EPCC BĂRBUNCEȘTI COMPRESSOR STATION

STAȚIE COMPRESOARE BĂRBUNCEȘTI

DETAIL DESIGN
PROIECTARE DE DETALIU

TECHNICAL MEMO FOR COMPRESSOR FOUNDATION


MEMORIU TEHNIC FUNDAȚII COMPRESOARE

Issued for
01 01.2021 comments / Emis I. DAMIAN L. SOARE J. NAN C. STAN
pentru comentarii

Project
Date Description Prepared Checked Manager Approved
Rev.
(Data) (Descriere) (Intocmit) (Verificat) (Sef (Aprobat)
Proiect)
TECHNICAL MEMO FOR COMPRESSOR FOUNDATION /

MEMORIU TEHNIC FUNDAȚII COMPRESOARE

Doc. No.: PU-D-ROA0915422512-EX-CS-CAL-004-01-B Rev.: 01


Project no.
Project Title / Titlul proiectului: Page no.:

CONFIND

EPCC BARBUNCESTI CBARB


1 OF 39

COMPRESSOR STATION (PR. 1220/2020)


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 2 of 39
no.

Revision No Reason for Revision Date


(Revizia nr.) (Motivul reviziei) (Data)

Issued for comments /


01 01.2021
Emis pentru comentarii
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 3 of 39
no.

INDE

Introduction............................................................................................................................................. 5

Introducere.............................................................................................................................................. 5

2.............................................................................................................................................................. 6

Proposed solutions.................................................................................................................................. 6

Soluții propuse........................................................................................................................................ 6

3.............................................................................................................................................................. 8

Applicable codes and standards............................................................................................................. 8

Standarde și coduri aplicabile................................................................................................................. 8

4.............................................................................................................................................................. 9

Site description....................................................................................................................................... 9

Descrierea amplasamentului................................................................................................................... 9

4.1........................................................................................................................................................... 9

Topography............................................................................................................................................. 9

Topografiie.............................................................................................................................................. 9

4.2........................................................................................................................................................... 9

Climate conditions................................................................................................................................... 9

Condiții climatice..................................................................................................................................... 9

4.3......................................................................................................................................................... 10

Seismic risk........................................................................................................................................... 10

Condiții de risc seismic.......................................................................................................................... 10

5............................................................................................................................................................ 11

Foundation soil...................................................................................................................................... 11

Terenul de fundare................................................................................................................................ 11
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 4 of 39
no.

6............................................................................................................................................................ 14

Materials............................................................................................................................................... 14

Materiale............................................................................................................................................... 14

7............................................................................................................................................................ 15

Foundation design................................................................................................................................. 15

Proiectarea fundațiilor........................................................................................................................... 15

7.1......................................................................................................................................................... 15

Compressor eccentricity........................................................................................................................ 15

Excentricitatea compresoarelor............................................................................................................. 15

7.2......................................................................................................................................................... 16

Resonance limit state............................................................................................................................ 16

Starea limită de rezonanță.................................................................................................................... 16

7.3......................................................................................................................................................... 22

Dynamic analysis.................................................................................................................................. 22

Analiza dinamică................................................................................................................................... 22

7.4......................................................................................................................................................... 24

Soil check.............................................................................................................................................. 24

Verificarea terenului.............................................................................................................................. 24

7.5......................................................................................................................................................... 31

Design of the equipment connection.....................................................................................................31

Verificarea prinderii echipamentului......................................................................................................31

8............................................................................................................................................................ 31

Solil tests............................................................................................................................................... 31

Teste pe teren....................................................................................................................................... 31

9............................................................................................................................................................ 32

Execution technology............................................................................................................................ 32
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 5 of 39
no.

Tehnologia de execuție......................................................................................................................... 32

10.......................................................................................................................................................... 33

Execution set-up................................................................................................................................... 33

Organizarea execuției lucrărilor............................................................................................................. 33

11.......................................................................................................................................................... 34

Environmental protection...................................................................................................................... 34

Protecția mediului înconjurător..............................................................................................................34

12.......................................................................................................................................................... 35

The control of execution quality............................................................................................................. 35

Controlul calității lucrărilor..................................................................................................................... 35

13.......................................................................................................................................................... 36

Legislation and measures regarding work safety and healthcare..........................................................36

Acte normative și măsuri de securitate și sănătate în muncă aplicabile................................................36

14.......................................................................................................................................................... 40

Conclusions.......................................................................................................................................... 40

Concluzii............................................................................................................................................... 40

1 Introduction Introducere
The objective of the project is to design two Scopul proiectului este proiectarea a șase
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 6 of 39
no.

compressor foundations from the new OMV fundații de compresor din noua stație de
PETROM compressor station from Bărbuncești, compresoare a OMV PETROM din zona
belonging to production area 33 Berca, Bărbuncești, aparținînd de sectorul de producție
Bărbuncești deposit, Asset Moldova Sud. 33 Berca, zăcământul Bărbuncești, Asset
Moldova Sud.
The foundations are made for three tipes of
natural gas compression units: Fundațiile susțin 3 tipuri de compresoare:

- CI163 (23-PK-011 A/B) with UMEB 315S-6 - CI163 (23-PK-011 A/B) format din motorul
75kW VFD engine and Ariel JG/2 compressor; UMEB 315S-6 75kW VFD și compresorul Ariel
JG/2;
- CI164 (23-PK-021 A/B) with Siemens
1NA1_564-6_B3_AFB_CU 783kW VFD engine and - CI164 (23-PK-021 A/B) format din motorul
Ariel JGD/2 compressor; Siemens 1NA1_564-6_B3_AFB_CU 783kW VFD și
compresorul Ariel JGD/2;
- CI165 (23-PK-031 A/B) with Siemens
1NA1_564-6_B3_AFB_CU 710kW VFD engine and - CI165 (23-PK-031 A/B) format din
Ariel JGF/2 compressor. motorul Siemens 1NA1_564-6_B3_AFB_CU
710kW VFD și compresorul Ariel JGF/2.
Fundațiile sunt după cum urmează:
Fundațiile sunt după cum urmează:
- Two foundations with the dimensions
3.45X10m for two compressors CI163 (17t - Două fundații cu dimensiuni în plan
weight, 985rpm working frequency); 3.45X10m pentru două compresoare CI163
(masă 17t, turație de lucru 985rpm);
- Two foundations with the dimensions
5.2X13.5m for two compressors CI164 (50t - Două fundații cu dimensiuni în plan
weight, 975rpm working frequency); 5.2X13.5m pentru două compresoare CI164
(masă 50t, turație de lucru 975rpm);
- Two foundations with the dimensions
5.1X12.0m for two compressors CI165 (40t - Două fundații cu dimensiuni în plan
weight, 990rpm working frequency). 5.1X12.0m pentru două compresoare CI165
(masă 40t, turație de lucru 990rpm).

2 Proposed solutions Soluții propuse


The foundation solution used for all compressor Soluția de fundare utilizată pentru toate tipurile
types is a mat foundation placed on a quarry de compresoare este radier pe un pat de piatră
stone layer with the thickness of 1m. The spartă cu grosimea de 1m. Grosimea radierului
thickness of the mat foundation is 110cm, 30cm este 110cm, fiind dezvoltat 30cm deasupra
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 7 of 39
no.

being above sistematized terain level, according platformei, conform cerinței beneficiarului și
to beneficiary requirements and 80cm below 80cm sub cota superioară a platformei pentru a
sistematized terain level in order to respect the respecta adâncimea de îngheț.
freezing depth.
Radierul se amplasează pe un beton de egalizare
The mat foundation is placed on a leveling cu grosimea de 10cm.
concrete with 10cm thickness.
Între fundația compresoarelor și platformă se
Between the foundation of the compressors and lasă un rost cu grosimea de 1cm.
the platform is a 1cm gap..
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 8 of 39
no.

3 Applicable codes and standards Standarde și coduri aplicabile


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 9 of 39
no.

Construction works shall be performed according Lucrarile de realizare a constructiilor se vor


to the following normative acts: efectua respectand următoarele acte normative:

• CR 0-2012 – Design code. Basis of • CR 0-2012 – Cod de proiectare. Bazele


proiectarii constructiilor
construction structure design
• CR 1-1-4/2012 – Cod de proiectare.
• CR 1-1-4/2012 –Design code. Evaluation Evaluarea actiunii vantului asupra constructiilor
of wind on buildings
• CR 1-1-3/2012 – Cod de proiectare.
• CR 1-1-3/2012 –Design code. Evaluation Evaluarea actiunii zapezii asupra constructiilor
of snow on buildings
• SR EN 1991-1-5 & SR EN 1991-1-5/NB –
• SR EN 1991-1-5 & SR EN 1991-1-5/NB – Eurocod 1: Acțiuni asupra structurilor. Partea 1-
Eurocode 1: Actions on structures. Part 1-5: 5: Acțiuni generale – Acțiuni termice
General actions – Thermal actions • SR EN 1992-1-1 si SR EN 1992-1-1/NB –
Eurocod 2: Proiectarea structurilor de beton.
• SR EN 1992-1-1 &SR EN 1992-1-1/NB – Partea 1-1: Reguli generale si reguli pentru
Eurocod 2: Design of concrete structures. Part 1- cladiri si Anexa Nationala
1: General rules and rules for buildings & National
Annex • P100-1/2013 – Cod de proiectare
seismica. Partea 1: Prevederi de proiectare
• P100-1/2013 – Code of structures design pentru cladiri
for earthquake resistance. Part 1: Design rules for • NP 112 – 2014 – Normativ pentru
buildings proiectarea structurilor de fundare directa

• NP 112 – 2014 – Code for the structure • NE 012-1/2007 – Cod de practica pentru
design of directly founded executarea lucrarilor din beton, beton armat si
beton precomprimat
• NE 012-1/2007 – Code of practice for
execution of reinforced concrete and pre- • NE 012-2/2010 – Normativ pentru
producerea si executarea lucrarilor din beton,
stressed concrete
beton armat si beton precomprimat
• NE 012-2/2010 – Standard for production
and execution of concrete, reinforced and pre-
stressed works

• NE 013 – 2002 – Code of practice for


execution of precast elements from concrete,
reinforced and pre-stressed
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 10 of 39
no.

• Geotechnical Report • Studiu Geotehnic

• TO-HQ-02-041-00 – Philosophy for • TO-HQ-02-041-00 – Filosofie pentru


Structures and Foundations Structuri si Fundatii

• ST009-2011 – Specificatie tehnica


• ST009-2011 - Technical specification for
privind produse din otel utilizate ca armaturi.
steel products used for reinforcement. Cerinte si criterii de performanta
Requirements and performance criteria
• STAS 7206-87 – Fundații de mașini –
• STAS 7206-87 – Machine Foundations – Prescripții de proiectare
Design rules
• ACI315.3R-04 – Fundații pentru
• ACI315.3R-04 – Foundations for Dynamic echipamente dinamice.
Equipment.

4 Site description Descrierea amplasamentului

4.1 Topography Topografiie


Location of the designed works, from Amplasamentul lucrarilor proiectate se găseşte,
administrative point of view, belongs to din punct de vedere administrativ, in perimetrul
Barbuncesti locality, county Buzau. localitatii Barbuncesti, jud. Buzau.

From a geological - structural point of view, the Din punct de vedere geologic - structural,
studied site is within the structural unit called the amplasamentul studiat se incadreaza in unitatea
internal flank of the Carpathian Forearm. structurala denumita flancul intern al Avanfosei
Carpatice.

4.2 Climate conditions Condiții climatice


The climate for the researched perimeter is a Clima perimetrului cercetat este temperat -
subtype of temperate continental, with the continentală, fiind caracterizat de următorii
following parameters: parametrii :

-average annualtemperature….……+10.6°C -temperatura medie anuală.............+10.6˚C

-the absolute minimum temperature...-29.0°C -temperatura minimă absolută........ – 29.0˚C

-the absolute maximum temperature. +39.6°C -temperatura maximă absolută....... +39.6˚C

• The average annual rainfall value is • Precipitaţiile medii anuale au valoarea


665mm. de 665 mm.
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 11 of 39
no.

• Prevailing wind direction is Northeast • Direcţia predominantă a vânturilor este


(25.4%) and south west (11.8%). Calm records cea nord-estica (25.4%) si sud-vestica (11.8%).
the percentage of 29.3% and the average Calmul înregistrează valoarea procentuală de
intensity of the Beaufort wind scale has a value of 29.3%, iar intensitatea medie a vânturilor la
1.4-3.4 m/s. scara Beaufort are valoarea de 1.4-3.4m/s.

• The maximum freeze depth is 0.8m • Adâncimea maximǎ la îngheţ este de


according to STAS 6054/77 (Maximum freeze 0.8m, conform STAS 6054/77 (Zonarea României
depths for Romanian territory). după adâncimea maximă de îngheţ)

• According to CR 1-1-4/2012, base wind • Conform CR 1-1-4/2012, presiunea de


pressure is 0.7kPa; bază a vîntului este 0.7kPa;

• According to CR 1-1-3/2012, base snow • Conform CR 1-1-3/2012, încărcarea la sol


loading is 2kPa. cu zăpadă este 2kPa.

4.3 Seismic risk Condiții de risc seismic


In terms of seismic zoning of the territory of Din punct de vedere seismic, amplasamentul se
Romania, according to norm P100/1-2013 the caracterizeaza conform Normativului P100/1-
land is in a seismic zone with the following 2013 prin urmatorii parametrii:
parameters:
 acceleratia de varf a terenului ag=0.40g
 peak ground acceleration ag = 0.40g  perioada de control /de colt Tc=1.6s;
 control / corner period Tc =1.6s;  clasă de importanță: III.
 importance class: III.
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 12 of 39
no.

5 Foundation soil Terenul de fundare


Two geotechnical studies were realized on the Pe amplasament au fost executate două studii
site. The first one was realized in july 2018 by geotehnice. Primul a fost realizat în iulie 2018 de
Mistar Project and was based on two boreholes Mistar Proiect și a constat în două foraje și două
and two DPL tests. încercări de tip DPL.

The second geotechnical study was emitted first Cel de-al doilea a avut prima emitere în
issue in february 2020. According to geotechnical februarie 2020, fiind studiul geotehnic de
survey, the invesment is considered geotechnic referință. Conform studiului geotehnic, investiția
cathegory 2, corresponding to moderate se încadrează în categoria geotehnică 2,
geotechnic risk. corespunzătoare riscului geothehnic moderat.

The characterization of the soil was made based Caracterizarea terenului din amplasament s-a
on the following geotechnical investigations: făcut pe baza următoarelor investigații
geotehnice:
• Two geotechnical boreholes with 6m
depth; • Două foreje geotehnice cu adâncimea de
6m;
• Measurements of dynamic parameters on
the site with SRS, SRT and MASW method. • Măsurători ale parametrilor dinamici în
amplasament cu metodele SRS, SRT și MASW.
The following soil layers were intercepted in
borehole 1 (246.895 rNM): Stratificația întâlnită în forajul 1 (246.895 rNM),
realizat la contactul terasei cu zona deluroasă
1) Vegetal soil and filling in silty body 0.0… este:
0.7m;
1) Sol vegetal și umpluturi în masă prăfoasă
2) Silty clay yellow-red with plant roots, 0.0...0.7m;
carbonic interlayer, consistent 0.7…1.0m;
2) Praf argilos galben roșcat cu rădăcini de
3) Silty sandy clay brown-red with yellow plante, intercalații carbonatice, vârtos
brown interlayers, plant roots and carbonic knot, 0.7...1.0m;
firm 1.0…2.0m;
3) Praf nisipos argilos cafeniu roșcat cu
intercalații galben cafenii, rădăcini de plante și
concrețiuni carbonatice, tare 1.0...2.0m;
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 13 of 39
no.

4) Silty sandy clay red with limestone knot 4) Praf nisipos argilos roșcat cu fragmente
fragments, firm 2.0…3.0m; de concrețiuni calcaroase, tare 2.0...3.0m;

5) Silty sand yellow-red with knots, firm 5) Nisip prăfos galben roșcat cu
3.0…6.0m. concrețiuni, tare 3.0...6.0m.

For the second borehole (246.35 rNM) the layers Stratificația întâlnită în forajul 2 (246.35 rNM),
are: realizat pe nivelul de terasă este:

1) Medium sand yellow-red with small 1) Nisip mediu galben roșcat cu pietriș mic,
gravel, loose 0.0…0.8m; afânat 0.0...0.8m;

2) Silty sand yellow-red with large sand and 2) Nisip prăfos galben roșcat cu intercalații
gravel interlayers, loose to medium 0.8…1.5m; de nisip mare cu pietriș, afânat spre mediu
îndesat 0.8...1.5m;
3) Silty sand yellow-red with large sand and
gravel interlayers, medium 1.5…3.0m; 3) Nisip prăfos galben roșcat cu intercalații
de nisip mare cu pietriș, mediu îndesat
4) Silty sand yellow-red with gravel 1.5...3.0m;
interlayers, plastic consistent 3.0…3.5m;
4) Nisip prăfos galben roșcat cu intercalații
5) Silty sand yellow-brown with large sand de pietriș, plastic consistent 3.0...3.5m;
and gravel interlayers, very wet, medium 3.5…
6.0m. 5) Nisip prăfos galben cafeniu cu
intercalații de nisip mare cu pietriș, foarte umed,
Water table was not intercepted in none of the de îndesare medie 3.5...6.0m.
two geotechnical boreholes.
Apa subterană nu a fost întâlnită în nici un foraj.
The dinamic parameters on the first meters are:
Măsurătorile parametrilor dinamici au scos în
- Poisson’s ratio 0.41...0.43; evidență pe primii metri următoarele valori:
- Transversal elasticity modulus - Coeficientul lui Poisson 0.41...0.43;
63000...74000kPa.
- Coeficientul de elasticitate transversal
For borehole F1, the characteristic values of the 63000...74000kPa.
parameters are:
Pentru forajul F1, valorile caracteristice ale
- Longitudinal elasticity modulus parametrilor sunt:
15400...20000kPa;
- Modulul de elasticitate longitudinal
- Friction angle 23°; 15400...20000kPa;
- Cohesion 23.4kPa. - Unghi de frecare internă 23°;
For borehole F2, the characteristic values of the - Coeziune drenată 23.4kPa.
parameters are:
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 14 of 39
no.

- Longitudinal elasticity modulus Pentru forajul F2, valorile caracteristice ale


7000...9000kPa; parametrilor sunt:

- Friction angle 33°; - Modulul de elasticitate longitudinal


7000...9000kPa;
- Cohesion 4.5kPa.
- Unghi de frecare internă 33°;
The reccomandentions are:
- Coeziune drenată 4.5kPa.
1) For borehole F1, direct founding at depth
larger than 0.8m, considering a conventional base Ca soluții de fundare se recomandă:
pressure of 275kPa;
1) Pentru forajul F1, fundare directă la o
2) For borehole F2 soil improvement with a adâncime mai mare de 0.8m, considerând o
layer of quarry stone. For 1m thickness, the presiune de bază de 275kPa;
reccomended conventional base pressure is
2) Pentru forajul F2 se recomandă
250kPa.
îmbunătățirea terenului de fundare cu o pernă
din piatră spartă. Pentru o grosime de 1m se
recomandă o presiune convențională de 250kPa.
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 15 of 39
no.

6 Materials Materiale

Exposure class of the foundation is XC2 and XF3. Clasele de expunere ale fundației sunt XC2, XF3.
The minimum concrete class associated with this Clasa de beton minimă asociată acestor clase de
exposure class is C35/45. expunere este C35/45.

In order to limit thermal shrinkage cracking, the Pentru a limita fisurarea din contracție termică,
cement used for the foundation concrete cimentul folosit pentru betonul din fundația
depends on the exterior pouring temperature, as compresorului depinde de temperatura de
it follows: punere în operă, după cum urmează:

• -5...5°C CEM II A-S 42.5 R; • -5...5°C CEM II A-S 42.5 R;

• 5...25°C CEM II A-S 32.5 R; • 5...25°C CEM II A-S 32.5 R;

• >25°C CEM III 42.5 LH/ CEM II B-M (S-V) • >25°C CEM III 42.5 LH/ CEM II B-M (S-V)
42.5 N-LH. 42.5 N-LH.

The exposure class of the leveling concrete is X0, Clasa de expunere a betonului de egalizare este
the minimum concrete class being C8/10. The X0, clasa minimă de beton fiind C8/10. Cimentul
cement may be a normal one: CEM II A-S 32.5R. poate fi unul normal: CEM II A-S 32.5R.

The steel used for mat reinforcement is BSt500. Oțelul folosit pentru armarea radierului este
BSt500.
The anchor bolts used to secure the skid are gr.
4.6. Buloanele de ancoraj utilizate pentru asigurarea
batiului sunt gr. 4.6.
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 16 of 39
no.

7 Foundation design Proiectarea fundațiilor

7.1 Compressor eccentricity Excentricitatea compresoarelor


According to STAS 7206-87, the eccentricity of Conform STAS 7206-87, excentricitatea forțelor
total vertical forces relative to the center of verticale față de centrul fundației trebuie să fie
gravity of foundation should be less than 3% from sub 3% din dimensiunea tălpii de fundare
the dimension of foundation along the paralele cu excentricitatea. Verificarea este
eccentricity. The check is presented in tab. 1-3. It prezentată în tab. 1-3. Se observă că
can be observed that the eccentricities on the excentricitățile pe cele două direcții sunt
two directions are not significant.. nesemnificative.

Tab. 1 Eccentricity of vertical loads check for CI163 natural gas compression unit/ Verificarea excentricității
forțelor verticale pentru compresorul CI163

Directie L M [tm] CM [m] CF [m] e [m] l [m] e/l [%]

X 553 4.94 5.00 0.06 10 0.56

Y 194 1.73 1.73 0.01 3.45 0.16

Tab. 2 Eccentricity of vertical loads check for CI164 natural gas compression unit/ Verificarea excentricității
forțelor verticale pentru compresorul CI164

Directie L M [tm] CM [m] CF [m] e [m] l [m] e/l [%]

X 1582 6.51 6.75 0.24 13.5 1.78

Y 632 2.60 2.60 0.00 5.2 0.04

Tab. 3 Eccentricity of vertical loads check for CI165 natural gas compression unit/ Verificarea excentricității
forțelor verticale pentru compresorul CI165

Directie L M [tm] CM [m] CF [m] e [m] l [m] e/l [%]

X 1209 5.80 6.00 0.20 12 1.63

Y 529 2.54 2.55 0.01 5.1 0.17

L M static moment in tones-meter/ moment static în tone-metru;


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 17 of 39
no.

CM the position of total vertical forces/ poziția rezultantei tuturor forțelor verticale;

CF center of gravity of the foundation/ centru de greutate al fundației;

e eccentricity in meters/ excentricitatea în metri;

l the length of foundation along eccentricity/ latura paralelă cu excentricitatea;

e/l relative eccentricity in percent/ excentricitatea relativă în procente.

7.2 Resonance limit state Starea limită de rezonanță


It is considered that the foundation and the Se consideră că fundația și compresorul
compressor are a single indeformable frame. The formează un corp comun indeformabil. Se
rotational moment of inertia of the compressor neglijează momentul de inerție rotațională
are neglected. propriu al compresorului.

The equations are written relative to the center Ecuațiile de echilibru sunt scrise față de centrul
of gravity of the foundation. It is considered that de greutate al fundației. Se consideră că
the actions are applied in the center of gravity of acțiunile sunt aplicate în centrul de greutate al
the compressor. compresorului.

There are six degrees of freedom: three Există șase grade de libertate: trei translații și
translations and three rotations. trei rotații.

Soil stiffness depends on working frequency. Rigiditatea terenului depinde de frecvența de


However, because the working period is low, lucru a mașinii. Totuși, pentru că perioada de
static stiffness is used for the soil-foundation lucru este foarte rigidă, se acceptă folosirea
system. rigidităților statice ale ansamblului teren-
fundație.
For stiffness, Gazetas equations are used,
whereas for damping are used Richart equations. Pentru calculul rigidității se utilizează relațiile lui
Gazetas, iar pentru calculul amortizării se
Modal analysis is done according to STAS 7206- folosesc relațiile Richart.
87. Modal analysis is performed for two sets of
values for stiffness and mass: Analiza modală se face conform STAS 7206-87.
Determinarea modurilor proprii de vibrații se
1) The values that produces minimum face pentru două seturi de valori ale
values for frequencies, using the following parametrilor de rigiditate și masă, după cum
parameters: urmează:
• Minimum modulus of elasticity for 1) Setul de valori ce dă frcvențe proprii
concrete: Ec=0.67Ec,din; minime, considerându-se următorii parametri:
• Minimum stiffness of the soil: k=0.5ks; • Modulul de elasticitate minim pentru
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 18 of 39
no.

• Maximum value of masses: m=1.1M. beton: Ec=0.67Ec,din;

2) The values that produces maximum • Rigidități minime ale terenului: k=0.5ks;
values for frequencies, using the following
• Mase maxime: m=1.1M.
parameters:

• Maximum modulul of elasticity for 2) Setul de valori ce dă frcvențe proprii


maxime, considerându-se următorii parametri:
concrete: Ec=1.33Ec,din;

• Maximum stiffness for soil: k=1.5ks; • Modulul de elasticitate maxim pentru


beton: Ec=1.33Ec,din;
• Minimum value of masses: m=0.9M.
• Rigidități maxime ale terenului: k=1.5ks;
Dynamic value of modulus of elasticity of
• Mase minime: m=0.9M.
concrete is considered Ec,din=1.1Ecm, where Ecm
is the mean value for modulus of elasticity of Modulul de elasticitate dinamic al betonului se
concrete. consideră Ec,din=1.1Ecm, unde Ecm este modul
Modal analysis results for median and limit values de elasticitate mediu al betonului.
are presented in tab. 4-11. It can be observed Rezultatele analizei modale pentru valorile
that resonance vibration modes da not involve mediane și limită sunt prezentate în tab. 4-11. Se
significant mass, therefore it can be considered observă că perioadele de vibrație din zona de
that resonance is avoided. rezonanță (0.51...0.76s) au participare masică
nesemnificativă, motiv pentru care se poate
spune că rezonanța este evitată.
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 19 of 39
no.

Tab. 4 Periods and modal participating mass ratios for median model CI163/ Perioade proprii și
coeficienți de echivalență pentru modelul median CI163

Mod T [s] εx εy εz εθx εθy εθz

1 0.044 0.15 0.00 0.00 0.00 0.01 0.00

2 0.042 0.00 0.00 0.52 0.00 0.00 0.00

3 0.042 0.00 0.40 0.00 0.04 0.00 0.00

4 0.024 0.85 0.00 0.48 0.00 0.99 0.00

5 0.022 0.00 0.29 0.00 0.00 0.00 1.00

6 0.018 0.00 0.32 0.00 0.96 0.00 0.00

Tab. 5 Periods and modal participating mass ratios for flexible model CI163/ Perioade proprii și
coeficienți de echivalență pentru modelul flexibil CI163

Mod T [s] εx εy εz εθx εθy εθz

1 0.066 0.15 0.00 0.00 0.00 0.01 0.00

2 0.062 0.00 0.00 0.52 0.00 0.00 0.00

3 0.063 0.00 0.40 0.00 0.04 0.00 0.00

4 0.036 0.85 0.00 0.48 0.00 0.99 0.00

5 0.033 0.00 0.29 0.00 0.00 0.00 1.00

6 0.026 0.00 0.32 0.00 0.96 0.00 0.00

Tab. 6 Periods and modal participating mass ratios for stiff model CI163/ Perioade proprii și
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 20 of 39
no.

coeficienți de echivalență pentru modelul rigid CI163

Mod T [s] εx εy εz εθx εθy εθz

1 0.034 0.15 0.00 0.00 0.00 0.01 0.00

2 0.032 0.00 0.00 0.52 0.00 0.00 0.00

3 0.033 0.00 0.40 0.00 0.04 0.00 0.00

4 0.019 0.85 0.00 0.48 0.00 0.99 0.00

5 0.017 0.00 0.29 0.00 0.00 0.00 1.00

6 0.014 0.00 0.32 0.00 0.96 0.00 0.00

Tab. 7 Periods and modal participating mass ratios for median model CI164/ Perioade proprii și
coeficienți de echivalență pentru modelul median CI164

Mod T [s] εx εy εz εθx εθy εθz

1 0.057 0.09 0.00 0.01 0.00 0.01 0.00

2 0.053 0.01 0.00 0.10 0.00 0.01 0.00

3 0.055 0.00 0.14 0.00 0.06 0.00 0.01

4 0.030 0.90 0.00 0.88 0.00 0.98 0.00

5 0.029 0.00 0.75 0.00 0.02 0.00 0.98

6 0.024 0.00 0.11 0.00 0.92 0.00 0.01

Tab. 8 Periods and modal participating mass ratios for flexible model CI164/ Perioade proprii și
coeficienți de echivalență pentru modelul flexibil CI164
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 21 of 39
no.

Mod T [s] εx εy εz εθx εθy εθz

1 0.084 0.09 0.00 0.01 0.00 0.01 0.00

2 0.078 0.01 0.00 0.10 0.00 0.01 0.00

3 0.081 0.00 0.14 0.00 0.06 0.00 0.01

4 0.044 0.90 0.00 0.88 0.00 0.98 0.00

5 0.043 0.00 0.75 0.00 0.02 0.00 0.98

6 0.035 0.00 0.11 0.00 0.92 0.00 0.01

Tab. 9 Periods and modal participating mass ratios for stiff model CI164/ Perioade proprii și
coeficienți de echivalență pentru modelul rigid CI164

Mod T [s] εx εy εz εθx εθy εθz

1 0.044 0.09 0.00 0.01 0.00 0.01 0.00

2 0.041 0.01 0.00 0.10 0.00 0.01 0.00

3 0.042 0.00 0.14 0.00 0.06 0.00 0.01

4 0.023 0.90 0.00 0.88 0.00 0.98 0.00

5 0.023 0.00 0.75 0.00 0.02 0.00 0.98

6 0.018 0.00 0.11 0.00 0.92 0.00 0.01

Tab. 10 Periods and modal participating mass ratios for median model CI165/ Perioade proprii și
coeficienți de echivalență pentru modelul median CI165

Mod T [s] εx εy εz εθx εθy εθz


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 22 of 39
no.

1 0.054 0.11 0.00 0.01 0.00 0.01 0.00

2 0.051 0.01 0.00 0.14 0.00 0.01 0.00

3 0.052 0.00 0.15 0.00 0.04 0.00 0.01

4 0.023 0.00 0.13 0.00 0.94 0.00 0.01

5 0.028 0.88 0.00 0.85 0.00 0.98 0.00

6 0.028 0.00 0.72 0.00 0.01 0.00 0.99

Tab. 11 Periods and modal participating mass ratios for flexible model CI165/ Perioade proprii și
coeficienți de echivalență pentru modelul flexibil CI165

Mod T [s] εx εy εz εθx εθy εθz

1 0.080 0.11 0.00 0.01 0.00 0.01 0.00

2 0.075 0.01 0.00 0.14 0.00 0.01 0.00

3 0.078 0.00 0.15 0.00 0.04 0.00 0.01

4 0.034 0.00 0.13 0.00 0.94 0.00 0.01

5 0.042 0.88 0.00 0.85 0.00 0.98 0.00

6 0.041 0.00 0.72 0.00 0.01 0.00 0.99

Tab. 12 Periods and modal participating mass ratios for stiff model CI165/ Perioade proprii și
coeficienți de echivalență pentru modelul rigid CI165

Mod T [s] εx εy εz εθx εθy εθz


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 23 of 39
no.

1 0.042 0.11 0.00 0.01 0.00 0.01 0.00

2 0.039 0.01 0.00 0.14 0.00 0.01 0.00

3 0.041 0.00 0.15 0.00 0.04 0.00 0.01

4 0.018 0.00 0.13 0.00 0.94 0.00 0.01

5 0.022 0.88 0.00 0.85 0.00 0.98 0.00

6 0.022 0.00 0.72 0.00 0.01 0.00 0.99

T period in seconds/ perioada în secunde;

εx,y,z modal participating mass ratios for translations/ coeficienți de echivalență la translație;

εθx,y,z modal participating mass ratios for translations/ coeficienți de echivalență la rotație.

7.3 Dynamic analysis Analiza dinamică


Dynamic analysis is performed with modal Analiza dinamică se efectuează cu metoda
decomposition method, using dynamic response descompunerii modale, folosind spectrul de
spectra for a single degree of freedom excited by răspuns dinamic al sistemului cu un singur grad
a sinusoidal excitation. de libertate excitat de o forță sinusoidă.

The three actions are considered simultanously. Cele trei excitații se consideră simultane.
Maximum modal results are combined using CQC Rezultatele modale maxime se combină cu
method. metoda CQC.

Maximum results expressed in relative Rezultatele maxime exprimate în deplasări,


displacements, relative velocities and relative viteze și accelerații relative ale fundației sunt
accelerations of the foundation are presented in prezentate în tab. 13-15.
tab. 13-15.
Deplasările maxime între două vârfuri pe orice
Maximum displacements between two peaks on direcție rezultă:
each direction result:
d pk  pk  2  d  2  0.449  0.9 m
d pk  pk  2  d  2  0.449  0.9 m d pk  pk  0.0009mm  d lim  0.06mm
d pk  pk  0.0009mm  dlim  0.06mm
Valoarea maximă a vitezei rezultă:
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 24 of 39
no.

Maximum speed is: v  0.086mm / s  vlim  2.5mm / s

v  0.086mm / s  vlim  2.5mm / s  Verificările sunt îndeplinite cu coeficient


mare de siguranță.
The check is achieved with large safety
coefficients.

Tab. 13 Maximum displacements at the center of gravity of the foundation/ Deplasările maxime în
centrul de greutate al fundației

Compresor Dx [μm] Dy [μm] Dz [μm] θx [μrad] θy [μrad] θz [μrad]

CI163 0.109 0.010 0.000 0.037 0.005 0.017

CI164 0.252 0.449 0.003 0.548 0.008 0.194

CI165 0.268 0.331 0.007 0.654 0.003 0.187

Tab. 14 Maximum velocities at the center of gravity of the foundation/ Vitezele maxime în centrul de
greutate al fundației

Compres Vx Vy Vz Vxx Vyy Vzz


or [mm/s] [mm/s] [mm/s] [mrad/s] [mrad/s] [mrad/s]

CI163 0.015 0.002 0.000 0.013 0.001 0.005

CI164 0.028 0.086 0.001 0.144 0.002 0.041

CI165 0.031 0.064 0.002 0.183 0.001 0.044

Tab. 15 Maximum accelerations at the center of gravity of the foundation/ Accelerațiile maxime în
centrul de greutate al fundației

Compresor Ax [mm/s2] Ay [mm/s2] Az [mm/s2] Axx [mrad/s2] Ayy [mrad/s2] Azz [mrad/s2]

CI163 2.155 0.836 0.017 4.624 0.273 1.399

CI164 3.028 19.141 0.178 37.860 0.314 8.438

CI165 3.705 15.048 0.569 51.134 0.194 10.340

7.4 Soil check Verificarea terenului


Tab. 16 present effort evaluation at the base of Tab. 16 prezintă evaluarea eforturilor la baza
foundation in GFV combination (fundamental fundației din combinația GFV (combinația
combination with wind principal action). fundamentală cu vântul acțiunea principal).
Pressure check for each combination is Verificarea presiunilor pe teren pentru fiecare
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 25 of 39
no.

presented in tab. 17-20. The design is done only combinație este prezentată în tab. 17-20.
in transversal direction, which is the weak Calculul se face numai pe direcția transversală,
direction. It can be observed that maximum care este dimensionantă. Se observă că
pressure is less than limit one. presiunile maxime sunt mult sub cele limită.

Furthermore, tab. 21-24 present settlement De asemenea, tab. 21-24 prezintă evaluarea
evaluation with elementar layers method. The tasărilor sub fundație cu metota însumării pe
pressure on the foundation is 35kPa, resulting straturi elementare. Presiunea pe fundație este
settlements less than 5mm. It can be observed în jur de 35kPa, rezultând tasări de maxim 5mm.
that the settlements are small, a big part of Se observă că tasările sunt relativ mici, mare
settlements being consumed after execution. parte consumându-se după execuția fundației.

Tab. 16 Pressure check at the base of the foundation in fundamental combination GFV/ Verificarea
de presiune din combinația fundamentală GFV

Funda B H NEd,f MEd,f e esc esc/ A W pmax plim plim/p


tie [m] [m] [kN] [kNm] [m] [m] e [m2] [m3] [kPa] [kPa] max

3.4 0.0 10.


CI163 10 1603 84 0.58 34.5 19.8 51 300 5.92
5 5 95

13. 0.0 11.


CI164 5.2 3465 268 0.87 70.2 60.8 54 300 5.58
5 8 22

0.0 10.
CI165 12 5.1 2969 252 0.85 61.2 52.0 53 300 5.62
8 02

Tab. 17 Pressure check at the base of the foundation in fundamental combination GFU/ Verificarea
de presiune din combinația fundamentală GFU

e
B H NEd,f MEd,f esc esc/ A W pmax plim plim/pm
Funda [m
[m] [m] [kN] [kNm] [m] e [m2] [m3] [kPa] [kPa] ax
tie ]

3.4 0.0 15.


CI163 10 1610 60 0.58 34.5 19.8 50 300 6.04
5 4 42
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 26 of 39
no.

13. 0.0 13.


CI164 5.2 3481 227 0.87 70.2 60.8 53 300 5.63
5 7 29

0.0 11.
CI165 12 5.1 2982 221 0.85 61.2 52.0 53 300 5.66
7 49

Tab. 18 Pressure check at the base of the foundation in fundamental combination GFZ/ Verificarea
de presiune din combinația fundamentală GFZ

e
B H NEd,f MEd,f esc esc/ A W pmax plim plim/pm
Funda [m
[m] [m] [kN] [kNm] [m] e [m2] [m3] [kPa] [kPa] ax
tie ]

3.4 0.0 15. 34.


CI163 10 1634 60 0.58 19.8 50 300 5.96
5 4 65 5

13. 0.0 13. 70.


CI164 5.2 3528 227 0.87 60.8 54 300 5.56
5 6 47 2

0.0 11. 61.


CI165 12 5.1 3024 221 0.85 52.0 54 300 5.59
7 65 2

Tab. 19 Pressure check at the base of the foundation in seismic combination GS/ Verificarea de
presiune din combinația seismică GS

Fun MEd,f pmax


B H NEd,f e esc A W plim plim/p
dati [kN esc/e [kPa
[m] [m] [kN] [m] [m] [m2] [m3] [kPa] max
e m] ]

CI16
10 3.45 1153 428 0.37 0.58 1.55 34.5 19.8 55 350 6.36
3

CI16 118
13.5 5.2 2497 0.47 0.87 1.83 70.2 60.8 55 350 6.37
4 2
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 27 of 39
no.

CI16
12 5.1 2138 974 0.46 0.85 1.87 61.2 52.0 54 350 6.52
5

B foundation width/ lățimea fundației;

H foundation length/ lungimea fundației;

e eccentricity of the applied axial force/ excentricitatea forței axiale aplicate;

esc eccentricity of the core/ excentricitatea sîmburelui central;

A foundation area/ aria fundației;

W foundation section modulus/ modulul de rezistență al fundației;

pmax maximum pressure on foundation/ presiunea maximă pe fundație;

plim limit pressure on foundation/ presiunea limită pe fundație.

B foundation width/ lățimea fundației;

H foundation length/ lungimea fundației;

e eccentricity of the applied axial force/ excentricitatea forței axiale aplicate;

esc eccentricity of the core/ excentricitatea sîmburelui central;

A foundation area/ aria fundației;

W foundation section modulus/ modulul de rezistență al fundației;

pmax maximum pressure on foundation/ presiunea maximă pe fundație;

plim limit pressure on foundation/ presiunea limită pe fundație.

Tab. 20 Settlement calculation for CI163/ Evaluarea tasării pentru CI163

σz
Strat z [m] z/B α0 [kPa 0.2 σg [kPa] σzi [kPa] Hi [kPa] Ei [kPa] si [m]
]

1 0 0 1 17 3 17 0.345 40000 0.0001

2 0.345 0.1 0.99 17 5 17 0.345 40000 0.0001

3 0.69 0.2 0.98 17 6 17 0.345 40000 0.0001

4 1.035 0.3 0.93 16 7 16 0.345 7000 0.0008


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 28 of 39
no.

5 1.38 0.4 0.88 15 9 15 0.345 7000 0.0007

6 1.725 0.5 0.82 14 10 14 0.345 7000 0.0007

7 2.07 0.6 0.75 13 11 12 0.345 7000 0.0006

Tab. 21 Settlement calculation for CI164/ Evaluarea tasării pentru CI164

Str σz
z [m] z/B α0 0.2 σg [kPa] σzi [kPa] Hi [kPa] Ei [kPa] si [m]
at [kPa]

1 0 0 1 17 3 17 0.52 40000 0.0002

2 0.52 0.1 0.99 17 5 17 0.52 40000 0.0002

3 1.04 0.2 0.97 17 7 16 0.52 7000 0.0012

4 1.56 0.3 0.92 16 9 16 0.52 7000 0.0012

5 2.08 0.4 0.88 15 12 15 0.52 7000 0.0011

6 2.6 0.5 0.81 14 14 13 0.52 7000 0.0010

7 3.12 0.6 0.74 13 16 12 0.52 7000 0.0009


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 29 of 39
no.

Tab. 22 Settlement calculation for CI165/ Evaluarea tasării pentru CI165

σz
Stra z
z/B α0 [kPa 0.2 σg [kPa] σzi [kPa] Hi [kPa] Ei [kPa] si [m]
t [m]
]

1 0 0 1 17 3 17 0.52 40000 0.0002

2 0.52 0.1 0.99 17 5 17 0.52 40000 0.0002

3 1.04 0.2 0.97 17 7 16 0.52 7000 0.0012

4 1.56 0.3 0.92 16 9 16 0.52 7000 0.0012

5 2.08 0.4 0.88 15 12 15 0.52 7000 0.0011

6 2.6 0.5 0.81 14 14 13 0.52 7000 0.0010

7 3.12 0.6 0.74 13 16 12 0.52 7000 0.0009

z depth under the foundation level/ adâncimea sub cota de fundare;

α0 pressure reduction coefficient/ coeficient de reducere a presiunii;

σz vertical pressure/ presiunea verticală;

σzi mean vertical pressure on a layer/ presiunea verticală medie pe un strat;

σg geologic pressure/ presiunea geologică;


EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 30 of 39
no.

Hi thickness of the layer/ grosimea stratului;

Ei elasticity modulus of the layer/ modul de elasticitate al stratului.

7.5 Design of the equipment connection Verificarea prinderii echipamentului


Traction efforts in anchor bolts is necessary Verificarea efortului de întindere în buloanele de
especially for seismic action. Transversal ancoraj este necesară în special pentru acțiunea
direction is determinant. seismică. Direcția transversală este
determinantă.
Maximum traction force in a bolt results:
Forța maximă de întindere într-un bulon rezultă:
2  M Ed N Ed
TEd  
zn n 2  M Ed N Ed
TEd  
zn n
z lever arm;
z brațul de pârghie;
n total number of bolts;
n numărul total de buloane;
Tab. 23 presents traction efforts in anchor bolts.
It can be observed that the bolts rest all the time Tab. 23 prezintă eforturile de întindere în
in compression. The design is suitable. buloane. Se observă că buloanele rămân tot
timpul comprimate. Verificarea este îndeplinită.

Tab. 23 Evaluation of traction efforts in a bolt/ Evaluarea eforturilor de întindere într-un bulon

Fundatie NEd [kN] MEd,s [kNm] MEd,c [kNm] MEd [kNm] z [m] n T [kN]

CI163 170 105 2.8 108 2.45 14 -6

CI164 500 483 98 581 4.2 18 -12

CI165 400 300 109.6 410 4.1 14 -14

8 Solil tests Teste pe teren


In order to confirm the stiffness of the filling Pentru confirmarea rigidității umpluturii sub
material under the foundations, several tests are fundații se execută mai multe teste.
carried out:
1) Se execută teste cu placa Lucas de 60cm, câte
1) Tests with Lucas plate having 60cm edge, two două la câte 50cm de umplutură realizată.
tests for 50cm thickness of filling material. Modulul de elasticitate trebuie să rezulte cel
Elasticity modulus should be at least
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 31 of 39
no.

Ev1=40000kPa, and the ratio Ev2/Ev1<2.3. puțin Ev1=40000kPa, iar raportul Ev2/Ev1<2.3.

2) Dynamic shear modulus should be 2) Se execută teste pentru determinarea


determined, one for each foundation. The modulului de elasticitate transversal dinamic,
important results are soil parameters for the câte unul pe fiecare fundație. Interesează în
filling (Gdin, νdin). Dynamic shear modulus principal caractersiticile terenului (Gdin, νdin) pe
should be at least Gdin=100000kPa. grosimea umpluturii. Modulul de elasticitate
transversal în condiții dinamice trebuie să rezulte
minim Gdin=100000kPa.

9 Execution technology Tehnologia de execuție


The execution of working is done only by a Executarea lucrărilor se va face numai de către
specialized and certified contractor. un antreprenor specializat şi atestat tehnic.

While executing foundations (digging, Pe timpul executării fundaţiilor (săpături,


reinforcing, etc.) specific measures should be armături, etc.) se vor lua măsurile specifice
adopted, in order to insure the stability of soil pentru asigurarea stabilităţii terenului şi a
and neighbour buildings (roads, network, construcţiilor învecinate (drumuri, reţele, clădiri,
buildings, etc.). etc.)

For all construction works executed on property Pentru toate lucrările executate pe limita de
limi that can affect neighbour properties (terrain, proprietate şi care pot afecta proprietăţile
fence, pipes, structures, etc.) notarial agreement învecinate (teren, garduri, conducte, clădiri, etc.),
of owner should be obtained. se va obţine acordul notarial al proprietarilor.

Before concreting, pieces required for facilities, Înainte de turnarea betonului se vor monta şi
earthing, parapets, etc. according to facilities, piesele necesare pentru instalaţii, pământare,
architectural and exterior socket plans should be parapeţi, etc., în conformitate cu planşele de
installed. instalaţii, arhitectură şi racorduri exterioare.

In the technological project and project of site În proiectul tehnologic şi de organizare de


organization and in technological documentation şantier, precum şi în fişele tehnologice întocmite
made by the contractor, all phases of working de unitatea executantă de construcţii-montaj, se
operations and working phases should be vor explica detaliat toate fazele şi operaţiunile de
detailed, including their sequence and safety and lucru, succesiunea lor, precum şi măsurile de
safecare measures required for each type of protecţia muncii specifice fiecărui gen de lucrări.
work.
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 32 of 39
no.

10 Execution set-up Organizarea execuției


lucrărilor
Site organization (cabins for tools, small storage Organizarea de şantier (amplasarea de barăci
areas for materials) will be done in places settled pentru scule, depozite mici de materiale) se va
by mutual agreement between contractor and face în locuri stabilite de comun acord executant
beneficiary. It is reccomended that the – beneficiar. Se recomandă ca organizarea
organization of working execution to be realized execuţiei lucrărilor să se facă numai în incinta
only in site area, without affecting public spaces şantierului, fără a fi afectate spaţii publice
(sidewalk, roadway, etc.). (trotuare, carosabil, etc.).

Semifabricated preparing will be done in Prepararea semifabricatelor se va face în


centralized instalations, certified for this instalaţii centralizate, autorizate în acest scop,
operation and the transfer to the site should be transportul lor pe şantier făcându-se numai pe
done in agreement to their placing. măsura punerii lor în operă.

Heavy materials will be supplied at the Materialele de masă se vor aproviziona la baza
production base of the contractor and will be de producţie a executantului şi se vor aduce la
supplied to the site only in agreement to their lucrare numai pe măsura punerii lor în operă.
placing.
Se interzice deversarea apelor uzate în spaţiile
It is prohibited the overflow of tail water in naturale existente în zonă.
natural spaces existing in the area.
Întocmirea proiectului de execuţie pentru
Realising execution project for site organization organizarea de şantier cade în sarcina
is contractor obligation. This documentation will executantului. În cadrul acestei documentaţii se
provide measures for labour protection, vor prevedea şi măsurile pentru protecţia muncii,
circulation safety and PSI for execution period of siguranţa circulaţiei şi de PSI pentru perioada
the works. In site organization works, all execuţiei lucrărilor. În cadrul lucrărilor de
measures of signalization and control of walker organizare de şantier se vor lua toate măsurile de
and auto circulation should be secured, while semnalizare şi dirijare a circulaţiei pietonale şi
execution (from the site and adjacent public auto, pe timpul execuţiei (din şantier şi din
areas). zonele publice adiacente).

11 Environmental protection Protecția mediului


înconjurător
Site organization works will mandatorily install a În cadrul lucrărilor de organizare de şantier se va
bathroom for the staff. amenaja obligatoriu un grup sanitar pentru
personal.
It is prohibited to deposit materials on existing
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 33 of 39
no.

green areas, adjacent to the site. Furthermore, it Se interzice depozitarea materialelor pe spaţiile
is forbidden to drive along the site vihicles on the verzi existente, adiacente şantierului. De
green areas and other lands, except the ones asemenea, se interzice circulaţia autovehiculelor
allocated for site organization. de şantier peste spaţiile verzi şi alte terenuri, cu
excepţia celor destinate pentru organizarea de
Materials resulted from demolition, digging, etc., şantier.
will be transported and deposit in special places
for which all notices and approval have been Materialele rezultate din demolări, săpături, etc.
obtained from local enpower agencies. se vor transporta şi depozita în locuri special
amenajate şi pentru care s-au obţinut toate
Site cleaning will be insure by the contractor and avizele şi acordurile organelor locale abilitate.
will be controlled by the benificiary’s site
supervisor. Curăţenia pe şantier se va asigura prin grija
executantului şi va fi controlată de beneficiar
While executing it is prohibited the overflowing prin intermediul dirigintelui de şantier.
of residual water in natural areas near the site
and measures will be taken to avoid soil Pe perioada execuţiei se interzice deversarea
contamination by gas and eventual residual apelor uzate în spaţiile naturale din zonă şi se vor
bituminous materials. lua măsuri ca benzina şi eventualele materiale
bituminoase utilizate să nu contamineze solul.
After finishing working, the soil will be free of all
material remaining. The tarrain area affected by După terminarea lucrărilor terenul se va elibera
the site organisation will be rearanged de toate resturile de materiale neutilizate.
(becoming overgrown with glass, etc.), in order Suprafaţa de teren afectată organizării de şantier
to reach the initial parameters. va fi reamenajată (înierbări, etc.), aducându-se la
parametrii iniţiali.
Work accomplishment and building exploitation
in normal conditions should not create Realizarea lucrărilor şi exploatarea clădirii în
conditions for insult that can affect environment. condiţii normale nu creează condiţii pentru
producerea de noxe care să afecteze mediul
înconjurător.

12 The control of execution Controlul calității lucrărilor


quality
Quality control of working will be done by Controlul calităţii lucrărilor se va face prin grija
beneficiary, respecting the legal foresight in beneficiarului, cu respectarea prevederilor legale
standards, standards and technical directive. cuprinse în standarde, norme, instrucţiuni
tehnice, etc.
The quality of the used materials will be certified
by quality documents that join the materials Calitatea materialelor puse în operă va fi atestată
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 34 of 39
no.

provided by suppliers. In the case of using prin buletine de calitate care însoţesc materialele
materials from local sources, laboratory tests will livrate de furnizori. În cazul utilizării unor
be obligatory performed in order to establish the materiale din surse locale, se vor face în mod
quality of this materials. Tests will be performed obligatoriu analize de laborator pentru stabilirea
obligatory by an authorized specialized calităţii acestor materiale. Analizele se vor face
laboratory. obligatoriu într-un laborator de specialitate
autorizat.
Semifabricats that are realized in production
bases of the contractor or of other specialty Semifabricatele preparate în bazele de producţie
suppliers will be verified for quality in site ale executantului sau ale altor furnizori de
laboratory or in supplier’s laboratory. specialitate vor fi verificate din punct de vedere
al calităţii în laboratorul de şantier sau în
It is prohibited to use materials or semifabricated
laboratorul furnizorului respectiv.
that do not correspond qualitative.
Se interzice punerea în operă a materialelor sau
Quality control of working will be done by a semifabricatelor care nu corespund din punct
beneficiary by a specialty site supervisor. de vedere calitativ.
Execution phases that are obligatory controlled
and documents that are done for attesting Controlul calităţii execuţiei lucrărilor se va face
working quality are presented in the „Control de către beneficiar prin intermediul unui diriginte
program” of the documentation. de şantier de specialitate. Fazele de execuţie
supuse în mod obligatoriu controlului, precum şi
Quality control of working will be done actele ce se vor întocmi în vederea atestării
permanent, based on execution phases and calităţii lucrărilor executate, sunt prezentate în
working category according to C56-96 code. The “Programul de control” anexat prezentei
requirements of I.C. will be respected regarding documentaţii.
qualitative reception of work, regarding the
settle of determinant phases in order to insure Controlul calităţii lucrărilor se va face
strength, durability and exploitation safety of permanent, pe faze de execuţie şi categorii de
designed working. lucrări conform Normativului C56-96. Se vor
respecta prevederile I.C., privind recepţia
At working reception, the reception committee calitativă a lucrărilor, cu privire la stabilirea
will examine workings relative to project fazelor determinante pentru asigurarea
requirements regarding technical conditions and rezistenţei, durabilităţii şi siguranţei în
quality of execution and the observations exploatare a lucrărilor proiectate.
registered while execution process by the site
inspector, beneficiary, designer and site La recepţia lucrărilor, comisia de recepţie va
supervisor, etc. examina lucrările faţă de prevederile proiectului
privind condiţiile tehnice şi de calitate ale
Final reception will take place at the end of execuţiei, precum şi constatările consemnate în
assurance period and will be done while cursul execuţiei de către organele de control,
respecting legal active requirements. beneficiar, proiectant, diriginte, etc.
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 35 of 39
no.

Recepţia finală va avea loc după expirarea


perioadei de garanţie şi se va face în condiţiile
respectării prevederilor legale în vigoare.

13 Legislation and measures Acte normative și măsuri de


regarding work safety and securitate și sănătate în
healthcare muncă aplicabile
Documentation was prepared based on Documentaţia s-a întocmit pe baza precizărilor
stipulations of Law 319/2006 – Law of work din Legea 319/2006-Legea securităţii şi sănătăţii
safety and healthcare, with the purpose of în muncă, având ca scop asigurarea celor mai
ensuring the best conditions for work safety, bune condiţii în desfăşurarea procesului de
lifeguard, and healthcare of employees and muncă, apărarea vieţii, integrităţii corporale şi
other people involved with the work processes sănătăţii angajaţilor şi a altor persoane
on site. participante în procesul de muncă.

The documents, which must be respected by all Documentele care vor fi respectate in mod
involved with the construction work are: obligatoriu de catre toti factorii participanţi la
realizarea lucrărilor constructor - proiectant -
• Law 319/2006 - Law of work safety and beneficiar sunt:
healthcare
• Legea 319/2006 –Legea securităţii şi
• HG 1.425/30.10.2006 – Methodology for sănătăţii în muncă
Law 319/2006
• H.G. 1.425/30.10.2006-Norme
• HG 1.146/30.10.2006 – Minimum work metodologice de aplicare a Legii 319/2006
safety and healthcare requirements – the use of
work equipment • H.G. 1.146/30.10.2006 –Cerinţe minime
de securitate şi sănătate în muncă-utilizarea în
• HG 1.048/09.08.2006 - Minimum work muncă de către lucrători a echipamentului de
safety and healthcare requirements – the use of muncă
individual protective equipment
• H.G. 1.048/09.08.2006 – Cerinţe minime
• HG 1.091/16.09.2006 - Minimum work de securitate şi sănătate în muncă –utilizarea de
safety and healthcare requirements către lucrători a echipamentelor individuale de
• HG 971/09.08.2006 – Minimum protecţie la locul de muncă
requirements for work safety and healthcare • H.G. 1.091/16.09.02006 – Cerinţe
signaling in the workplace minime de securitate şi sănătate pentru locul de
• HG 1.058/09.08.2006 - Minimum muncă
requirements for work safety and healthcare • H.G. 971/09.08.2006 – Cerinţe minime
improvement for workers that may be exposed
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 36 of 39
no.

to a potential risk due to explosives. pentru semnalizarea de securitate şi/sau


sanatate la locul de munca

• H.G. 1.058/09.08.2006 – Cerinţe minime


The following provisions were taken into account
pentru imbunătaţirea securităţii şi protecţia
while preparing the technical documentation:
sanatăţii lucratorilor care pot fi expusi unui
• Law 307/12.06.2006 – Law regarding fire potenţial risc datorat atmosferelor explozive.
safety

• General fire safety norms – MAI Order La întocmirea documentaţiei tehnice de


163/28.03.2007 proiectare, s-au respectat prevederile din
• Departmental PSI norms – Order 138 – următoarele acte normative:
ed. 1988 • Legea 307/12.06.2006 –Legea privind
• DG PSI-004 – MI Order 108/2001 apărarea împotriva incendiilor

• MI Order 712/2005 – regarding training • Norme Generale de aparare impotriva


employees for safety in case of emergencies incendiilor – Ordin MAI 163/28.03.2007

• Departmental norm for planning and • Norme Departamentale de PSI – Ordin


development of buildings and installations in the 138 – ed.1988
chemical industry, from a fire safety point of • DG PSI-004 – Ordin MI 108/2001
view 1977 ed. 1979
• Ordin M.I .712/2005 – privind instruirea
• P 118/2-2013 – Norm for building fire salariatilor in domeniu situatiilor de urgenta
safety
• Normativ Departamental pentru
• Law 481/2004 – regarding civil protectio proiectarea si executarea constructiilor si
• Law 440/2002 – regarding the quality of instalatiilor din punct de vedere al prevenirii
installation for technological facilities incendiilor in industria chimica 1977 ed. 1979

• MAI Order no. 1435/2006 – • P 118/2-2013 – Normativ de siguranta la


Methodology for approval and authorization foc a constructiilor
regarding fire safety and civil protection. • Legea 481/2004 –privind protectia civila

• Legea 440/2002-privind calitatea


During investigation, construction, installation lucrărilor de montaj instalaţii tehnologice
and commissioning, the beneficiary will take the
• Ordin MAI nr 1435/2006 – Norme
following measures:
metodologice de avizare si autorizare privind
• instructing all the personnel working for securitatea la incendiu si protectia civila.
the constructor regarding the general and
specific measures of society (in accordance with
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 37 of 39
no.

OMI 712/2005) Pe timpul executării lucrărilor de investiţii,


construcţii montaj şi puneri in funcţiune
• preparing the necessary permits for all beneficiarul va lua următoarele măsuri:
investigation work, work permits, hot work
permit, digging permit, etc. • instruirea întregului personal al
constructorului cu măsurile generale si specifice
• the permit will become invalid after societăţii (conf. OMI 712/2005)
signing for reception, which certifies the work is
complete. Any following modification will be • întocmirea permiselor necesare în bune
made only after the issue of a new work permit. condiţiuni pentru toate lucrările de investiţii,
permis de lucru, permis de lucru cu foc, permis
• operations to prepare the ground for hot de săpături etc.
work shall be performed in accordance with
procedures OMV Petrom. Before beginning any • Permisul îşi pierde valabilitatea după
hot work, the authorized signatory of the hot semnarea pentru recepţia lucrării prin care se
work permit must inspect the enforcement of certifică faptul că lucrarea a fost terminată. Orice
the measures provided in the permit. remediere ulterioară se va efectua numai pe
baza unui nou permis de lucru.
• if it becomes necessary to execute any
construction or installation work near working • Operaţiile de pregătire a terenului pentru
installations, areas considered dangerous in lucru cu foc se vor executa conform procedurilor
regards to fire safety, aside from the proper OMV Petrom. Înainte de începerea lucrului cu
permit, a “Plan of action” must also be prepared, foc, semnatarul autorizat al permisului de lucru
that should include special measures for work cu foc va controla obligatoriu realizarea
safety. This plan must also include precise tasks masurilor prevăzute în permis.
broken into people responsible, deadlines and
responsibilities, and must be approved by the • Dacă apare necesitatea executării unor
lucrări de investiţii construcţii montaj în
unit management.
apropierea unor instalaţii în funcţiune, în locuri
• depending on the level of danger for the potenţial periculoase din punct de vedere
areas where work is executed, other special Aparare Impotiva Incendiilor, în afara permiselor
measures of fire safety will be taken (supplying necesare se va întocmi şi un „Plan de acţiuni”
additional means of intervention, using steam care să cuprindă măsuri speciale pentru
curtains or placing mobile devices with personnel desfăşurarea în deplină siguranţă a lucrărilor.
from the Fire Safety Unit. Acest plan va cuprinde sarcini precise defalcate
pe persoane, termene de execuţie şi
• in case of a gas or leak, all work will stop responsabilităţi, şi va fi aprobat de conducerea
and measures will be taken to remove the cause; unităţii.
if the leaks are a results of digging, measures will
be taken to determine the gas concentration • in funcţie de periculozitatea zonelor
after the determined periods. Only after there is unde se execută lucrări de investiţii se vor lua
no more gas and no more danger of fire or după caz şi alte măsuri speciale de aparare
explosion can the work continue. impotriv incendiilor (amplasare unor mijloace
suplimentare de intervenţie, utilizarea de
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 38 of 39
no.

All construction, installation, completion or perdele cu abur sau amplasarea unor dispozitive
modification work will be made only based on mobile cu personal din cadrul Serviciului de
the technical documentation of the project; any Aparare Impotiva Incendiilor.
additional work will need written approval from
the planner. • in cazul în care în zona respectivă se
constată emanaţii de gaze sau vapori inflamabili
• the work site will be visibly marked with se opresc lucrările şi se iau măsuri de înlăturare a
warning signs and surrounded with marking cauzei; dacă aceste emanaţii de gaze apar în
tape. urma unor lucrări de săpături se iau măsuri de
determinare a concentraţiilor de gaze după
These measures are mandatory and are not periodicitatea stabilită.
exclusive; they may be improved by the
beneficiary and the constructor depending on Toate lucrările de construcţie montaj, completări
the situation on site. sau modificări se vor face numai în baza
documentaţiei tehnice de proiectare, orice
lucrare apărută în plus se va cere aprobarea
scrisă a proiectantului.

• zona unde se execută lucrări de investiţii


va fi marcată vizibil cu plăcuţe de avertizare şi
imprejmuită cu bandă indicatoare.

Măsurile de mai sus nu sunt limitative ele pot fi


îmbunătăţite de beneficiar , executant şi
constructor în funcţie de situaţia de pe teren.

14 Conclusions Concluzii
The foundations are designed according to actual Construcția analizată este proiectată în
design standards. Work execution will be done conformitate cu normele actuale de proiectare.
according to EXECUTION DETAILS (E.D.) project Execuţia lucrărilor se va face pe baza proiectului
and other specialties project, correlated by the întocmit în faza DETALII DE EXECUŢIE (D.E.),
general contractor and by site inspectors. precum şi pe baza proiectelor de alte specialități,
corelate între ele prin grija proiectantului general
Before the start of the execution, site studies şi al inspectorilor de şantier.
regarding the technical situation of the field will
be realized (subterain constructions, networks, Înainte de începerea proiectului de execuţie se
structures, fences, etc.) and of the existing vor completa studiile de teren privind starea
neighbour buildings, facilities and roads, in order tehnică a amplasamentului (construcţii
to adapt the tender and gone solutions to the subterane, reţele, clădiri, împrejmuiri, etc.) şi a
real existing situation. clădirilor, reţelelor şi drumurilor existente
învecinate, în scopul adaptării soluţiilor ofertate
EPCC BARBUNCESTI Client PU-D-
Doc. ROA0915422512-EX-
COMPRESSOR STATION no.: CS-CAL-004-01-B

TECHNICAL MEMO/ Rev. 01


no.:
MEMORIU TEHNIC CONFIND Page 39 of 39
no.

şi licitate la situaţia reală, existentă.

S-ar putea să vă placă și