Pag 1 OBIECTIV: Beneficiar: Proiectant: Executant: LOCUINTA PARTER LAKATOS GHEORGHE PROIECT SA CONSTRUCTII SA Proiect: CASA DE LOCUIT PARTER

nr: 04 Plansa: __________________ nr: ___ __________________ Faza:

C4 - LISTA cuprinzand cantitatile de lucrari


- lei SECTIUNEA TEHNICA Nr. Capitolul de lucrari 0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: INFRA+SUPRASTRUCTURA 04.05.2011 SECTIUNEA FINANCIARA Pretul unitar U.M. Cantitatea (exclusiv TVA) -lei2 3 4 TOTALUL (exclusiv TVA) -lei5=3x4

INFRASTRUCTURA
0.23 428.39 98.53

Sapatura mecanica cu excavatorul de 100 0.40-0.70 mc,cu motor cu ardere interna si mc comanda hidraulica,in :...pamant cu umiditate naturala,descarcare in autovehicule teren catg 2 1.2 TSA03F1 mc Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime,executata fara sprijiniri,cu taluz inclinat,la fundatii,canale,etc...in teren de coeziune mijlocie sau foarte coeziv, pana la 1,50 m adancime, teren tare 20.36 ore manopera 1.3 TSD04B1 mc Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv 0.11 tone greutate materiale 0.86 ore manopera 1.4 CA01D1 mc Turnarea betonului simplu...marca... 1) n straturi de 320 cm grosime, pentru egalizari, pante, sape etc, la constructii cu naltimea pna la 35 m inclusiv 11.11 tone greutate materiale 16.66 ore manopera 1.4.L 2100921 mc Beton de ciment B 75, stas 3622 1.5 CA01F1 mc Turnarea betonului simplu...marca... 1) n straturi de 320 cm grosime, pentru egalizari, pante, sape etc, la constructii cu naltimea ntre 6080 m inclusiv 48.77 tone greutate materiale 85.36 ore manopera 1.5.L 2100945 mc Beton de ciment B 150 stas 3622 1.6 CC01C2 kg Montarea armaturilor din otel-beton in fundatii...continue si radiere (placi), distantier din mortar de ciment

1.1 TSC03F1

6.81

30.52

207.81

1.14

7.68

8.75

4.54

38.14

173.15

4.58 18.20

103.30 48.87

472.73 889.39

18.35 261.00

133.35 0.24

2,446.36 63.86

Pag 2 STADIUL FIZIC: INFRA+SUPRASTRUCTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: INFRA+SUPRASTRUCTURA tone greutate materiale ore manopera

5=3x4

0.00 5.22 1.7 CZ0301A1 kg Confectionarea armaturilor din otel beton pentru beton armat n fundatii...fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, n ateliere centralizate OB 37, D= 6-8 mm 0.06 tone greutate materiale 1.88 ore manopera 1.8 CZ0301C1 kg Confectionarea armaturilor din otel beton pentru beton armat n fundatii...fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, n ateliere centralizate OB 37, D> 16 mm; 0.21 tone greutate materiale 4.49 ore manopera 1.9 CB02A mp Cofraje din panouri refolosibile cu astereala din scndura, scurte si subscurte...pentru turnarea betonului n fundatii continue, cuzineti, fundatii-pahar, fundatii utilaje, inclusiv sprijinirile. 26.40 ore manopera 1.10 CA02C1 mc Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante...marca ...1) n fundatii continue, radiere si pereti cu grosime pna la 30 cm inclusiv; 5.86 tone greutate materiale 8.31 ore manopera 1.10.L 2100945 mc Beton de ciment B 150 stas 3622 1.11 TRA06A10 Transportul rutier al betonului-mortarului cu tona autobetoniera de...5,5mc dist. =10km 1.12 TRA01A10 tona Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 10 km. 1.13 TRA01A10P tona Transportul rutier al...pamantului sau molozului cu autobasculanta dist.=10 km 0.00 ore manopera

57.00

2.89

164.57

204.00

2.77

566.08

22.00

12.25

269.44

2.27

38.57

87.56

2.29 65.80 0.38

133.35 8.32 6.80

305.12 547.20 2.58

22.50

6.80

153.06

SUPRASTRUCTURA
kg Montarea armaturilor din otel-beton n elemente de constructii, exclusiv cele din constructiile executate n cofraje glisante...la constructii executate la o naltime pna la 35 m inclusiv, din bare fasonate avnd diametrul pna la 18 mm inclusiv, in grinzi si stlpi si pna la 10 mm inclusiv, n placi (inclusiv scari si podeste) cu distantier din plastic 0.00 tone greutate materiale 6.50 ore manopera 197.00 0.38 75.49

2.1 CC02C1

Pag 3 STADIUL FIZIC: INFRA+SUPRASTRUCTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: INFRA+SUPRASTRUCTURA


2.2 CZ0302B1

5=3x4

kg Confectionarea armaturilor din otel beton pentru beton armat n elemente de constructii turnate n cofraje, exclusiv cele executate n cofraje glisante...fasonarea barelor pentru pereti, grinzi, stlpi si diafragme la constructii obisnuite, n ateliere centralizate, OB 37 D= 10 - 16 mm 0.05 tone greutate materiale 1.14 ore manopera 2.3 CZ0302A1 kg Confectionarea armaturilor din otel beton pentru beton armat n elemente de constructii turnate n cofraje, exclusiv cele executate n cofraje glisante...fasonarea barelor pentru pereti, grinzi, stlpi si diafragme la constructii obisnuite, n ateliere centralizate, OB 37 D = 6-8 mm 0.15 tone greutate materiale 5.22 ore manopera 2.4 CB04A1 Cofraje pentru beton armat n placi, grinzi si mp stlpi. din panouri refolosibile, cu astereala din scnduri de rasinoase...la constructii avnd naltimea pna la 20 m inclusiv, la placi si grinzi 0.03 tone greutate materiale 14.92 ore manopera 2.5 CA02J1 mc Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante...marca ...1) la constructii cu naltimea pna la 35 m inclusiv n plansee (grinzi, stlpi, placi) cu grosimea placii peste 10 cm ; 3.07 tone greutate materiale 3.40 ore manopera 2.5.L 2100957 mc Beton de ciment B 200 stas 3622 2.6 CB04A1 Cofraje pentru beton armat n placi, grinzi si mp stlpi. din panouri refolosibile, cu astereala din scnduri de rasinoase...la constructii avnd naltimea pna la 20 m inclusiv, la placi si grinzi 0.06 tone greutate materiale 27.06 ore manopera 2.7 CC02C1 kg Montarea armaturilor din otel-beton n elemente de constructii, exclusiv cele din constructiile executate n cofraje glisante...la constructii executate la o naltime pna la 35 m inclusiv, din bare fasonate avnd diametrul pna la 18 mm inclusiv, in grinzi si stlpi si pna la 10 mm inclusiv, n placi (inclusiv scari si podeste) cu distantier din plastic 0.00 tone greutate materiale 9.21 ore manopera

52.00

2.77

144.18

145.00

2.91

422.35

18.20

10.40

189.20

1.11

32.09

35.62

1.12 33.00

138.98 10.40

155.51 343.06

279.00

0.38

106.92

Pag 4 STADIUL FIZIC: INFRA+SUPRASTRUCTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: INFRA+SUPRASTRUCTURA


2.8 CZ0302A1

5=3x4

kg Confectionarea armaturilor din otel beton pentru beton armat n elemente de constructii turnate n cofraje, exclusiv cele executate n cofraje glisante...fasonarea barelor pentru pereti, grinzi, stlpi si diafragme la constructii obisnuite, n ateliere centralizate, OB 37 D = 6-8 mm 0.06 tone greutate materiale 2.30 ore manopera 2.9 CZ0302B1 kg Confectionarea armaturilor din otel beton pentru beton armat n elemente de constructii turnate n cofraje, exclusiv cele executate n cofraje glisante...fasonarea barelor pentru pereti, grinzi, stlpi si diafragme la constructii obisnuite, n ateliere centralizate, OB 37 D= 10 - 16 mm 0.22 tone greutate materiale 4.73 ore manopera 2.10 CA02J1 mc Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante...marca ...1) la constructii cu naltimea pna la 35 m inclusiv n plansee (grinzi, stlpi, placi) cu grosimea placii peste 10 cm ; 7.59 tone greutate materiale 8.38 ore manopera 2.10.L 2100957 mc Beton de ciment B 200 stas 3622 2.11 RPCA06A1 mc Umplutura...de pamant 0.70 tone greutate materiale 15.09 ore manopera 2.12 TSD04B1 mc Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv 0.18 tone greutate materiale 1.32 ore manopera 2.13 DA06A1 Strat de agregate naturale cilindrate, avand mc functia de rezidenta filtranta, izolatoare, antigeliva si anticapilara, cu asternere...manuala; 8.64 tone greutate materiale 4.07 ore manopera 2.14 DA18A1 mc Strat de fundatie din agregate in amestecuri optimate, executat:...cu asternere manuala; 2.48 tone greutate materiale 3.64 ore manopera 2.14.L 2200525 mc Nisip sortat nespalat de rau si lacuri 0,0-7,0 mm 2.15 RCSE40A1% Straturi impermeabile pentru turnarea mp betoanelor, din folie pvc 0.00 tone greutate materiale

64.00

2.91

186.41

215.00

2.77

596.12

2.74

32.09

87.94

2.76 7.02

138.98 21.96

383.86 154.19

1.76

7.68

13.51

3.51

46.02

161.52

1.76

44.80

78.84

1.77 35.20

8.76 3.53

15.53 124.23

Pag 5 STADIUL FIZIC: INFRA+SUPRASTRUCTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: INFRA+SUPRASTRUCTURA 11.97 ore manopera


2.16 CC02F1

5=3x4

kg Montarea armaturilor din otel-beton n elemente de constructii, exclusiv cele din constructiile executate n cofraje glisante...la constructii executate la o naltime pna la 35 m inclusiv, din plase sudate avnd greutatea pna la 3 kg/m2 inclusiv, n pereti si diafragme cu distantier din plastic 0.12 tone greutate materiale 3.81 ore manopera 2.16.L 2000860 kg Plasa sudate tip 106 gq 126(29,4 kg/buc) OL 37-1n 2.17 CA01B1 mc Turnarea betonului simplu...marca...1) n fundatii continue, izolate, socluri cu volum peste 3 mc, precum si n ziduri de sprijin 9.05 tone greutate materiale 9.58 ore manopera 2.17.L 2100945 mc Beton de ciment B 150 stas 3622 2.18 TRA06A10 Transportul rutier al betonului-mortarului cu tona autobetoniera de...5,5mc dist. =10km 2.19 TRA01A10 tona Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 10 km.

123.00

0.37

44.97

123.00 3.51

1.44 28.68

176.79 100.67

3.54 19.80 12.70

133.35 8.32 6.80

471.80 164.66 86.39

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
6,460.48

manopera
3,081.11 640.87 12.32 26.19 15.41 7.70 160.22 3,943.82 394.38 4,338.20 216.91 4,555.12

utilaj
280.50 0.00 0.00 0.00 0.00 0.00 0.00 280.50 28.05 308.55 15.43 323.97

transport
953.89 0.00 0.00 0.00 0.00 0.00 0.00 953.89 95.39 1,049.28 52.46 1,101.74

total
10,775.97 640.87 12.32 26.19 15.41 7.70 160.22 11,638.69 1,163.87 12,802.55 640.13 13,442.68

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 6,460.48 646.05 7,106.52 355.33 7,461.85

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: 5.000 % Profit Total Inclusiv Profit:

OBIECTUL: CONSTRUCTII STADIUL FIZIC: ARHITECTURA

PERETI, TAVANE, TAMPLARIE


35.20 5.83 205.24

1.1 IZF12G

mp Izolatii termice n camere frigorifice la ...pardoseli, cu placi din polistiren celular tip ...* avnd grosimea de ...* mm, ntr-un strat, lipite cu mastic de bitum tip H 80/90, Inclusiv chituirea placilor 0.21 tone greutate materiale 3.52 ore manopera 1.1.L 2602841 mp Placa austrotherm 20xps-g/030 50 mm cant neted

35.55

21.32

758.12

Pag 6 STADIUL FIZIC: ARHITECTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: ARHITECTURA


1.2 CG01D1

5=3x4

Strat suport pentru pardoseli executate din mp ...mortar de ciment marca M 100-T de 3 cm grosime, cu suprafata fin driscuita ; 16.11 ore manopera 1.3 CG01E1 Strat suport pentru pardoseli executate din mp ...mortar de ciment marca M 100-T de 3 cm grosime, de 2 cm grosime, cu suprafata fin driscuita ; 14.84 ore manopera 1.4 CD07C2 mc Zidarie din blocuri mici din beton celular autoclavizat...n ziduri cu o grosime de 24 cm, la constructii executate la o naltime pna la 35 m inclusiv, cu blocuri GBN, paletizate 23.32 tone greutate materiale 86.72 ore manopera 1.5 IZF01B mp Amorsarea suprafetelor pentru aplicarea stratului de lifuzie, a barierei contra vaporilor, a termoizolatiei sau a hidroizolatiei ...pe suprafete orizontale, nclinate sau verticale, cu suspensie de bitum filerizat (subif) ntr-un strat 0.01 tone greutate materiale 0.39 ore manopera 1.6 IZF04H Strat hidroizolant executat la cald la terase, mp acoperisuri sau la fundatii si radiere, n terenuri fara ape freatice, inclusiv scafele si doliile din hidroizolatia curenta...pe suprafete nclinate peste 40% sau verticale plane sau curbe, cu mastic de bitum sau bitum cu adaus de cauciuc tip *, aplicat cu pnza bitumata acoperita tip ...* sau cu tesatura din fibre de sticla bitumata tip ...* lipita pe toata suprafata cu mastic de bitum sau bitum cu adaus de cauciuc tip ...*; 0.04 tone greutate materiale 1.37 ore manopera 1.6.L 2600036 kg Bitum pentru materiale si lucrari pentru hidroizolatii tip h 68/75 s 7064 1.6.L 2600713 mp Pinza bit fara strat de acoperire pi 50 100cmx20m s1046 1.7 IZF12A mp Izolatii termice n camere frigorifice la ...pereti, cu placi din polistiren celular tip ...* avnd grosimea de ...* mm ntr-un strat lipite cu mastic de bitum tip H 80/90 si fixate cu mustati din srma zincata. Inclusiv chituirea placilor 0.03 tone greutate materiale 1.61 ore manopera 1.7.L 2602819 mp Placa austrotherm xps-r/035 30 mm cant neted 1.8 IZF12A* mp Termosistem pentru fatade executat cu placi polistiren expandat, inclusiv finisajele 3.79 tone greutate materiale 332.75 ore manopera

42.40

4.35

184.64

42.40

3.81

161.56

27.10

239.99

6,503.66

9.80

0.86

8.40

9.80

1.74

17.04

15.68 10.78 7.00

1.60 7.75 7.96

25.12 83.54 55.72

7.07 117.00

12.79 81.30

90.46 9,511.52

Pag 7 STADIUL FIZIC: ARHITECTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: ARHITECTURA


1.8.2 IzTc05A

5=3x4

Executarea pe suprafete verticale pereti a mp unui strat termoizolator din placi de polistiren celular, lipit cu mortar de ciment aracet...Aplicarea placilor de polistiren 60.84 ore manopera 1.8.3 20012932 Placa polistiren expandat Austrotherm EPS mp A50, 10 cm gros. 0.02 tone greutate materiale 1.8.4 20011246 DIBLU DE POLISTIREN 10X160+CUI DE buc PLASTIC IU 0.02 tone greutate materiale 1.8.5 20012549 Mortar adeziv Extherm Termo pentru lipire kg placi polistiren 0.94 tone greutate materiale 1.8.6 IzTc05B* Montare plasa fibra sticla la executarea pe mp suprafete verticale pereti a unui strat termoizolator din placi de polistiren celular, lipit cu mortar adeziv. 35.10 ore manopera 1.8.8 20019309 mp Plasa fibra de sticla, 165 g/mp 0.13 tone greutate materiale mp Tencuieli exterioare obisnuite...executate manual, driscuite, pe ziduri din caramida, din blocuri mici de beton sau din blocuri de beton celular autoclavizat, cu mortar de var-ciment marca M25-T, in grosime medie de 2,5 cm; 2.17 tone greutate materiale 149.76 ore manopera 1.8.9. 2101195 Mortar tencuiala M 100 (var hidrat) s 1030 mc 1.8.11 RPCXR02B Zugraveli exterioare...superioare vopsitorii mp lavabile cu vinarom in doua straturi 0.18 tone greutate materiale 81.90 ore manopera 1.8.13 IZF33A+ ml Montare profile de protectie a stratului termoizolant aferent sistemului de izolare termica Baumit...Profil metalic pentru soclu 0.33 tone greutate materiale 5.15 ore manopera 1.9 IZF33B+ ml Montare profile de protectie a stratului termoizolant aferent sistemului de izolare termica Baumit... Profil metalic pentru colturi 0.00 tone greutate materiale 0.14 ore manopera 1.10 RCSH15C% mc Grinzi pt.plansee, deschidere >4m, din lemn rasin. 2 fete plane, incl.carboliniarea 0.88 tone greutate materiale 22.71 ore manopera 1.11 CQ16A+ mp Tavane false executate din placi de gips-carton, montat pe schelet metalic de sustinere suspendat cu elemente de tip NONIUS...executat cu un strat de placi de gips-carton
1.8.9 CF06B1

117.00

5.31

620.93

120.51

21.15

2,548.26

819.00

0.30

244.99

936.00

1.14

1,069.18

117.00

3.06

358.23

128.70 117.00

1.97 13.79

254.04 1,613.26

2.69 117.00

1.06 9.43

2.86 1,103.68

46.80

36.24

1,696.11

0.86

36.51

31.21

1.67

702.98

1,173.98

42.40

61.83

2,621.57

Pag 8 STADIUL FIZIC: ARHITECTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: ARHITECTURA tone greutate materiale ore manopera
1.11.L 20010044

5=3x4

1.36 36.04 mp 42.82 72.80 17.28 55.93 739.93 4,071.45

Placa GK 12,5 ignifugata

ACOPERIS

Sarpanta din lemn la acoperisuri simple cu mp 1 pina la 4 pante exec.pe scaune din lemn rot.pt.inv.grel 2.79 tone greutate materiale 141.96 ore manopera 2.2 CE18A1 mp Astereala la nvelitori sau la doliile invelitorilor din tigla si azbociment...scinduri din rasinoase 1.02 tone greutate materiale 16.20 ore manopera 2.3 RpIzF08A1% Folie anticondens pentru invelitori la mp acoperis (asim) 0.01 tone greutate materiale 160.38 ore manopera 2.4 CE01A1 mp Invelitoare din tigla profilata din argila arsa...la acoperisuri fara astereala, asezate pe sipci 28x48 mm, inclusiv executarea din tabla zincata a doliilor, paziilor, racordarilor la cosuri 3.69 tone greutate materiale 53.46 ore manopera 2.4.L 2303016 buc Tigla cu jgheab lat.cu 4 cioc c2 405x230x11 s515 2.5 CE13C1 Jgheaburi din tabla zincata...semirotunda, m cu diametrul de 15 cm, prefabricate 0.11 tone greutate materiale 13.07 ore manopera 2.6 CE09XA-01 Burlane din tabla zn de 0,5 mm inadite prin m petrececere cca.6mm rotunde cu diam.15,4cm conf.santier - in cazul folosirii burlanelor semirotunde prefabr. 0.02 tone greutate materiale 5.12 ore manopera 2.7 CK34A+ Usi din PVC, cu doua canaturi , (unul fix si mp altul mobil) , montate cu dibluri din plastic, etansarea rosturilor cu spuma poliuretanica si cordon de silicon, avnd suprafata tocului:...pn la 5 mp inclusiv; 0.10 tone greutate materiale 3.46 ore manopera 2.7.L 6313356 buc Diblu cu expandare marimea 10 2.7.L 20012680 l Silicon de etansare 2.7.L 20010080 l Spuma poliuretanica 2.7.L 6720308 mp Usa din profile PVC - tip gealan 2.8 CK21A# Usi profiluri...aluminiu,1 canat,supraf toc <= mp 7 mp,inclusiv armaturi si accesorii, montare in zid de orice fel, la constructii cu H <= 35 m 0.08 tone greutate materiale

2.1 CE12XB

81.00

11.67

945.39

81.00

24.95

2,020.64

81.00

15.21

1,231.71

1,296.00 36.30

0.62 13.10

805.34 475.57

12.80

106.24

1,359.83

3.84

13.92

53.46

23.04 0.77 0.96 3.84 3.78

4.60 30.04 45.82 130.51 24.38

106.07 23.07 43.99 501.16 92.14

Pag 9 STADIUL FIZIC: ARHITECTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: ARHITECTURA ore manopera


2.8.L

5=3x4

3.59 mp Usa din profile aluminiu tip gold 600 mp Ferestre din PVC, cu un singur canat mobil, avand suprafata tocului pana la 1mp inclusiv, izolarea rosturilor cu spume poliuretanice, etansarea cu spume siliconice....montata la perti din caramida cu goluri sau BCA 0.10 tone greutate materiale 1.02 ore manopera 2.9.L 20010087 Fereastra PVC OCHI MOBIL - SD 80x120 mp cm 2.10 CK05A+ Ferestre din PVC, doua canaturi (unul fix si mp altul mobil), avand suprafata tocului pana la 1mp inclusiv, izolarea rosturilor cu spume poliuretanice, etansarea cu spume siliconice....montata la perti din beton 0.35 tone greutate materiale 4.28 ore manopera 2.10.L 20010096 mp Fereastra PVC FIX + DD 150x120 cm 2.11 CF01A1 mp Tencuieli interioare driscuite la pereti si stalpi...la pereti si stlpi, executate manual, pe suprafete de zidarie de caramida, cu mortar de var-ciment marca M10-T n grosime medie de 2 cm, inclusiv schela pe capre; 1.86 tone greutate materiale 99.51 ore manopera 2.11.L 2101195 Mortar tencuiala M 100 (var hidrat) s 1030 mc 2.12 RPCJ13A1 m Reparatii de tencuieli interioare, n jurul tocurilor si pervazurile la usi si ferestre, de 2 cm grosime, driscuite, executate cu mortar de var-ciment marca 10-T, avnd spaletii...drepti pna la 15 cm latime 0.60 tone greutate materiale 30.18 ore manopera 2.13 CI06C-03% mp Placaj faianta 15x15-30x30cm fixate cu adeziv ptr.montarea placajelor pe supraf.plane >10mp - pentru placaj in incaperi cu suprafata mai mica de 10 mp (inclusiv) 0.37 tone greutate materiale 101.26 ore manopera 2.13.L 6110525 kg Adeziv cu pulbere pe baza de ciment cu lianti hidraulici ( apa si aditivi ) tip adesilex P9 2.14 CF22A01+ Glet DEKO pentru pereti interiori,...Glet de mp perete 0.06 tone greutate materiale 17.95 ore manopera 2.15 RCSR08A% mp Zugraveli lavabile, vopsea-acetat de polivinil-vinacet, la int./ext., 2str., pe tencuieli exist. 0.17 tone greutate materiale 6308046 2.9 CK04C+

3.78 1.28

575.44 46.01

2,175.15 58.89

1.28 4.50

383.09 38.56

490.35 173.53

4.50 107.00

337.11 10.24

1,517.02 1,095.88

1.93 61.60

1.06 5.52

2.05 339.83

33.20

32.38

1,075.04

78.02

7.94

619.11

71.80

6.60

473.65

107.00

6.41

685.36

Pag 10 STADIUL FIZIC: ARHITECTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: ARHITECTURA ore manopera


2.15.L 6104353

5=3x4

65.27 kg Vopsea vinarom alba v.108-210 stas 7359-80 2.16 7331070 l Colorant universal casati arlecchino 0.01 tone greutate materiale 2.17 CG06D1 mp Pardoseli din mozaic turnate pe loc ...simplu, n cmp continuu in grosime de 1,5 cm, fara bordura, cu piatra de mozaic din marmura, n ncaperi cu suprafete peste 5 mp; 0.65 tone greutate materiale 10.60 ore manopera 2.18 CG11A1 mp Pardoseli din placi din gresie ceramica ...patrate sau dreptunghiulare de aceias culoare asezate simplu 1.31 tone greutate materiale 16.06 ore manopera 2.18.L 2419328 mp Placa gresie mapisa 33.3x33.3 kenya 2.19 CG02D1 mp Pardoseli din parchet...cu parchet de stejar sau fag1) montat la 45 prin lipire cu aracet, n ncaperi cu suprafete peste 10mp; 0.44 tone greutate materiale 21.22 ore manopera 2.19.L 2941131 Parchet fag lmb,ul 22 x 50 x 300 xx cls.2 mp s 228/4 2.19.L 2944717 mp Frizuri fag 22 x 60 x 700 xx s 228/1 2.20 CZ0204A1 Mortar de var - ciment pentru zidarie marca mc M 100-Z...preparat cu ciment M 30, n instalatii centralizate fara adaos de var; 0.30 tone greutate materiale 0.07 ore manopera 2.21 TRA01A10 tona Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 10 km.

48.15 14.36 5.76

5.41 75.09 47.82

260.62 1,078.31 275.42

14.60

21.45

313.20

15.04 22.10

29.37 12.84

441.62 283.72

21.00 2.32 0.14

28.32 27.06 170.72

594.61 62.80 23.90

50.20

6.80

341.49

TROTUARE SI SCARI
mc 1.70 7.68 13.05

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv tone greutate materiale ore manopera 3.2 DA18A1 Strat de fundatie din agregate in amestecuri optimate, executat:...cu asternere manuala; tone greutate materiale ore manopera 3.2.L 2200525 Nisip sortat nespalat de rau si lacuri 0,0-7,0 mm

3.1 TSD04B1

0.17 1.28 mc 1.70 44.80 76.16

2.40 3.52 mc 1.71 8.76 15.00

Pag 11 STADIUL FIZIC: ARHITECTURA

0 1 OBIECTUL: CONSTRUCTII STADIUL FIZIC: ARHITECTURA


3.3 CG34A%

5=3x4

mp Pardoseli pavele beton simplu,prefabricate, la trotuare,alei,pat nisip 5cm,rosturi cu nisip 11.16 tone greutate materiale 51.00 ore manopera 3.3.L 2800329 Pavele prefabricate din beton tip uni 6 cm mp gros 3.4 CA04D05 mc Beton turnat n placi, grinzi, stlpi....Beton turnat n rampe de scari si podeste, ridicat cu bob si transportat cu roaba 30 m 2.87 ore manopera 3.5 CC02F1 kg Montarea armaturilor din otel-beton n elemente de constructii, exclusiv cele din constructiile executate n cofraje glisante...la constructii executate la o naltime pna la 35 m inclusiv, din plase sudate avnd greutatea pna la 3 kg/m2 inclusiv, n pereti si diafragme cu distantier din plastic 0.01 tone greutate materiale 0.31 ore manopera 3.5.L 2001101 kg Plasa sudate tip 130 gr 283(40,6 kg/buc) OL 37-1n 3.6 CB02A1 mp Cofraje pentru beton n elevatie, din panouri refolosibile, cu astereala din scnduri de rasinoase, la ziduri drepte avand inaltimea de...0-3m. 0.01 tone greutate materiale 1.78 ore manopera 3.7 CH01E1 m Trepte din beton simplu B 100...sclivisite sau rolate, cu mortar de ciment marca M 100T, finisate simplu, cu muchii drepte si suprafete perfect plane 0.66 tone greutate materiale 8.26 ore manopera 3.8 TRA01A10 tona Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 10 km.

34.00

16.06

545.98

35.02 0.58

25.18 50.52

881.79 29.30

10.00

0.37

3.66

10.00 2.25

1.38 10.65

13.81 23.96

8.10

17.38

140.77

14.40

6.80

97.96

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
33,243.17

manopera
13,776.62 2,865.54 55.11 117.10 68.88 34.44 716.38 17,634.08 1,763.41 19,397.49 969.87 20,367.36

utilaj
665.27 0.00 0.00 0.00 0.00 0.00 0.00 665.27 66.53 731.80 36.59 768.39

transport
439.45 0.00 0.00 0.00 0.00 0.00 0.00 439.45 43.94 483.39 24.17 507.56

total
48,124.51 2,865.54 55.11 117.10 68.88 34.44 716.38 51,981.97 5,198.20 57,180.17 2,859.01 60,039.17

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 33,243.17 3,324.32 36,567.49 1,828.37 38,395.87

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: Profit 5.000 % Total Inclusiv Profit:

Pag 12 STADIUL FIZIC: INSTALATII ELECTRICE

0 1 OBIECTUL: INSTALATII ELECTRICE STADIUL FIZIC: INSTALATII ELECTRICE


1 EB06A1

5=3x4

2 3

4 5

5.L 6

6.L 7

7.L 8

9.L 10

Conducta punte (INTENC), pentru instalatii m electrice fixe, montata pe ziduri si plafoane...inclusiv dozele si legaturile in doze 0.02 tone greutate materiale 22.26 ore manopera 4826880 m Conductor fy 1x 1,5 s 6865 0.00 tone greutate materiale EB06A1 Conducta punte (INTENC), pentru instalatii m electrice fixe, montata pe ziduri si plafoane...inclusiv dozele si legaturile in doze 0.01 tone greutate materiale 15.29 ore manopera 4826892 m Conductor fy 1x 2,5 s 6865 0.00 tone greutate materiale ED01A1 buc Intreruptor manual...unipolar, constructie normala sau impermeabila (flans), montat ngropat 0.00 tone greutate materiale 0.96 ore manopera 5500720 Intrerupator cumpana st.simbol 0170 250 V buc 10a ED03A1 buc Comutator unipolar...serie, constructie normala, sau constructie impermeabila (flans) montat ngropat 0.00 tone greutate materiale 0.36 ore manopera 5520366 Comutator cumpana st.simbol 0176 10 A buc ;250 v ED08A1 buc Priza...bipolara, simpla sau dubla, constructie normala sau constructie impermeabila (flans), cu sau fara contact de protectie (nul), montata ngropat 0.00 tone greutate materiale 2.56 ore manopera 5536157 buc Priza bipolara bachel.cu cont.prot.marit apar 250/10a EF05D1 Tablou de apartament tip bloc electric...bloc buc electric cu 4 circuite 0.01 tone greutate materiale 1.59 ore manopera EE12H1 Corp de iluminat, pentru lampi fluorescente buc tubulare...etans, montat pe dibluri (bolturi) metalice 0.00 tone greutate materiale 0.70 ore manopera 5103546 buc Corp il.fl.fipa -02 250 V 1x 20w EE05C1 Aplica...simpla, oblica sau dreapta, cu glob buc de sticla opala montata pe tavan sau pe perete, pe dibluri de material plastic 0.00 tone greutate materiale 0.64 ore manopera

106.00

2.37

251.31

109.18 72.80

0.63 2.37

68.99 172.60

75.00 3.00

1.01 3.49

75.83 10.48

3.03 1.00

6.34 3.90

19.21 3.90

1.01 8.00

7.81 3.49

7.89 27.96

8.08 1.00

5.53 303.87

44.71 303.87

1.00

9.19

9.19

1.00 2.00

80.71 5.75

80.95 11.50

Pag 13 STADIUL FIZIC: INSTALATII ELECTRICE

0 1 OBIECTUL: INSTALATII ELECTRICE STADIUL FIZIC: INSTALATII ELECTRICE


10.L 5104083

5=3x4

buc Aplica aminopl.dul.e27,dr,60w, tip aa-dsimb.b11324 11 20018406 Detector de miscare PIR Paradoor, vertical buc 0.00 tone greutate materiale

2.02 1.00 3.00

1.52 230.01 5.75

3.07 230.01 17.25

12 EE05C1

Aplica...simpla, oblica sau dreapta, cu glob buc de sticla opala montata pe tavan sau pe perete, pe dibluri de material plastic 0.00 tone greutate materiale 0.96 ore manopera 13 11397383 buc Corp iluminat fluorescent cpb 1x40 w+starter 0.01 tone greutate materiale 14 7302105 buc Plafoniera decorativa 0.00 tone greutate materiale 15 EH01A1 buc ncercarea cablurilor de energie electrica,...de maximum 1 kV 7.70 ore buc Verificarea si ncercarea retelei electrice aeriene n vederea receptiei si punerii n functiune...retea noua; 3.42 ore

1.00

32.69

32.69

3.00 10.00

44.89 25.60

134.66 255.99

manopera
16 W2J01A#

1.00

94.77

94.77

manopera

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
1,043.58

manopera
576.00 119.81 2.30 4.90 2.88 1.44 29.95 737.28 73.73 811.01 40.55 851.56

utilaj
237.28 0.00 0.00 0.00 0.00 0.00 0.00 237.28 23.73 261.00 13.05 274.05

transport
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

total
1,856.85 119.81 2.30 4.90 2.88 1.44 29.95 2,018.13 201.81 2,219.95 111.00 2,330.94

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 1,043.58 104.36 1,147.94 57.40 1,205.33

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: Profit 5.000 % Total Inclusiv Profit:

OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII ALIM APA


1 mc Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren tare 3.87 ore manopera ACE08A1 mc Umplutura in...sant. la cond. de alim. cu apa si canalizare cu: nisip 0.19 tone greutate materiale 0.09 ore manopera TSA02F1 1.62 24.39 39.52

0.14

15.20

2.13

Pag 14 STADIUL FIZIC: INSTALATII ALIM APA

0 1 OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII ALIM APA


3 AcA43A+

5=3x4

m Pregatirea pentru imbinare tuburi din PEHD - VALROM in colaci cu L=100 m si pozitionarea in pamant dupa imbinare...D < 63 mm inclusiv 0.03 tone greutate materiale 0.54 ore manopera 3.L 2303549 TUB <WaterKIT> APA PE100 D. 40x 2,0mm m PN6 SDR26 4 RPCA03 mc Umplutura pamint executata in straturi orizontale de 20-30 cm gros.udata si batuta cu maiul de mina 0.15 tone greutate materiale 3.20 ore manopera 5 AcE101A1+ Camin de inspectie Wavin SG 315, cu baza buc din PE, avind racorduri cu D= 110mm...baza camin cu doua racorduri, coloana fara tub telescopic 0.00 tone greutate materiale 0.90 ore manopera 5.L 20013428 buc Baza camin PP D 425mm Tip I 1intrare/1 iesire D110mm 5.L 20013504 buc Coloana camin TEGRA 1000 H=1000mm 6 ACD01G1 buc Capac si rama stas 2308-81 pentru camine...cu piesa suport necarosabil tip i 0.45 tone greutate materiale 1.80 ore manopera 7 ATD24C buc Robinet montat...prin:insurubare,cu diametrul pina la 1 1.64 ore manopera 8 4204192 buc Robinet sfera si rac oland,sect trec tot,fluture manevra 1" 0.00 tone greutate materiale 9 AcA65D+ Imbinare fiting de compresiune din PEHD - buc VALROM cu 2 imbinari (racord/cot tip FE sau FI)...D = 40-50 x 1 0.00 tone greutate materiale 0.38 ore manopera 9.L 20020496 buc Racord <waterkit> compres.d. 40x1 fe 10 AcA65B+ Imbinare fiting de compresiune din PEHD - buc VALROM cu 2 imbinari (racord/cot tip FE sau FI)...D = 25-32 x 0.00 tone greutate materiale 0.14 ore manopera 10.L 20020494 buc Racord <waterkit> compres.d. 32x3/4 fe 11 AcA58B+ buc Sudura prin electrofuziune mufa/cot electrosudabil din PEHD - VALROM...D = 40 mm 0.01 tone greutate materiale 0.92 ore manopera 11.L 20020213 buc Cot 90electrosudabil d. 40 RPSE24A# buc Montarea filtrului pentru apa potabila cu mufe filetate pentru montaj pe conducta, ...avand dimensiunile de 1"...2"

10.00

2.52

25.20

10.15 1.49

2.75 21.96

27.91 32.73

1.00

41.45

41.45

1.00 1.02 1.00

306.30 1,701.56 179.52

306.30 1,735.59 179.52

2.00

8.36

16.73

2.00

27.43

54.86

2.00

2.98

5.97

2.00 1.00

9.14 2.11

18.27 2.11

1.00 2.00

4.92 10.58

4.92 21.16

2.00 1.00

52.69 28.10

105.39 28.10

Pag 15 STADIUL FIZIC: INSTALATII ALIM APA

0 1 OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII ALIM APA tone greutate materiale ore manopera
.L 7322056 13 SA19A#

5=3x4

0.00 2.75 1.00 30.00 3.54 2.14 3.54 64.05

buc Filtru pentru apa cu mufe filetate D = 1 m Teava pe, pp, pp-r si similare imbin prin sudura prin...electrofuziune, la constructii industriale, d=20 mm 0.01 tone greutate materiale 5.40 ore manopera 13.L 6717087 Tub din polipropilena, diametrul de 20 mm m 13.L 6719485 buc Cot din polipropilena, avind diametrul 20 mm 13.L 6719493 buc Teu din polipropilena avind diametrul 20 mm 13.L 6719477 Mufa polipropilena avind diametrul exterior buc 20 mm 13.L 6713671 buc Racord fe polipropilena DN 20 x 1/2 cod 64100303 14 SA19A# m Teava pe, pp, pp-r si similare imbin prin sudura prin...electrofuziune, la constructii industriale, d=20 mm 0.01 tone greutate materiale 3.96 ore manopera 14.L 6701255 Tub pp-r+al tip coprax DN 20 cod 63al0004 m 14.L 6719485 buc Cot din polipropilena, avind diametrul 20 mm 14.L 6719493 buc Teu din polipropilena avind diametrul 20 mm 14.L 6719477 Mufa polipropilena avind diametrul exterior buc 20 mm 14.L 6713671 buc Racord fe polipropilena DN 20 x 1/2 cod 64100303 15 RPSA43A# Montarea bratarii pentru fixarea conductelor buc din otel sau material plastic de alimentare cu apa si gaze, montata prin incastrare, conductele avind diametrul de:...1/2; 0.17 tone greutate materiale 16.80 ore manopera 15.L 4204068 buc Bratara tevi instalatii apa si gaze 1/2 16 SD08XA Robinet de trecere cu ventil si mufe avind buc diametrul de 3/8" si 1/2" 0.00 tone greutate materiale 0.80 ore manopera 16.L 4202474 Robinet trec. fonta 1/2 A vent+mufa pn10 buc s6480 17 SE56A# Filtru pentru apa potabila, cu...mufe filetate buc pentru montaj pe conducta,dimens 1 -2 0.00 tone greutate materiale 2.30 ore manopera 17.L 2806227 buc Filtru de apa pentru impuritati y 3/4 18 SD07B# Robinet de trecere cu ventil si mufe, cu sau buc fara descarcare, pentru tevi...otel,d=3/4 0.00 tone greutate materiale 0.72 ore manopera

30.60 6.00 6.30 7.50 30.00 22.00

108.79 8.69 0.37 3.48 45.47 2.14

3,329.07 52.13 2.31 26.14 1,364.07 46.97

22.44 4.40 4.62 5.50 22.00 60.00

16.03 8.69 0.37 3.48 45.47 3.06

359.65 38.23 1.70 19.17 1,000.32 183.78

60.00 4.00

0.71 2.54

42.68 10.16

4.00 1.00

12.50 23.60

49.99 23.60

1.00 3.00

12.40 2.89

12.40 8.66

Pag 16 STADIUL FIZIC: INSTALATII ALIM APA

0 1 OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII ALIM APA


18.L 4204427

5=3x4

Robinet de trecere cu sfera pentru apa, tip buc fi - fi cu D = 3/4" 19 SC36B1 Spalator dublu pentru vase,din tabla de otel buc emailata,Montare pe console fixate cu dibluri...metalice 0.02 tone greutate materiale 1.63 ore manopera 19.L 4200361 buc Spalator tabla email dublu 20 SC07E1 buc Lavoar din portelan sanitar, montat pe...piedestal 0.02 tone greutate materiale 1.71 ore manopera 20.L 2437996 Lavoar portelan f.spatar l 2-550mm mono buc c. 2 s1540 20.L 2453861 Piedestal lavoar p1 portelan mono c. buc 2 ni 806 21 SC38A1 buc Instalatie pentru closet completa,din semiportelan sau portelan sanitar si rezervor de...9 litri 0.03 tone greutate materiale 4.50 ore manopera 21.L 2446416 Vas closet civ3 portelan mono c. 2 buc s 2066 22 SC01B-1# Cada baie fonta em,tb...em,polimetacr,fibr buc st incl hidromas, tevi scurg pb, picioare fonta (corectie) 0.02 tone greutate materiale 3.80 ore manopera 22.L 4203363 buc Ventil scurgere cada baie 1 1/4 rac.cotit s9610 22.L 2308532 buc Cada acryl sirius 170x70 cm 23 SD05XA buc Baterie amestecatoare pt.lavoar sau spalator avindd=1/2" asezata stativa 0.00 tone greutate materiale 2.30 ore manopera 24 SD08A1 buc Baterie amestecatoare de perete pentru...spalator,din fonta sau alama,avand d=1/2 toli 0.00 tone greutate materiale 0.50 ore manopera 24.L 4201470 buc Baterie amestec spalator alama t.flx.jet.perl.1/2s8732 25 SD04C1 buc Baterie amestec cu dus fix de 1/2 toli,din fonta sau alama,Montare cu...dibluri metalice 0.00 tone greutate materiale 1.10 ore manopera 25.L 4201511 Baterie amest.alama tub flexibpara monob buc I 1/2 ni 4309 26 SC19A1 buc Sifon din...bachelita pentru lavoar de portelan sanitar 0.00 tone greutate materiale 0.79 ore manopera

3.00 1.00

21.81 31.57

65.44 31.57

1.01 1.00

63.63 17.48

63.95 17.48

1.01 1.01 1.00

421.83 32.70 288.56

426.04 33.02 288.56

1.01 1.00

86.26 94.97

87.12 94.97

1.00 1.00 1.00

8.25 96.78 129.81

8.25 96.78 129.81

1.00

5.68

5.68

1.00 1.00

217.38 12.25

217.38 12.25

1.00 1.00

223.98 9.09

223.98 9.09

Pag 17 STADIUL FIZIC: INSTALATII ALIM APA

0 1 OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII ALIM APA


26.L 4203145

5=3x4

buc Sifon simplu extensibil ies oriz boira DN 11/4 cod m110 27 SC20A1 Sifon pentru spalator dublu(pant....)de 1 1/2 buc ,simbol 797 0.00 tone greutate materiale 1.04 ore manopera 28 SC26A2 buc Oglinda sanit. semicrist. margini. slef. cu dimens....500x600mm 0.01 tone greutate materiale 0.98 ore manopera 29 SC25A1 buc Etajera din...portelan sanitar tip 0.00 tone greutate materiale 0.51 ore manopera 29.L 2451734 Etajera portelan tip e2.55 mono c.1 buc ni 567 30 SC28B1 buc Sapuniera din...portelan sanitar,tip sa2-15,aparenta,simpla 0.00 tone greutate materiale 0.31 ore manopera 31 SC20XA buc Suport din portelan pt. hirtie montat pe perete 0.00 tone greutate materiale 0.43 ore manopera 31.L 2453794 buc Port - hirtie portelan ha-23-15 melania mono c.1 TRA01A10 tona Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 10 km.

1.00 1.00

5.37 37.68

5.37 37.68

1.00

34.17

34.17

1.00

5.51

5.51

1.01 1.00

15.37 8.83

15.53 8.83

1.00

4.95

4.95

1.00 1.15

11.17 6.80

11.17 7.82

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
10,545.66

manopera
671.65 139.70 2.69 5.71 3.36 1.68 34.93 859.71 85.97 945.68 47.28 992.96

utilaj
3.70 0.00 0.00 0.00 0.00 0.00 0.00 3.70 0.37 4.08 0.20 4.28

transport
7.82 0.00 0.00 0.00 0.00 0.00 0.00 7.82 0.78 8.61 0.43 9.04

total
11,228.84 139.70 2.69 5.71 3.36 1.68 34.93 11,416.90 1,141.69 12,558.59 627.93 13,186.52

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 10,545.66 1,054.57 11,600.23 580.01 12,180.24

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: Profit 5.000 % Total Inclusiv Profit:

OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII DE SCURGERE


1 SB08E# m Teava pe,pp,pp-r pentru canal,imbin cu garn cauciuc,Montare apar sau ingrop sub...pard,dn=110 mm 0.00 tone greutate materiale 0.64 ore manopera 6717091 Tub din polipropilena, diametrul de 50 mm m 2.00 3.42 6.85

1.L

2.06

108.79

224.11

Pag 18 STADIUL FIZIC: INSTALATII DE SCURGERE

0 1 OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII DE SCURGERE


2 RPSB15E#

5=3x4

2.L 2.L 3

3.L

4.L 5

5.L 6

6.L

7.L 8

8.L

Montarea pieselor de legatura (ramificatie buc simpla) din material plastic (PE, PP, PP-R si similar), pentru canalizare, imbinate cu garnitura de cauciuc, avind diametrul de:...110 mm 0.00 tone greutate materiale 0.76 ore manopera 2304865 buc Ramificatie PP 110/50x45 2304866 buc Ramificatie PP 110/50x90 SB10C# buc Piesa legatura(ramificatie simpla)pe,pp,pp-r,canal,imbin garn cauciuc,...dn=50 mm 0.00 tone greutate materiale 0.50 ore manopera 6704177 buc Ramificatie simpla mat plast (pe,pp,pp-r,etc) canal,imbin garn cauc D = 50mm SB09C# buc Piese legatura (cot,red,piesa curat mufa dubla,comp dilat)pe,pp,pp-r canal imb grn...caucdn=50mm 0.00 tone greutate materiale 1.32 ore manopera 6721013 buc Cot pentru instal canalizare,poliprop ignif, D = 50 mm SB09E# buc Piese legatura (cot,red,piesa curat mufa dubla,comp dilat)pe,pp,pp-r canal imb grn...caucdn=110mm 0.00 tone greutate materiale 0.06 ore manopera 6704144 buc Cot mat plast (pe,pp,pp-r,etc) canal,imbin garn cauc D = 110 mm SB09E# buc Piese legatura (cot,red,piesa curat mufa dubla,comp dilat)pe,pp,pp-r canal imb grn...caucdn=110mm 0.00 tone greutate materiale 0.03 ore manopera 2306291 buc Reductie excentrica din polipropilena ignifugata pentru canalizari interioare HTR-A110/050 SB28A# buc Sifon de pardoseala din polipropilena, avand diametrul iesirii de...50 mm 0.00 tone greutate materiale 0.25 ore manopera 6721103 buc Sifon pard,1 iesire d50, 1 intrare d40 si capac prot AcD27A3+ Tuburi Wavin PVC-KG imbinate prin mufe m si garnituri, pentru instalatii de canalizare exterioara, cu diametrul nominal de:...Dn=110-125 mm , lungime tronson teava 3-5m 0.01 tone greutate materiale 4.62 ore manopera 20013938 m Tub uPVC-KG SN8 cu mufa si garnitura D=110x3.2mm; L=3.0m

2.00

4.37

8.74

1.00 1.00 2.00

5.89 6.16 2.79

5.89 6.16 5.57

2.00

5.17

10.33

6.00

2.36

14.17

6.00 2.00

152.20 0.53

913.19 1.06

2.00 1.00

5.44 0.53

10.88 0.53

1.00

0.40

0.40

1.00

2.71

2.71

1.00 10.50

7.85 4.49

7.85 47.15

10.71

15.62

167.29

Pag 19 STADIUL FIZIC: INSTALATII DE SCURGERE

0 1 OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: INSTALATII DE SCURGERE


9 ACA11B1-1

5=3x4

m Montare teava pp-r pentru canalizare, in pamant, in exteriorul cladirilor, avand dn...50 0.01 tone greutate materiale 0.69 ore manopera 10 SB08C# m Teava pe,pp,pp-r pentru canal,imbin cu garn cauciuc,Montare apar sau ingrop sub...pard,dn=50 mm 0.00 tone greutate materiale 2.00 ore manopera 10.L 2303548 Tub <easykit> pp ignifugat d. 50 cu 1mufa buc l1000 11 RPCA01A1 mc Sapatura de pamnt in spatii limitate sub 1,00 m latime si 1,50 m adncime, cu talaz vertical, pentru gropi poligonale de fundatii, santuri, canale etc., executate n cantitati pna la 20mp la punctul de lucru cu maluri ...nesprijinite 11.16 ore manopera 12 ACF03A% mc Umpluturi in santuri la conductele de alimentare cu apa sau canalizare, ca substrat, strat de protectie, strat de izolare sau strat filtrant la tuburile de drenaj, executate cu:...nisip 0.42 tone greutate materiale 0.18 ore manopera 13 RPCA03 mc Umplutura pamint executata in straturi orizontale de 20-30 cm gros.udata si batuta cu maiul de mina 0.33 tone greutate materiale 7.10 ore manopera 14 ACD05XL buc Camin de vizitare stas2448-82 cu sect. rectang.dinzidar de caram.pt.canal cu sect ovoid.bxh700x1050 76.60 tone greutate materiale 248.20 ore manopera 15 AcA42A3+ buc Piese de legatura Wavin PE montate prin sudura cap la cap, pentru instalatii de alimentare cu apa ...Dn=110-125 mm , cot, reductie, piesa de curatire, 0.00 tone greutate materiale 2.40 ore manopera 15.L 20014416 buc Piesa de curatire PE canalizare 45grd110 16 ACD01G1 buc Capac si rama stas 2308-81 pentru camine...cu piesa suport necarosabil tip i 1.80 tone greutate materiale 7.20 ore manopera

3.00

116.66

349.99

8.00

2.64

21.14

8.24 3.60

7.60 31.64

62.62 113.90

0.30

15.20

4.56

3.30

21.96

72.48

4.00

2,755.10

11,020.40

4.00

6.12

24.49

4.00 4.00

85.34 179.52

341.35 718.06

procent Cheltuieli directe:

material
11,100.48

manopera
2,930.13

utilaj
131.29

transport
0.00

total
14,161.89

Pag 20 STADIUL FIZIC: INSTALATII DE SCURGERE

0 Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

1 Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 11,100.48 1,110.05 12,210.52 610.53 12,821.05

2
609.47 11.72 24.91 14.65 7.33 152.37 3,750.56 375.06 4,125.62 206.28 4,331.90

3
0.00 0.00 0.00 0.00 0.00 0.00 131.29 13.13 144.42 7.22 151.64

4
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5=3x4
609.47 11.72 24.91 14.65 7.33 152.37 14,982.33 1,498.23 16,480.56 824.03 17,304.59

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: Profit 5.000 % Total Inclusiv Profit:

OBIECTUL: INSTALATII SANITARE STADIUL FIZIC: MONTAJ UTILAJ ALIM APA


1 RpAcB02A% buc Montarea in caminul existent a contorului de apa si a robinetului de concesie ingropat, la bransamentele de plumb, avand diametrul de:...20 mm 0.00 tone greutate materiale 1.44 ore manopera 1.00 34.24 34.24

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
19.55

manopera
14.70 3.06 0.06 0.12 0.07 0.04 0.76 18.81 1.88 20.69 1.03 21.73

utilaj
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

transport
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

total
34.24 3.06 0.06 0.12 0.07 0.04 0.76 38.36 3.84 42.19 2.11 44.30

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 19.55 1.95 21.50 1.08 22.58

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: 5.000 % Profit Total Inclusiv Profit:

OBIECTUL: INSTALATII TERMICE STADIUL FIZIC: CONDUCTE SI RADIATOARE


m Teava din polietilena armata de inalta densitate sau polipropilena montata in distribuitie instalatii de incalzire centrala avand...d= 25 mm 0.00 tone greutate materiale 3.04 ore manopera 1.L 6716502 m Teava din polipropilena cu folie aluminiu (pp-al) DN = 25 mm 2 IC03B1-1 m Teava din polietilena armata de inalta densitate sau polipropilena montata in distributie instal de incalzire centrala avand ...d= 20 mm 0.02 tone greutate materiale 20.52 ore manopera 1 IC03C1-1 8.00 3.88 31.03

8.08 57.00

4.57 3.67

36.92 209.42

Pag 21 STADIUL FIZIC: CONDUCTE SI RADIATOARE

0 1 OBIECTUL: INSTALATII TERMICE STADIUL FIZIC: CONDUCTE SI RADIATOARE


2.L 3 6716501

5=3x4

3.L 4

4.L 5

5.L 6

6.L 7

7.L 8

8.L 9

9.L

m Teava din polipropilena cu folie aluminiu (pp-al) DN = 20 mm IC36B1# m Teava din polietilena armata de inalta densitate su poliprop. armata sau...nearmata montata in coloane in instal. de incalzire centr. cu diametrul ext. de 25 mm 0.00 tone greutate materiale 1.58 ore manopera 6716502 m Teava din polipropilena cu folie aluminiu (pp-al) DN = 25 mm IC36A1# m Teava din polietilena armata de inalta densitate su poliprop. armata sau...nearmata montata in coloane in instal. de incalzire centr. cu diametrul ext. de pana la 20 mm inclusiv 0.00 tone greutate materiale 2.16 ore manopera 6716501 m Teava din polipropilena cu folie aluminiu (pp-al) DN = 20 mm IC42D1 buc Distribuitor-colector montat pe sustinator gata confectionat avand...d =273 mm 0.00 tone greutate materiale 8.69 ore manopera 7318830 Distribuitor / colector cu 5 racorduri pentru buc tub pe-al-pe tip xlpe/hdpe ID14B1 Robinet de retinere cu ventil, drept, cu mufe buc pentru Instalatie incalz. centrala cu d:...3/4 0.00 tone greutate materiale 0.75 ore manopera 3811279 buc Robinet cu sfera corp alama 3/4 25 seria arizona cod 658 mt RPSE24A# buc Montarea filtrului pentru apa potabila cu mufe filetate pentru montaj pe conducta, ...avand dimensiunile de 1"...2" 0.00 tone greutate materiale 2.75 ore manopera 2806227 buc Filtru de apa pentru impuritati y 3/4 IB02C01 buc Convectoradiator tip panou ...montare 1 rind tevi,racordat cu mufa,h=624mm avand <15 tevi verticale 0.01 tone greutate materiale 0.36 ore manopera 5701403 Convectoradiator c.r.p. 1 rind 624/ 5 mufa buc nii 341 IB02C01 buc Convectoradiator tip panou ...montare 1 rind tevi,racordat cu mufa,h=624mm avand <15 tevi verticale 0.00 tone greutate materiale 0.18 ore manopera 5700800 buc Radiator portprosop RADY LINEAR CROMAT RC 040/120 mm

57.57 4.50

4.57 3.57

263.07 16.07

4.64 7.20

4.57 3.06

21.18 22.04

7.42 1.00

4.57 122.46

33.89 122.46

1.00 3.00

44.87 3.17

44.87 9.52

3.00 1.00

4.69 28.19

14.07 28.19

1.00 2.00

12.40 1.95

12.40 3.90

2.00 1.00

31.21 1.95

62.43 1.95

1.00

99.32

99.32

Pag 22 STADIUL FIZIC: CONDUCTE SI RADIATOARE

0 1 OBIECTUL: INSTALATII TERMICE STADIUL FIZIC: CONDUCTE SI RADIATOARE


10 IB02D01

5=3x4

buc Convectoradiator tip panou ...montare 1 rind tevi,racordat cu mufa,h=624mm avand >15 tevi verticale 0.03 tone greutate materiale 0.42 ore manopera 10.L 5701568 Convectoradiator c.r.p. 1 rind 624/13 mufa buc nii 341 11 ID01A2 buc Robinet ventil dublu reglaj de colt pentru Instalatie incalzire centrala cu d:...1/2 0.00 tone greutate materiale 0.85 ore manopera 11.L 4202721 buc Robinet termostatic drept DN 1/2 pentru teava OL cod 4o290403 12 ID01A2 buc Robinet ventil dublu reglaj de colt pentru Instalatie incalzire centrala cu d:...1/2 0.00 tone greutate materiale 0.85 ore manopera 12.L 4507213 buc Robinet coltar teava cu reglaj retur dn1/2 cod 4o120414 13 RPID02A buc Robineti de aerisire sau trecere cu diametrul pinala 1/2" 0.00 tone greutate materiale 4.30 ore manopera 14 IC50A2 buc Cot ua2 cu racord olandez negru...d=1/2 toli 0.00 tone greutate materiale 0.75 ore manopera 15 RPIC80A1-1 buc Montat fitinguri pp, pe (cot,mufa,teu,niplu,reductii) in intalatii de incalzire...3/8-1 0.01 tone greutate materiale 55.90 ore manopera 15.L 6719485 buc Cot din polipropilena, avind diametrul 20 mm 15.L 6719493 buc Teu din polipropilena avind diametrul 20 mm 15.L 6719477 Mufa polipropilena avind diametrul exterior buc 20 mm 15.L 3330749 buc Racord drept PPR 20 x 1/2 FI 16 IC35C1 Bratari...pentru fixarea tevi. otel la Instalatie buc incalz. sau gaze Montare in zid caram. sau beton d= 1/2 toli 0.10 tone greutate materiale 8.00 ore manopera 17 IC35D1 Bratari...pentru fixarea tevi. otel la Instalatie buc incalz. sau gaze Montare in zid. caram. sau beton d=3/4 toli 0.02 tone greutate materiale 1.50 ore manopera 18 IE03A1 m Efectuare proba etans. la pres. a cond. pentru alim. aeroterme si baterii cu d:...3/8 la 1 toli 6.93 ore manopera

2.00

2.25

4.51

2.00 5.00

61.76 2.11

123.53 10.54

5.00 5.00

37.08 2.11

185.38 10.54

5.00 5.00

22.22 9.12

111.08 45.62

5.00

11.59

57.96

65.00

9.02

586.60

35.00 10.00 5.00 10.00 32.00

8.69 0.37 3.48 4.44 3.47

304.04 3.67 17.42 44.39 111.04

6.00

3.49

20.97

77.00

0.92

70.73

Pag 23 STADIUL FIZIC: CONDUCTE SI RADIATOARE

0 1 OBIECTUL: INSTALATII TERMICE STADIUL FIZIC: CONDUCTE SI RADIATOARE


19 IE04A1 m Efectuare proba dilat.-contract. si funct. a cond. de alim aeroterme si baterii cu d:...3/8 la 1 6.93 ore

5=3x4

77.00

0.92

70.73

manopera

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
1,520.91

manopera
1,290.56 268.44 5.16 10.97 6.45 3.23 67.11 1,651.92 165.19 1,817.12 90.86 1,907.97

utilaj
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

transport
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

total
2,811.47 268.44 5.16 10.97 6.45 3.23 67.11 3,172.83 317.28 3,490.11 174.51 3,664.62

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 1,520.91 152.09 1,673.00 83.65 1,756.65

Total Inclusiv Cheltuieli Directe: 10.000 % Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte: Profit 5.000 % Total Inclusiv Profit:

OBIECTUL: INSTALATII TERMICE STADIUL FIZIC: MONTAJ UTILAJE SI ECHIPAMENTE CT


1 buc Cazan monobloc pentru incalzire centrala-aiacs-avand debitul...de:40000 kcal/h ,cu combustibil solid 0.00 tone greutate materiale 12.39 ore manopera IA23B2 buc Armaturi fine pentru cazane incalzire centrala:...manometru 0.00 tone greutate materiale 0.38 ore manopera FF07B1 buc Ventil reglaj termostatic(presostatic)dn...15-20 mm 0.00 tone greutate materiale 1.30 ore manopera IA05A1 1.00 146.61 146.61

1.00

34.42

34.42

1.00

13.78

13.78

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
51.19

manopera
143.62 29.87 0.57 1.22 0.72 0.36 7.47 183.83 18.38 202.22 10.11 212.33

utilaj
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

transport
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

total
194.81 29.87 0.57 1.22 0.72 0.36 7.47 235.02 23.50 258.53 12.93 271.45

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 51.19 5.12 56.31 2.82 59.13

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: Profit 5.000 % Total Inclusiv Profit:

OBIECTUL: INSTALATII GAZE

Pag 24 STADIUL FIZIC: INSTALATII GAZE

0 1 OBIECTUL: INSTALATII GAZE STADIUL FIZIC: INSTALATII GAZE


1 GA01A2

5=3x4

1.L 2

2.L 3

4.L 5

5.L 6

7.L 8

8.L 9

Teava de otel cu gros pina la 6mm Montare hm cu executie manuala...dn= 50 mm teren greu 0.21 tone greutate materiale 2.81 ore manopera 3108009 Teava pentru constructii fara sudura LC 51 m x 6 / OLT 35 s 404/2 GB01A1 Robinet cu flanse pn 10-16, avand...dn= 50 buc mm 0.03 tone greutate materiale 0.58 ore manopera 4601618 Robinet sert.pana af pu oi PN = 25 D = buc 50 450 n 5315 GE01A1 buc Regulator de presiune montat individual pentru debitul nominal de...10 mc/h 0.01 tone greutate materiale 2.05 ore manopera IC23A1 m Teava otel instalatie sud. Long. Ng. neteda. Instalatie gaze constructii industriale sudura la locuri ardere...d=3/4 toli 0.01 tone greutate materiale 4.26 ore manopera 3304835 Teava pentru instalatii.neagra nefil.m - 20( m 3/4) OL 32 1 s 7656 IC22A1 m Teava otel...Instalatie sud. long. ng+filet+mufa insurubata indistributie sere d=3/8 toli 0.02 tone greutate materiale 7.48 ore manopera 3304811 Teava pentru instalatii.neagra nefil.m - 10( m 3/8) OL 32 1 s 7656 IA24B1 buc Supapa de siguranta din...alama cu d:3/4 0.01 tone greutate materiale 0.26 ore manopera ID21A2 Robinet cu cep cu capat pentru racordarea buc tubului de cauciuc pentru Instalatie de gaze, cu d:...3/8 0.00 tone greutate materiale 0.44 ore manopera 4202709 buc Robinet dublu reglaj fonta cen ventil,simb.4121 3/8 ID20B1 Robinet cu cep pentru instalatii de gaze, de buc inchidere cu...d: 3/4 0.00 tone greutate materiale 1.38 ore manopera 4202711 Robinet cu dublu reglaj pentru radiatoare buc 3/4 toli fc IE06A1 m Verificarea definitiva la pres. a cond. de gaze montate ,robinete, d:...pina la 1 0.00 tone greutate materiale 2.52 ore manopera

0.20

250.76

50.15

20.06 1.00

39.17 19.28

785.66 19.28

1.00 1.00

490.06 217.13

490.06 217.13

6.00

7.45

44.70

6.06 22.00

3.27 3.65

19.79 80.34

22.22 2.00

2.00 92.69

44.46 185.38

1.00

4.71

4.71

1.00 2.00

16.14 7.51

16.14 15.03

2.00 28.00

26.83 0.93

53.67 26.08

Pag 25 STADIUL FIZIC: INSTALATII GAZE

0 1 OBIECTUL: INSTALATII GAZE STADIUL FIZIC: INSTALATII GAZE


10 IE06B1 m Verificarea definitiva la pres. a cond. de gaze montate ,robinete, d:...peste 1 0.00 tone greutate materiale 2.60 ore manopera

5=3x4

20.00

1.34

26.79

procent Cheltuieli directe: Recapitulatia: CAS Fond de risc Concedii si indemnizatii Somaj Fond de garantare Sanatate

material
1,817.64

manopera
248.84 51.76 1.00 2.12 1.24 0.62 12.94 318.51 31.85 350.36 17.52 367.88 22,733.23 10,875.58 33,608.80 8,066.11 41,674.92

utilaj
12.91 0.00 0.00 0.00 0.00 0.00 0.00 12.91 1.29 14.20 0.71 14.91 1,330.94 206.30 1,537.24 368.94 1,906.18

transport
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,401.16 217.18 1,618.34 388.40 2,006.74

total
2,079.39 51.76 1.00 2.12 1.24 0.62 12.94 2,149.06 214.91 2,363.97 118.20 2,482.17 91,267.98 21,498.46 112,766.44 27,063.95 139,830.39

Recapitulatie 1 ianuarie 2011


20.800 % 0.400 % 0.850 % 0.500 % 0.250 % 5.200 % 0.00 0.00 0.00 0.00 0.00 0.00 1,817.64 181.76 1,999.40 99.97 2,099.37 65,802.65 10,199.41 76,002.06 18,240.49 94,242.55

Total Inclusiv Cheltuieli Directe: Cheltuieli indirecte 10.000 % Total Inclusiv Cheltuieli indirecte: 5.000 % Profit Total Inclusiv Profit:

Cheltuieli directe: Recapitulatie: TOTAL GENERAL (faraTVA): TVA: TOTAL GENERAL:

1 euro = 4.26 lei, curs la data de 2/1/2011

Executant,

Director General,
Raport generat cu ISDP GRATUIT , www.devize.ro, e-mail: suport@intelsoftdeviz.ro, tel.: 0236 477.007