Sunteți pe pagina 1din 1

DN 2 Km279+650

KEY PLAN
Sc. 1:1000
Ax calea 2 stanga
Left carriageway axis 2
A1L
SOP SOP
SOP
Ax proiectat
Designed axis
P1L
K
M
5
+
4
9
8
.1
0
P2L
K
M
5
+
5
6
8
.1
0
A1L
K
M
5
+
4
4
7
.4
6
A2L
K
M
5
+
6
1
8
.7
4
P1R
K
M
5
+
4
8
9
.7
2
P2R
K
M
5
+
5
5
9
.7
2
A2R
K
M
5
+
6
1
0
.3
6
K
M
5
+
4
3
9
.0
8
A1R
A1R
SOP
Piloti forati de diametru mare
Drilled piles 1.20m, L=26.00m
VEDERE C-C / C-C VIEW
Sc. 1:50
1
1
.5
0
VEDERE A-A / A-A VIEW
Sc. 1:50
Beton de egalizare C8/10 20cm
Levelling concrete
Piloti forati de diametru mare
Drilled piles 1.20m, L=26.00m
50 50 1.20 38 1.20 38 1.20 38 1.20 38 1.20 38 1.20 38 1.20 38 1.20 38 1.20 38 1.20 38 1.20 50 50
17.95
2
.0
0
2
0
140.00
1
5
1
5
142.00
153.50
1
1
.5
0
2
.0
0
2
0
3.13 1.30 9.10
3.13 11.70
3.13 1.30
3.13
C
C
D
D
50 50 1.20
7.70
1.55 1.20 1.55 50 50 1.20
2
.0
0
2
0
140.00
1
5
142.00
153.50
2.55 2.60 2.55
7.70
A
A
51 36 3.19 3.57 36 3.19 51
11.70
M
o
to
rw
a
y
a
x
is
A
x
a
u
to
s
tra
d
a
1.57xsin70 1.57xsin70
26 1.16 99 19
19 1.16 99 26
27 27
Scara / Scale: 1:50
0 0.5 1 1.5 2 m
C4170/OB.1/05/1001 - GENERAL ARRANGEMENT
C4170/OB.1/05/1001 - DISPOZITIE GENERALA
ing.A.Otelea
Description Date Date
MODI FI CATI ONS
EMPLOYER
Drawn, Date Checked, Date
Date Designed, Date
Date
Cod:
ENTITATE ACHIZITOARE
MODI FI CARI
Descriere Data
Description Date
Data
Date
MODI FI CATI ONS
EMPLOYER
Data
Date
2012
apr.
Verificat,
Proiectat,
Desenat,
Data Data
Data Data
2012 2012
2012 2012
apr. apr.
apr. apr.
PROIECTANT GENERAL
GENERAL DESIGNER
1 2 3 4 5 6 7 8 9 10 11 12
G
F
E
D
C
B
A
M
L
K
J
H
13 14 15 16
8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7
M
L
K
J
H
G
F
E
D
C
B
A
NOTE
NOTES
DESENE DE REFERINTA
REFERENCE DRAWINGS
ing. M.Florescu

ing. M.Florescu

LUCRARI PODURI
BRIDGES WORKS
COORDONATE DE TRASARE (SOP)
SETTING OUT POINTS (SOP)
5+568.10 5+498.10
560266.124 560199.217
650901.540 650880.964
P2L P1L
Chainage
Kilometraj
Nord
Est
Easting
Northing
C4170/OB.1/05/1702 - PLAN COFRAJ PILE P1L, P2L.
PARTEA 2
C4170/OB.1/05/1702 - P1L, P2L PIERS FORMWORK PLAN.
SHEET 2
ACEASTA PLANSA VA FI CITITA IMPREUNA CU "NOTA" DIN
DISPOZITIA GENERALA.
1. PREZENTA PLANSA VA FI CITITA IMPREUNA CU DESENELE DE
REFERINTA.
2. PUNCTELE SOP DIN TABEL SE AFLA LA INTERSECTIA AXULUI
PROIECTAT (DRUMSAU BRETEA) CU LIMITA ZIDULUI DE GARDA
PENTRU CULEI SI CU AXUL TRANSVERSAL PENTRU PILE.
3. TOATE MUCHIILE ELEMENTELOR DIN BETON VOR AVEA SAMFREN
DE 20x20 mm.
4. COTELE DE NIVEL SUNT DATE PE STRUCTURA DE REZISTENTA.
5. ANTREPRENORUL VA VERIFICA COTA FIECARUI CUZINET INAINTE
DE BETONAREA ACESTORA.
6. ANTREPRENORUL VA VERIFICA STABILITATEA EXCAVATIILOR
PENTRU EXECUTAREA RADIERELOR.
7. DIMENSIUNILE SUNT DATE IN METRI, IAR CELE MAI MICI DE UN
METRU SUNT DATE IN CENTIMETRI.
8. PLACILE METALICE PENTRU RIDICAREA GRINZILOR SE MONTEAZA
INTRE CUZINETI SI SE DISPUN ORIZONTAL.
THIS DRAWING SHALL BE READIN CONJ UCTION WITH THE "NOTE"
ON GENERAL ARRANGEMENT DRAWING.
1. THIS DRAWING HAS TO BE READIN COJ UCTION WITH RELEVANT
REFERENCE DRAWINGS.
2. THE SETTING OUT POINTS (SOP) FOR EACH SUPPORT ARE GIVEN
AT THE INTERSECTION OF THE DESIGNED(ROADOR LINK ROAD)
AXIS WITH INTERNAL FACE OF THE ABUTMENT ANDFOR THE
PIERS, THE TRANSVERSAL AXIS.
3. UNLESS STATEDOTHERWISE, ALL CONCRETE EDGES WILL HAVE A
20x20 mmCHAMFER.
4. ALL LEVELS ARE TO STRUCTURAL CONCRETE.
5. THE BEARING PLINTH LEVELS ARE BASEDON ASSUMEDBEARINGS
THICKNESS. THE CONTRACTOR SHALL VERIFY THIS LEVELS PRIOR
TO CONSTRUCTION OF BEARING PLINTH.
6. THE CONTACTOR TO ENSURE THE STABILITY OF THE EXCAVATED
FACE, PRIOR TO CONSTRUCTION OF FOUNDATION.
7. DIMENSIONS ARE TO BE READIN METERS (m) ANDSMALLER THAN
METER ARE TO BE READIN CENTIMETERS (cm).
8. METALLIC PLATES FOR BEAMS LIFTING ARE MOUNTING BETWEEN
BEARING BLOCKS ANDARE PLACEDHORIZONTALY.
CERIN]E MINIME DE ASIGURARE A DURABILIT ]II PENTRU BETON
MINIMUM REQUIREMENTS FOR CONCRETE DURABILITY
Element Clasa beton
Clasa de
expunere
Raport A/C max
Dozaj minimde
ciment (kg/mc)
Aer antrenat Alte conditii Tip de ciment
Element Concrete class Exposure class Max. W/C raport
Cement minim
ratio
Air content Other conditions Cement type
Piloti forati
Drilled piles
C20/25 XC2 0.60 375 -
ConformSR EN
1536:2004
CEMI, CEMII A/B
S, CEMII H II AS,
CEMII A LL, CEM
II MA, S-D, CEM
II MA, S-T, CEMII
MA, S-LL, CEMII
MA, D-T, CEMII
MA, D-LL, CEMII
MA, T-LL, CEMII
MB, S-D, CEMII
MB, S-T, CEMII
MB, D-T
Beton de egalizare
Leveling concrete
C8/10 X0 - - - -
Radiere
Pile caps
C20/25 XC3 0.60 280 - -
Elevatii
Elevations
C35/45
XC4+XD3+
XF2
0.45 320 -
Agregate
rezistente la
inghet-dezghet
conform
SR EN 12620

S-ar putea să vă placă și