Sunteți pe pagina 1din 2

1

A. CANTITI BETON:
1. Infrastructur:
a. beton de egalizare 10 cm: 13.05 mc C8/10;
b. plac slab armat 10 cm: 17.06 mc C8/10;
b. grinzi de fundare: 80.05 mc C20/25;
c. perei de beton la subsol, grosime 25 cm: 45.30 mc C20/25;
d. stlpi la subsol: 7.37 mc C20/25;
e. placa i grinzi peste subsol: 38.94 mc C20/25;
TOTAL INFRASTRUCTUR: 171.66 mc beton C20/25;
30.11 mc beton C8/10
2. Suprastructur:
a. stlpi: 14.42 x 5 = 72.10 mc C20/25;
b. plci + grinzi: 51.31 x 5 = 256.55 mc C20/25;
d. scri + atice: 12.88 mc C20/25;
TOTAL CANTITATE BETON SUPRASTRUCTUR: 341.53 mc beton C20/25
TOTAL CANTITATE BETON CLDIRE D+P+4E (infrastr. +suprastr.):
171.66 + 341.53 = 513.20 mc beton C20/25.
30.11 mc beton C8/10.
B. CANTITI ARMTUR (fier-beton) BST500S + OB37:
1. Infrastructur (fundaia):
a. grinzi + tlpi: 3.97 tone;
2
b. perei de beton armat: 2.40 tone
c. plac slab armat: 0.891 tone
TOTAL INFRASTRUCTUR: 7.261 tone
2. Suprastructur:
a. stlpi: 10.20 tone;
b. plci : 2.60 + 2.80 x 5 = 16.60 tone;
c. grinzi: 2.50 + 2.90 x 5 = 17.00 tone;
d. scri: 0.22 x 4 = 0.88 tone
TOTAL OEL SUPRASTRUCTUR: 44.68 tone
TOTAL CANTITATE OEL CLDIRE D+P+4E (infrastr. + suprastr.): 51.95 tone.

S-ar putea să vă placă și