Sunteți pe pagina 1din 3

OBIECTIV: MODERNIZARE DRUM JUDETEAN DJ764

OBIECTUL:
STADIUL FIZIC: Deviz
Beneficiar: ________________________________________
Proiectant: ________________________________________ Proiect: __________________ nr: ___
Executant: ________________________________________ Plansa: __________________ nr: ___
Faza: __________________

C5 - LISTA cuprinzand cantitatile de lucrari


- lei -

SECTIUNEA TEHNICA SECTIUNEA FINANCIARA

Pretul unitar TOTALUL


Nr. Capitolul de lucrari U.M. Cantitatea (exclusiv TVA) (exclusiv TVA)
-lei- -lei-
0 1 2 3 4 5=3x4
TSC02D1 Sapatura mecanica cu excavator pe pneuri de 100  59.00  604.36  35,657.18
0.12-0.39 mc,cu comanda hidraulica,in mc material:  0.00  0.00
:...pamant cu umiditate naturala descarcare manopera:  0.00  0.00
auto in teren catg 2  604.36
utilaj:  35,657.18
transport:  0.00  0.00
TSC35A32 Excavat,transport,cu incarcator frontal,la 100  52.00  564.22  29,339.67
distante de :...incarcare in autovehicul cu mc material:  0.00  0.00
incarcator frontal pe pneuri de 1.5-4.0 manopera:  0.00  0.00
mc,pamant din teren categoria 1 la distanta 21-  564.22
utilaj:  29,339.67
30
transport:  0.00  0.00
TRA01A20P Transportul rutier al...pamantului sau molozului tona  52.00  12.11  629.73
cu autobasculanta dist.=20 km material:  0.00  0.00
manopera:  0.00  0.01
utilaj:  0.00  0.00
transport:  12.11  629.72
manopera ore  0.00
DA01A1 Curatarea si inlaturarea stratului de noroi in 100  117.00  17.88  2,092.23
grosime medie de 5 cm de pe straturile rutiere mp material:  0.00  0.00
manopera:  2.50  292.21
utilaj:  15.38  1,800.02
transport:  0.00  0.00
manopera ore  29.25
DA04C% Scarificarea usoara a impietruirii pâna la 5 cm mp  11,700.00  0.67  7,825.36
adâncime, executata:...autogrederul, inclusiv material:  0.00  0.00
reprofilarea; manopera:  0.40  4,675.32
utilaj:  0.27  3,150.04
transport:  0.00  0.00
manopera ore  468.00
L1C31A1 Compactarea straturilor de balast cu 100  132.00  62.45  8,243.68
ajutorul...placilor vibrocompactoare sau a altor mp material:  0.00  0.00
utilaje metalice similare manopera:  17.88  2,360.44
utilaj:  44.57  5,883.24
transport:  0.00  0.00
manopera ore  236.28
DZ01C1 Prepararea in statii fixe a amestecurilor pentru mc  1,464.00  139.72  204,551.62
straturi rutiere stabilizate executate din : balast material:  92.94  136,058.39
cu 6 % ciment manopera:  3.85  5,630.76
utilaj:  42.94  62,862.46
transport:  0.00  0.00
greutate materiale tone  3,669.28
manopera ore  563.64
STADIUL FIZIC: Deviz
0 1 2 3 4 5=3x4
TRA01A15
DZ16B1
IFB09B2 Strat drenantbetonului
Transportul
Prepararea rutier
din balast,
asfaltic
avandcu grosimea
agregat mare,dupa mp
tona  2,500.00
 1,422.00
 7,050.00  206.15
 9.48
 3.25  293,151.83
 23,700.00
 22,944.93
al...materialelor,semifabricatelor
executat
compactarela cald,
de : 10
cu cm
bitum, in : instalatii
cu tip L P material:  145.79
 0.00
 1.26  207,318.27
 8,859.03
 0.00
autobasculanta
X ; pe dist.= 15 km. manopera:  2.00
 0.00
 1.50  14,085.90
 2,130.87
 0.00
utilaj:  58.86
 0.00  83,702.69
 0.00
transport:  9.48
 0.00  23,700.00
 0.00
DA10B1
greutate materiale
Strat rutier din materiale granulare,stabilizate
tone  1,512.25
 1,234.46 mc  1,464.00  51.71  75,710.67
manopera cu ciment sau var si zguraore granulata prin
 1,410.00
 213.30 material:  1.16  1,696.63
TRA01A15
PB02B1 metoda amestecarii
Transportul
Turnare beton simpluinb75
rutier statiiinfixe,executata cu mc
fundatii...obisnuite tona manopera:
 1,422.00
 705.00  17.29
 9.48
 8.79  12,190.07
 13,480.56
 12,870.32
asternere mecanica;etc. cu pompa
al...materialelor,semifabricatelor
zidde sprijin,pereuri cu material:  0.00
 41.76  0.00
utilaj:  61,143.73
autobasculanta pe dist.= 15 km. manopera:  3.41
 0.00  2,404.11
 0.00
transport:
greutate materiale tone  1,281.37 utilaj:  13.88
 0.00  9,785.96
 0.00
manopera ore  1,288.32 transport:  9.48
 0.00  13,480.56
 0.00
manopera
L1C31A1
DB02D1 Compactarea
Amorsarea suprafetelor deore
straturilor straturilor
balast cu  240.65
de baza sau 100  132.00  77.07
 62.45  10,172.59
 8,243.68
TRA01A15 ajutorul...placilor
a imbracamintilor
Transportul rutiervibrocompactoare
existente in vvederea mp material:
sau a altor tona  1,700.00  9.48
 50.97
 0.00  16,116.00
 6,728.03
 0.00
utilaje metalice
aplicarii unui strat
similare
de uzura din mixtura
al...materialelor,semifabricatelor cu material:
manopera:  0.00
 17.88
 19.98  0.00
 2,360.44
 2,637.36
asfaltica, executata
autobasculanta cu: emulsie
pe dist.= 15 km.cationica cu manopera:  0.00
 44.57
 6.12  0.00
utilaj:  5,883.24
 807.20
rupere rapida
utilaj:
transport:  0.00  0.00
manopera
greutate materiale ore
tone  236.28
 12.55 transport:  9.48  16,116.00
DB02D1
manopera Amorsarea procent
suprafetelor material
straturilor
ore de baza manopera
sau
 264.00 100 utilaj
 132.00 transport
 77.07 total
 10,172.59
DB16H1
Cheltuieli a imbracamintilor existente
directe: Imbracaminte de beton asfaltic in vvederea mp
mp material:
cu agregate 79,328.83
 716,963.09  12,985.00
 550,287.03  50.97
 3.06
 81,295.04  6,728.03
 39,704.94
 1,427,874.00
aplicarii unui
marunte strat de
executata la uzura dingrosime
cald, in mixturade : 4,0 manopera:
material:  19.98
 0.03  2,637.36
 339.95
asfaltica, executata cu: emulsie cationica cu
TOTAL GENERAL cm (faracu asternere
TVA): mecanica utilaj:
manopera:  6.12
 0.52  807.20
 6,745.45
 1,427,874.00
rupere rapida
TVA: transport:
utilaj:  0.00
 24.00 2.51
%  32,619.54
 0.00
 342,689.76
greutate materiale tone  12.55 transport:  0.00  0.00
 1,770,563.75
TOTAL GENERAL:
manopera
greutate materiale ore
tone  264.00
 0.14
DZ11F1
manopera Prepararea mixturii asfaltice
orepentru straturi de tona
 675.22  1,790.00  141.20  252,742.33
DZ14B1 baza, executate la cald cu bitum si cu
Prepararea betonului asfaltic fin, bogat inagregate tona material:
 1,097.00  92.91
 215.89  166,305.16
 236,826.27
naturlae executat
criblura, de balastiera decu
la cald 0-31 mm,inin: instalatii
bitum, instalatii manopera:
material:  1.20
 155.52  2,145.85
 170,610.09
tip L
tip LPPXX;  47.09
utilaj:
manopera:  1.50  84,291.31
 1,643.85
transport:
utilaj:  0.00
 58.86  0.00
 64,572.33
greutate materiale tone  1,888.13 transport:  0.00  0.00
manopera
greutate materiale ore
tone  1,170.08
 214.80
TRA01A15
manopera Transportul rutier ore  164.55 tona  1,790.00  9.48  16,969.20
TRA01A15 al...materialelor,semifabricatelor
Transportul rutier cu tona material:
 1,097.00  0.00
 9.48  0.00
 10,399.56
autobasculanta pe dist.= 15 km.cu
al...materialelor,semifabricatelor manopera:
material:  0.00  0.00
autobasculanta pe dist.= 15 km. utilaj:
manopera:  0.00  0.00
transport:
utilaj:  9.48
 0.00  16,969.20
 0.00
DB14B1 Strat de baza din mixturi asfaltice executat la tona transport:
 1,790.00  25.22
 9.48  45,152.25
 10,399.56
DF24A1 cald cu asternere
Semnalizarea mecanica;
rutiera pentru asigurarea ps material: 2.00  0.27
 423.26  489.92
 846.52
continuitatii circulatiei in timpul executarii manopera:
material:  4.10
 158.43  7,331.66
 316.85
lucrarilor, cu indicatoare metalice utilaj:
manopera:  20.86
 264.83  37,330.66
 529.67
transport:
utilaj:  0.00  0.00
greutate materiale tone  0.21 transport:  0.00  0.00
manopera
greutate materiale ore
tone  733.90
 0.06
DB02D1
manopera Amorsarea suprafetelor straturilor
ore de baza sau 100
 53.02  132.00  77.07  10,172.59
DF16A1 a imbracamintilor
Marcaje existente in simple
rutiere longitudinale, vvederea mp
sau duble, km material: 5.60  50.97
 851.54  6,728.03
 4,768.62
aplicarii
cu unui strat
intreruperi de uzura din
sau continue, mixtura
executate manopera:
material:  19.98
 784.91  2,637.36
 4,395.51
asfaltica, executata
mecanizat cu vopsea cu:deemulsie cationica
email cu cu de
microbile  6.12
utilaj:
manopera:  33.17  807.20
 185.73
rupere
sticla; rapida
transport:
utilaj:  0.00
 33.46  0.00
 187.38
greutate materiale tone  12.55 transport:  0.00  0.00
manopera
greutate materiale ore
tone  264.00
 0.44
1 euroDB12B1
=manopera Stratdede
4.39 lei, curs la data legatura (binder) ore
6/27/2013  18.59 tona
de criblura executata  1,422.00  25.22  35,869.55
CB01B la cald cu
Cofraje dinasternere
scânduri mecanica
de rasinoase pentru mp material:
 10.00  0.27
 19.98  389.20
 199.80
Executant,
turnarea betonului....în constructia apeductelor, manopera:
material:  4.10
 0.00  5,824.37
 0.00
canalelor si anexelor inclusiv sprijinirile utilaj:
manopera:  20.86
 19.98  29,655.98
 199.80
transport:
utilaj:  0.00  0.00
Director General,
greutate materiale tone  0.16 transport:  0.00  0.00
manopera ore  583.02
 20.00
Raport generat cu ISDP GRATUIT , www.devize.ro, e-mail: suport@intelsoftdeviz.ro, tel.: 0236 477.007