914 M.C. 84.000 215.00 18060


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 18060

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

004 TSA24B1 ORA 42.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 670
DE 8,1-14KW 0.00 0 670

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


201.600 18060.59 3627.62 893.34 2219.70 24801.25
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 893.34

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3627.62 + 893.34 * 0.000 +
2219.70 * 0.000) * 0.003375 = 12.24

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


201.600 18060.59 3639.87 893.34 2219.70 24813.50

Cheltuieli indirecte:
24813.50 * 0.03000 = 744.40
Profit:
25557.90 * 0.02000 = 511.16

TOTAL GENERAL DEVIZ: 26 069.06


TVA 26069.06 * 19.0% = 4 953.12
TOTAL cu TVA 31 022.18

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391300 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391300 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 234.000 4.62 1081
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 4455
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 5536

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.841 1080.74 4455.08 0.00 0.00 5535.82

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4455.08 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 15.04

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.841 1080.74 4470.12 0.00 0.00 5550.85

Cheltuieli indirecte:
5550.85 * 0.03000 = 166.53
Profit:
5717.38 * 0.02000 = 114.35

TOTAL GENERAL DEVIZ: 5 831.73


TVA 5831.73 * 19.0% = 1 108.03
TOTAL cu TVA 6 939.76

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391301 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391301 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 6480.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 3499
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 3499

002 PD02A1 KG 6480.000 0.06 359


MONT.ARMATURI PT.BETON ARMAT IN 0.50 3263
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 3622

003 2100205 KG 6480.000 2.90 18798


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 18798

004 TRA04A17 TONA 6.480 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 77 77

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.577 19157.15 6762.53 0.00 77.11 25996.79

Detaliere transporturi:
-Articole TRA 77.11

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6762.53 + 0.00 * 0.000 +
77.11 * 0.000) * 0.003375 = 22.82

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.577 19157.15 6785.35 0.00 77.11 26019.61

Cheltuieli indirecte:
26019.61 * 0.03000 = 780.59
Profit:
26800.20 * 0.02000 = 536.00

TOTAL GENERAL DEVIZ: 27 336.20


TVA 27336.20 * 19.0% = 5 193.88
TOTAL cu TVA 32 530.08

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391302 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391302 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 76.800 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 748
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1103
EXISTENTE CU POMPA 0.00 0 1850

002 2101004 M.C. 76.800 255.00 19584


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 19584

003 TRA06A17 TONA 192.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2029 2029

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 19584.00 747.56 1102.62 2029.44 23463.61
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1102.62

Detaliere transporturi:
-Articole TRA 2 029.44

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 747.56 + 1102.62 * 0.000 +
2029.44 * 0.000) * 0.003375 = 2.52

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 19584.00 750.08 1102.62 2029.44 23466.14

Cheltuieli indirecte:
23466.14 * 0.03000 = 703.98
Profit:
24170.12 * 0.02000 = 483.40

TOTAL GENERAL DEVIZ: 24 653.52


TVA 24653.52 * 19.0% = 4 684.17
TOTAL cu TVA 29 337.69

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391303 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391303 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 468.000 0.60 282
MONTAREA SI DEMONTARE SCHELEI MET 9.60 4493
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 4775

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 140.400 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2668
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2668

004 IZA01A1 MP. 140.400 0.49 68


CURATIREA PRIN SABLARE PT PROT 7.20 1011
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 2128
0.00 0 3208

005 PK48C1 TONA 0.150 18.47 3


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 13
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 16

006 RPCB20A1 M.C. 0.400 4029.39 1612


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 110
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 303
AMORSA 0.00 0 2025

007 2100210 M.C. 0.400 431.93 173


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 173

008 2100211 KG 140.400 20.75 2913


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2913

009 NMB109921 ORA 224.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 4480
0.00 0
0.00 0 4480

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.095 5051.36 12774.05 2591.86 0.00 20417.28
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2591.86

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 12774.05 + 2591.86 * 0.000 +
0.00 * 0.000) * 0.003375 = 43.11

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.095 5051.36 12817.17 2591.86 0.00 20460.39

Cheltuieli indirecte:
20460.39 * 0.03000 = 613.81
391303 pag 2
======================================================================================================================
Profit:
21074.20 * 0.02000 = 421.48

TOTAL GENERAL DEVIZ: 21 495.69


TVA 21495.69 * 19.0% = 4 084.18
TOTAL cu TVA 25 579.87

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391304 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391304 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 45.000 39.44 1775
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 2250
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 4025

002 TRA01A35 TONA 88.740 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 1739 1739

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1774.80 2250.00 0.00 1739.30 5764.10

Detaliere transporturi:
-Articole TRA 1 739.30

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2250.00 + 0.00 * 0.000 +
1739.30 * 0.000) * 0.003375 = 7.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1774.80 2257.59 0.00 1739.30 5771.70

Cheltuieli indirecte:
5771.70 * 0.03000 = 173.15
Profit:
5944.85 * 0.02000 = 118.90

TOTAL GENERAL DEVIZ: 6 063.75


TVA 6063.75 * 19.0% = 1 152.11
TOTAL cu TVA 7 215.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391305 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0040 45000000 POD KM. 7+050 PESTE PARAU-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391305 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 12.000 22.95 275
BORDURI PREFABRICATE DIN BETON PT 11.80 142
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 417

002 2100898 M.C. 0.540 200.00 108


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 108

003 TRA06A17 TONA 1.650 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 17 17

004 PB06A1 M.C. 3.240 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 155
ZID,TIMPAN MANUAL 2.50 8
0.00 0 163

005 2100898 M.C. 3.240 200.00 648


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 648

006 TRA06A17 TONA 8.100 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 86 86

007 DB02D1 100 MP. 0.160 70.98 11


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 6
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 19

008 DB18A1 MP. 16.200 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 26
DE 2,5 CM CU ASTERNERE MANUALA 0.32 5
0.00 0 32

009 2100047 TONA 1.160 310.00 360


BA 8 0.00 0
0.00 0
0.00 0 360

010 TRA01A35 TONA 1.160 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 23 23

011 TRA05A49 TONA 0.007 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


10.445 1402.71 329.25 14.12 126.07 1872.15
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 14.12

Detaliere transporturi:
-Articole TRA 126.07
391305 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 329.25 + 14.12 * 0.000 +
126.07 * 0.000) * 0.003375 = 1.11

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


10.445 1402.71 330.37 14.12 126.07 1873.26

Cheltuieli indirecte:
1873.26 * 0.03000 = 56.20
Profit:
1929.46 * 0.02000 = 38.59

TOTAL GENERAL DEVIZ: 1 968.05


TVA 1968.05 * 19.0% = 373.93
TOTAL cu TVA 2 341.98

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391306 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391306 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 14.000 472.87 6620
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 6620

002 TRA04A17 TONA 24.080 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 287 287

003 PI06A1 BUC. 14.000 30.98 434


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 350
MACARAUA PE PNEURI DE 9,9 TF 45.75 640
0.00 0 1424

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 350.00 640.50 286.55 8330.99
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 640.50

Detaliere transporturi:
-Articole TRA 286.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 350.00 + 640.50 * 0.000 +
286.55 * 0.000) * 0.003375 = 1.18

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


24.051 7053.94 351.18 640.50 286.55 8332.18

Cheltuieli indirecte:
8332.18 * 0.03000 = 249.97
Profit:
8582.14 * 0.02000 = 171.64

TOTAL GENERAL DEVIZ: 8 753.78


TVA 8753.78 * 19.0% = 1 663.22
TOTAL cu TVA 10 417.00

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391307 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391307 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.540 70.98 38
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 22
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 63

002 DB19E1 MP. 54.600 0.03 2


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 57
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 67
MECANICA 0.00 0 125

003 2100207 TONA 5.350 315.00 1685


BAP16 0.00 0
0.00 0
0.00 0 1685

004 TRA01A35 TONA 5.350 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 105 105

005 DB02D1 100 MP. 0.540 70.98 38


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 22
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 63

006 DB16H1 MP. 54.600 0.03 2


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 57
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 67
0.00 0 125

007 2100051 TONA 5.130 320.00 1642


MAS16 0.00 0
0.00 0
0.00 0 1642

008 TRA01A35 TONA 5.130 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 101 101

009 TRA05A49 TONA 0.050 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2 2

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


25.207 3406.54 157.40 139.30 207.41 3910.65
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 139.30

Detaliere transporturi:
-Articole TRA 207.41

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 157.40 + 139.30 * 0.000 +
207.41 * 0.000) * 0.003375 = 0.53

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


25.207 3406.54 157.93 139.30 207.41 3911.18
391307 pag 2
======================================================================================================================

Cheltuieli indirecte:
3911.18 * 0.03000 = 117.34
Profit:
4028.51 * 0.02000 = 80.57

TOTAL GENERAL DEVIZ: 4 109.08


TVA 4109.08 * 19.0% = 780.73
TOTAL cu TVA 4 889.81

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391308 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391308 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 21.600 0.65 14
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 1521
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 1535

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.659 561.90 3423.04 0.00 0.00 3984.93

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3423.04 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.659 561.90 3434.59 0.00 0.00 3996.49

Cheltuieli indirecte:
3996.49 * 0.03000 = 119.89
Profit:
4116.38 * 0.02000 = 82.33

TOTAL GENERAL DEVIZ: 4 198.71


TVA 4198.71 * 19.0% = 797.75
TOTAL cu TVA 4 996.46

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391309 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391309 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 84.000 4.62 388
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 1599
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 1987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1599.26 0.00 0.00 1987.22

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1599.26 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1604.66 0.00 0.00 1992.61

Cheltuieli indirecte:
1992.61 * 0.03000 = 59.78
Profit:
2052.39 * 0.02000 = 41.05

TOTAL GENERAL DEVIZ: 2 093.44


TVA 2093.44 * 19.0% = 397.75
TOTAL cu TVA 2 491.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391310 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391310 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 880.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 475
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 475

002 PD02A1 KG 880.000 0.06 49


MONT.ARMATURI PT.BETON ARMAT IN 0.50 443
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 492

003 2100205 KG 880.000 2.90 2553


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 2553

004 TRA04A17 TONA 0.880 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 10 10

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.893 2601.59 918.37 0.00 10.47 3530.43

Detaliere transporturi:
-Articole TRA 10.47

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 918.37 + 0.00 * 0.000 +
10.47 * 0.000) * 0.003375 = 3.10

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.893 2601.59 921.47 0.00 10.47 3533.53

Cheltuieli indirecte:
3533.53 * 0.03000 = 106.01
Profit:
3639.53 * 0.02000 = 72.79

TOTAL GENERAL DEVIZ: 3 712.32


TVA 3712.32 * 19.0% = 705.34
TOTAL cu TVA 4 417.67

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391311 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391311 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 24.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 1036
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 64
MANUAL 0.00 0 1100

002 2100899 M.C. 24.000 210.00 5040


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 5040

003 TRA06A17 TONA 60.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 634 634

004 TSA24B1 ORA 12.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 191
DE 8,1-14KW 0.00 0 191

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


57.600 5040.22 1036.46 255.24 634.20 6966.12
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 255.24

Detaliere transporturi:
-Articole TRA 634.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1036.46 + 255.24 * 0.000 +
634.20 * 0.000) * 0.003375 = 3.50

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


57.600 5040.22 1039.96 255.24 634.20 6969.62

Cheltuieli indirecte:
6969.62 * 0.03000 = 209.09
Profit:
7178.71 * 0.02000 = 143.57

TOTAL GENERAL DEVIZ: 7 322.28


TVA 7322.28 * 19.0% = 1 391.23
TOTAL cu TVA 8 713.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391312 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391312 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 14.400 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 140
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 207
EXISTENTE CU POMPA 0.00 0 347

002 2101004 M.C. 14.400 255.00 3672


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 3672

003 TRA06A17 TONA 36.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 381 381

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 3672.00 140.17 206.74 380.52 4399.43
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 206.74

Detaliere transporturi:
-Articole TRA 380.52

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 140.17 + 206.74 * 0.000 +
380.52 * 0.000) * 0.003375 = 0.47

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 3672.00 140.64 206.74 380.52 4399.90

Cheltuieli indirecte:
4399.90 * 0.03000 = 132.00
Profit:
4531.90 * 0.02000 = 90.64

TOTAL GENERAL DEVIZ: 4 622.54


TVA 4622.54 * 19.0% = 878.28
TOTAL cu TVA 5 500.82

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391314 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391314 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 1.750 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 264
0.00 0 264

002 TRA01A02 TONA 315.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 353 353

003 TSD01D1 M.C. 35.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 398
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 398

004 TSD05B1 100 MC. 1.750 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 309
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 281
STRAT DIN PAM.COEZI 0.00 0 589

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 707.00 544.28 352.80 1604.08
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 544.28

Detaliere transporturi:
-Articole TRA 352.80

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 707.00 + 544.28 * 0.000 +
352.80 * 0.000) * 0.003375 = 2.39

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 709.39 544.28 352.80 1606.47

Cheltuieli indirecte:
1606.47 * 0.03000 = 48.19
Profit:
1654.66 * 0.02000 = 33.09

TOTAL GENERAL DEVIZ: 1 687.75


TVA 1687.75 * 19.0% = 320.67
TOTAL cu TVA 2 008.43

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391315 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391315 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 280.000 3.19 894
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 1120
NISIP 0.00 0
0.00 0 2014

002 TRA01A17 TONA 47.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 453 453

003 IFA03C1 MP. 280.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 7840
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 7840

004 2100957 M.C. 28.000 190.00 5320


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 5320

005 TRA06A17 TONA 70.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 740 740

006 TRI1AA01C1 TONA 70.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 490
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 490

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9450.00 0.00 1193.05 16857.51

Detaliere transporturi:
-Articole TRA 1 193.05

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9450.00 + 0.00 * 0.000 +
1193.05 * 0.000) * 0.003375 = 31.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 6214.46 9481.89 0.00 1193.05 16889.41

Cheltuieli indirecte:
16889.41 * 0.03000 = 506.68
Profit:
17396.09 * 0.02000 = 347.92

TOTAL GENERAL DEVIZ: 17 744.01


TVA 17744.01 * 19.0% = 3 371.36
TOTAL cu TVA 21 115.37

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391316 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391316 SCARI PE TALUZ INCLUSIV MANA CURENTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK29A1 M 11.000 29.31 322
SCARI PE TALUZ DIN TREPTE DE BETON 55.87 615
PREFABRICATE PE SANTIER 1.34 15
0.00 0 952

002 PK18A1 M 11.000 148.48 1633


MINA CURENTA SI UMPLUT. TEVI OTEL CONF. 192.21 2114
SANTIER SI STILPI B. A. MONOLIT SAU 0.00 0
PREFABRICAT 0.00 0 3748

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.282 1955.72 2728.84 14.69 0.00 4699.26
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 14.69

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2728.84 + 14.69 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.21

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.282 1955.72 2738.05 14.69 0.00 4708.47

Cheltuieli indirecte:
4708.47 * 0.03000 = 141.25
Profit:
4849.72 * 0.02000 = 96.99

TOTAL GENERAL DEVIZ: 4 946.72


TVA 4946.72 * 19.0% = 939.88
TOTAL cu TVA 5 886.59

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391317 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0041 45000000 POD KM. 7+050 PESTE PARAU-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391317 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 100.000 2.23 223
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

002 6306339 KG 2071.000 4.66 9651


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 9651

003 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

004 TRA06A17 TONA 20.750 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 219 219

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2073.00 0.00 219.33 13743.14

Detaliere transporturi:
-Articole TRA 219.33

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2073.00 + 0.00 * 0.000 +
219.33 * 0.000) * 0.003375 = 7.00

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2080.00 0.00 219.33 13750.13

Cheltuieli indirecte:
13750.13 * 0.03000 = 412.50
Profit:
14162.64 * 0.02000 = 283.25

TOTAL GENERAL DEVIZ: 14 445.89


TVA 14445.89 * 19.0% = 2 744.72
TOTAL cu TVA 17 190.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391318 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0042 45000000 POD KM. 7+050 PESTE PARAU-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391318 SAPATURA PENTRU PROFILAREA ALBIEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.750 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 123
0.00 0 123

002 TSC35B31 100 MC. 0.750 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 128
M 0.00 0 128

003 TRA01A02 TONA 135.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 151 151

004 TSD03C1 100 MC. 0.900 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 38
TER.CAT.1 SAU 2 0.00 0 38

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 289.14 151.20 440.34
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 289.14

Detaliere transporturi:
-Articole TRA 151.20

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 289.14 151.20 440.34

Cheltuieli indirecte:
440.34 * 0.03000 = 13.21
Profit:
453.55 * 0.02000 = 9.07

TOTAL GENERAL DEVIZ: 462.62


TVA 462.62 * 19.0% = 87.90
TOTAL cu TVA 550.52

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391319 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0043 45000000 POD KM. 7+050 PESTE PARAU-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391319 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 3270001 M.C. 0.800 180.00 144


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 144

008 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

004 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

005 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

006 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

007 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391319 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391320 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0044 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391320 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 488.000 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 1493
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 1493

002 TRA01A02 TONA 70.320 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 79 79

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1493.28 0.00 78.76 1572.04

Detaliere transporturi:
-Articole TRA 78.76

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1493.28 + 0.00 * 0.000 +
78.76 * 0.000) * 0.003375 = 5.04

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1498.32 0.00 78.76 1577.08

Cheltuieli indirecte:
1577.08 * 0.03000 = 47.31
Profit:
1624.39 * 0.02000 = 32.49

TOTAL GENERAL DEVIZ: 1 656.88


TVA 1656.88 * 19.0% = 314.81
TOTAL cu TVA 1 971.69

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391321 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0044 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391321 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 176.060 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 11902
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 8513
FUND DRUM 0.00 0 20415

002 TRI1AA02C3 TONA 440.150 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 3961
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 3961

003 TRA01A02 TONA 440.150 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 493 493

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 15862.97 8513.21 492.97 24869.14
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 8513.21

Detaliere transporturi:
-Articole TRA 492.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 15862.97 + 8513.21 * 0.000 +
492.97 * 0.000) * 0.003375 = 53.54

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 15916.51 8513.21 492.97 24922.68

Cheltuieli indirecte:
24922.68 * 0.03000 = 747.68
Profit:
25670.36 * 0.02000 = 513.41

TOTAL GENERAL DEVIZ: 26 183.77


TVA 26183.77 * 19.0% = 4 974.92
TOTAL cu TVA 31 158.69

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391322 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0044 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391322 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 6.690 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 1373
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 1373

002 TSC19C1 100 MC. 3.350 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 548
0.00 0 548

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1372.79 548.33 0.00 1921.12
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 548.33

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1372.79 + 548.33 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.63

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1377.42 548.33 0.00 1925.75

Cheltuieli indirecte:
1925.75 * 0.03000 = 57.77
Profit:
1983.52 * 0.02000 = 39.67

TOTAL GENERAL DEVIZ: 2 023.19


TVA 2023.19 * 19.0% = 384.41
TOTAL cu TVA 2 407.60

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391323 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391323 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 116.000 0.60 70
MONTAREA SI DEMONTARE SCHELEI MET 9.60 1114
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1184

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.089 69.99 1113.60 320.00 0.00 1503.59
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1113.60 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.089 69.99 1117.36 320.00 0.00 1507.35

Cheltuieli indirecte:
1507.35 * 0.03000 = 45.22
Profit:
1552.57 * 0.02000 = 31.05

TOTAL GENERAL DEVIZ: 1 583.63


TVA 1583.63 * 19.0% = 300.89
TOTAL cu TVA 1 884.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391324 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391324 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 406.000 2.20 894
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 24490
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 25384

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.296 894.03 24490.16 0.00 0.00 25384.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 24490.16 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 82.65

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.296 894.03 24572.82 0.00 0.00 25466.85

Cheltuieli indirecte:
25466.85 * 0.03000 = 764.01
Profit:
26230.86 * 0.02000 = 524.62

TOTAL GENERAL DEVIZ: 26 755.47


TVA 26755.47 * 19.0% = 5 083.54
TOTAL cu TVA 31 839.01

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391325 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391325 APARATE DE REAZAM DIN NEOPREN TIP 3

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100216 BUC. 7.000 102.00 714
APARATE REAZAM DIN NEOPREN TIP 3 0.00 0
0.00 0
0.00 0 714

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Cheltuieli indirecte:
714.00 * 0.03000 = 21.42
Profit:
735.42 * 0.02000 = 14.71

TOTAL GENERAL DEVIZ: 750.13


TVA 750.13 * 19.0% = 142.52
TOTAL cu TVA 892.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391326 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391326 APARATE DE REAZAM DIN NEOPREN TIP 4 (150MMX300MMX41MM)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100219 BUC. 7.000 166.00 1162
APARATE REAZAM DIN NEOPREN TIP 4 0.00 0
0.00 0
0.00 0 1162

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Cheltuieli indirecte:
1162.03 * 0.03000 = 34.86
Profit:
1196.89 * 0.02000 = 23.94

TOTAL GENERAL DEVIZ: 1 220.83


TVA 1220.83 * 19.0% = 231.96
TOTAL cu TVA 1 452.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391327 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391327 GRINZI PREF. PRECOMPRIMATE CU ARMATURA ADERENTA L=21 M H=0,93 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PI08B1 BUC. 7.000 0.00 0
ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT PRECOMPRIMAT 0.00 0
0.00 0 0

002 2100218 BUC. 7.000 18500.00 129500


GRINDA PREF PREC. CU ARMATURAADERENTA L= 0.00 0
21M, H=0,93M 0.00 0
0.00 0 129500

003 PI06A1 BUC. 7.000 30.98 217


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 175
MACARAUA PE PNEURI DE 9,9 TF 45.75 320
0.00 0 712

004 TRA04A49 TONA 131.600 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.49 KM.* 131.60 17319 17319

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.00 320.25 17318.56 147530.72
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.25

Detaliere transporturi:
-Articole TRA 17 318.56

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 175.00 + 320.25 * 0.000 +
17318.56 * 0.000) * 0.003375 = 0.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.59 320.25 17318.56 147531.31

Cheltuieli indirecte:
147531.31 * 0.03000 = 4 425.94
Profit:
151957.25 * 0.02000 = 3 039.14

TOTAL GENERAL DEVIZ: 154 996.39


TVA 154996.39 * 19.0% = 29 449.31
TOTAL cu TVA 184 445.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391328 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391328 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
007 CZ0302K1 [ 1] KG 7350.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 3969
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 3969

008 PD02A1 KG 7350.000 0.06 407


MONT.ARMATURI PT.BETON ARMAT IN 0.50 3701
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 4108

009 2100205 KG 7350.000 2.90 21322


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 21322

010 TRA04A17 TONA 7.350 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 87 87

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7.460 21729.17 7670.46 0.00 87.47 29487.10

Detaliere transporturi:
-Articole TRA 87.47

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 7670.46 + 0.00 * 0.000 +
87.47 * 0.000) * 0.003375 = 25.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7.460 21729.17 7696.35 0.00 87.47 29512.99

Cheltuieli indirecte:
29512.99 * 0.03000 = 885.39
Profit:
30398.37 * 0.02000 = 607.97

TOTAL GENERAL DEVIZ: 31 006.34


TVA 31006.34 * 19.0% = 5 891.21
TOTAL cu TVA 36 897.55

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391329 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391329 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 63.000 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 613
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 676
0.00 0 1289

002 3270091 M.C. 63.000 255.00 16065


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 16065

003 TRA06A17 TONA 157.500 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1665 1665

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


157.500 16065.00 613.23 676.05 1664.78 19019.06
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 676.05

Detaliere transporturi:
-Articole TRA 1 664.78

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 613.23 + 676.05 * 0.000 +
1664.78 * 0.000) * 0.003375 = 2.07

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


157.500 16065.00 615.30 676.05 1664.78 19021.13

Cheltuieli indirecte:
19021.13 * 0.03000 = 570.63
Profit:
19591.76 * 0.02000 = 391.84

TOTAL GENERAL DEVIZ: 19 983.60


TVA 19983.60 * 19.0% = 3 796.88
TOTAL cu TVA 23 780.48

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391330 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391330 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 229.320 0.05 12
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 1101
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 1113

002 PF04A1 MP. 229.320 6.36 1459


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 215
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 1674

003 PF05B1 MP. 229.320 9.98 2288


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 825
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 413
STRAT MASTIC. 0.00 0 3526

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.998 3758.78 2141.34 412.78 0.00 6312.90
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 412.78

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2141.34 + 412.78 * 0.000 +
0.00 * 0.000) * 0.003375 = 7.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.998 3758.78 2148.57 412.78 0.00 6320.12

Cheltuieli indirecte:
6320.12 * 0.03000 = 189.60
Profit:
6509.73 * 0.02000 = 130.19

TOTAL GENERAL DEVIZ: 6 639.92


TVA 6639.92 * 19.0% = 1 261.59
TOTAL cu TVA 7 901.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391331 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391331 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 159.500 4.87 777
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 936
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 47
4CM GROS LA POD 0.00 0 1760

002 2100047 TONA 11.480 310.00 3559


BA 8 0.00 0
0.00 0
0.00 0 3559

003 TRA01A35 TONA 11.480 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 225 225

004 DB02D1 100 MP. 1.590 70.98 113


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 64
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 9
EMULSIE CATIONICA 0.00 0 186

005 DB19E1 MP. 159.500 0.03 4


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 167
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 194
MECANICA 0.00 0 366

006 2100207 TONA 15.630 315.00 4923


BAP16 0.00 0
0.00 0
0.00 0 4923

007 TRA01A35 TONA 15.630 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 306 306

008 DB02D1 100 MP. 1.590 70.98 113


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 64
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 9
EMULSIE CATIONICA 0.00 0 186

009 DB16H1 MP. 159.500 0.03 4


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 167
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 194
0.00 0 366

010 2100051 TONA 15.000 320.00 4800


MAS16 0.00 0
0.00 0
0.00 0 4800

011 TRA01A35 TONA 15.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 294 294

012 TRA05A49 TONA 0.014 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


75.313 14293.32 1397.30 453.58 825.92 16970.11
Din care:
Valoare aferenta utilaje termice = 0.00
391331 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 453.58

Detaliere transporturi:
-Articole TRA 825.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1397.30 + 453.58 * 0.000 +
825.92 * 0.000) * 0.003375 = 4.72

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


75.313 14293.32 1402.01 453.58 825.92 16974.82

Cheltuieli indirecte:
16974.82 * 0.03000 = 509.24
Profit:
17484.07 * 0.02000 = 349.68

TOTAL GENERAL DEVIZ: 17 833.75


TVA 17833.75 * 19.0% = 3 388.41
TOTAL cu TVA 21 222.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391332 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391332 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 58.000 3.19 185
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 1710
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 1895

002 2100202 KG 4060.000 6.44 26159


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 26159

003 3270091 M.C. 7.000 255.00 1785


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 1785

004 TRA06A17 TONA 17.500 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 185 185

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


21.616 28128.33 1710.01 0.00 184.97 30023.32

Detaliere transporturi:
-Articole TRA 184.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1710.01 + 0.00 * 0.000 +
184.97 * 0.000) * 0.003375 = 5.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


21.616 28128.33 1715.79 0.00 184.97 30029.09

Cheltuieli indirecte:
30029.09 * 0.03000 = 900.87
Profit:
30929.96 * 0.02000 = 618.60

TOTAL GENERAL DEVIZ: 31 548.56


TVA 31548.56 * 19.0% = 5 994.23
TOTAL cu TVA 37 542.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391333 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391333 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 42.000 22.95 964
BORDURI PREFABRICATE DIN BETON PT 11.80 496
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1460

002 PF01A1 MP. 6.300 3.15 20


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 90
MARCA 100 DRISCUITA 0.19 1
0.00 0 111

003 PF09A1 M 84.000 41.21 3462


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 504
SAPEI HIDR 0.00 0
0.00 0 3966

004 PB06A1 M.C. 15.500 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 742
ZID,TIMPAN MANUAL 2.50 39
0.00 0 780

005 2100898 M.C. 15.500 200.00 3100


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 3100

006 TRA06A17 TONA 38.850 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 411 411

007 DB02D1 100 MP. 0.770 70.98 55


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 31
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 4
EMULSIE CATIONICA 0.00 0 90

008 TRA05A49 TONA 0.035 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 77.700 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 126
DE 2,5 CM CU ASTERNERE MANUALA 0.32 24
0.00 0 151

010 2100047 TONA 5.600 310.00 1736


BA 8 0.00 0
0.00 0
0.00 0 1736

011 TRA01A35 TONA 5.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 110 110

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


42.661 9338.08 1987.27 68.79 521.81 11915.95
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 68.79

Detaliere transporturi:
-Articole TRA 521.81
391333 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1987.27 + 68.79 * 0.000 +
521.81 * 0.000) * 0.003375 = 6.71

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


42.661 9338.08 1993.98 68.79 521.81 11922.65

Cheltuieli indirecte:
11922.65 * 0.03000 = 357.68
Profit:
12280.33 * 0.02000 = 245.61

TOTAL GENERAL DEVIZ: 12 525.94


TVA 12525.94 * 19.0% = 2 379.93
TOTAL cu TVA 14 905.87

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391334 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391334 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 1767.000 8.30 14673
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 14673

002 PK31A1 TONA 1.760 201.46 355


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1582
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 1936

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.044 15027.74 1581.71 0.00 0.00 16609.45

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1581.71 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.34

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.044 15027.74 1587.05 0.00 0.00 16614.79

Cheltuieli indirecte:
16614.79 * 0.03000 = 498.44
Profit:
17113.23 * 0.02000 = 342.26

TOTAL GENERAL DEVIZ: 17 455.50


TVA 17455.50 * 19.0% = 3 316.54
TOTAL cu TVA 20 772.04

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391335 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391335 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.000 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 19
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 19

002 PC05A1 MP. 10.000 2.20 22


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 603
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 625

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 21.800 1813.50 39534


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 39534

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.058 40935.18 982.40 60.37 0.00 41977.95
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 982.40 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.32

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.058 40935.18 985.72 60.37 0.00 41981.26

Cheltuieli indirecte:
41981.26 * 0.03000 = 1 259.44
Profit:
43240.70 * 0.02000 = 864.81

TOTAL GENERAL DEVIZ: 44 105.52


TVA 44105.52 * 19.0% = 8 380.05
TOTAL cu TVA 52 485.57

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391336 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0045 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391336 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 693.420 0.60 418
MONTAREA SI DEMONTARE SCHELEI MET 9.60 6657
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 7075

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 208.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 3952
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 3952

004 IZA01A1 MP. 208.000 0.49 101


CURATIREA PRIN SABLARE PT PROT 7.20 1498
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 3153
0.00 0 4752

005 PK48C1 [ 1] TONA 0.250 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 22
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 22

006 YC01RON LEI. 13478.000 1.00 13478


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 13478

007 2100211 KG 208.000 20.75 4316


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 4316

008 NMB109921 ORA 320.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 6400
0.00 0
0.00 0 6400

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.465 18313.70 18528.34 3313.28 0.00 40155.32
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 3313.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 18528.34 + 3313.28 * 0.000 +
0.00 * 0.000) * 0.003375 = 62.53

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.465 18313.70 18590.87 3313.28 0.00 40217.86

Cheltuieli indirecte:
40217.86 * 0.03000 = 1 206.54
Profit:
41424.39 * 0.02000 = 828.49

TOTAL GENERAL DEVIZ: 42 252.88


TVA 42252.88 * 19.0% = 8 028.05
391336 pag 2
======================================================================================================================
TOTAL cu TVA 50 280.93

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391337 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391337 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 152.400 3.40 519
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 2834
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 3353

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2834.49 0.00 0.00 3353.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2834.49 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2844.05 0.00 0.00 3362.74

Cheltuieli indirecte:
3362.74 * 0.03000 = 100.88
Profit:
3463.62 * 0.02000 = 69.27

TOTAL GENERAL DEVIZ: 3 532.90


TVA 3532.90 * 19.0% = 671.25
TOTAL cu TVA 4 204.15

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391338 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391338 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 186.550 0.01 1
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 8056
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 496
MANUAL 0.00 0 8554

002 2100914 M.C. 186.550 215.00 40109


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 40109

003 TRA06A17 TONA 466.370 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 4930 4930

004 TSA24B1 ORA 93.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 1483
DE 8,1-14KW 0.00 0 1483

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8056.35 1979.57 4929.53 55075.01
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1979.57

Detaliere transporturi:
-Articole TRA 4 929.53

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8056.35 + 1979.57 * 0.000 +
4929.53 * 0.000) * 0.003375 = 27.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8083.54 1979.57 4929.53 55102.20

Cheltuieli indirecte:
55102.20 * 0.03000 = 1 653.07
Profit:
56755.26 * 0.02000 = 1 135.11

TOTAL GENERAL DEVIZ: 57 890.37


TVA 57890.37 * 19.0% = 10 999.17
TOTAL cu TVA 68 889.54

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391339 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391339 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 271.440 4.62 1254
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5168
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6422

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5167.89 0.00 0.00 6421.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5167.89 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 17.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5185.33 0.00 0.00 6438.99

Cheltuieli indirecte:
6438.99 * 0.03000 = 193.17
Profit:
6632.16 * 0.02000 = 132.64

TOTAL GENERAL DEVIZ: 6 764.80


TVA 6764.80 * 19.0% = 1 285.31
TOTAL cu TVA 8 050.12

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391340 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391340 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 9700.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 5238
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 5238

002 PD02A1 KG 9700.000 0.06 537


MONT.ARMATURI PT.BETON ARMAT IN 0.50 4885
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 5422

003 2100205 KG 9700.000 2.90 28140


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 28140

004 TRA04A17 TONA 9.700 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 115 115

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10122.92 0.00 115.43 38914.94

Detaliere transporturi:
-Articole TRA 115.43

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 10122.92 + 0.00 * 0.000 +
115.43 * 0.000) * 0.003375 = 34.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10157.08 0.00 115.43 38949.11

Cheltuieli indirecte:
38949.11 * 0.03000 = 1 168.47
Profit:
40117.58 * 0.02000 = 802.35

TOTAL GENERAL DEVIZ: 40 919.93


TVA 40919.93 * 19.0% = 7 774.79
TOTAL cu TVA 48 694.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391341 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391341 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 378.120 0.60 228
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3630
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3858

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 113.430 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2155
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2155

004 IZA01A1 MP. 113.430 0.49 55


CURATIREA PRIN SABLARE PT PROT 7.20 817
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1720
0.00 0 2592

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 113.000 20.75 2345


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2345

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9252.80 2107.15 0.00 15328.34
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2107.15

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9252.80 + 2107.15 * 0.000 +
0.00 * 0.000) * 0.003375 = 31.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9284.03 2107.15 0.00 15359.56

Cheltuieli indirecte:
15359.56 * 0.03000 = 460.79
391341 pag 2
======================================================================================================================
Profit:
15820.35 * 0.02000 = 316.41

TOTAL GENERAL DEVIZ: 16 136.76


TVA 16136.76 * 19.0% = 3 065.98
TOTAL cu TVA 19 202.74

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391342 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391342 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 33.750 39.44 1331
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 1688
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 3019

002 TRA01A34 TONA 67.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1276 1276

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1687.50 0.00 1275.68 4294.28

Detaliere transporturi:
-Articole TRA 1 275.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1687.50 + 0.00 * 0.000 +
1275.68 * 0.000) * 0.003375 = 5.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1693.20 0.00 1275.68 4299.98

Cheltuieli indirecte:
4299.98 * 0.03000 = 129.00
Profit:
4428.97 * 0.02000 = 88.58

TOTAL GENERAL DEVIZ: 4 517.55


TVA 4517.55 * 19.0% = 858.34
TOTAL cu TVA 5 375.89

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391343 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391343 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 8.000 22.95 184
BORDURI PREFABRICATE DIN BETON PT 11.80 94
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 278

002 2100898 M.C. 0.360 200.00 72


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 72

003 TRA06A17 TONA 0.900 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 10 10

004 PB06A1 M.C. 2.960 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 142
ZID,TIMPAN MANUAL 2.50 7
0.00 0 149

005 2100898 M.C. 2.960 200.00 592


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 592

006 TRA06A17 TONA 7.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 78 78

007 DB02D1 100 MP. 0.148 70.98 11


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 6
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 17

008 DB18A1 MP. 14.800 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 24
DE 2,5 CM CU ASTERNERE MANUALA 0.32 5
0.00 0 29

009 2100047 TONA 1.060 310.00 329


BA 8 0.00 0
0.00 0
0.00 0 329

010 TRA01A35 TONA 1.060 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 21 21

011 TRA05A49 TONA 0.006 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 265.90 12.91 108.75 1574.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 12.91

Detaliere transporturi:
-Articole TRA 108.75
391343 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 265.90 + 12.91 * 0.000 +
108.75 * 0.000) * 0.003375 = 0.90

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 266.79 12.91 108.75 1575.46

Cheltuieli indirecte:
1575.46 * 0.03000 = 47.26
Profit:
1622.73 * 0.02000 = 32.45

TOTAL GENERAL DEVIZ: 1 655.18


TVA 1655.18 * 19.0% = 314.48
TOTAL cu TVA 1 969.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391344 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0046 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391344 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 204.750 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 1993
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 2940
EXISTENTE CU POMPA 0.00 0 4933

002 2101004 M.C. 204.750 255.00 52211


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 52211

003 TRA06A17 TONA 512.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 5412 5412

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1993.00 2939.60 5411.84 62555.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2939.60

Detaliere transporturi:
-Articole TRA 5 411.84

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1993.00 + 2939.60 * 0.000 +
5411.84 * 0.000) * 0.003375 = 6.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1999.72 2939.60 5411.84 62562.41

Cheltuieli indirecte:
62562.41 * 0.03000 = 1 876.87
Profit:
64439.28 * 0.02000 = 1 288.79

TOTAL GENERAL DEVIZ: 65 728.07


TVA 65728.07 * 19.0% = 12 488.33
TOTAL cu TVA 78 216.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391345 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391345 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 10.000 472.87 4729
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 4729

002 TRA04A17 TONA 17.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 205 205

003 PI06A1 BUC. 10.000 30.98 310


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 250
MACARAUA PE PNEURI DE 9,9 TF 45.75 458
0.00 0 1017

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.00 457.50 204.68 5950.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 457.50

Detaliere transporturi:
-Articole TRA 204.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 250.00 + 457.50 * 0.000 +
204.68 * 0.000) * 0.003375 = 0.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.84 457.50 204.68 5951.55

Cheltuieli indirecte:
5951.55 * 0.03000 = 178.55
Profit:
6130.10 * 0.02000 = 122.60

TOTAL GENERAL DEVIZ: 6 252.70


TVA 6252.70 * 19.0% = 1 188.01
TOTAL cu TVA 7 440.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391346 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391346 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.490 70.98 35
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

002 DB19E1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 51
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 60
MECANICA 0.00 0 112

003 2100207 TONA 4.800 315.00 1512


BAP16 0.00 0
0.00 0
0.00 0 1512

004 TRA01A35 TONA 4.800 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 94 94

005 DB02D1 100 MP. 0.490 70.98 35


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

006 DB16H1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 51
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 60
0.00 0 112

007 2100051 TONA 4.600 320.00 1472


MAS16 0.00 0
0.00 0
0.00 0 1472

008 TRA01A35 TONA 4.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 90 90

009 TRA05A49 TONA 0.044 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2 2

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 141.69 125.07 186.00 3509.04
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 125.07

Detaliere transporturi:
-Articole TRA 186.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 141.69 + 125.07 * 0.000 +
186.00 * 0.000) * 0.003375 = 0.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 142.17 125.07 186.00 3509.52
391346 pag 2
======================================================================================================================

Cheltuieli indirecte:
3509.52 * 0.03000 = 105.29
Profit:
3614.81 * 0.02000 = 72.30

TOTAL GENERAL DEVIZ: 3 687.10


TVA 3687.10 * 19.0% = 700.55
TOTAL cu TVA 4 387.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391347 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391347 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 30.000 0.65 19
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 2112
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 2131

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.667 567.35 4014.39 0.00 0.00 4581.74

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4014.39 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 13.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.667 567.35 4027.94 0.00 0.00 4595.29

Cheltuieli indirecte:
4595.29 * 0.03000 = 137.86
Profit:
4733.15 * 0.02000 = 94.66

TOTAL GENERAL DEVIZ: 4 827.81


TVA 4827.81 * 19.0% = 917.28
TOTAL cu TVA 5 745.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391348 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391348 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 30.000 4.62 139
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 571
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 710

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.108 138.56 571.16 0.00 0.00 709.72

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 571.16 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 1.93

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.108 138.56 573.09 0.00 0.00 711.65

Cheltuieli indirecte:
711.65 * 0.03000 = 21.35
Profit:
733.00 * 0.02000 = 14.66

TOTAL GENERAL DEVIZ: 747.66


TVA 747.66 * 19.0% = 142.05
TOTAL cu TVA 889.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391349 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391349 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 2200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 1188
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 1188

002 PD02A1 KG 2200.000 0.06 122


MONT.ARMATURI PT.BETON ARMAT IN 0.50 1108
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 1230

003 2100205 KG 2200.000 2.90 6382


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 6382

004 TRA04A17 TONA 2.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 26 26

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2295.92 0.00 26.18 8826.07

Detaliere transporturi:
-Articole TRA 26.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2295.92 + 0.00 * 0.000 +
26.18 * 0.000) * 0.003375 = 7.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2303.67 0.00 26.18 8833.82

Cheltuieli indirecte:
8833.82 * 0.03000 = 265.01
Profit:
9098.83 * 0.02000 = 181.98

TOTAL GENERAL DEVIZ: 9 280.81


TVA 9280.81 * 19.0% = 1 763.35
TOTAL cu TVA 11 044.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391350 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391350 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 60.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 2591
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 160
MANUAL 0.00 0 2751

002 2100899 M.C. 60.000 210.00 12600


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 12600

003 TRA06A17 TONA 150.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1586 1586

004 TSA24B1 ORA 30.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 478
DE 8,1-14KW 0.00 0 478

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2591.16 638.10 1585.50 17415.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 638.10

Detaliere transporturi:
-Articole TRA 1 585.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2591.16 + 638.10 * 0.000 +
1585.50 * 0.000) * 0.003375 = 8.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2599.91 638.10 1585.50 17424.05

Cheltuieli indirecte:
17424.05 * 0.03000 = 522.72
Profit:
17946.77 * 0.02000 = 358.94

TOTAL GENERAL DEVIZ: 18 305.70


TVA 18305.70 * 19.0% = 3 478.08
TOTAL cu TVA 21 783.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391351 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391351 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 84.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 818
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1206
EXISTENTE CU POMPA 0.00 0 2024

002 2101004 M.C. 84.000 255.00 21420


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 21420

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 817.64 1205.99 2219.70 25663.33
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1205.99

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 817.64 + 1205.99 * 0.000 +
2219.70 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 820.40 1205.99 2219.70 25666.09

Cheltuieli indirecte:
25666.09 * 0.03000 = 769.98
Profit:
26436.07 * 0.02000 = 528.72

TOTAL GENERAL DEVIZ: 26 964.79


TVA 26964.79 * 19.0% = 5 123.31
TOTAL cu TVA 32 088.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391352 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391352 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 3.500 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 527
0.00 0 527

002 TRA01A02 TONA 630.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 706 706

003 TSD01D1 M.C. 70.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 797
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 797

004 TSD05B1 100 MC. 3.500 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 617
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 561
STRAT DIN PAM.COEZI 0.00 0 1178

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1414.00 1088.56 705.60 3208.16
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1088.56

Detaliere transporturi:
-Articole TRA 705.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1414.00 + 1088.56 * 0.000 +
705.60 * 0.000) * 0.003375 = 4.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1418.77 1088.56 705.60 3212.93

Cheltuieli indirecte:
3212.93 * 0.03000 = 96.39
Profit:
3309.32 * 0.02000 = 66.19

TOTAL GENERAL DEVIZ: 3 375.51


TVA 3375.51 * 19.0% = 641.35
TOTAL cu TVA 4 016.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391353 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391353 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 84.000 3.19 268
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 336
NISIP 0.00 0
0.00 0 604

002 TRA01A17 TONA 14.280 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 136 136

003 IFA03C1 MP. 84.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 2352
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 2352

004 2100957 M.C. 8.400 190.00 1596


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1596

005 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

006 TRI1AA01C1 TONA 21.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 147
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 147

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2835.00 0.00 357.92 5057.25

Detaliere transporturi:
-Articole TRA 357.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2835.00 + 0.00 * 0.000 +
357.92 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2844.57 0.00 357.92 5066.82

Cheltuieli indirecte:
5066.82 * 0.03000 = 152.00
Profit:
5218.83 * 0.02000 = 104.38

TOTAL GENERAL DEVIZ: 5 323.20


TVA 5323.20 * 19.0% = 1 011.41
TOTAL cu TVA 6 334.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391354 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0047 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391354 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 50.000 2.23 111
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 1036
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 1148

002 6306339 KG 1035.500 4.66 4825


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 4825

003 2100957 M.C. 4.150 190.00 789


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 789

004 TRA06A17 TONA 10.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 106 106

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 5725.41 1036.50 0.00 105.70 6867.61

Detaliere transporturi:
-Articole TRA 105.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1036.50 + 0.00 * 0.000 +
105.70 * 0.000) * 0.003375 = 3.50

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 5725.41 1040.00 0.00 105.70 6871.10

Cheltuieli indirecte:
6871.10 * 0.03000 = 206.13
Profit:
7077.24 * 0.02000 = 141.54

TOTAL GENERAL DEVIZ: 7 218.78


TVA 7218.78 * 19.0% = 1 371.57
TOTAL cu TVA 8 590.35

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391355 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0048 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391355 SAPATURA PENTRU PROFILAREA ALBIEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.250 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 41
0.00 0 41

002 TSC35B31 100 MC. 0.250 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 43
M 0.00 0 43

003 TRA01A02 TONA 45.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 50 50

004 TSD03C1 100 MC. 0.300 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 13
TER.CAT.1 SAU 2 0.00 0 13

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 96.38 50.40 146.78
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 96.38

Detaliere transporturi:
-Articole TRA 50.40

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 96.38 50.40 146.78

Cheltuieli indirecte:
146.78 * 0.03000 = 4.40
Profit:
151.18 * 0.02000 = 3.02

TOTAL GENERAL DEVIZ: 154.21


TVA 154.21 * 19.0% = 29.30
TOTAL cu TVA 183.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391356 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0049 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391356 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 3270001 M.C. 0.800 180.00 144


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391356 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391357 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0049 45000000 POD KM. 7+610 PESTE PARAUL MUEREASCA-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391357 VARIANTA PROVIZORIE DE CIRCULATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19B1 100 MC. 0.550 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.2 135.52 75
0.00 0 75

002 PI08A1 BUC. 4.000 0.00 0


ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT 0.00 0
0.00 0 0

003 6422963 BUC. 4.000 3745.00 14980


ELEMENT PENTRU POD TRONSON TIP C3 BETON 0.00 0
ARMAT INCARCARE SPALIERA .L=1,6M LUM 3 0.00 0
0.00 0 14980

004 DA06B1 M.C. 150.000 26.24 3936


STRAT AGREG NAT CILINDRATE CU FUNC 7.37 1106
REZIST FILTRANTIZOLAT AERISIRE SI 12.12 1819
ANTICAP CU ASTER MEC BALAST 0.00 0 6860

005 TRA01A17 TONA 334.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 3180 3180

006 DF09B1 M 100.000 2.23 223


PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

007 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

008 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3179.19 1893.29 3401.65 29189.60
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1893.29

Detaliere transporturi:
-Articole TRA 3 401.65

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3179.19 + 1893.29 * 0.000 +
3401.65 * 0.000) * 0.003375 = 10.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3189.92 1893.29 3401.65 29200.33

Cheltuieli indirecte:
29200.33 * 0.03000 = 876.01
Profit:
30076.34 * 0.02000 = 601.53
391357 pag 2
======================================================================================================================

TOTAL GENERAL DEVIZ: 30 677.87


TVA 30677.87 * 19.0% = 5 828.80
TOTAL cu TVA 36 506.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391358 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0050 45000000 POD KM. 7+900-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391358 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 540.830 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 1655
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 1655

002 TRA01A02 TONA 77.880 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 87 87

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1654.94 0.00 87.23 1742.17

Detaliere transporturi:
-Articole TRA 87.23

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1654.94 + 0.00 * 0.000 +
87.23 * 0.000) * 0.003375 = 5.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1660.53 0.00 87.23 1747.75

Cheltuieli indirecte:
1747.75 * 0.03000 = 52.43
Profit:
1800.18 * 0.02000 = 36.00

TOTAL GENERAL DEVIZ: 1 836.19


TVA 1836.19 * 19.0% = 348.88
TOTAL cu TVA 2 185.06

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391359 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0050 45000000 POD KM. 7+900-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391359 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 181.060 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 12240
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 8755
FUND DRUM 0.00 0 20995

002 TRI1AA02C3 TONA 452.650 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 4074
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 4074

003 TRA01A02 TONA 452.650 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 507 507

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 16313.47 8754.98 506.97 25575.41
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 8754.98

Detaliere transporturi:
-Articole TRA 506.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 16313.47 + 8754.98 * 0.000 +
506.97 * 0.000) * 0.003375 = 55.06

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 16368.53 8754.98 506.97 25630.47

Cheltuieli indirecte:
25630.47 * 0.03000 = 768.91
Profit:
26399.39 * 0.02000 = 527.99

TOTAL GENERAL DEVIZ: 26 927.37


TVA 26927.37 * 19.0% = 5 116.20
TOTAL cu TVA 32 043.57

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391360 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0050 45000000 POD KM. 7+900-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391360 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 7.410 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 1521
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 1521

002 TSC19C1 100 MC. 3.710 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 607
0.00 0 607

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1520.53 607.25 0.00 2127.78
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 607.25

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1520.53 + 607.25 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.13

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1525.66 607.25 0.00 2132.92

Cheltuieli indirecte:
2132.92 * 0.03000 = 63.99
Profit:
2196.90 * 0.02000 = 43.94

TOTAL GENERAL DEVIZ: 2 240.84


TVA 2240.84 * 19.0% = 425.76
TOTAL cu TVA 2 666.60

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391361 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391361 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 116.000 0.60 70
MONTAREA SI DEMONTARE SCHELEI MET 9.60 1114
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1184

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.089 69.99 1113.60 320.00 0.00 1503.59
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1113.60 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.089 69.99 1117.36 320.00 0.00 1507.35

Cheltuieli indirecte:
1507.35 * 0.03000 = 45.22
Profit:
1552.57 * 0.02000 = 31.05

TOTAL GENERAL DEVIZ: 1 583.63


TVA 1583.63 * 19.0% = 300.89
TOTAL cu TVA 1 884.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391362 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391362 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 406.000 2.20 894
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 24490
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 25384

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.296 894.03 24490.16 0.00 0.00 25384.20

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 24490.16 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 82.65

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.296 894.03 24572.82 0.00 0.00 25466.85

Cheltuieli indirecte:
25466.85 * 0.03000 = 764.01
Profit:
26230.86 * 0.02000 = 524.62

TOTAL GENERAL DEVIZ: 26 755.47


TVA 26755.47 * 19.0% = 5 083.54
TOTAL cu TVA 31 839.01

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391363 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391363 APARATE DE REAZAM DIN NEOPREN TIP 3

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100216 BUC. 7.000 102.00 714
APARATE REAZAM DIN NEOPREN TIP 3 0.00 0
0.00 0
0.00 0 714

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Cheltuieli indirecte:
714.00 * 0.03000 = 21.42
Profit:
735.42 * 0.02000 = 14.71

TOTAL GENERAL DEVIZ: 750.13


TVA 750.13 * 19.0% = 142.52
TOTAL cu TVA 892.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391364 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391364 APARATE DE REAZAM DIN NEOPREN TIP 4 (150MMX300MMX41MM)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100219 BUC. 7.000 166.00 1162
APARATE REAZAM DIN NEOPREN TIP 4 0.00 0
0.00 0
0.00 0 1162

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Cheltuieli indirecte:
1162.03 * 0.03000 = 34.86
Profit:
1196.89 * 0.02000 = 23.94

TOTAL GENERAL DEVIZ: 1 220.83


TVA 1220.83 * 19.0% = 231.96
TOTAL cu TVA 1 452.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391365 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391365 GRINZI PREF. PRECOMPRIMATE CU ARMATURA ADERENTA L=21 M H=0,93 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PI08B1 BUC. 7.000 0.00 0
ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT PRECOMPRIMAT 0.00 0
0.00 0 0

002 2100218 BUC. 7.000 18500.00 129500


GRINDA PREF PREC. CU ARMATURAADERENTA L= 0.00 0
21M, H=0,93M 0.00 0
0.00 0 129500

003 PI06A1 BUC. 7.000 30.98 217


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 175
MACARAUA PE PNEURI DE 9,9 TF 45.75 320
0.00 0 712

004 TRA04A49 TONA 131.600 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.49 KM.* 131.60 17319 17319

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.00 320.25 17318.56 147530.72
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.25

Detaliere transporturi:
-Articole TRA 17 318.56

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 175.00 + 320.25 * 0.000 +
17318.56 * 0.000) * 0.003375 = 0.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.59 320.25 17318.56 147531.31

Cheltuieli indirecte:
147531.31 * 0.03000 = 4 425.94
Profit:
151957.25 * 0.02000 = 3 039.14

TOTAL GENERAL DEVIZ: 154 996.39


TVA 154996.39 * 19.0% = 29 449.31
TOTAL cu TVA 184 445.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391366 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391366 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
007 CZ0302K1 [ 1] KG 7350.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 3969
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 3969

008 PD02A1 KG 7350.000 0.06 407


MONT.ARMATURI PT.BETON ARMAT IN 0.50 3701
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 4108

009 2100205 KG 7350.000 2.90 21322


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 21322

010 TRA04A17 TONA 7.350 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 87 87

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7.460 21729.17 7670.46 0.00 87.47 29487.10

Detaliere transporturi:
-Articole TRA 87.47

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 7670.46 + 0.00 * 0.000 +
87.47 * 0.000) * 0.003375 = 25.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7.460 21729.17 7696.35 0.00 87.47 29512.99

Cheltuieli indirecte:
29512.99 * 0.03000 = 885.39
Profit:
30398.37 * 0.02000 = 607.97

TOTAL GENERAL DEVIZ: 31 006.34


TVA 31006.34 * 19.0% = 5 891.21
TOTAL cu TVA 36 897.55

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391367 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391367 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 63.000 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 613
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 676
0.00 0 1289

002 3270091 M.C. 63.000 255.00 16065


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 16065

003 TRA06A17 TONA 157.500 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1665 1665

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


157.500 16065.00 613.23 676.05 1664.78 19019.06
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 676.05

Detaliere transporturi:
-Articole TRA 1 664.78

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 613.23 + 676.05 * 0.000 +
1664.78 * 0.000) * 0.003375 = 2.07

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


157.500 16065.00 615.30 676.05 1664.78 19021.13

Cheltuieli indirecte:
19021.13 * 0.03000 = 570.63
Profit:
19591.76 * 0.02000 = 391.84

TOTAL GENERAL DEVIZ: 19 983.60


TVA 19983.60 * 19.0% = 3 796.88
TOTAL cu TVA 23 780.48

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391368 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391368 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 229.320 0.05 12
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 1101
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 1113

002 PF04A1 MP. 229.320 6.36 1459


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 215
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 1674

003 PF05B1 MP. 229.320 9.98 2288


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 825
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 413
STRAT MASTIC. 0.00 0 3526

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.998 3758.78 2141.34 412.78 0.00 6312.90
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 412.78

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2141.34 + 412.78 * 0.000 +
0.00 * 0.000) * 0.003375 = 7.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.998 3758.78 2148.57 412.78 0.00 6320.12

Cheltuieli indirecte:
6320.12 * 0.03000 = 189.60
Profit:
6509.73 * 0.02000 = 130.19

TOTAL GENERAL DEVIZ: 6 639.92


TVA 6639.92 * 19.0% = 1 261.59
TOTAL cu TVA 7 901.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391369 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391369 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 159.500 4.87 777
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 936
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 47
4CM GROS LA POD 0.00 0 1760

002 2100047 TONA 11.480 310.00 3559


BA 8 0.00 0
0.00 0
0.00 0 3559

003 TRA01A35 TONA 11.480 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 225 225

004 DB02D1 100 MP. 1.590 70.98 113


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 64
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 9
EMULSIE CATIONICA 0.00 0 186

005 DB19E1 MP. 159.500 0.03 4


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 167
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 194
MECANICA 0.00 0 366

006 2100207 TONA 15.630 315.00 4923


BAP16 0.00 0
0.00 0
0.00 0 4923

007 TRA01A35 TONA 15.630 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 306 306

008 DB02D1 100 MP. 1.590 70.98 113


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 64
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 9
EMULSIE CATIONICA 0.00 0 186

009 DB16H1 MP. 159.500 0.03 4


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 167
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 194
0.00 0 366

010 2100051 TONA 15.000 320.00 4800


MAS16 0.00 0
0.00 0
0.00 0 4800

011 TRA01A35 TONA 15.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 294 294

012 TRA05A49 TONA 0.140 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 6 6

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


75.313 14293.32 1397.30 453.58 830.97 16975.16
Din care:
Valoare aferenta utilaje termice = 0.00
391369 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 453.58

Detaliere transporturi:
-Articole TRA 830.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1397.30 + 453.58 * 0.000 +
830.97 * 0.000) * 0.003375 = 4.72

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


75.313 14293.32 1402.01 453.58 830.97 16979.87

Cheltuieli indirecte:
16979.87 * 0.03000 = 509.40
Profit:
17489.27 * 0.02000 = 349.79

TOTAL GENERAL DEVIZ: 17 839.06


TVA 17839.06 * 19.0% = 3 389.42
TOTAL cu TVA 21 228.48

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391370 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391370 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 58.000 3.19 185
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 1710
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 1895

002 2100202 KG 4060.000 6.44 26159


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 26159

003 3270091 M.C. 7.000 255.00 1785


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 1785

004 TRA06A17 TONA 17.500 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 185 185

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


21.616 28128.33 1710.01 0.00 184.97 30023.32

Detaliere transporturi:
-Articole TRA 184.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1710.01 + 0.00 * 0.000 +
184.97 * 0.000) * 0.003375 = 5.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


21.616 28128.33 1715.79 0.00 184.97 30029.09

Cheltuieli indirecte:
30029.09 * 0.03000 = 900.87
Profit:
30929.96 * 0.02000 = 618.60

TOTAL GENERAL DEVIZ: 31 548.56


TVA 31548.56 * 19.0% = 5 994.23
TOTAL cu TVA 37 542.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391371 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391371 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 42.000 22.95 964
BORDURI PREFABRICATE DIN BETON PT 11.80 496
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1460

002 PF01A1 MP. 6.300 3.15 20


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 90
MARCA 100 DRISCUITA 0.19 1
0.00 0 111

003 PF09A1 M 84.000 41.21 3462


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 504
SAPEI HIDR 0.00 0
0.00 0 3966

004 PB06A1 M.C. 15.500 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 742
ZID,TIMPAN MANUAL 2.50 39
0.00 0 780

005 2100898 M.C. 15.500 200.00 3100


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 3100

006 TRA06A17 TONA 38.850 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 411 411

007 DB02D1 100 MP. 0.770 70.98 55


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 31
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 4
EMULSIE CATIONICA 0.00 0 90

008 TRA05A49 TONA 0.035 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 77.700 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 126
DE 2,5 CM CU ASTERNERE MANUALA 0.32 24
0.00 0 151

010 2100047 TONA 5.600 310.00 1736


BA 8 0.00 0
0.00 0
0.00 0 1736

011 TRA01A35 TONA 5.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 110 110

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


42.661 9338.08 1987.27 68.79 521.81 11915.95
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 68.79

Detaliere transporturi:
-Articole TRA 521.81
391371 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1987.27 + 68.79 * 0.000 +
521.81 * 0.000) * 0.003375 = 6.71

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


42.661 9338.08 1993.98 68.79 521.81 11922.65

Cheltuieli indirecte:
11922.65 * 0.03000 = 357.68
Profit:
12280.33 * 0.02000 = 245.61

TOTAL GENERAL DEVIZ: 12 525.94


TVA 12525.94 * 19.0% = 2 379.93
TOTAL cu TVA 14 905.87

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391372 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391372 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 1767.000 8.30 14673
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 14673

002 PK31A1 TONA 1.760 201.46 355


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1582
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 1936

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.044 15027.74 1581.71 0.00 0.00 16609.45

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1581.71 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.34

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.044 15027.74 1587.05 0.00 0.00 16614.79

Cheltuieli indirecte:
16614.79 * 0.03000 = 498.44
Profit:
17113.23 * 0.02000 = 342.26

TOTAL GENERAL DEVIZ: 17 455.50


TVA 17455.50 * 19.0% = 3 316.54
TOTAL cu TVA 20 772.04

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391373 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391373 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.000 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 19
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 19

002 PC05A1 MP. 10.000 2.20 22


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 603
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 625

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 22.000 1813.50 39897


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 39897

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.063 41297.88 982.40 60.37 0.00 42340.65
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 982.40 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.32

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.063 41297.88 985.72 60.37 0.00 42343.96

Cheltuieli indirecte:
42343.96 * 0.03000 = 1 270.32
Profit:
43614.28 * 0.02000 = 872.29

TOTAL GENERAL DEVIZ: 44 486.57


TVA 44486.57 * 19.0% = 8 452.45
TOTAL cu TVA 52 939.02

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391374 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0051 45000000 POD KM. 7+900-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391374 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 693.420 0.60 418
MONTAREA SI DEMONTARE SCHELEI MET 9.60 6657
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 7075

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 208.000 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 3952
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 3952

004 IZA01A1 MP. 208.000 0.49 101


CURATIREA PRIN SABLARE PT PROT 7.20 1498
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 3153
0.00 0 4752

005 PK48C1 [ 1] TONA 0.250 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 22
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 22

006 YC01RON LEI. 13478.000 1.00 13478


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 13478

007 2100211 KG 208.000 20.75 4316


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 4316

008 NMB109921 ORA 320.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 6400
0.00 0
0.00 0 6400

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.465 18313.70 18528.34 3313.28 0.00 40155.32
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 3313.28

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 18528.34 + 3313.28 * 0.000 +
0.00 * 0.000) * 0.003375 = 62.53

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.465 18313.70 18590.87 3313.28 0.00 40217.86

Cheltuieli indirecte:
40217.86 * 0.03000 = 1 206.54
Profit:
41424.39 * 0.02000 = 828.49

TOTAL GENERAL DEVIZ: 42 252.88


TVA 42252.88 * 19.0% = 8 028.05
391374 pag 2
======================================================================================================================
TOTAL cu TVA 50 280.93

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391375 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391375 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 152.400 3.40 519
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 2834
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 3353

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2834.49 0.00 0.00 3353.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2834.49 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2844.05 0.00 0.00 3362.74

Cheltuieli indirecte:
3362.74 * 0.03000 = 100.88
Profit:
3463.62 * 0.02000 = 69.27

TOTAL GENERAL DEVIZ: 3 532.90


TVA 3532.90 * 19.0% = 671.25
TOTAL cu TVA 4 204.15

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391376 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391376 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 186.550 0.01 1
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 8056
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 496
MANUAL 0.00 0 8554

002 2100914 M.C. 186.550 215.00 40109


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 40109

003 TRA06A17 TONA 466.370 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 4930 4930

004 TSA24B1 ORA 93.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 1483
DE 8,1-14KW 0.00 0 1483

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8056.35 1979.57 4929.53 55075.01
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1979.57

Detaliere transporturi:
-Articole TRA 4 929.53

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8056.35 + 1979.57 * 0.000 +
4929.53 * 0.000) * 0.003375 = 27.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8083.54 1979.57 4929.53 55102.20

Cheltuieli indirecte:
55102.20 * 0.03000 = 1 653.07
Profit:
56755.26 * 0.02000 = 1 135.11

TOTAL GENERAL DEVIZ: 57 890.37


TVA 57890.37 * 19.0% = 10 999.17
TOTAL cu TVA 68 889.54

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391377 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391377 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 271.440 4.62 1254
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5168
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6422

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5167.89 0.00 0.00 6421.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5167.89 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 17.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5185.33 0.00 0.00 6438.99

Cheltuieli indirecte:
6438.99 * 0.03000 = 193.17
Profit:
6632.16 * 0.02000 = 132.64

TOTAL GENERAL DEVIZ: 6 764.80


TVA 6764.80 * 19.0% = 1 285.31
TOTAL cu TVA 8 050.12

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391378 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391378 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 204.750 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 1993
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 2940
EXISTENTE CU POMPA 0.00 0 4933

002 2101004 M.C. 204.750 255.00 52211


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 52211

003 TRA06A17 TONA 512.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 5412 5412

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1993.00 2939.60 5411.84 62555.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2939.60

Detaliere transporturi:
-Articole TRA 5 411.84

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1993.00 + 2939.60 * 0.000 +
5411.84 * 0.000) * 0.003375 = 6.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1999.72 2939.60 5411.84 62562.41

Cheltuieli indirecte:
62562.41 * 0.03000 = 1 876.87
Profit:
64439.28 * 0.02000 = 1 288.79

TOTAL GENERAL DEVIZ: 65 728.07


TVA 65728.07 * 19.0% = 12 488.33
TOTAL cu TVA 78 216.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391379 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391379 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 378.120 0.60 228
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3630
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3858

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 113.430 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2155
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2155

004 IZA01A1 MP. 113.430 0.49 55


CURATIREA PRIN SABLARE PT PROT 7.20 817
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1720
0.00 0 2592

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 113.000 20.75 2345


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2345

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9252.80 2107.15 0.00 15328.34
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2107.15

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9252.80 + 2107.15 * 0.000 +
0.00 * 0.000) * 0.003375 = 31.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9284.03 2107.15 0.00 15359.56

Cheltuieli indirecte:
15359.56 * 0.03000 = 460.79
391379 pag 2
======================================================================================================================
Profit:
15820.35 * 0.02000 = 316.41

TOTAL GENERAL DEVIZ: 16 136.76


TVA 16136.76 * 19.0% = 3 065.98
TOTAL cu TVA 19 202.74

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391380 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391380 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 33.750 39.44 1331
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 1688
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 3019

002 TRA01A34 TONA 67.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1276 1276

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1687.50 0.00 1275.68 4294.28

Detaliere transporturi:
-Articole TRA 1 275.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1687.50 + 0.00 * 0.000 +
1275.68 * 0.000) * 0.003375 = 5.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1693.20 0.00 1275.68 4299.98

Cheltuieli indirecte:
4299.98 * 0.03000 = 129.00
Profit:
4428.97 * 0.02000 = 88.58

TOTAL GENERAL DEVIZ: 4 517.55


TVA 4517.55 * 19.0% = 858.34
TOTAL cu TVA 5 375.89

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391381 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391381 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 8.000 22.95 184
BORDURI PREFABRICATE DIN BETON PT 11.80 94
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 278

002 2100898 M.C. 0.360 200.00 72


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 72

003 TRA06A17 TONA 0.900 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 10 10

004 PB06A1 M.C. 2.960 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 142
ZID,TIMPAN MANUAL 2.50 7
0.00 0 149

005 2100898 M.C. 2.960 200.00 592


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 592

006 TRA06A17 TONA 7.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 78 78

007 DB02D1 100 MP. 0.148 70.98 11


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 6
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 17

008 DB18A1 MP. 14.800 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 24
DE 2,5 CM CU ASTERNERE MANUALA 0.32 5
0.00 0 29

009 2100047 TONA 1.060 310.00 329


BA 8 0.00 0
0.00 0
0.00 0 329

010 TRA01A35 TONA 1.060 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 21 21

011 TRA05A49 TONA 0.006 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 265.90 12.91 108.75 1574.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 12.91

Detaliere transporturi:
-Articole TRA 108.75
391381 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 265.90 + 12.91 * 0.000 +
108.75 * 0.000) * 0.003375 = 0.90

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 266.79 12.91 108.75 1575.46

Cheltuieli indirecte:
1575.46 * 0.03000 = 47.26
Profit:
1622.73 * 0.02000 = 32.45

TOTAL GENERAL DEVIZ: 1 655.18


TVA 1655.18 * 19.0% = 314.48
TOTAL cu TVA 1 969.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391382 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0052 45000000 POD KM. 7+900-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391382 armatura bst500 s

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 9700.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 5238
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 5238

002 PD02A1 KG 9700.000 0.06 537


MONT.ARMATURI PT.BETON ARMAT IN 0.50 4885
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 5422

003 2100205 KG 9700.000 2.90 28140


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 28140

004 TRA04A17 TONA 9.700 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 115 115

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10122.92 0.00 115.43 38914.94

Detaliere transporturi:
-Articole TRA 115.43

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 10122.92 + 0.00 * 0.000 +
115.43 * 0.000) * 0.003375 = 34.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10157.08 0.00 115.43 38949.11

Cheltuieli indirecte:
38949.11 * 0.03000 = 1 168.47
Profit:
40117.58 * 0.02000 = 802.35

TOTAL GENERAL DEVIZ: 40 919.93


TVA 40919.93 * 19.0% = 7 774.79
TOTAL cu TVA 48 694.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391383 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391383 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 10.000 472.87 4729
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 4729

002 TRA04A17 TONA 17.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 205 205

003 PI06A1 BUC. 10.000 30.98 310


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 250
MACARAUA PE PNEURI DE 9,9 TF 45.75 458
0.00 0 1017

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.00 457.50 204.68 5950.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 457.50

Detaliere transporturi:
-Articole TRA 204.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 250.00 + 457.50 * 0.000 +
204.68 * 0.000) * 0.003375 = 0.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.84 457.50 204.68 5951.55

Cheltuieli indirecte:
5951.55 * 0.03000 = 178.55
Profit:
6130.10 * 0.02000 = 122.60

TOTAL GENERAL DEVIZ: 6 252.70


TVA 6252.70 * 19.0% = 1 188.01
TOTAL cu TVA 7 440.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391384 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391384 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.490 70.98 35
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

002 DB19E1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 51
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 60
MECANICA 0.00 0 112

003 2100207 TONA 4.800 315.00 1512


BAP16 0.00 0
0.00 0
0.00 0 1512

004 TRA01A35 TONA 4.800 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 94 94

005 DB02D1 100 MP. 0.490 70.98 35


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

006 DB16H1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 51
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 60
0.00 0 112

007 2100051 TONA 4.600 320.00 1472


MAS16 0.00 0
0.00 0
0.00 0 1472

008 TRA01A35 TONA 4.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 90 90

009 TRA05A49 TONA 0.044 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2 2

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 141.69 125.07 186.00 3509.04
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 125.07

Detaliere transporturi:
-Articole TRA 186.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 141.69 + 125.07 * 0.000 +
186.00 * 0.000) * 0.003375 = 0.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 142.17 125.07 186.00 3509.52
391384 pag 2
======================================================================================================================

Cheltuieli indirecte:
3509.52 * 0.03000 = 105.29
Profit:
3614.81 * 0.02000 = 72.30

TOTAL GENERAL DEVIZ: 3 687.10


TVA 3687.10 * 19.0% = 700.55
TOTAL cu TVA 4 387.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391385 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391385 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 30.000 0.65 19
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 2112
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 2131

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.667 567.35 4014.39 0.00 0.00 4581.74

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4014.39 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 13.55

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.667 567.35 4027.94 0.00 0.00 4595.29

Cheltuieli indirecte:
4595.29 * 0.03000 = 137.86
Profit:
4733.15 * 0.02000 = 94.66

TOTAL GENERAL DEVIZ: 4 827.81


TVA 4827.81 * 19.0% = 917.28
TOTAL cu TVA 5 745.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391386 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391386 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 84.000 4.62 388
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 1599
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 1987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1599.26 0.00 0.00 1987.22

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1599.26 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1604.66 0.00 0.00 1992.61

Cheltuieli indirecte:
1992.61 * 0.03000 = 59.78
Profit:
2052.39 * 0.02000 = 41.05

TOTAL GENERAL DEVIZ: 2 093.44


TVA 2093.44 * 19.0% = 397.75
TOTAL cu TVA 2 491.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391387 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391387 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 2200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 1188
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 1188

002 PD02A1 KG 2200.000 0.06 122


MONT.ARMATURI PT.BETON ARMAT IN 0.50 1108
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 1230

003 2100205 KG 2200.000 2.90 6382


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 6382

004 TRA04A17 TONA 2.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 26 26

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2295.92 0.00 26.18 8826.07

Detaliere transporturi:
-Articole TRA 26.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2295.92 + 0.00 * 0.000 +
26.18 * 0.000) * 0.003375 = 7.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2303.67 0.00 26.18 8833.82

Cheltuieli indirecte:
8833.82 * 0.03000 = 265.01
Profit:
9098.83 * 0.02000 = 181.98

TOTAL GENERAL DEVIZ: 9 280.81


TVA 9280.81 * 19.0% = 1 763.35
TOTAL cu TVA 11 044.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391388 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391388 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 60.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 2591
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 160
MANUAL 0.00 0 2751

002 2100899 M.C. 60.000 210.00 12600


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 12600

003 TRA06A17 TONA 150.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1586 1586

004 TSA24B1 ORA 30.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 478
DE 8,1-14KW 0.00 0 478

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2591.16 638.10 1585.50 17415.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 638.10

Detaliere transporturi:
-Articole TRA 1 585.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2591.16 + 638.10 * 0.000 +
1585.50 * 0.000) * 0.003375 = 8.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2599.91 638.10 1585.50 17424.05

Cheltuieli indirecte:
17424.05 * 0.03000 = 522.72
Profit:
17946.77 * 0.02000 = 358.94

TOTAL GENERAL DEVIZ: 18 305.70


TVA 18305.70 * 19.0% = 3 478.08
TOTAL cu TVA 21 783.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391389 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391389 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 84.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 818
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1206
EXISTENTE CU POMPA 0.00 0 2024

002 2101004 M.C. 84.000 255.00 21420


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 21420

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 817.64 1205.99 2219.70 25663.33
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1205.99

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 817.64 + 1205.99 * 0.000 +
2219.70 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 820.40 1205.99 2219.70 25666.09

Cheltuieli indirecte:
25666.09 * 0.03000 = 769.98
Profit:
26436.07 * 0.02000 = 528.72

TOTAL GENERAL DEVIZ: 26 964.79


TVA 26964.79 * 19.0% = 5 123.31
TOTAL cu TVA 32 088.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391390 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391390 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 3.500 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 527
0.00 0 527

002 TRA01A02 TONA 630.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 706 706

003 TSD01D1 M.C. 70.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 797
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 797

004 TSD05B1 100 MC. 3.500 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 617
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 561
STRAT DIN PAM.COEZI 0.00 0 1178

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1414.00 1088.56 705.60 3208.16
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1088.56

Detaliere transporturi:
-Articole TRA 705.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1414.00 + 1088.56 * 0.000 +
705.60 * 0.000) * 0.003375 = 4.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1418.77 1088.56 705.60 3212.93

Cheltuieli indirecte:
3212.93 * 0.03000 = 96.39
Profit:
3309.32 * 0.02000 = 66.19

TOTAL GENERAL DEVIZ: 3 375.51


TVA 3375.51 * 19.0% = 641.35
TOTAL cu TVA 4 016.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391391 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391391 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 84.000 3.19 268
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 336
NISIP 0.00 0
0.00 0 604

002 TRA01A17 TONA 14.280 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 136 136

003 IFA03C1 MP. 84.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 2352
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 2352

004 2100957 M.C. 8.400 190.00 1596


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1596

005 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

006 TRI1AA01C1 TONA 21.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 147
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 147

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2835.00 0.00 357.92 5057.25

Detaliere transporturi:
-Articole TRA 357.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2835.00 + 0.00 * 0.000 +
357.92 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2844.57 0.00 357.92 5066.82

Cheltuieli indirecte:
5066.82 * 0.03000 = 152.00
Profit:
5218.83 * 0.02000 = 104.38

TOTAL GENERAL DEVIZ: 5 323.20


TVA 5323.20 * 19.0% = 1 011.41
TOTAL cu TVA 6 334.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391392 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0053 45000000 POD KM. 7+900-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391392 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 50.000 2.23 111
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 1036
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 1148

002 6306339 KG 1035.500 4.66 4825


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 4825

003 2100957 M.C. 4.150 190.00 789


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 789

004 TRA06A17 TONA 10.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 106 106

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 5725.41 1036.50 0.00 105.70 6867.61

Detaliere transporturi:
-Articole TRA 105.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1036.50 + 0.00 * 0.000 +
105.70 * 0.000) * 0.003375 = 3.50

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 5725.41 1040.00 0.00 105.70 6871.10

Cheltuieli indirecte:
6871.10 * 0.03000 = 206.13
Profit:
7077.24 * 0.02000 = 141.54

TOTAL GENERAL DEVIZ: 7 218.78


TVA 7218.78 * 19.0% = 1 371.57
TOTAL cu TVA 8 590.35

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391393 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0054 45000000 POD KM. 7+900-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391393 SAPATURA PENTRU PROFILAREA ALBIEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.250 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 41
0.00 0 41

002 TSC35B31 100 MC. 0.250 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 43
M 0.00 0 43

003 TRA01A02 TONA 45.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 50 50

004 TSD03C1 100 MC. 0.300 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 13
TER.CAT.1 SAU 2 0.00 0 13

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 96.38 50.40 146.78
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 96.38

Detaliere transporturi:
-Articole TRA 50.40

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 96.38 50.40 146.78

Cheltuieli indirecte:
146.78 * 0.03000 = 4.40
Profit:
151.18 * 0.02000 = 3.02

TOTAL GENERAL DEVIZ: 154.21


TVA 154.21 * 19.0% = 29.30
TOTAL cu TVA 183.51

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391394 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0055 45000000 POD KM. 7+900-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391394 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 3270001 M.C. 0.800 180.00 144


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391394 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391395 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0055 45000000 POD KM. 7+900-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391395 VARIANTA PROVIZORIE DE CIRCULATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19B1 100 MC. 0.550 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.2 135.52 75
0.00 0 75

002 PI08A1 BUC. 4.000 0.00 0


ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT 0.00 0
0.00 0 0

003 6422963 BUC. 4.000 3745.00 14980


ELEMENT PENTRU POD TRONSON TIP C3 BETON 0.00 0
ARMAT INCARCARE SPALIERA .L=1,6M LUM 3 0.00 0
0.00 0 14980

004 DA06B1 M.C. 150.000 26.24 3936


STRAT AGREG NAT CILINDRATE CU FUNC 7.37 1106
REZIST FILTRANTIZOLAT AERISIRE SI 12.12 1819
ANTICAP CU ASTER MEC BALAST 0.00 0 6860

005 TRA01A17 TONA 334.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 3180 3180

006 DF09B1 M 100.000 2.23 223


PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

007 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

008 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3179.19 1893.29 3401.65 29189.60
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1893.29

Detaliere transporturi:
-Articole TRA 3 401.65

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3179.19 + 1893.29 * 0.000 +
3401.65 * 0.000) * 0.003375 = 10.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3189.92 1893.29 3401.65 29200.33

Cheltuieli indirecte:
29200.33 * 0.03000 = 876.01
Profit:
30076.34 * 0.02000 = 601.53
391395 pag 2
======================================================================================================================

TOTAL GENERAL DEVIZ: 30 677.87


TVA 30677.87 * 19.0% = 5 828.80
TOTAL cu TVA 36 506.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391396 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0056 45000000 POD KM. 8+150-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391396 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 421.830 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 1291
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 1291

002 TRA01A02 TONA 60.740 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 68 68

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1290.80 0.00 68.03 1358.83

Detaliere transporturi:
-Articole TRA 68.03

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1290.80 + 0.00 * 0.000 +
68.03 * 0.000) * 0.003375 = 4.36

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1295.16 0.00 68.03 1363.19

Cheltuieli indirecte:
1363.19 * 0.03000 = 40.90
Profit:
1404.08 * 0.02000 = 28.08

TOTAL GENERAL DEVIZ: 1 432.16


TVA 1432.16 * 19.0% = 272.11
TOTAL cu TVA 1 704.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391397 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0056 45000000 POD KM. 8+150-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391397 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 287.230 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 19417
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 13889
FUND DRUM 0.00 0 33305

002 TRI1AA02C3 TONA 718.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 6462
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 6462

003 TRA01A02 TONA 718.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 804 804

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 25878.69 13888.72 804.16 40571.57
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 13888.72

Detaliere transporturi:
-Articole TRA 804.16

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 25878.69 + 13888.72 * 0.000 +
804.16 * 0.000) * 0.003375 = 87.34

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 25966.03 13888.72 804.16 40658.91

Cheltuieli indirecte:
40658.91 * 0.03000 = 1 219.77
Profit:
41878.68 * 0.02000 = 837.57

TOTAL GENERAL DEVIZ: 42 716.25


TVA 42716.25 * 19.0% = 8 116.09
TOTAL cu TVA 50 832.34

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391398 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0056 45000000 POD KM. 8+150-DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391398 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 6.500 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 1334
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 1334

002 TSC19C1 100 MC. 3.250 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 532
0.00 0 532

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1333.80 531.96 0.00 1865.76
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 531.96

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1333.80 + 531.96 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.50

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1338.30 531.96 0.00 1870.26

Cheltuieli indirecte:
1870.26 * 0.03000 = 56.11
Profit:
1926.37 * 0.02000 = 38.53

TOTAL GENERAL DEVIZ: 1 964.90


TVA 1964.90 * 19.0% = 373.33
TOTAL cu TVA 2 338.23

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391399 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391399 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 104.000 0.60 63
MONTAREA SI DEMONTARE SCHELEI MET 9.60 998
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1061

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.079 62.75 998.40 320.00 0.00 1381.15
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 998.40 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.37

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.079 62.75 1001.77 320.00 0.00 1384.52

Cheltuieli indirecte:
1384.52 * 0.03000 = 41.54
Profit:
1426.06 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.58


TVA 1454.58 * 19.0% = 276.37
TOTAL cu TVA 1 730.95

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391400 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391400 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 364.000 2.20 802
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 21957
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 22758

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.265 801.55 21956.70 0.00 0.00 22758.24

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 21956.70 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 74.10

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.265 801.55 22030.80 0.00 0.00 22832.35

Cheltuieli indirecte:
22832.35 * 0.03000 = 684.97
Profit:
23517.32 * 0.02000 = 470.35

TOTAL GENERAL DEVIZ: 23 987.67


TVA 23987.67 * 19.0% = 4 557.66
TOTAL cu TVA 28 545.32

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391401 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391401 APARATE DE REAZAM DIN NEOPREN TIP 3

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100216 BUC. 7.000 102.00 714
APARATE REAZAM DIN NEOPREN TIP 3 0.00 0
0.00 0
0.00 0 714

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Cheltuieli indirecte:
714.00 * 0.03000 = 21.42
Profit:
735.42 * 0.02000 = 14.71

TOTAL GENERAL DEVIZ: 750.13


TVA 750.13 * 19.0% = 142.52
TOTAL cu TVA 892.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391402 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391402 APARATE DE REAZAM DIN NEOPREN TIP 4 (150MMX300MMX41MM)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100219 BUC. 7.000 166.00 1162
APARATE REAZAM DIN NEOPREN TIP 4 0.00 0
0.00 0
0.00 0 1162

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Cheltuieli indirecte:
1162.03 * 0.03000 = 34.86
Profit:
1196.89 * 0.02000 = 23.94

TOTAL GENERAL DEVIZ: 1 220.83


TVA 1220.83 * 19.0% = 231.96
TOTAL cu TVA 1 452.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391403 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391403 GRINZI PREF. PRECOMPRIMATE CU ARMATURA ADERENTA L=21 M H=0,93 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PI08B1 BUC. 7.000 0.00 0
ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT PRECOMPRIMAT 0.00 0
0.00 0 0

002 2100218 BUC. 7.000 18500.00 129500


GRINDA PREF PREC. CU ARMATURAADERENTA L= 0.00 0
21M, H=0,93M 0.00 0
0.00 0 129500

003 PI06A1 BUC. 7.000 30.98 217


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 175
MACARAUA PE PNEURI DE 9,9 TF 45.75 320
0.00 0 712

004 TRA04A49 TONA 131.600 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.49 KM.* 131.60 17319 17319

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.00 320.25 17318.56 147530.72
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.25

Detaliere transporturi:
-Articole TRA 17 318.56

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 175.00 + 320.25 * 0.000 +
17318.56 * 0.000) * 0.003375 = 0.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.59 320.25 17318.56 147531.31

Cheltuieli indirecte:
147531.31 * 0.03000 = 4 425.94
Profit:
151957.25 * 0.02000 = 3 039.14

TOTAL GENERAL DEVIZ: 154 996.39


TVA 154996.39 * 19.0% = 29 449.31
TOTAL cu TVA 184 445.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391404 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391404 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
007 CZ0302K1 [ 1] KG 6300.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 3402
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 3402

008 PD02A1 KG 6300.000 0.06 349


MONT.ARMATURI PT.BETON ARMAT IN 0.50 3173
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 3521

009 2100205 KG 6300.000 2.90 18276


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 18276

010 TRA04A17 TONA 6.300 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 75 75

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.394 18625.01 6574.68 0.00 74.97 25274.65

Detaliere transporturi:
-Articole TRA 74.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6574.68 + 0.00 * 0.000 +
74.97 * 0.000) * 0.003375 = 22.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.394 18625.01 6596.87 0.00 74.97 25296.84

Cheltuieli indirecte:
25296.84 * 0.03000 = 758.91
Profit:
26055.75 * 0.02000 = 521.11

TOTAL GENERAL DEVIZ: 26 576.86


TVA 26576.86 * 19.0% = 5 049.60
TOTAL cu TVA 31 626.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391405 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391405 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 54.000 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 526
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 579
0.00 0 1105

002 3270091 M.C. 54.000 255.00 13770


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 13770

003 TRA06A17 TONA 135.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1427 1427

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


135.000 13770.00 525.63 579.47 1426.95 16302.05
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 579.47

Detaliere transporturi:
-Articole TRA 1 426.95

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 525.63 + 579.47 * 0.000 +
1426.95 * 0.000) * 0.003375 = 1.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


135.000 13770.00 527.40 579.47 1426.95 16303.82

Cheltuieli indirecte:
16303.82 * 0.03000 = 489.11
Profit:
16792.94 * 0.02000 = 335.86

TOTAL GENERAL DEVIZ: 17 128.80


TVA 17128.80 * 19.0% = 3 254.47
TOTAL cu TVA 20 383.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391406 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391406 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 196.560 0.05 10
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 943
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 954

002 PF04A1 MP. 196.560 6.36 1250


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 185
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 1435

003 PF05B1 MP. 196.560 9.98 1961


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 707
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 354
STRAT MASTIC. 0.00 0 3022

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.570 3221.81 1835.44 353.81 0.00 5411.06
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 353.81

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1835.44 + 353.81 * 0.000 +
0.00 * 0.000) * 0.003375 = 6.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.570 3221.81 1841.63 353.81 0.00 5417.25

Cheltuieli indirecte:
5417.25 * 0.03000 = 162.52
Profit:
5579.77 * 0.02000 = 111.60

TOTAL GENERAL DEVIZ: 5 691.36


TVA 5691.36 * 19.0% = 1 081.36
TOTAL cu TVA 6 772.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391407 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391407 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 52.000 3.19 166
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 1533
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 1699

002 2100202 KG 3640.000 6.44 23453


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 23453

003 3270091 M.C. 6.300 255.00 1606


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 1606

004 TRA06A17 TONA 15.700 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 166 166

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


19.440 25224.66 1533.12 0.00 165.95 26923.72

Detaliere transporturi:
-Articole TRA 165.95

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1533.12 + 0.00 * 0.000 +
165.95 * 0.000) * 0.003375 = 5.17

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


19.440 25224.66 1538.29 0.00 165.95 26928.89

Cheltuieli indirecte:
26928.89 * 0.03000 = 807.87
Profit:
27736.76 * 0.02000 = 554.74

TOTAL GENERAL DEVIZ: 28 291.50


TVA 28291.50 * 19.0% = 5 375.38
TOTAL cu TVA 33 666.88

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391408 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391408 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 1584.400 8.30 13157
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 13157

002 PK31A1 TONA 1.584 201.46 319


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1424
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 1743

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.834 13475.97 1423.54 0.00 0.00 14899.51

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1423.54 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.834 13475.97 1428.34 0.00 0.00 14904.32

Cheltuieli indirecte:
14904.32 * 0.03000 = 447.13
Profit:
15351.45 * 0.02000 = 307.03

TOTAL GENERAL DEVIZ: 15 658.47


TVA 15658.47 * 19.0% = 2 975.11
TOTAL cu TVA 18 633.59

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391409 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391409 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 50 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.920 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 24
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 24

002 PC05A1 MP. 12.300 2.20 27


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 742
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 769

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 22.000 1813.50 39897


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 39897

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 41302.99 1125.56 60.37 0.00 42488.91
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1125.56 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.065 41302.99 1129.36 60.37 0.00 42492.71

Cheltuieli indirecte:
42492.71 * 0.03000 = 1 274.78
Profit:
43767.50 * 0.02000 = 875.35

TOTAL GENERAL DEVIZ: 44 642.84


TVA 44642.84 * 19.0% = 8 482.14
TOTAL cu TVA 53 124.99

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391410 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391410 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 594.360 0.60 359
MONTAREA SI DEMONTARE SCHELEI MET 9.60 5706
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 6064

002 AUT1303 ORA 120.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 120
0.00 0 120

003 RPCB12A1 MP. 178.300 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 3388
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 3388

004 IZA01A1 MP. 178.300 0.49 87


CURATIREA PRIN SABLARE PT PROT 7.20 1284
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 2703
0.00 0 4074

005 PK48C1 [ 1] TONA 0.200 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 18
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 18

006 YC01RON LEI. 11552.000 1.00 11552


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 11552

007 2100211 KG 178.300 20.75 3700


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 3700

008 NMB109921 ORA 240.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 4800
0.00 0
0.00 0 4800

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.256 15697.19 15194.84 2823.03 0.00 33715.06
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2823.03

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 15194.84 + 2823.03 * 0.000 +
0.00 * 0.000) * 0.003375 = 51.28

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.256 15697.19 15246.12 2823.03 0.00 33766.34

Cheltuieli indirecte:
33766.34 * 0.03000 = 1 012.99
Profit:
34779.33 * 0.02000 = 695.59

TOTAL GENERAL DEVIZ: 35 474.92


TVA 35474.92 * 19.0% = 6 740.23
391410 pag 2
======================================================================================================================
TOTAL cu TVA 42 215.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391411 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391411 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 36.000 22.95 826
BORDURI PREFABRICATE DIN BETON PT 11.80 425
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1251

002 PF01A1 MP. 5.400 3.15 17


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 77
MARCA 100 DRISCUITA 0.19 1
0.00 0 95

003 PF09A1 M 72.000 41.21 2967


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 432
SAPEI HIDR 0.00 0
0.00 0 3399

004 PB06A1 M.C. 13.320 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 637
ZID,TIMPAN MANUAL 2.50 33
0.00 0 671

005 2100898 M.C. 13.320 200.00 2664


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 2664

006 TRA06A17 TONA 33.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 349 349

007 DB02D1 100 MP. 0.660 70.98 47


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 26
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 4
EMULSIE CATIONICA 0.00 0 77

008 TRA05A49 TONA 0.030 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 66.600 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 108
DE 2,5 CM CU ASTERNERE MANUALA 0.32 21
0.00 0 130

010 2100047 TONA 4.800 310.00 1488


BA 8 0.00 0
0.00 0
0.00 0 1488

011 TRA01A35 TONA 4.800 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 94 94

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


36.649 8010.92 1705.02 59.05 444.09 10219.08
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 59.05

Detaliere transporturi:
-Articole TRA 444.09
391411 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1705.02 + 59.05 * 0.000 +
444.09 * 0.000) * 0.003375 = 5.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


36.649 8010.92 1710.77 59.05 444.09 10224.83

Cheltuieli indirecte:
10224.83 * 0.03000 = 306.75
Profit:
10531.58 * 0.02000 = 210.63

TOTAL GENERAL DEVIZ: 10 742.21


TVA 10742.21 * 19.0% = 2 041.02
TOTAL cu TVA 12 783.23

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391412 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0057 45000000 POD KM. 8+150-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391412 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 143.000 4.87 696
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 840
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 42
4CM GROS LA POD 0.00 0 1577

002 2100047 TONA 10.290 310.00 3190


BA 8 0.00 0
0.00 0
0.00 0 3190

003 TRA01A35 TONA 10.290 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 202 202

004 DB02D1 100 MP. 1.430 70.98 102


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 57
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 8
EMULSIE CATIONICA 0.00 0 167

005 DB19E1 MP. 143.000 0.03 4


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 150
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 174
MECANICA 0.00 0 328

006 2100207 TONA 14.010 315.00 4413


BAP16 0.00 0
0.00 0
0.00 0 4413

007 TRA01A35 TONA 14.010 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 275 275

008 DB02D1 100 MP. 1.430 70.98 102


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 57
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 8
EMULSIE CATIONICA 0.00 0 167

009 DB16H1 MP. 143.000 0.03 4


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 150
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 174
0.00 0 328

010 2100051 TONA 13.440 320.00 4301


MAS16 0.00 0
0.00 0
0.00 0 4301

011 TRA01A35 TONA 13.440 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 263 263

012 TRA05A49 TONA 0.130 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 5 5

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


67.495 12810.96 1253.11 406.70 744.92 15215.69
Din care:
Valoare aferenta utilaje termice = 0.00
391412 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 406.70

Detaliere transporturi:
-Articole TRA 744.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1253.11 + 406.70 * 0.000 +
744.92 * 0.000) * 0.003375 = 4.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


67.495 12810.96 1257.34 406.70 744.92 15219.92

Cheltuieli indirecte:
15219.92 * 0.03000 = 456.60
Profit:
15676.52 * 0.02000 = 313.53

TOTAL GENERAL DEVIZ: 15 990.05


TVA 15990.05 * 19.0% = 3 038.11
TOTAL cu TVA 19 028.15

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391413 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391413 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 152.400 3.40 519
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 2834
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 3353

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2834.49 0.00 0.00 3353.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2834.49 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2844.05 0.00 0.00 3362.74

Cheltuieli indirecte:
3362.74 * 0.03000 = 100.88
Profit:
3463.62 * 0.02000 = 69.27

TOTAL GENERAL DEVIZ: 3 532.90


TVA 3532.90 * 19.0% = 671.25
TOTAL cu TVA 4 204.15

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391414 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391414 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 186.550 0.01 1
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 8056
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 496
MANUAL 0.00 0 8554

002 2100914 M.C. 186.550 215.00 40109


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 40109

003 TRA06A17 TONA 466.370 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 4930 4930

004 TSA24B1 ORA 93.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 1483
DE 8,1-14KW 0.00 0 1483

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8056.35 1979.57 4929.53 55075.01
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1979.57

Detaliere transporturi:
-Articole TRA 4 929.53

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8056.35 + 1979.57 * 0.000 +
4929.53 * 0.000) * 0.003375 = 27.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8083.54 1979.57 4929.53 55102.20

Cheltuieli indirecte:
55102.20 * 0.03000 = 1 653.07
Profit:
56755.26 * 0.02000 = 1 135.11

TOTAL GENERAL DEVIZ: 57 890.37


TVA 57890.37 * 19.0% = 10 999.17
TOTAL cu TVA 68 889.54

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391415 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391415 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 271.440 4.62 1254
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5168
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6422

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5167.89 0.00 0.00 6421.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5167.89 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 17.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5185.33 0.00 0.00 6438.99

Cheltuieli indirecte:
6438.99 * 0.03000 = 193.17
Profit:
6632.16 * 0.02000 = 132.64

TOTAL GENERAL DEVIZ: 6 764.80


TVA 6764.80 * 19.0% = 1 285.31
TOTAL cu TVA 8 050.12

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391416 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391416 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 204.750 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 1993
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 2940
EXISTENTE CU POMPA 0.00 0 4933

002 2101004 M.C. 204.750 255.00 52211


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 52211

003 TRA06A17 TONA 512.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 5412 5412

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1993.00 2939.60 5411.84 62555.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2939.60

Detaliere transporturi:
-Articole TRA 5 411.84

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1993.00 + 2939.60 * 0.000 +
5411.84 * 0.000) * 0.003375 = 6.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1999.72 2939.60 5411.84 62562.41

Cheltuieli indirecte:
62562.41 * 0.03000 = 1 876.87
Profit:
64439.28 * 0.02000 = 1 288.79

TOTAL GENERAL DEVIZ: 65 728.07


TVA 65728.07 * 19.0% = 12 488.33
TOTAL cu TVA 78 216.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391417 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391417 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 378.120 0.60 228
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3630
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3858

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 113.430 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2155
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2155

004 IZA01A1 MP. 113.430 0.49 55


CURATIREA PRIN SABLARE PT PROT 7.20 817
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1720
0.00 0 2592

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 113.000 20.75 2345


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2345

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9252.80 2107.15 0.00 15328.34
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2107.15

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9252.80 + 2107.15 * 0.000 +
0.00 * 0.000) * 0.003375 = 31.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9284.03 2107.15 0.00 15359.56

Cheltuieli indirecte:
15359.56 * 0.03000 = 460.79
391417 pag 2
======================================================================================================================
Profit:
15820.35 * 0.02000 = 316.41

TOTAL GENERAL DEVIZ: 16 136.76


TVA 16136.76 * 19.0% = 3 065.98
TOTAL cu TVA 19 202.74

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391418 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391418 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 33.750 39.44 1331
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 1688
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 3019

002 TRA01A34 TONA 67.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1276 1276

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1687.50 0.00 1275.68 4294.28

Detaliere transporturi:
-Articole TRA 1 275.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1687.50 + 0.00 * 0.000 +
1275.68 * 0.000) * 0.003375 = 5.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1693.20 0.00 1275.68 4299.98

Cheltuieli indirecte:
4299.98 * 0.03000 = 129.00
Profit:
4428.97 * 0.02000 = 88.58

TOTAL GENERAL DEVIZ: 4 517.55


TVA 4517.55 * 19.0% = 858.34
TOTAL cu TVA 5 375.89

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391419 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391419 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 9700.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 5238
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 5238

002 PD02A1 KG 9700.000 0.06 537


MONT.ARMATURI PT.BETON ARMAT IN 0.50 4885
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 5422

003 2100205 KG 9700.000 2.90 28140


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 28140

004 TRA04A17 TONA 9.700 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 115 115

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10122.92 0.00 115.43 38914.94

Detaliere transporturi:
-Articole TRA 115.43

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 10122.92 + 0.00 * 0.000 +
115.43 * 0.000) * 0.003375 = 34.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10157.08 0.00 115.43 38949.11

Cheltuieli indirecte:
38949.11 * 0.03000 = 1 168.47
Profit:
40117.58 * 0.02000 = 802.35

TOTAL GENERAL DEVIZ: 40 919.93


TVA 40919.93 * 19.0% = 7 774.79
TOTAL cu TVA 48 694.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391420 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0058 45000000 POD KM. 8+150-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391420 TROTUAR PE CULEI LATIME L=2

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 8.000 22.95 184
BORDURI PREFABRICATE DIN BETON PT 11.80 94
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 278

002 2100898 M.C. 0.360 200.00 72


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 72

003 TRA06A17 TONA 0.900 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 10 10

004 PB06A1 M.C. 2.960 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 142
ZID,TIMPAN MANUAL 2.50 7
0.00 0 149

005 2100898 M.C. 2.960 200.00 592


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 592

006 TRA06A17 TONA 7.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 78 78

007 DB02D1 100 MP. 0.148 70.98 11


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 6
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 17

008 DB18A1 MP. 14.800 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 24
DE 2,5 CM CU ASTERNERE MANUALA 0.32 5
0.00 0 29

009 2100047 TONA 1.060 310.00 329


BA 8 0.00 0
0.00 0
0.00 0 329

010 TRA01A35 TONA 1.060 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 21 21

011 TRA05A49 TONA 0.060 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2 2

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 265.90 12.91 110.91 1576.73
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 12.91

Detaliere transporturi:
-Articole TRA 110.91
391420 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 265.90 + 12.91 * 0.000 +
110.91 * 0.000) * 0.003375 = 0.90

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 266.79 12.91 110.91 1577.63

Cheltuieli indirecte:
1577.63 * 0.03000 = 47.33
Profit:
1624.96 * 0.02000 = 32.50

TOTAL GENERAL DEVIZ: 1 657.45


TVA 1657.45 * 19.0% = 314.92
TOTAL cu TVA 1 972.37

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391421 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391421 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 10.000 472.87 4729
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 4729

002 TRA04A17 TONA 17.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 205 205

003 PI06A1 BUC. 10.000 30.98 310


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 250
MACARAUA PE PNEURI DE 9,9 TF 45.75 458
0.00 0 1017

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.00 457.50 204.68 5950.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 457.50

Detaliere transporturi:
-Articole TRA 204.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 250.00 + 457.50 * 0.000 +
204.68 * 0.000) * 0.003375 = 0.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.84 457.50 204.68 5951.55

Cheltuieli indirecte:
5951.55 * 0.03000 = 178.55
Profit:
6130.10 * 0.02000 = 122.60

TOTAL GENERAL DEVIZ: 6 252.70


TVA 6252.70 * 19.0% = 1 188.01
TOTAL cu TVA 7 440.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391422 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391422 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.490 70.98 35
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

002 DB19E1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 51
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 60
MECANICA 0.00 0 112

003 2100207 TONA 4.800 315.00 1512


BAP16 0.00 0
0.00 0
0.00 0 1512

004 TRA01A35 TONA 4.800 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 94 94

005 DB02D1 100 MP. 0.490 70.98 35


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

006 DB16H1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 51
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 60
0.00 0 112

007 2100051 TONA 4.600 320.00 1472


MAS16 0.00 0
0.00 0
0.00 0 1472

008 TRA01A35 TONA 4.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 90 90

009 TRA05A49 TONA 0.044 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2 2

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 141.69 125.07 186.00 3509.04
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 125.07

Detaliere transporturi:
-Articole TRA 186.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 141.69 + 125.07 * 0.000 +
186.00 * 0.000) * 0.003375 = 0.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 142.17 125.07 186.00 3509.52
391422 pag 2
======================================================================================================================

Cheltuieli indirecte:
3509.52 * 0.03000 = 105.29
Profit:
3614.81 * 0.02000 = 72.30

TOTAL GENERAL DEVIZ: 3 687.10


TVA 3687.10 * 19.0% = 700.55
TOTAL cu TVA 4 387.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391423 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391423 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 35.630 0.65 23
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 2508
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 2531

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.672 571.00 4410.74 0.00 0.00 4981.75

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4410.74 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 14.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.672 571.00 4425.63 0.00 0.00 4996.64

Cheltuieli indirecte:
4996.64 * 0.03000 = 149.90
Profit:
5146.53 * 0.02000 = 102.93

TOTAL GENERAL DEVIZ: 5 249.47


TVA 5249.47 * 19.0% = 997.40
TOTAL cu TVA 6 246.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391424 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391424 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 84.000 4.62 388
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 1599
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 1987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1599.26 0.00 0.00 1987.22

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1599.26 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1604.66 0.00 0.00 1992.61

Cheltuieli indirecte:
1992.61 * 0.03000 = 59.78
Profit:
2052.39 * 0.02000 = 41.05

TOTAL GENERAL DEVIZ: 2 093.44


TVA 2093.44 * 19.0% = 397.75
TOTAL cu TVA 2 491.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391425 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391425 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 2200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 1188
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 1188

002 PD02A1 KG 2200.000 0.06 122


MONT.ARMATURI PT.BETON ARMAT IN 0.50 1108
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 1230

003 2100205 KG 2200.000 2.90 6382


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 6382

004 TRA04A17 TONA 2.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 26 26

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2295.92 0.00 26.18 8826.07

Detaliere transporturi:
-Articole TRA 26.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2295.92 + 0.00 * 0.000 +
26.18 * 0.000) * 0.003375 = 7.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2303.67 0.00 26.18 8833.82

Cheltuieli indirecte:
8833.82 * 0.03000 = 265.01
Profit:
9098.83 * 0.02000 = 181.98

TOTAL GENERAL DEVIZ: 9 280.81


TVA 9280.81 * 19.0% = 1 763.35
TOTAL cu TVA 11 044.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391426 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391426 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 60.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 2591
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 160
MANUAL 0.00 0 2751

002 2100899 M.C. 60.000 210.00 12600


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 12600

003 TRA06A17 TONA 150.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1586 1586

004 TSA24B1 ORA 30.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 478
DE 8,1-14KW 0.00 0 478

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2591.16 638.10 1585.50 17415.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 638.10

Detaliere transporturi:
-Articole TRA 1 585.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2591.16 + 638.10 * 0.000 +
1585.50 * 0.000) * 0.003375 = 8.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2599.91 638.10 1585.50 17424.05

Cheltuieli indirecte:
17424.05 * 0.03000 = 522.72
Profit:
17946.77 * 0.02000 = 358.94

TOTAL GENERAL DEVIZ: 18 305.70


TVA 18305.70 * 19.0% = 3 478.08
TOTAL cu TVA 21 783.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391427 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391427 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 84.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 818
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1206
EXISTENTE CU POMPA 0.00 0 2024

002 2101004 M.C. 84.000 255.00 21420


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 21420

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 817.64 1205.99 2219.70 25663.33
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1205.99

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 817.64 + 1205.99 * 0.000 +
2219.70 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 820.40 1205.99 2219.70 25666.09

Cheltuieli indirecte:
25666.09 * 0.03000 = 769.98
Profit:
26436.07 * 0.02000 = 528.72

TOTAL GENERAL DEVIZ: 26 964.79


TVA 26964.79 * 19.0% = 5 123.31
TOTAL cu TVA 32 088.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391428 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391428 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 3.500 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 527
0.00 0 527

002 TRA01A02 TONA 630.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 706 706

003 TSD01D1 M.C. 70.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 797
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 797

004 TSD05B1 100 MC. 3.500 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 617
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 561
STRAT DIN PAM.COEZI 0.00 0 1178

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1414.00 1088.56 705.60 3208.16
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1088.56

Detaliere transporturi:
-Articole TRA 705.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1414.00 + 1088.56 * 0.000 +
705.60 * 0.000) * 0.003375 = 4.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1418.77 1088.56 705.60 3212.93

Cheltuieli indirecte:
3212.93 * 0.03000 = 96.39
Profit:
3309.32 * 0.02000 = 66.19

TOTAL GENERAL DEVIZ: 3 375.51


TVA 3375.51 * 19.0% = 641.35
TOTAL cu TVA 4 016.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391429 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391429 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 84.000 3.19 268
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 336
NISIP 0.00 0
0.00 0 604

002 TRA01A17 TONA 14.280 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 136 136

003 IFA03C1 MP. 84.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 2352
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 2352

004 2100957 M.C. 8.400 190.00 1596


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1596

005 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

006 TRI1AA01C1 TONA 21.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 147
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 147

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2835.00 0.00 357.92 5057.25

Detaliere transporturi:
-Articole TRA 357.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2835.00 + 0.00 * 0.000 +
357.92 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2844.57 0.00 357.92 5066.82

Cheltuieli indirecte:
5066.82 * 0.03000 = 152.00
Profit:
5218.83 * 0.02000 = 104.38

TOTAL GENERAL DEVIZ: 5 323.20


TVA 5323.20 * 19.0% = 1 011.41
TOTAL cu TVA 6 334.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391430 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0059 45000000 POD KM. 8+150-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391430 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 100.000 2.23 223
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

002 6306339 KG 2071.000 4.66 9651


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 9651

003 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

004 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2073.00 0.00 221.97 13745.78

Detaliere transporturi:
-Articole TRA 221.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2073.00 + 0.00 * 0.000 +
221.97 * 0.000) * 0.003375 = 7.00

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2080.00 0.00 221.97 13752.78

Cheltuieli indirecte:
13752.78 * 0.03000 = 412.58
Profit:
14165.36 * 0.02000 = 283.31

TOTAL GENERAL DEVIZ: 14 448.67


TVA 14448.67 * 19.0% = 2 745.25
TOTAL cu TVA 17 193.91

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391431 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0060 45000000 POD KM. 8+150-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391431 SAPATURA PENTRU PROFILAREA ALBIEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.450 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 74
0.00 0 74

002 TSC35B31 100 MC. 0.450 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 77
M 0.00 0 77

003 TRA01A02 TONA 81.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 91 91

004 TSD03C1 100 MC. 0.540 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 23
TER.CAT.1 SAU 2 0.00 0 23

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 173.48 90.72 264.20
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 173.48

Detaliere transporturi:
-Articole TRA 90.72

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 173.48 90.72 264.20

Cheltuieli indirecte:
264.20 * 0.03000 = 7.93
Profit:
272.13 * 0.02000 = 5.44

TOTAL GENERAL DEVIZ: 277.57


TVA 277.57 * 19.0% = 52.74
TOTAL cu TVA 330.31

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391432 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0061 45000000 POD KM. 8+150-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391432 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 3270001 M.C. 0.800 180.00 144


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391432 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391433 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0061 45000000 POD KM. 8+150-LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391433 VARIANTA PROVIZORIE DE CIRCULATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19B1 100 MC. 0.550 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.2 135.52 75
0.00 0 75

002 PI08A1 BUC. 4.000 0.00 0


ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT 0.00 0
0.00 0 0

003 6422963 BUC. 4.000 3745.00 14980


ELEMENT PENTRU POD TRONSON TIP C3 BETON 0.00 0
ARMAT INCARCARE SPALIERA .L=1,6M LUM 3 0.00 0
0.00 0 14980

004 DA06B1 M.C. 150.000 26.24 3936


STRAT AGREG NAT CILINDRATE CU FUNC 7.37 1106
REZIST FILTRANTIZOLAT AERISIRE SI 12.12 1819
ANTICAP CU ASTER MEC BALAST 0.00 0 6860

005 TRA01A17 TONA 334.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 3180 3180

006 DF09B1 M 100.000 2.23 223


PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

007 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

008 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3179.19 1893.29 3401.65 29189.60
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1893.29

Detaliere transporturi:
-Articole TRA 3 401.65

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3179.19 + 1893.29 * 0.000 +
3401.65 * 0.000) * 0.003375 = 10.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3189.92 1893.29 3401.65 29200.33

Cheltuieli indirecte:
29200.33 * 0.03000 = 876.01
Profit:
30076.34 * 0.02000 = 601.53
391433 pag 2
======================================================================================================================

TOTAL GENERAL DEVIZ: 30 677.87


TVA 30677.87 * 19.0% = 5 828.80
TOTAL cu TVA 36 506.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391434 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0062 45000000 POD KM. 8+475 - DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391434 DECAPAREA SISTEMULUI RUTIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG05C1 MP. 453.300 0.00 0
DECAP IMBR CU STRAT PINA LA 3CM GROS 3.06 1387
FORMATE DIN ASFALT TURNAT PE FUNDATIE 0.00 0
DIN BETON 0.00 0 1387

002 TRA01A02 TONA 65.280 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 73 73

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1387.10 0.00 73.11 1460.21

Detaliere transporturi:
-Articole TRA 73.11

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1387.10 + 0.00 * 0.000 +
73.11 * 0.000) * 0.003375 = 4.68

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1391.78 0.00 73.11 1464.89

Cheltuieli indirecte:
1464.89 * 0.03000 = 43.95
Profit:
1508.84 * 0.02000 = 30.18

TOTAL GENERAL DEVIZ: 1 539.02


TVA 1539.02 * 19.0% = 292.41
TOTAL cu TVA 1 831.43

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391435 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0062 45000000 POD KM. 8+475 - DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391435 DEMOLARE ELEMENTE BETON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DG06B1 M.C. 210.540 0.00 0
SPARG SI DESF BET CIM PE SUPRAF LIMIT PT 67.60 14232
POZARE CABL COND POD GURI,SCURG IN ALEI 48.35 10180
FUND DRUM 0.00 0 24413

002 TRI1AA02C3 TONA 526.350 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 9.00 4737
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.3 0.00 0 4737

003 TRA01A02 TONA 526.350 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 590 590

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 18969.61 10180.45 589.51 29739.58
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 10180.45

Detaliere transporturi:
-Articole TRA 589.51

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 18969.61 + 10180.45 * 0.000 +
589.51 * 0.000) * 0.003375 = 64.02

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 19033.63 10180.45 589.51 29803.60

Cheltuieli indirecte:
29803.60 * 0.03000 = 894.11
Profit:
30697.71 * 0.02000 = 613.95

TOTAL GENERAL DEVIZ: 31 311.66


TVA 31311.66 * 19.0% = 5 949.22
TOTAL cu TVA 37 260.87

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391436 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0062 45000000 POD KM. 8+475 - DEMOLARE
Lista cu cantitatile de lucrari
Deviz oferta 391436 AMENAJAREA TERENULUI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSG03A1 100 MP. 7.560 0.00 0
DEFRISAREA MAN.A SUPRAF.IMPAD.CU 205.20 1551
TUFISURI SI ARBUSTI CU DIAM.<10CM. 0.00 0
DEPOZIT.MAT.,FARA SCOAT.RADAC 0.00 0 1551

002 TSC19C1 100 MC. 3.780 0.00 0


SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 619
0.00 0 619

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1551.31 618.71 0.00 2170.02
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 618.71

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1551.31 + 618.71 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.24

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1556.55 618.71 0.00 2175.26

Cheltuieli indirecte:
2175.26 * 0.03000 = 65.26
Profit:
2240.52 * 0.02000 = 44.81

TOTAL GENERAL DEVIZ: 2 285.33


TVA 2285.33 * 19.0% = 434.21
TOTAL cu TVA 2 719.54

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391437 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391437 COFRAJE PLANE PENTRU SUPRASTRUCTURA-OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC05A1 MP. 364.000 2.20 802
COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 21957
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 22758

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.265 801.55 21956.70 0.00 0.00 22758.24

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 21956.70 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 74.10

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.265 801.55 22030.80 0.00 0.00 22832.35

Cheltuieli indirecte:
22832.35 * 0.03000 = 684.97
Profit:
23517.32 * 0.02000 = 470.35

TOTAL GENERAL DEVIZ: 23 987.67


TVA 23987.67 * 19.0% = 4 557.66
TOTAL cu TVA 28 545.32

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391438 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391438 APARATE DE REAZAM DIN NEOPREN TIP 3

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100216 BUC. 7.000 102.00 714
APARATE REAZAM DIN NEOPREN TIP 3 0.00 0
0.00 0
0.00 0 714

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.070 714.00 0.00 0.00 0.00 714.00

Cheltuieli indirecte:
714.00 * 0.03000 = 21.42
Profit:
735.42 * 0.02000 = 14.71

TOTAL GENERAL DEVIZ: 750.13


TVA 750.13 * 19.0% = 142.52
TOTAL cu TVA 892.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391439 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391439 SCHELA DE LUCRU PENTRU LARGIRE SI CONSOLIDARE TABLIER EXISTENT

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 104.000 0.60 63
MONTAREA SI DEMONTARE SCHELEI MET 9.60 998
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 1061

002 AUT1303 ORA 320.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 320
0.00 0 320

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.079 62.75 998.40 320.00 0.00 1381.15
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 998.40 + 320.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.37

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.079 62.75 1001.77 320.00 0.00 1384.52

Cheltuieli indirecte:
1384.52 * 0.03000 = 41.54
Profit:
1426.06 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.58


TVA 1454.58 * 19.0% = 276.37
TOTAL cu TVA 1 730.95

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391440 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391440 APARATE DE REAZAM DIN NEOPREN TIP 4 (150MMX300MMX41MM)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100219 BUC. 7.000 166.00 1162
APARATE REAZAM DIN NEOPREN TIP 4 0.00 0
0.00 0
0.00 0 1162

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.350 1162.03 0.00 0.00 0.00 1162.03

Cheltuieli indirecte:
1162.03 * 0.03000 = 34.86
Profit:
1196.89 * 0.02000 = 23.94

TOTAL GENERAL DEVIZ: 1 220.83


TVA 1220.83 * 19.0% = 231.96
TOTAL cu TVA 1 452.78

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391441 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391441 GRINZI PREF. PRECOMPRIMATE CU ARMATURA ADERENTA L=21 M H=0,93 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PI08B1 BUC. 7.000 0.00 0
ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT PRECOMPRIMAT 0.00 0
0.00 0 0

002 2100218 BUC. 7.000 18500.00 129500


GRINDA PREF PREC. CU ARMATURAADERENTA L= 0.00 0
21M, H=0,93M 0.00 0
0.00 0 129500

003 PI06A1 BUC. 7.000 30.98 217


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 175
MACARAUA PE PNEURI DE 9,9 TF 45.75 320
0.00 0 712

004 TRA04A49 TONA 131.600 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.49 KM.* 131.60 17319 17319

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.00 320.25 17318.56 147530.72
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 320.25

Detaliere transporturi:
-Articole TRA 17 318.56

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 175.00 + 320.25 * 0.000 +
17318.56 * 0.000) * 0.003375 = 0.59

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


131.709 129716.91 175.59 320.25 17318.56 147531.31

Cheltuieli indirecte:
147531.31 * 0.03000 = 4 425.94
Profit:
151957.25 * 0.02000 = 3 039.14

TOTAL GENERAL DEVIZ: 154 996.39


TVA 154996.39 * 19.0% = 29 449.31
TOTAL cu TVA 184 445.71

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391442 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391442 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
007 CZ0302K1 [ 1] KG 6300.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 3402
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 3402

008 PD02A1 KG 6300.000 0.06 349


MONT.ARMATURI PT.BETON ARMAT IN 0.50 3173
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 3521

009 2100205 KG 6300.000 2.90 18276


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 18276

010 TRA04A17 TONA 6.300 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 75 75

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.394 18625.01 6574.68 0.00 74.97 25274.65

Detaliere transporturi:
-Articole TRA 74.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 6574.68 + 0.00 * 0.000 +
74.97 * 0.000) * 0.003375 = 22.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


6.394 18625.01 6596.87 0.00 74.97 25296.84

Cheltuieli indirecte:
25296.84 * 0.03000 = 758.91
Profit:
26055.75 * 0.02000 = 521.11

TOTAL GENERAL DEVIZ: 26 576.86


TVA 26576.86 * 19.0% = 5 049.60
TOTAL cu TVA 31 626.47

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391443 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391443 BETON TURNAT MONOLIT IN SUPRASTRUCTURA CLASA C35/45

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB11B1 M.C. 54.000 0.00 0
TURN.BET.ARMAT B200 IN TABL.PLACI 9.73 526
PLATELAJE CORONAMENTE,ETC. CU POMPA 10.73 579
0.00 0 1105

002 3270091 M.C. 54.000 255.00 13770


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 13770

003 TRA06A17 TONA 135.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1427 1427

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


135.000 13770.00 525.63 579.47 1426.95 16302.05
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 579.47

Detaliere transporturi:
-Articole TRA 1 426.95

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 525.63 + 579.47 * 0.000 +
1426.95 * 0.000) * 0.003375 = 1.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


135.000 13770.00 527.40 579.47 1426.95 16303.82

Cheltuieli indirecte:
16303.82 * 0.03000 = 489.11
Profit:
16792.94 * 0.02000 = 335.86

TOTAL GENERAL DEVIZ: 17 128.80


TVA 17128.80 * 19.0% = 3 254.47
TOTAL cu TVA 20 383.27

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391444 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391444 HIDROIZOLATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 196.560 0.05 10
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 943
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 954

002 PF04A1 MP. 196.560 6.36 1250


STRAT AMORSAJ APLICAT CU PERIA DIN BITUM 0.94 185
TAIAT CU WHITE SPIRIT RAFINAT 0.00 0
0.00 0 1435

003 PF05B1 MP. 196.560 9.98 1961


HIDROIZOLATII PT.POD SOSEA DIN 2 STRAT. 3.60 707
CARTON BIT.LIPITE DE STRAT SUPORT PRIN 1.80 354
STRAT MASTIC. 0.00 0 3022

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.570 3221.81 1835.44 353.81 0.00 5411.06
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 353.81

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1835.44 + 353.81 * 0.000 +
0.00 * 0.000) * 0.003375 = 6.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.570 3221.81 1841.63 353.81 0.00 5417.25

Cheltuieli indirecte:
5417.25 * 0.03000 = 162.52
Profit:
5579.77 * 0.02000 = 111.60

TOTAL GENERAL DEVIZ: 5 691.36


TVA 5691.36 * 19.0% = 1 081.36
TOTAL cu TVA 6 772.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391445 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391445 CALE POD

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PF07B1 MP. 143.000 4.87 696
SAPA DE PROTECTIE A HIDROIZOLATIILOR LA 5.87 840
LUCRARILE DE ARTA DIN 1 STR.BET.B150 DE 0.29 42
4CM GROS LA POD 0.00 0 1577

002 2100047 TONA 10.300 310.00 3193


BA 8 0.00 0
0.00 0
0.00 0 3193

003 TRA01A35 TONA 10.300 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 202 202

004 DB02D1 100 MP. 1.430 70.98 102


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 57
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 8
EMULSIE CATIONICA 0.00 0 167

005 DB19E1 MP. 143.000 0.03 4


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 150
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 174
MECANICA 0.00 0 328

006 2100207 TONA 14.010 315.00 4413


BAP16 0.00 0
0.00 0
0.00 0 4413

007 TRA01A35 TONA 14.010 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 275 275

008 DB02D1 100 MP. 1.430 70.98 102


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 57
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 8
EMULSIE CATIONICA 0.00 0 167

009 DB16H1 MP. 143.000 0.03 4


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 150
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 174
0.00 0 328

010 2100051 TONA 13.440 320.00 4301


MAS16 0.00 0
0.00 0
0.00 0 4301

011 TRA01A35 TONA 13.440 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 263 263

012 TRA05A49 TONA 0.130 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 5 5

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


67.495 12814.06 1253.11 406.70 745.11 15218.99
Din care:
Valoare aferenta utilaje termice = 0.00
391445 pag 2
======================================================================================================================
Valoare aferenta utilaje electrice = 406.70

Detaliere transporturi:
-Articole TRA 745.11

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1253.11 + 406.70 * 0.000 +
745.11 * 0.000) * 0.003375 = 4.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


67.495 12814.06 1257.34 406.70 745.11 15223.21

Cheltuieli indirecte:
15223.21 * 0.03000 = 456.70
Profit:
15679.91 * 0.02000 = 313.60

TOTAL GENERAL DEVIZ: 15 993.51


TVA 15993.51 * 19.0% = 3 038.77
TOTAL cu TVA 19 032.28

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391447 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391447 PARAPET METALIC DIRECTIOANAL TIP FOARTE GREU PE SUPRASTRUCTURA H4B

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09C1 M 52.000 3.19 166
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 29.48 1533
C CU LISA SI STILPI METALICI 0.00 0
0.00 0 1699

002 2100202 KG 3640.000 6.44 23453


PARAPET METALIC H4b 0.00 0
0.00 0
0.00 0 23453

003 3270091 M.C. 6.300 255.00 1606


BETON CLASA C35/45 - S2, D=16 MM 0.00 0
(FABRICAT CU CIMENT CEM II A-LL 42,5 R 0.00 0
0.00 0 1606

004 TRA06A17 TONA 15.700 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 166 166

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


19.440 25224.66 1533.12 0.00 165.95 26923.72

Detaliere transporturi:
-Articole TRA 165.95

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1533.12 + 0.00 * 0.000 +
165.95 * 0.000) * 0.003375 = 5.17

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


19.440 25224.66 1538.29 0.00 165.95 26928.89

Cheltuieli indirecte:
26928.89 * 0.03000 = 807.87
Profit:
27736.76 * 0.02000 = 554.74

TOTAL GENERAL DEVIZ: 28 291.50


TVA 28291.50 * 19.0% = 5 375.38
TOTAL cu TVA 33 666.88

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391448 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391448 TROTUAR PE SUPRASTRUCTURA LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 36.000 22.95 826
BORDURI PREFABRICATE DIN BETON PT 11.80 425
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 1251

002 PF01A1 MP. 5.400 3.15 17


TENCUIALA DE 2 CM.DIN MORTAR CIMENT 14.22 77
MARCA 100 DRISCUITA 0.19 1
0.00 0 95

003 PF09A1 M 72.000 41.21 2967


UMPLUTURA CELOCHIT DE 6-8MM LA MARGIN. 6.00 432
SAPEI HIDR 0.00 0
0.00 0 3399

004 PB06A1 M.C. 13.320 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 637
ZID,TIMPAN MANUAL 2.50 33
0.00 0 671

005 2100898 M.C. 13.320 200.00 2664


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 2664

006 TRA06A17 TONA 33.300 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 352 352

007 DB02D1 100 MP. 0.660 70.98 47


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 26
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 4
EMULSIE CATIONICA 0.00 0 77

008 TRA05A49 TONA 0.030 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 1 1

009 DB18A1 MP. 66.600 0.02 1


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 108
DE 2,5 CM CU ASTERNERE MANUALA 0.32 21
0.00 0 130

010 2100047 TONA 4.800 310.00 1488


BA 8 0.00 0
0.00 0
0.00 0 1488

011 TRA01A35 TONA 4.800 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 94 94

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


36.649 8010.92 1705.02 59.05 447.26 10222.25
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 59.05

Detaliere transporturi:
-Articole TRA 447.26
391448 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1705.02 + 59.05 * 0.000 +
447.26 * 0.000) * 0.003375 = 5.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


36.649 8010.92 1710.77 59.05 447.26 10228.01

Cheltuieli indirecte:
10228.01 * 0.03000 = 306.84
Profit:
10534.85 * 0.02000 = 210.70

TOTAL GENERAL DEVIZ: 10 745.54


TVA 10745.54 * 19.0% = 2 041.65
TOTAL cu TVA 12 787.20

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391449 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391449 PARAPET METALIC PIETONAL PE SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 2100208 KG 1584.000 8.30 13154
PARAPET PIETONAL 0.00 0
0.00 0
0.00 0 13154

002 PK31A1 TONA 1.584 201.46 319


PARAPET DIN TEAVA SUB FORMA DE PANOURI 898.70 1424
INCL.STILPI CONF.IN INDUSTRIE MONTAT PE 0.00 0
POD DIN BETON ARM 0.00 0 1743

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.833 13472.65 1423.54 0.00 0.00 14896.19

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1423.54 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 4.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.833 13472.65 1428.34 0.00 0.00 14900.99

Cheltuieli indirecte:
14900.99 * 0.03000 = 447.03
Profit:
15348.02 * 0.02000 = 306.96

TOTAL GENERAL DEVIZ: 15 654.99


TVA 15654.99 * 19.0% = 2 974.45
TOTAL cu TVA 18 629.43

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391450 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391450 DISPOZITIVE DE ACOPERIRE A ROSTURILOR DE DILATATIE DE 20 MM

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PK20A1 MP. 4.920 0.05 0
CURATIREA CU PERIA DE SIRMA,SPALAREA CU 4.80 24
APA SI SPOIREA CU LAPTE DE CIMENT A 0.00 0
SUPR. DE BETON. DEMO 0.00 0 24

002 PC05A1 MP. 12.300 2.20 27


COFRAJE PANOURI PLACAJ TIP P PT.BETON 60.32 742
ARMAT LA MONOLITIZARE SUPRASTRUCTURI LA 0.00 0
PODURI DIN ELEM.PR 0.00 0 769

003 CZ0302A1 KG 500.000 2.76 1379


CONFECT ARMAT PT PERETI GRINZI STILPI 0.72 360
DIAFRAGME LACONST OBIS IN ATELIERE 0.12 60
CENTRALIZATE OB 37 D=6- 0.00 0 1799

004 2100209 M 18.200 1813.50 33006


ROST DE DILATATIE 0.00 0
0.00 0
0.00 0 33006

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.970 34411.69 1125.56 60.37 0.00 35597.61
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 60.37

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1125.56 + 60.37 * 0.000 +
0.00 * 0.000) * 0.003375 = 3.80

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.970 34411.69 1129.36 60.37 0.00 35601.41

Cheltuieli indirecte:
35601.41 * 0.03000 = 1 068.04
Profit:
36669.46 * 0.02000 = 733.39

TOTAL GENERAL DEVIZ: 37 402.85


TVA 37402.85 * 19.0% = 7 106.54
TOTAL cu TVA 44 509.39

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391451 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0063 45000000 POD KM. 8+475-SUPRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391451 VOPSEA DE PROTECTIE BETOANE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 594.360 0.60 359
MONTAREA SI DEMONTARE SCHELEI MET 9.60 5706
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 6064

002 AUT1303 ORA 120.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 120
0.00 0 120

003 RPCB12A1 MP. 178.300 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 3388
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 3388

004 IZA01A1 MP. 178.300 0.49 87


CURATIREA PRIN SABLARE PT PROT 7.20 1284
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 2703
0.00 0 4074

005 PK48C1 [ 1] TONA 0.200 0.00 0


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 18
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 18

006 YC01RON LEI. 11552.000 1.00 11552


DIFERENTA PRET MATERIALE - RON 0.00 0
0.00 0
0.00 0 11552

007 2100211 KG 178.300 20.75 3700


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 3700

008 NMB109921 ORA 240.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 4800
0.00 0
0.00 0 4800

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.256 15697.19 15194.84 2823.03 0.00 33715.06
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2823.03

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 15194.84 + 2823.03 * 0.000 +
0.00 * 0.000) * 0.003375 = 51.28

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.256 15697.19 15246.12 2823.03 0.00 33766.34

Cheltuieli indirecte:
33766.34 * 0.03000 = 1 012.99
Profit:
34779.33 * 0.02000 = 695.59

TOTAL GENERAL DEVIZ: 35 474.92


TVA 35474.92 * 19.0% = 6 740.23
391451 pag 2
======================================================================================================================
TOTAL cu TVA 42 215.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391452 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391452 COFRAJE PENTRU FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC01A1 MP. 152.400 3.40 519
COFRAJE PT. BETOANE FUNDATII,RADIERE 18.60 2834
EXECUT. DIN PANOURI CU PLACAJ TIP P 0.00 0
0.00 0 3353

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2834.49 0.00 0.00 3353.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2834.49 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.370 518.69 2844.05 0.00 0.00 3362.74

Cheltuieli indirecte:
3362.74 * 0.03000 = 100.88
Profit:
3463.62 * 0.02000 = 69.27

TOTAL GENERAL DEVIZ: 3 532.90


TVA 3532.90 * 19.0% = 671.25
TOTAL cu TVA 4 204.15

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391453 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391453 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 186.550 0.01 1
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 8056
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 496
MANUAL 0.00 0 8554

002 2100914 M.C. 186.550 215.00 40109


BETON MARFA CLASA C 25/20 (BC 25/B 330) 0.00 0
0.00 0
0.00 0 40109

003 TRA06A17 TONA 466.370 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 4930 4930

004 TSA24B1 ORA 93.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 1483
DE 8,1-14KW 0.00 0 1483

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8056.35 1979.57 4929.53 55075.01
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1979.57

Detaliere transporturi:
-Articole TRA 4 929.53

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 8056.35 + 1979.57 * 0.000 +
4929.53 * 0.000) * 0.003375 = 27.19

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


447.720 40109.56 8083.54 1979.57 4929.53 55102.20

Cheltuieli indirecte:
55102.20 * 0.03000 = 1 653.07
Profit:
56755.26 * 0.02000 = 1 135.11

TOTAL GENERAL DEVIZ: 57 890.37


TVA 57890.37 * 19.0% = 10 999.17
TOTAL cu TVA 68 889.54

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391454 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391454 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 271.440 4.62 1254
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 5168
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 6422

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5167.89 0.00 0.00 6421.55

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 5167.89 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 17.44

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.976 1253.66 5185.33 0.00 0.00 6438.99

Cheltuieli indirecte:
6438.99 * 0.03000 = 193.17
Profit:
6632.16 * 0.02000 = 132.64

TOTAL GENERAL DEVIZ: 6 764.80


TVA 6764.80 * 19.0% = 1 285.31
TOTAL cu TVA 8 050.12

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391455 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391455 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 204.750 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 1993
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 2940
EXISTENTE CU POMPA 0.00 0 4933

002 2101004 M.C. 204.750 255.00 52211


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 52211

003 TRA06A17 TONA 512.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 5412 5412

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1993.00 2939.60 5411.84 62555.68
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2939.60

Detaliere transporturi:
-Articole TRA 5 411.84

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1993.00 + 2939.60 * 0.000 +
5411.84 * 0.000) * 0.003375 = 6.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 52211.25 1999.72 2939.60 5411.84 62562.41

Cheltuieli indirecte:
62562.41 * 0.03000 = 1 876.87
Profit:
64439.28 * 0.02000 = 1 288.79

TOTAL GENERAL DEVIZ: 65 728.07


TVA 65728.07 * 19.0% = 12 488.33
TOTAL cu TVA 78 216.40

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391456 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391456 PROTECTIE INFRASTRUCTURI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CB47A1 MP. 378.120 0.60 228
MONTAREA SI DEMONTARE SCHELEI MET 9.60 3630
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0
VERTICALE H<30,0M 0.00 0 3858

002 AUT1303 ORA 160.000 0.00 0


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0
13,5 3SCH.LEI/MP 1.00 160
0.00 0 160

003 RPCB12A1 MP. 113.430 0.00 0


INLATURAREA PRIN CIOPLIRE A PROEMINENT 19.00 2155
SAU A STRATULUI DE BETON SUPERFICIAL PE 0.00 0
O ADINCIM.DE 5 CM 0.00 0 2155

004 IZA01A1 MP. 113.430 0.49 55


CURATIREA PRIN SABLARE PT PROT 7.20 817
ANTICOROZIVE SUPRAFBETON CU NISIP DE RIU 15.16 1720
0.00 0 2592

005 PK48C1 TONA 0.100 18.47 2


VOPSIREA PIESELOR MET CU UN STRAT DE 87.80 9
VOPSEA MINIU SUP V351-3 CU PENSULA DE 0.00 0
MINA LA PARAPETE 0.00 0 11

006 RPCB20A1 M.C. 0.300 4029.39 1209


BETON EPOXIDIC PREPARAT SI TURNAT LA 274.08 82
CONSOLIDARI ELEM DE BETON ARMAT INCLUSIV 758.49 228
AMORSA 0.00 0 1519

007 2100210 M.C. 0.300 431.93 130


BETON EPOXIDIL 0.00 0
0.00 0
0.00 0 130

008 2100211 KG 113.000 20.75 2345


VOPSEA PROTECTIE BETOANE 0.00 0
0.00 0
0.00 0 2345

009 NMB109921 ORA 128.000 0.00 0


MUNCITOR DESERVIRE CAT.2 20.00 2560
0.00 0
0.00 0 2560

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9252.80 2107.15 0.00 15328.34
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 2107.15

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 9252.80 + 2107.15 * 0.000 +
0.00 * 0.000) * 0.003375 = 31.23

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


1.628 3968.39 9284.03 2107.15 0.00 15359.56

Cheltuieli indirecte:
15359.56 * 0.03000 = 460.79
391456 pag 2
======================================================================================================================
Profit:
15820.35 * 0.02000 = 316.41

TOTAL GENERAL DEVIZ: 16 136.76


TVA 16136.76 * 19.0% = 3 065.98
TOTAL cu TVA 19 202.74

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391457 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391457 DREN DIN PIATRA BRUTA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PE01C1 M.C. 33.750 39.44 1331
ZIDARIE USCATA IN DRENURI LA CULEI SI 50.00 1688
ZID. SPIJ. DIN PIATRA BRUTA ROCA 0.00 0
SEDIMENTARA 0.00 0 3019

002 TRA01A34 TONA 67.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 34 KM. 19.04 1276 1276

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1687.50 0.00 1275.68 4294.28

Detaliere transporturi:
-Articole TRA 1 275.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1687.50 + 0.00 * 0.000 +
1275.68 * 0.000) * 0.003375 = 5.70

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1331.10 1693.20 0.00 1275.68 4299.98

Cheltuieli indirecte:
4299.98 * 0.03000 = 129.00
Profit:
4428.97 * 0.02000 = 88.58

TOTAL GENERAL DEVIZ: 4 517.55


TVA 4517.55 * 19.0% = 858.34
TOTAL cu TVA 5 375.89

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391458 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391458 ARMATURA BST 500S

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 9700.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 5238
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 5238

002 PD02A1 KG 9700.000 0.06 537


MONT.ARMATURI PT.BETON ARMAT IN 0.50 4885
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 5422

003 2100205 KG 9700.000 2.90 28140


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 28140

004 TRA04A17 TONA 9.700 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 115 115

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10122.92 0.00 115.43 38914.94

Detaliere transporturi:
-Articole TRA 115.43

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 10122.92 + 0.00 * 0.000 +
115.43 * 0.000) * 0.003375 = 34.16

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


9.846 28676.60 10157.08 0.00 115.43 38949.11

Cheltuieli indirecte:
38949.11 * 0.03000 = 1 168.47
Profit:
40117.58 * 0.02000 = 802.35

TOTAL GENERAL DEVIZ: 40 919.93


TVA 40919.93 * 19.0% = 7 774.79
TOTAL cu TVA 48 694.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391459 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0064 45000000 POD KM. 8+475-INFRASTRUCTURA
Lista cu cantitatile de lucrari
Deviz oferta 391459 TROTUAR PE CULEI, LATIME T=2 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DE10A1 M 8.000 22.95 184
BORDURI PREFABRICATE DIN BETON PT 11.80 94
TROTUARE 20 X 25CM,PE FUNDATIE DIN BETON 0.00 0
30 X 15 CM 0.00 0 278

002 2100898 M.C. 0.360 200.00 72


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 72

003 TRA06A17 TONA 0.900 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 10 10

004 PB06A1 M.C. 2.960 0.01 0


TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI, 47.84 142
ZID,TIMPAN MANUAL 2.50 7
0.00 0 149

005 2100898 M.C. 2.960 200.00 592


BETON DE CIMENT CLASA C 20/16 (BC 20/ 0.00 0
B250) CU 390 KG CIMENT 0.00 0
0.00 0 592

006 TRA06A17 TONA 7.400 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 78 78

007 DB02D1 100 MP. 0.148 70.98 11


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 6
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 1
EMULSIE CATIONICA 0.00 0 17

008 DB18A1 MP. 14.800 0.02 0


IMBRAC DE MORT ASF EXEC LA CALD IN GROS 1.62 24
DE 2,5 CM CU ASTERNERE MANUALA 0.32 5
0.00 0 29

009 2100047 TONA 1.060 310.00 329


BA 8 0.00 0
0.00 0
0.00 0 329

010 TRA01A35 TONA 1.060 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 21 21

011 TRA05A49 TONA 0.006 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 0 0

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 265.90 12.91 108.75 1574.56
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 12.91

Detaliere transporturi:
-Articole TRA 108.75
391459 pag 2
======================================================================================================================
Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 265.90 + 12.91 * 0.000 +
108.75 * 0.000) * 0.003375 = 0.90

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


8.886 1187.02 266.79 12.91 108.75 1575.46

Cheltuieli indirecte:
1575.46 * 0.03000 = 47.26
Profit:
1622.73 * 0.02000 = 32.45

TOTAL GENERAL DEVIZ: 1 655.18


TVA 1655.18 * 19.0% = 314.48
TOTAL cu TVA 1 969.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391460 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391460 PLACI DE RACORDARE L=3M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 6424179 BUC. 10.000 472.87 4729
PLACI DE RACORDARE CU TERASAMENT L=3M PR 0.00 0
TIP NR C 5106/78 0.00 0
0.00 0 4729

002 TRA04A17 TONA 17.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 205 205

003 PI06A1 BUC. 10.000 30.98 310


MONTAREA ELEM.PREF.DIN BETON ARMAT CU 25.00 250
MACARAUA PE PNEURI DE 9,9 TF 45.75 458
0.00 0 1017

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.00 457.50 204.68 5950.71
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 457.50

Detaliere transporturi:
-Articole TRA 204.68

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 250.00 + 457.50 * 0.000 +
204.68 * 0.000) * 0.003375 = 0.84

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


17.179 5038.53 250.84 457.50 204.68 5951.55

Cheltuieli indirecte:
5951.55 * 0.03000 = 178.55
Profit:
6130.10 * 0.02000 = 122.60

TOTAL GENERAL DEVIZ: 6 252.70


TVA 6252.70 * 19.0% = 1 188.01
TOTAL cu TVA 7 440.72

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391461 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391461 CALE PE CULEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DB02D1 100 MP. 0.490 70.98 35
AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

002 DB19E1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARE EXEC LA 1.05 51
CALD IN GROSIME DE 4 CM CU ASTERN 1.22 60
MECANICA 0.00 0 112

003 2100207 TONA 4.800 315.00 1512


BAP16 0.00 0
0.00 0
0.00 0 1512

004 TRA01A35 TONA 4.800 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 94 94

005 DB02D1 100 MP. 0.490 70.98 35


AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST 40.00 20
IN VEDER APLIC STRAT UZ MIX ASF CU 5.72 3
EMULSIE CATIONICA 0.00 0 57

006 DB16H1 MP. 49.000 0.03 1


IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA 1.05 51
CALD IN GROS DE 4,0 CM ASTERN MECANICA 1.22 60
0.00 0 112

007 2100051 TONA 4.600 320.00 1472


MAS16 0.00 0
0.00 0
0.00 0 1472

008 TRA01A35 TONA 4.600 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 35 KM. 19.60 90 90

009 TRA05A49 TONA 0.044 0.00 0


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON, 0.00 0
ETC) PE DIST DE 49 40.09 2 2

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 141.69 125.07 186.00 3509.04
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 125.07

Detaliere transporturi:
-Articole TRA 186.00

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 141.69 + 125.07 * 0.000 +
186.00 * 0.000) * 0.003375 = 0.48

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


22.610 3056.28 142.17 125.07 186.00 3509.52
391461 pag 2
======================================================================================================================

Cheltuieli indirecte:
3509.52 * 0.03000 = 105.29
Profit:
3614.81 * 0.02000 = 72.30

TOTAL GENERAL DEVIZ: 3 687.10


TVA 3687.10 * 19.0% = 700.55
TOTAL cu TVA 4 387.65

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391462 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391462 SAPATURA CU ADANCIMEA < 4 M

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSA07E1 M.C. 35.630 0.65 23
SAP.MAN.IN SPATII LIMIT.PESTE 1M CU 70.40 2508
SPRIJ.SI EVAC.MAN.IN PAM.CU UMID.NAT. 0.00 0
ADINC.2,01-4M,T.MIJLOCI 0.00 0 2531

002 TSF01C1 MP. 164.000 3.34 548


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 11.60 1902
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.2,01-4M;0, 0.00 0
0-0,2M INTR.DULA 0.00 0 2450

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.672 571.00 4410.74 0.00 0.00 4981.75

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 4410.74 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 14.89

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.672 571.00 4425.63 0.00 0.00 4996.64

Cheltuieli indirecte:
4996.64 * 0.03000 = 149.90
Profit:
5146.53 * 0.02000 = 102.93

TOTAL GENERAL DEVIZ: 5 249.47


TVA 5249.47 * 19.0% = 997.40
TOTAL cu TVA 6 246.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391463 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391463 COFRAJE PLANE PENTRU ELEVATII OBISNUITE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PC02A1 MP. 84.000 4.62 388
COFRAJE PT.BETON ELEVATIE SI ZIDURI 19.04 1599
SPRIJ.DIN PANOURI CU PLACAJ P CU 0.00 0
SUPRAFETE PLANE 0.00 0 1987

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1599.26 0.00 0.00 1987.22

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1599.26 + 0.00 * 0.000 +
0.00 * 0.000) * 0.003375 = 5.40

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.302 387.96 1604.66 0.00 0.00 1992.61

Cheltuieli indirecte:
1992.61 * 0.03000 = 59.78
Profit:
2052.39 * 0.02000 = 41.05

TOTAL GENERAL DEVIZ: 2 093.44


TVA 2093.44 * 19.0% = 397.75
TOTAL cu TVA 2 491.19

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391464 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391464 ARMATURA BST 500 S IN SUPRASTRUCTURA

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 CZ0302K1 [ 1] KG 2200.000 0.00 0
CONFECT ARMAT PT PERETI GRINZI STILPI 0.54 1188
DIAFRAGME LACONST OBIS IN ATELIERE 0.00 0
SANTIER PC 52 D= 10-16 0.00 0 1188

002 PD02A1 KG 2200.000 0.06 122


MONT.ARMATURI PT.BETON ARMAT IN 0.50 1108
SUPRASTRUCTURA PODURILOR BOLTITE IN ARC 0.00 0
SI PARAPET 0.00 0 1230

003 2100205 KG 2200.000 2.90 6382


BST 500 - D=8; D=10;D=12 0.00 0
0.00 0
0.00 0 6382

004 TRA04A17 TONA 2.200 0.00 0


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0
20T PE DIS.17 KM.* 11.90 26 26

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2295.92 0.00 26.18 8826.07

Detaliere transporturi:
-Articole TRA 26.18

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2295.92 + 0.00 * 0.000 +
26.18 * 0.000) * 0.003375 = 7.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.233 6503.97 2303.67 0.00 26.18 8833.82

Cheltuieli indirecte:
8833.82 * 0.03000 = 265.01
Profit:
9098.83 * 0.02000 = 181.98

TOTAL GENERAL DEVIZ: 9 280.81


TVA 9280.81 * 19.0% = 1 763.35
TOTAL cu TVA 11 044.16

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391465 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391465 BETON C20/25 IN FUNDATII (RADIERE)

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB02A1 M.C. 60.000 0.01 0
TURNARE BETON SIMPLU B75 IN FUNDATII 43.19 2591
OBISNUITE,ZIDDE SPRIJIN PEREURI ETC. 2.66 160
MANUAL 0.00 0 2751

002 2100899 M.C. 60.000 210.00 12600


BETON DE CIMENT CLASA C 25/20 (BC 25/ 0.00 0
B330) CU 398 KG CIMENT 0.00 0
0.00 0 12600

003 TRA06A17 TONA 150.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 1586 1586

004 TSA24B1 ORA 30.000 0.00 0


EPUIZAREA MEC.A APEI DIN SAP.IN TEREN CU 0.00 0
INFILTR.PUTERNICE CU ELECTROPOMPA DE APA 15.95 478
DE 8,1-14KW 0.00 0 478

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2591.16 638.10 1585.50 17415.30
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 638.10

Detaliere transporturi:
-Articole TRA 1 585.50

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2591.16 + 638.10 * 0.000 +
1585.50 * 0.000) * 0.003375 = 8.75

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


144.000 12600.54 2599.91 638.10 1585.50 17424.05

Cheltuieli indirecte:
17424.05 * 0.03000 = 522.72
Profit:
17946.77 * 0.02000 = 358.94

TOTAL GENERAL DEVIZ: 18 305.70


TVA 18305.70 * 19.0% = 3 478.08
TOTAL cu TVA 21 783.79

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391466 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391466 BETON CLASA C30/37 IN ELEVATII

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 PB15B1 M.C. 84.000 0.00 0
TURN.BET.ARMAT B200 IN CAMASUIALA DE 9.73 818
PROTECTIE SI CONSOLIDAREA ELEVATIILOR 14.36 1206
EXISTENTE CU POMPA 0.00 0 2024

002 2101004 M.C. 84.000 255.00 21420


BETON DE CIMENT B 500 0.00 0
0.00 0
0.00 0 21420

003 TRA06A17 TONA 210.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 2220 2220

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 817.64 1205.99 2219.70 25663.33
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1205.99

Detaliere transporturi:
-Articole TRA 2 219.70

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 817.64 + 1205.99 * 0.000 +
2219.70 * 0.000) * 0.003375 = 2.76

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 21420.00 820.40 1205.99 2219.70 25666.09

Cheltuieli indirecte:
25666.09 * 0.03000 = 769.98
Profit:
26436.07 * 0.02000 = 528.72

TOTAL GENERAL DEVIZ: 26 964.79


TVA 26964.79 * 19.0% = 5 123.31
TOTAL cu TVA 32 088.10

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391467 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391467 UMPLUTURI SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC04F1 100 MC. 3.500 0.00 0
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU 0.00 0
UMIDITATE NATURAL DESC.AUT.TER.CAT.2 150.71 527
0.00 0 527

002 TRA01A02 TONA 630.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 706 706

003 TSD01D1 M.C. 70.000 0.00 0


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 11.38 797
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0
BULG.TEREN F.TARE 0.00 0 797

004 TSD05B1 100 MC. 3.500 0.00 0


COMPACTARE CU MAI.MEC.DE 150-200KG A 176.40 617
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 160.31 561
STRAT DIN PAM.COEZI 0.00 0 1178

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1414.00 1088.56 705.60 3208.16
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1088.56

Detaliere transporturi:
-Articole TRA 705.60

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 1414.00 + 1088.56 * 0.000 +
705.60 * 0.000) * 0.003375 = 4.77

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 1418.77 1088.56 705.60 3212.93

Cheltuieli indirecte:
3212.93 * 0.03000 = 96.39
Profit:
3309.32 * 0.02000 = 66.19

TOTAL GENERAL DEVIZ: 3 375.51


TVA 3375.51 * 19.0% = 641.35
TOTAL cu TVA 4 016.86

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391468 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391468 PEREU LA SFERTURI DE CON

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 IFB09B1 MP. 84.000 3.19 268
STRAT DRENANT CU GROSIMEA:10 CM DIN 4.00 336
NISIP 0.00 0
0.00 0 604

002 TRA01A17 TONA 14.280 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 136 136

003 IFA03C1 MP. 84.000 0.00 0


PEREU PLACI B 200 TURNAT IN CIMPURI 2 M 28.00 2352
SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 0.00 0
CM. 0.00 0 2352

004 2100957 M.C. 8.400 190.00 1596


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1596

005 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

006 TRI1AA01C1 TONA 21.000 0.00 0


INCARCAREA MATERIALELOR,GRUPA A-GRELE SI 7.00 147
MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0
AUTO CATEG.1 0.00 0 147

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2835.00 0.00 357.92 5057.25

Detaliere transporturi:
-Articole TRA 357.92

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2835.00 + 0.00 * 0.000 +
357.92 * 0.000) * 0.003375 = 9.57

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 1864.34 2844.57 0.00 357.92 5066.82

Cheltuieli indirecte:
5066.82 * 0.03000 = 152.00
Profit:
5218.83 * 0.02000 = 104.38

TOTAL GENERAL DEVIZ: 5 323.20


TVA 5323.20 * 19.0% = 1 011.41
TOTAL cu TVA 6 334.61

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391469 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0065 45000000 POD KM. 8+475-RACORDARI CU TERASAMENTE
Lista cu cantitatile de lucrari
Deviz oferta 391469 PARAP.MET ZINCAT LA MARG.ACOSTAM. SI IN LUNGUL RAURILOR PENTRU RAMBLEU

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF09B1 M 100.000 2.23 223
PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

002 6306339 KG 2071.000 4.66 9651


PARAPET METALIC DIRECTIONAL PENTRU 0.00 0
INSTALATII 0.00 0
0.00 0 9651

003 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

004 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2073.00 0.00 221.97 13745.78

Detaliere transporturi:
-Articole TRA 221.97

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 2073.00 + 0.00 * 0.000 +
221.97 * 0.000) * 0.003375 = 7.00

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.131 11450.81 2080.00 0.00 221.97 13752.78

Cheltuieli indirecte:
13752.78 * 0.03000 = 412.58
Profit:
14165.36 * 0.02000 = 283.31

TOTAL GENERAL DEVIZ: 14 448.67


TVA 14448.67 * 19.0% = 2 745.25
TOTAL cu TVA 17 193.91

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391470 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0066 45000000 POD KM. 8+475-LUCRARI IN ALBIE
Lista cu cantitatile de lucrari
Deviz oferta 391470 SAPATURA PENTRU PROFILAREA ALBIEI

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19C1 100 MC. 0.450 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.3 163.68 74
0.00 0 74

002 TSC35B31 100 MC. 0.450 0.00 0


INCARC. AUTO CU INCARC. PE PNEURI CUPA 0.00 0
2,6-3,9 MC TEREN CATEG 2 LA DIST. 11-20 171.15 77
M 0.00 0 77

003 TRA01A02 TONA 81.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 2 KM. 1.12 91 91

004 TSD03C1 100 MC. 0.540 0.00 0


IMPRAST.PAM.AFINAT CU BULD.PE SENILE DE 0.00 0
81-180 CP IN STRAT.CU GROS.DE 21-30 CM 42.24 23
TER.CAT.1 SAU 2 0.00 0 23

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 173.48 90.72 264.20
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 173.48

Detaliere transporturi:
-Articole TRA 90.72

Alte cheltuieli directe:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 0.00 0.00 173.48 90.72 264.20

Cheltuieli indirecte:
264.20 * 0.03000 = 7.93
Profit:
272.13 * 0.02000 = 5.44

TOTAL GENERAL DEVIZ: 277.57


TVA 277.57 * 19.0% = 52.74
TOTAL cu TVA 330.31

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391471 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0067 45000000 POD KM. 8+475 - LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391471 SEMN. RUTIERA PROV. PE TIMPUL EXECUTIEI LUCRARILOR

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 DF18A1 BUC. 8.000 0.00 0
PLANTARE STILPI PENTRU INDICATOARE DE 21.76 174
CIRCULATIE RUTIERA DIN METAL CONFECTIONA 0.00 0
TI INDUSTRIAL 0.00 0 174

002 6301793 BUC. 8.000 54.24 434


PROCURARE STILP METALIC PENTRU 0.00 0
INDICATOARE DE CIRCULATIE RUTIERA DIN 0.00 0
METALCONFECTIONATI INDUSTRIAL 0.00 0 434

003 3270001 M.C. 0.800 180.00 144


BETON DE CIMENT CLASA C 10/8 (BC 10/ 0.00 0
B150) CU 317 KG CIMENT 0.00 0
0.00 0 144

004 TRA06A17 TONA 2.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 21 21

005 DF19A1 BUC. 8.000 2.14 17


MONTAREA INDICATOARELOR PTR CIRC RUT DIN 8.80 70
TABL OTELSAU ALUM PE UN STILP GATA 0.00 0
PLANTAT 0.00 0 88

006 7100782 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
DREPTUNGHIULAR 1000X300MM F31 S1848 0.00 0
0.00 0 127

007 7101140 BUC. 4.000 67.50 270


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
CERC D= 600 MM F41 S1848 0.00 0
0.00 0 270

008 7101023 BUC. 2.000 63.28 127


INDICATOR CIRCULATIE TABLA OTEL+FOLIE R. 0.00 0
PATRAT LUNGIME= 600 MM F37 S1848 0.00 0
0.00 0 127

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 244.48 0.00 21.14 1383.78

Detaliere transporturi:
-Articole TRA 21.14

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 244.48 + 0.00 * 0.000 +
21.14 * 0.000) * 0.003375 = 0.83

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.073 1118.16 245.30 0.00 21.14 1384.60

Cheltuieli indirecte:
1384.60 * 0.03000 = 41.54
Profit:
1426.14 * 0.02000 = 28.52

TOTAL GENERAL DEVIZ: 1 454.66


TVA 1454.66 * 19.0% = 276.39
391471 pag 2
======================================================================================================================
TOTAL cu TVA 1 731.05

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
391472 pag 1
======================================================================================================================
Formularul F3

Obiectivul: 0391 45000000 REABILITARE SI MOD. DJ658 GURA VAII-MALU VARTOP-HOTARELE-MUEREASCA-GAVANESTI-MN.


FRSINEI, KM. 0+000-13+400
Obiectul: 0067 45000000 POD KM. 8+475 - LUCRARI AUXILIARE
Lista cu cantitatile de lucrari
Deviz oferta 391472 VARIANTA PROVIZORIE DE CIRCULATIE

Categoria de lucrari: 3140


Preturile sunt exprimate in RON
======================================================================================================================
Nr. Capitol de lucr. UM CANTITATEA PU MATERIAL MANOPERA UTILAJ TRANSPORT TOTAL
crt. sau a)Material (col.3x (col.3x (col.3x (col.3x (col.5+
Subcapitol(norma comasata) b)Manopera col.4a) col.4b) col.4c) col.4d) 6+7+8)
Denumire c)Utilaj
d)Transport
( RON /UM) ( RON ) ( RON ) ( RON ) ( RON ) ( RON )
----------------------------------------------------------------------------------------------------------------------
Sectiunea tehnica Sectiunea financiara
0 1 2 3 4 5 6 7 8 9
======================================================================================================================
001 TSC19B1 100 MC. 0.550 0.00 0
SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL. 0.00 0
IMPING.PAMINTULUI LA 10 M TEREN CAT.2 135.52 75
0.00 0 75

002 PI08A1 BUC. 4.000 0.00 0


ELEMENTE PREFABRICATE CONFECT.IN UZINA 0.00 0
DIN BETON ARMAT 0.00 0
0.00 0 0

003 6422963 BUC. 4.000 3745.00 14980


ELEMENT PENTRU POD TRONSON TIP C3 BETON 0.00 0
ARMAT INCARCARE SPALIERA .L=1,6M LUM 3 0.00 0
0.00 0 14980

004 DA06B1 M.C. 150.000 26.24 3936


STRAT AGREG NAT CILINDRATE CU FUNC 7.37 1106
REZIST FILTRANTIZOLAT AERISIRE SI 12.12 1819
ANTICAP CU ASTER MEC BALAST 0.00 0 6860

005 TRA01A17 TONA 334.000 0.00 0


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0
DIST.= 17 KM. 9.52 3180 3180

006 DF09B1 M 100.000 2.23 223


PARAP METALIC DEFORMABIL (FLEXIBIL) TIP 20.73 2073
B CU LISA SI STILPI METALICI 0.00 0
0.00 0 2296

007 2100957 M.C. 8.300 190.00 1577


BETON DE CIMENT B200 0.00 0
0.00 0
0.00 0 1577

008 TRA06A17 TONA 21.000 0.00 0


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0
DIST. =17KM 10.57 222 222

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3179.19 1893.29 3401.65 29189.60
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 1893.29

Detaliere transporturi:
-Articole TRA 3 401.65

Alte cheltuieli directe:

-CONTRIBUTIA ASIGURATORIE PTR MUNCA


( 3179.19 + 1893.29 * 0.000 +
3401.65 * 0.000) * 0.003375 = 10.73

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


54.060 20715.48 3189.92 1893.29 3401.65 29200.33

Cheltuieli indirecte:
29200.33 * 0.03000 = 876.01
Profit:
30076.34 * 0.02000 = 601.53
391472 pag 2
======================================================================================================================

TOTAL GENERAL DEVIZ: 30 677.87


TVA 30677.87 * 19.0% = 5 828.80
TOTAL cu TVA 36 506.66

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER

SISTEM INFORMATIC PROIECTAT DE FIRMA I N F S E R V (Tel:2109807)