Sunteți pe pagina 1din 83

Formularul F3

Obiectivul: 0184 000000185 ACTIUNEA 1- PRIMA INFIINTARE A


SISTEMULUI DE ALIMENTARE CU
APA IN SATUL GROJDIBODU,
COMUNA GROJDIBODU, JUDETUL OLT
Obiectul: 0006 6 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 184601 TERASAMENTE-SUBTRAVERSARI

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 GA09A1 [ 3] M 55.000 39.42 2168.10
SAPARE TUNEL SI INTROD CONCOM A TEVII DE 54.00 2970.00
PROT PE SUB DRUM SAU CF CU AJUT FREZEI 76.29 4195.95
TEAVA AVIND 219,1X6,3MM SI 273X8 MM 0.00 0.00
0.015 1 Total= 9334.05

001 7502173 M 6.120 184.00 1126.08


TEAVA OTEL PENTRU CONSTRUCTII 219,1X6. 0.00 0.00
3MM 0.00 0.00
0.00 0.00
0.033 0 Total= 1126.08

001 3112775 M 49.980 274.00 13694.52


TEAVA CONSTRUCTII FARA SUDURA LAMINATA 0.00 0.00
LA CALD 273 X 8 /OLT 35 S 404/2 0.00 0.00
0.00 0.00
0.052 3 Total= 13694.52

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.626 16988.70 2970.00 4195.95 0.00 24154.65
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 4195.95

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 2970.00 + 4195.95 * 0.000 +
0.00 * 0.000) * 0.003375 = 10.02

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.626 16988.70 2980.02 4195.95 0.00 24164.67
Cheltuieli indirecte:
24164.67 * 0.08000 = 1 933.17
Profit:
26097.85 * 0.02000 = 521.96
184601 pag 2
=================================================================

TOTAL GENERAL DEVIZ: 26 619.80


TVA 26619.80 * 19.0% = 5 057.76
TOTAL cu TVA 31 677.57

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185901 pag 3
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185901 TERASAMENTE-STATIE DE EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 TSC02A2 100 MC. 20.520 0.00 0.00
SAPATURA CU EXCAVAT.PE PNEURI 0,21-0,39 0.00 0.00
MC PAMINT IMBIB.CU APA DESC.DEP.TER.CAT. 419.40 8606.09
1 0.00 0.00
0.000 0 Total= 8606.09

002 TSD01C1 M.C. 540.000 0.00 0.00


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 7.79 4206.60
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0.00
BULG.TEREN TARE 0.00 0.00
0.000 0 Total= 4206.60

003 TSD04C1 M.C. 540.000 0.05 27.00


COMPACTAREA CU MAI.DE MINA A UMPLUT. 13.32 7192.80
EXECUT.PE STRAT.CU UDAREA FIEC.STRAT DE 0.00 0.00
20CM GROS.T.NECOEZIV 0.00 0.00
0.000 0 Total= 7219.80

004 TSC35A3 [ 2] 100 MC. 9.720 0.00 0.00


EXCAVAT, TRANSPORT, INCARC. AUTO CU 0.00 0.00
INCARC. PE PNEURI CUPA 2,4-3,9 MC TEREN 115.20 1119.74
LA DIST. < 10 M 0.00 0.00
0.000 0 Total= 1119.74

005 TRA01A05P TONA 1749.600 0.00 0.00


TRANSPORTUL RUTIER AL PAMINTULUI SAU 0.00 0.00
MOLOZULUI CU AUTOBASCULANTA DIST.= 5 KM 0.00 0.00
3.83 6700.97
0.000 0 Total= 6700.97

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 27.00 11399.40 9725.83 6700.97 27853.20
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 9725.83

Detaliere transporturi:
-Articole TRA 6 700.97
185901 pag 4
=================================================================

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 11399.40 + 9725.83 * 0.000 +
6700.97 * 0.000) * 0.003375 = 38.47

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 27.00 11437.87 9725.83 6700.97 27891.67

Cheltuieli indirecte:
27891.67 * 0.08000 = 2 231.33
Profit:
30123.01 * 0.02000 = 602.46

TOTAL GENERAL DEVIZ: 30 725.47


TVA 30725.47 * 19.0% = 5 837.84
TOTAL cu TVA 36 563.31

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185902 pag 5
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185902 PLATFORMA BETONATA AMPLASARE
CONTAINER PERSONAL- STATIA DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 CA01A1 M.C. 1.000 0.06 0.06
TURNARE BETON SIMPLU IN FUNDATII 57.24 57.24
(CONTINUE,IZOLATE)SI SOCLURI CU VOLUM 0.75 0.75
<3MC 0.00 0.00
0.000 0 Total= 58.05

001 2100945 M.C. 1.008 195.00 196.56


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 196.56

002 CA02C1 M.C. 10.400 0.05 0.52


TURNARE BETON ARMAT IN FUNDATII 65.88 685.15
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 11.75
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 697.42

002 2100971 M.C. 10.483 230.00 2411.09


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 2411.09

003 CC01A1 KG 1420.000 0.07 99.40


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 837.80
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 937.20

004 3270774 KG 1420.000 3.60 5112.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 1 Total= 5112.00
185902 pag 6
=================================================================
005 CB02A1 [ 1] MP. 84.000 5.73 481.32
COFRAJE PT.BETON IN ELEVATIE DIN PANOURI 14.22 1194.48
REFOL.DIN SCINDURI RASINOASE,LA ZIDURI 0.00 0.00
DREPTE AVAND INALTIMEA DE 0-3M 0.00 0.00
0.002 0 Total= 1675.80

006 CA02C1 M.C. 16.400 0.05 0.82


TURNARE BETON ARMAT IN FUNDATII 65.88 1080.43
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 18.53
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 1099.78

006 2100971 M.C. 16.530 230.00 3801.90


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 3801.90

007 CC01A1 KG 1480.000 0.07 103.60


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 873.20
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 976.80

008 3270774 KG 1480.000 3.60 5328.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 1 Total= 5328.00

009 TRA06A15 TONA 67.256 0.00 0.00


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 807.07
0.000 0 Total= 807.07

010 TRA02A15 TONA 2.900 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 34.80
0.000 0 Total= 34.80

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.068 17535.27 4728.30 31.03 841.87 23136.48
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 31.03

Detaliere transporturi:
-Articole TRA 841.87
Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 4728.30 + 31.03 * 0.000 +
841.87 * 0.000) * 0.003375 = 15.96
185902 pag 7
=================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.068 17535.27 4744.26 31.03 841.87 23152.44

Cheltuieli indirecte:
23152.44 * 0.08000 = 1 852.20
Profit:
25004.63 * 0.02000 = 500.09

TOTAL GENERAL DEVIZ: 25 504.73


TVA 25504.73 * 19.0% = 4 845.90
TOTAL cu TVA 30 350.62

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185903 pag 8
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185903 PLATFORMA BETONATA ECHIPAMENTE
TRATARE MECANICA- STATIA DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 CA01A1 M.C. 0.700 0.06 0.04
TURNARE BETON SIMPLU IN FUNDATII 57.24 40.07
(CONTINUE,IZOLATE)SI SOCLURI CU VOLUM 0.75 0.53
<3MC 0.00 0.00
0.000 0 Total= 40.63

001 2100945 M.C. 0.710 195.00 138.45


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 138.45

002 CA02C1 M.C. 7.200 0.05 0.36


TURNARE BETON ARMAT IN FUNDATII 65.88 474.34
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 8.14
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 482.83

002 2100971 M.C. 7.258 230.00 1669.34


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 1669.34

003 CC01A1 KG 990.000 0.07 69.30


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 584.10
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 653.40

004 3270774 KG 990.000 3.60 3564.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 1 Total= 3564.00
185903 pag 9
=================================================================
005 CB02A1 [ 1] MP. 66.000 5.73 378.18
COFRAJE PT.BETON IN ELEVATIE DIN PANOURI 14.22 938.52
REFOL.DIN SCINDURI RASINOASE,LA ZIDURI 0.00 0.00
DREPTE AVAND INALTIMEA DE 0-3M 0.00 0.00
0.002 0 Total= 1316.70

006 CA02C1 M.C. 11.800 0.05 0.59


TURNARE BETON ARMAT IN FUNDATII 65.88 777.38
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 13.33
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 791.31

006 2100971 M.C. 11.894 230.00 2735.62


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 2735.62

007 CC01A1 KG 1040.000 0.07 72.80


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 613.60
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 686.40

008 3270774 KG 1040.000 3.60 3744.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 1 Total= 3744.00

009 TRA06A15 TONA 47.664 0.00 0.00


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 571.97
0.000 0 Total= 571.97

010 TRA02A15 TONA 2.030 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 24.36
0.000 0 Total= 24.36

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.162 12372.68 3428.01 22.00 596.33 16419.01
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 22.00

Detaliere transporturi:
-Articole TRA 596.33
Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 3428.01 + 22.00 * 0.000 +
596.33 * 0.000) * 0.003375 = 11.57
185903 pag 10
=================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.162 12372.68 3439.58 22.00 596.33 16430.58

Cheltuieli indirecte:
16430.58 * 0.08000 = 1 314.45
Profit:
17745.03 * 0.02000 = 354.90

TOTAL GENERAL DEVIZ: 18 099.93


TVA 18099.93 * 19.0% = 3 438.99
TOTAL cu TVA 21 538.92

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185904 pag 11
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185904 PLATFORMA BETONATA DEPOZITARE
SACI NAMOL- STATIA DE EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 CA01A1 M.C. 0.260 0.06 0.02
TURNARE BETON SIMPLU IN FUNDATII 57.24 14.88
(CONTINUE,IZOLATE)SI SOCLURI CU VOLUM 0.75 0.20
<3MC 0.00 0.00
0.000 0 Total= 15.09

001 2100945 M.C. 0.262 195.00 51.09


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 51.09

002 CA02C1 M.C. 2.800 0.05 0.14


TURNARE BETON ARMAT IN FUNDATII 65.88 184.46
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 3.16
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 187.77

002 2100971 M.C. 2.822 230.00 649.06


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 649.06

003 CC01A1 KG 380.000 0.07 26.60


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 224.20
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 250.80

004 3270774 KG 380.000 3.60 1368.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 0 Total= 1368.00
185904 pag 12
=================================================================
005 CB02A1 [ 1] MP. 25.000 5.73 143.25
COFRAJE PT.BETON IN ELEVATIE DIN PANOURI 14.22 355.50
REFOL.DIN SCINDURI RASINOASE,LA ZIDURI 0.00 0.00
DREPTE AVAND INALTIMEA DE 0-3M 0.00 0.00
0.002 0 Total= 498.75

006 CA02C1 M.C. 4.400 0.05 0.22


TURNARE BETON ARMAT IN FUNDATII 65.88 289.87
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 4.97
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 295.06

006 2100971 M.C. 4.435 230.00 1020.05


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 1020.05

007 CC01A1 KG 400.000 0.07 28.00


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 236.00
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 264.00

008 3270774 KG 400.000 3.60 1440.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 0 Total= 1440.00

009 TRA06A15 TONA 18.046 0.00 0.00


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 216.55
0.000 0 Total= 216.55

010 TRA02A15 TONA 0.780 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 9.36
0.000 0 Total= 9.36

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.830 4726.43 1304.92 8.33 225.91 6265.59
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 8.33

Detaliere transporturi:
-Articole TRA 225.91
Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 1304.92 + 8.33 * 0.000 +
225.91 * 0.000) * 0.003375 = 4.40
185904 pag 13
=================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.830 4726.43 1309.32 8.33 225.91 6269.99

Cheltuieli indirecte:
6269.99 * 0.08000 = 501.60
Profit:
6771.59 * 0.02000 = 135.43

TOTAL GENERAL DEVIZ: 6 907.02


TVA 6907.02 * 19.0% = 1 312.33
TOTAL cu TVA 8 219.36

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185905 pag 14
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185905 PLATFORMA BETONATA CONTAINER
ECHIPAMENTE DESHIDRATARE NAMOL-
STATIA DE EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 CA01A1 M.C. 2.400 0.06 0.14
TURNARE BETON SIMPLU IN FUNDATII 57.24 137.38
(CONTINUE,IZOLATE)SI SOCLURI CU VOLUM 0.75 1.80
<3MC 0.00 0.00
0.000 0 Total= 139.32

001 2100945 M.C. 2.419 195.00 471.70


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 471.70

002 CA02C1 M.C. 2.600 0.05 0.13


TURNARE BETON ARMAT IN FUNDATII 65.88 171.29
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 2.94
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 174.36

002 2100971 M.C. 2.621 230.00 602.83


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 602.83

003 CC01A1 KG 355.000 0.07 24.85


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 209.45
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 234.30

004 3270774 KG 355.000 3.60 1278.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 0 Total= 1278.00
185905 pag 15
=================================================================
005 CB02A1 [ 1] MP. 24.000 5.73 137.52
COFRAJE PT.BETON IN ELEVATIE DIN PANOURI 14.22 341.28
REFOL.DIN SCINDURI RASINOASE,LA ZIDURI 0.00 0.00
DREPTE AVAND INALTIMEA DE 0-3M 0.00 0.00
0.002 0 Total= 478.80

006 CA02C1 M.C. 4.400 0.05 0.22


TURNARE BETON ARMAT IN FUNDATII 65.88 289.87
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 4.97
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 295.06

006 2100971 M.C. 4.435 230.00 1020.05


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 1020.05

007 CC01A1 KG 400.000 0.07 28.00


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 236.00
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 264.00

008 3270774 KG 400.000 3.60 1440.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 0 Total= 1440.00

009 TRA06A15 TONA 22.740 0.00 0.00


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 272.88
0.000 0 Total= 272.88

010 TRA02A15 TONA 0.780 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 9.36
0.000 0 Total= 9.36

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.803 5003.45 1385.27 9.71 282.24 6680.66
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 9.71

Detaliere transporturi:
-Articole TRA 282.24
Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 1385.27 + 9.71 * 0.000 +
282.24 * 0.000) * 0.003375 = 4.68
185905 pag 16
=================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.803 5003.45 1389.94 9.71 282.24 6685.34

Cheltuieli indirecte:
6685.34 * 0.08000 = 534.83
Profit:
7220.17 * 0.02000 = 144.40

TOTAL GENERAL DEVIZ: 7 364.57


TVA 7364.57 * 19.0% = 1 399.27
TOTAL cu TVA 8 763.84

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185906 pag 17
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185906 PLATFORMA BETONATA AMPLASARE
MODUL MECANO BIOLOGIC-STATIE DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 CA01A1 M.C. 1.000 0.06 0.06
TURNARE BETON SIMPLU IN FUNDATII 57.24 57.24
(CONTINUE,IZOLATE)SI SOCLURI CU VOLUM 0.75 0.75
<3MC 0.00 0.00
0.000 0 Total= 58.05

001 2100945 M.C. 1.008 195.00 196.56


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 196.56

002 CA02C1 M.C. 15.200 0.05 0.76


TURNARE BETON ARMAT IN FUNDATII 65.88 1001.38
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 17.18
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 1019.31

002 2100971 M.C. 15.322 230.00 3524.06


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 3524.06

003 CC01A1 KG 2200.000 0.07 154.00


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 1298.00
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 1452.00

004 3270774 KG 2200.000 3.60 7920.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 2 Total= 7920.00
185906 pag 18
=================================================================
005 CB02A1 [ 1] MP. 136.000 5.73 779.28
COFRAJE PT.BETON IN ELEVATIE DIN PANOURI 14.22 1933.92
REFOL.DIN SCINDURI RASINOASE,LA ZIDURI 0.00 0.00
DREPTE AVAND INALTIMEA DE 0-3M 0.00 0.00
0.002 0 Total= 2713.20

006 CA02C1 M.C. 29.000 0.05 1.45


TURNARE BETON ARMAT IN FUNDATII 65.88 1910.52
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 32.77
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 1944.74

006 2100971 M.C. 29.232 230.00 6723.36


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 6723.36

007 CC01A1 KG 5156.000 0.07 360.92


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 3042.04
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 3402.96

008 3270774 KG 5156.000 3.60 18561.60


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 5 Total= 18561.60

009 TRA06A15 TONA 109.348 0.00 0.00


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 1312.18
0.000 0 Total= 1312.18

010 TRA02A15 TONA 7.356 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 88.27
0.000 0 Total= 88.27

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7.628 38222.05 9243.10 50.70 1400.45 48916.29
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 50.70

Detaliere transporturi:
-Articole TRA 1 400.45
Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 9243.10 + 50.70 * 0.000 +
1400.45 * 0.000) * 0.003375 = 31.20
185906 pag 19
=================================================================

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


7.628 38222.05 9274.29 50.70 1400.45 48947.49

Cheltuieli indirecte:
48947.49 * 0.08000 = 3 915.80
Profit:
52863.28 * 0.02000 = 1 057.27

TOTAL GENERAL DEVIZ: 53 920.55


TVA 53920.55 * 19.0% = 10 244.90
TOTAL cu TVA 64 165.45

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185907 pag 20
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185907 PLATFORMA STATIE POMPARE-STATIE
DE EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 CA01A1 M.C. 2.000 0.06 0.12
TURNARE BETON SIMPLU IN FUNDATII 57.24 114.48
(CONTINUE,IZOLATE)SI SOCLURI CU VOLUM 0.75 1.50
<3MC 0.00 0.00
0.000 0 Total= 116.10

001 2100945 M.C. 2.016 195.00 393.12


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 393.12

002 CA02C1 M.C. 3.000 0.05 0.15


TURNARE BETON ARMAT IN FUNDATII 65.88 197.64
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 3.39
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 201.18

002 2100971 M.C. 3.024 230.00 695.52


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 695.52

003 CC01A1 KG 236.280 0.07 16.54


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 139.41
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 155.94

004 3270774 KG 236.280 3.60 850.61


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 0 Total= 850.61
185907 pag 21
=================================================================
005 TRA06A15 TONA 9.668 0.00 0.00
TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 116.02
0.000 0 Total= 116.02

006 TRA02A15 TONA 0.236 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 2.83
0.000 0 Total= 2.83

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.236 1956.06 451.53 4.89 118.85 2531.32
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 4.89

Detaliere transporturi:
-Articole TRA 118.85

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 451.53 + 4.89 * 0.000 +
118.85 * 0.000) * 0.003375 = 1.52

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.236 1956.06 453.05 4.89 118.85 2532.84

Cheltuieli indirecte:
2532.84 * 0.08000 = 202.63
Profit:
2735.47 * 0.02000 = 54.71

TOTAL GENERAL DEVIZ: 2 790.18


TVA 2790.18 * 19.0% = 530.13
TOTAL cu TVA 3 320.32

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185908 pag 22
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185908 PLATFORMA STATIE POMPARE REZERVO
R PAFS -STATIE DE EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 CA01A1 M.C. 0.960 0.06 0.06
TURNARE BETON SIMPLU IN FUNDATII 57.24 54.95
(CONTINUE,IZOLATE)SI SOCLURI CU VOLUM 0.75 0.72
<3MC 0.00 0.00
0.000 0 Total= 55.73

001 2100945 M.C. 0.968 195.00 188.76


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 188.76

002 CA02C1 M.C. 4.160 0.05 0.21


TURNARE BETON ARMAT IN FUNDATII 65.88 274.06
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 4.70
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 278.97

002 2100971 M.C. 4.190 230.00 963.70


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 963.70

003 CC01A1 KG 320.000 0.07 22.40


MONTARE ARMATURI DIN OTEL BETON D<18MM 0.59 188.80
IN FUNDATIIIZOLATE CU DISTANTIERI DIN 0.00 0.00
MASE PLASTICE 0.00 0.00
0.000 0 Total= 211.20

004 3270774 KG 320.000 3.60 1152.00


OTEL BETON PROFIL PERIODIC PC 52 D=10-16 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.001 0 Total= 1152.00
185908 pag 23
=================================================================
005 CL21A1 [ 1] KG 106.000 0.50 53.00
MONTAREA CONFECTIILOR METALICE DIVERSE 2.34 248.04
INGLOBATE TOTAL SAU PARTIAL IN BETON DIN 0.00 0.00
PROFILE LAMINATE , TABLA, TABLA STRIATA, 0.00 0.00
OTEL BETON, TEVI PENTRU SUSTINERI SAU Total= 301.04
ACOPERIRI
0.000 0

005 6309886 KG 106.000 7.23 766.38


CONFECTII METALICE INGLOBATE IN BETON 0.00 0.00
0.00 0.00
0.00 0.00
0.001 0 Total= 766.38

006 TRA06A15 TONA 12.380 0.00 0.00


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 148.56
0.000 0 Total= 148.56

007 TRA02A15 TONA 0.426 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 5.11
0.000 0 Total= 5.11

008 M1A01A1 [ 4] BUC. 1.000 0.00 0.00


MONTAJ REZERVOR 486.00 486.00
0.00 0.00
0.00 0.00
0.000 0 Total= 486.00

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.426 3146.51 1251.85 5.42 153.67 4557.45
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 5.42

Detaliere transporturi:
-Articole TRA 153.67

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 1251.85 + 5.42 * 0.000 +
153.67 * 0.000) * 0.003375 = 4.22

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.426 3146.51 1256.08 5.42 153.67 4561.67
Cheltuieli indirecte:
4561.67 * 0.08000 = 364.93
Profit:
4926.61 * 0.02000 = 98.53
185908 pag 24
=================================================================

TOTAL GENERAL DEVIZ: 5 025.14


TVA 5025.14 * 19.0% = 954.78
TOTAL cu TVA 5 979.92

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185909 pag 25
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185909 STATIE DE POMPARE LA STATIA DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 TSA01B1 M.C. 1.800 0.00 0.00
SAP.MAN.IN SPATII INTINSE IN PAM.CU 13.86 24.95
UMID.NAT.ARUNC.IN DEPOZ.SAU VEHIC.LA H 0.00 0.00
<0,6M T.MIJLOCIU* 0.00 0.00
0.000 0 Total= 24.95

002 TSC03G1 [ 4] 100 MC. 0.350 0.00 0.00


SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN PAM 0.00 0.00
CU UMIDITATE NATURAL DESC.AUTO.TEREN CAT 234.00 81.90
3 0.00 0.00
0.000 0 Total= 81.90

003 TSF01A1 MP. 40.560 1.85 75.04


SPRIJIN.DE MALURI CU DULAPI DE FAG ASEZ. 9.18 372.34
ORIZ.LAT.INTRE MAL.<1,5M,ADIN.0,0-2M,0,0 0.00 0.00
-0,2M INTRE DULA 0.00 0.00
0.004 0 Total= 447.38

004 TSD02B1 100 MC. 0.090 0.00 0.00


IMPRAST.PAMINT AFINAT PROVENIT DIN TER. 0.00 0.00
CAT.1 SAU 2 CU BULD.DE 65-80CP IN STRAT. 75.60 6.80
CU GROS.DE 21-30C 0.00 0.00
0.000 0 Total= 6.80

005 TSD05B1 100 MC. 0.090 0.00 0.00


COMPACTARE CU MAI.MEC.DE 150-200KG A 158.76 14.29
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 47.15 4.24
STRAT DIN PAM.COEZI 0.00 0.00
0.000 0 Total= 18.53

006 TRB01C12 TONA 3.240 0.00 0.00


TRANSPORTUL MATERIALELOR CU ROABA PE 10.40 33.70
PNEURI INC ARUNCARE DESC RASTURNARE 0.00 0.00
GRUP1-3 DISTANTA 20M 0.00 0.00
0.000 0 Total= 33.70
185909 pag 26
=================================================================
007 TRA01A05P TONA 50.700 0.00 0.00
TRANSPORTUL RUTIER AL PAMINTULUI SAU 0.00 0.00
MOLOZULUI CU AUTOBASCULANTA DIST.= 5 KM 0.00 0.00
3.83 194.18
0.000 0 Total= 194.18

008 TRI1AA02C1 TONA 50.700 0.00 0.00


INCARCAREA MATERIALELOR,GRUPA A-GRELE IN 8.10 410.67
BULGARI,PRIN ARUNCARE RAMPA SAU TEREN- 0.00 0.00
AUTO CATEG.1 0.00 0.00
0.000 0 Total= 410.67

009 DA06B1 [ 7] M.C. 1.010 32.89 33.22


STRAT AGREG NAT CILINDRATE CU FUNC 6.64 6.71
REZIST FILTRANTIZOLAT AERISIRE SI 17.14 17.31
ANTICAP CU ASTER MEC PIETRIS 0.00 0.00
0.000 0 Total= 57.24

010 CA01D1 M.C. 0.680 0.10 0.07


TURNARE BETON SIMPLU IN STRATURI DE 3- 66.06 44.92
20CM GROSIMELA CONSTRUCTII CU H<35M 0.60 0.41
0.00 0.00
0.000 0 Total= 45.40

010 2100945 M.C. 0.685 195.00 133.57


BETON DE CIMENT B 150 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 133.57

011 CA02C1 M.C. 1.660 0.05 0.08


TURNARE BETON ARMAT IN FUNDATII 65.88 109.36
CONTINUE,RADIERE SI PERETI SUB COTA ZERO 1.13 1.88
A CONSTR CU GROS <30CM 0.00 0.00
0.000 0 Total= 111.32

011 2100971 M.C. 1.673 230.00 384.79


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 384.79

012 CP19A1 [ 6] BUC. 4.000 0.00 0.00


MONTAREA ELEM.PREFABRICATE LA STATIILE 180.00 720.00
DE POMPARE (INCLUSIV RADIER 30.00 120.00
0.00 0.00
0.000 0 Total= 840.00

012 2100971 M.C. 7.500 230.00 1725.00


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 1725.00
185909 pag 27
=================================================================
012 6433780 KG 1604.000 3.60 5774.40
ARMATURI IN PREFABRICATE BETON PC 52 0.00 0.00
PESTE 10 MM BAREM 0.00 0.00
0.00 0.00
0.001 2 Total= 5774.40

013 RPCD07A1 BUC. 250.000 2.04 510.00


INNADIREA PRIN SUPRAPUNERE CU SUD. 3.96 990.00
ELECTR.A ARM.DIN OT.BET.PINA LA D=14 MM 0.00 0.00
INCLUSIV * 0.00 0.00
0.000 0 Total= 1500.00

014 ACE05B1 [ 1] TONA 0.060 0.00 0.00


PIESA DE TRECERE ETANSA A CONDUCTELOR 757.44 45.45
PRIN PERETI CU GREUT.PESTE 50 PINA LA 100.00 6.00
150 KG INCLUSIV 0.00 0.00
0.000 0 Total= 51.45

014 4124397 KG 60.000 8.30 498.00


PIESA LEGATURA FONTA TRECERE OTEL 0.00 0.00
CONDUCTA G< 6,3 BAREM PRET 0.00 0.00
0.00 0.00
0.001 0 Total= 498.00

014 6607587 BUC. 1.000 2.38 2.38


GARNITURA ETANSARE PLAN PN 6/2,5 0.00 0.00
DIAMETRU= 100 M 100-500 G2X4 S1733 0.00 0.00
0.00 0.00
0.000 0 Total= 2.38

015 CL21A1 [ 1] KG 150.000 0.50 75.00


MONTAREA CONFECTIILOR METALICE DIVERSE 2.34 351.00
INGLOBATE TOTAL SAU PARTIAL IN BETON DIN 0.00 0.00
PROFILE LAMINATE , TABLA, TABLA STRIATA, 0.00 0.00
OTEL BETON, TEVI PENTRU SUSTINERI SAU Total= 426.00
ACOPERIRI
0.000 0

015 6309886 KG 150.000 7.23 1084.50


CONFECTII METALICE INGLOBATE IN BETON 0.00 0.00
0.00 0.00
0.00 0.00
0.001 0 Total= 1084.50

016 CN18A1 [ 1] MP. 18.000 11.53 207.54


VOPSIREA TABLEI ZINCATE CUTATE PE FATA 13.50 243.00
LIBERA CU 3 STRATURI EMAIL ALCHIDIC PE 2 0.00 0.00
STRATURI GRUND 0.00 0.00
0.001 0 Total= 450.54

017 TRB05B25 TONA 0.180 0.00 0.00


TRANSPORTUL MATERIALELOR PRIN PURTAT 53.28 9.59
DIRECT,MATERIALE INCOMODE PESTE 25 KG 0.00 0.00
DISTANTA 50M 0.00 0.00
0.000 0 Total= 9.59
185909 pag 28
=================================================================
018 TRA02A15 TONA 19.040 0.00 0.00
TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOCAMIONUL PE 0.00 0.00
DIST.= 15 KM. 12.00 228.48
0.000 0 Total= 228.48

019 CF12A1 MP. 35.000 19.59 685.65


TENCUIELI SPECIALE DE PROTECTIE 78.84 2759.40
IMPERMEABILE LA CUVE,BAZINE,REZERVOARE, 0.00 0.00
ETC.PRESIUNEA APEI<2DAN/C 0.00 0.00
0.021 1 Total= 3445.05

020 RPCXE02C MP. 35.000 6.93 242.55


HIDROIZOLATII ORIZ.SI VERT.DIN UN STRAT 3.06 107.10
DE BITUM TOPIT APLICAT CU PERIA SAU 0.01 0.35
GLETUITOR 0.00 0.00
0.003 0 Total= 350.00

021 IZF18D1 MP. 32.000 0.00 0.00


STRAT EGALIZARE CU MORTAR CIMENT M100-T 8.28 264.96
PE SUPRAF.VERTICAL SAU INCLINPESTE 40% 0.18 5.76
IN GROS 2CM 0.00 0.00
0.000 0 Total= 270.72

021 2101145 M.C. 0.640 200.00 128.00


MORTAR DE ZIDARIE M 100 NISIP S 1030 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 128.00

022 CB47A1 MP. 42.000 0.66 27.72


MONTAREA SI DEMONTARE SCHELEI MET 8.64 362.88
TUBULARE PT LUCRARI PE SUPRAFETE 0.00 0.00
VERTICALE H<30,0M 0.00 0.00
0.001 0 Total= 390.60

023 AUT1303 ORA 75.000 0.00 0.00


ORA PR SCHELA MET TUB.EXT.S640MP G=11- 0.00 0.00
13,5 3SCH.LEI/MP 2.00 150.00
0.00 0.00
0.000 0 Total= 150.00

024 MDTC5506050 BUC. 0.100 0.00 0.00


TRANSPORT UTILAJ 50 KM 90100011 SCHELA 0.00 0.00
METALICA TUBULARA DE EXTERIOR CU S=640MP 47.63 4.76
G=11-13,5T 0.00 0.00
0.000 0 Total= 4.76

025 ACD01A1 [ 3] BUC. 1.000 494.89 494.89


CAPAC SI RAMA STAS 2308181 PENTRU CAMINE 12.60 12.60
FARA PIESA SUPORT NECAROSABIL TIP I 0.00 0.00
0.00 0.00
0.206 0 Total= 507.49
185909 pag 29
=================================================================
026 ACD02B1 BUC. 20.000 24.11 482.20
TREPTE OTEL BETON D=20 MM PT CAMINE DIN 2.52 50.40
ZIDARIE CARAMIDA, BETON MONOLIT, SAU 0.00 0.00
BOLTARI PREFABRICAT 0.00 0.00
0.003 0 Total= 532.60

027 TRA06A15 TONA 23.635 0.00 0.00


TRANSPORTUL RUTIER AL BETONULUI- 0.00 0.00
MORTARULUI CU AUTOBETONIERA DE 5,5MC 0.00 0.00
DIST. =15KM 12.00 283.62
0.000 0 Total= 283.62

028 CP25A1 M.C. 1.600 0.10 0.16


TURN.BET.IN IMBINARI ELEM.PREF.DIN BET. 172.44 275.90
ARM.LA MON OLITIZAREA STILPILOR IN 3.75 6.00
FUNDATII PAHAR 0.00 0.00
0.000 0 Total= 282.06

028 2100971 M.C. 1.613 230.00 370.99


BETON DE CIMENT B 300 STAS 3622 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 370.99

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.142 12935.75 7209.21 405.42 706.28 21256.66
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 405.42

Detaliere transporturi:
-Articole TRA 706.28

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 7209.21 + 405.42 * 0.000 +
706.28 * 0.000) * 0.003375 = 24.33

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.142 12935.75 7233.54 405.42 706.28 21280.99

Cheltuieli indirecte:
21280.99 * 0.08000 = 1 702.48
Profit:
22983.47 * 0.02000 = 459.67

TOTAL GENERAL DEVIZ: 23 443.14


TVA 23443.14 * 19.0% = 4 454.20
TOTAL cu TVA 27 897.34

PROIECTANT CONTRACTANT (OFERTANT)


185909 pag 30
=================================================================
DEVIZIER
185910 pag 31
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185910 TERASAMENTE-CAMINE STATIE DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 TSC02A2 [ 2] 100 MC. 0.200 0.00 0.00
SAPATURA CU EXCAVAT.PE PNEURI 0,12-0,39 0.00 0.00
MC PAMINT IMBIB.CU APA DESC.DEP.TER.CAT. 419.40 83.88
2 0.00 0.00
0.000 0 Total= 83.88

002 TSA12B1 [ 1] M.C. 2.000 0.00 0.00


SAP.MAN.IN GROPI CU LARG.1,5-6M CU 36.18 72.36
SPRIJ.EVAC.MAN.IN PAM.CU UMID.NAT.LA 0.00 0.00
ADINC.0,0-2,0M,T.MIJLOCI 0.00 0.00
0.000 0 Total= 72.36

003 TSD01B1 M.C. 4.000 0.00 0.00


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 5.51 22.04
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0.00
BULG.TEREN MIJL. 0.00 0.00
0.000 0 Total= 22.04

004 TSD05B1 100 MC. 0.050 0.00 0.00


COMPACTARE CU MAI.MEC.DE 150-200KG A 158.76 7.94
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 47.15 2.36
STRAT DIN PAM.COEZI 0.00 0.00
0.000 0 Total= 10.30

005 TSD14A1 M.C. 0.400 0.50 0.20


UDAREA CU AUTOCIST.DE 5-8T CU DISP.DE 0.00 0.00
STROP.STR. 2.50 1.00
0.00 0.00
0.000 0 Total= 1.20

006 TSD16XB M.C. 1.000 25.05 25.05


STR.REPART.BALAST 0,0-7 MM SUB PRISMA DE 22.68 22.68
BALASTARE C.F COMPACTAT CU PLACA VIBRAT 0.75 0.75
650 KG 0.00 0.00
0.000 0 Total= 48.48
185910 pag 32
=================================================================
007 TSC35B3 [ 4] 100 MC. 0.150 0.00 0.00
EXCAVAT,TRANSPORT, CU INCARC. FRONTAL 0.00 0.00
INCARCARE IN AUTOVEHICOL CU INCARCATOR 129.60 19.44
FRONTAL PE PNEURI CUPA 2,4-3,9 MC, 0.00 0.00
PAMANT , TEREN CATEG 2 LA DIST. < 10 M Total= 19.44
0.000 0

008 TRA01A05P TONA 32.400 0.00 0.00


TRANSPORTUL RUTIER AL PAMINTULUI SAU 0.00 0.00
MOLOZULUI CU AUTOBASCULANTA DIST.= 5 KM 0.00 0.00
3.83 124.09
0.000 0 Total= 124.09

009 TRA05A10 TONA 0.400 0.00 0.00


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0.00
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0.00
ETC)PE DIST.DE 10 7.20 2.88
0.000 0 Total= 2.88

010 TRA01A10 TONA 1.800 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0.00
DIST.= 10 KM. 6.00 10.80
0.000 0 Total= 10.80

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 25.25 125.02 107.43 137.77 395.47
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 107.43

Detaliere transporturi:
-Articole TRA 137.77

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 125.02 + 107.43 * 0.000 +
137.77 * 0.000) * 0.003375 = 0.42

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 25.25 125.44 107.43 137.77 395.89

Cheltuieli indirecte:
395.89 * 0.08000 = 31.67
Profit:
427.56 * 0.02000 = 8.55
TOTAL GENERAL DEVIZ: 436.11
TVA 436.11 * 19.0% = 82.86
TOTAL cu TVA 518.97

PROIECTANT CONTRACTANT (OFERTANT)


185910 pag 33
=================================================================

DEVIZIER
185911 pag 34
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185911 CONSTRUCTII- CAMINE STATIE DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 ACD17A1 [ 2] BUC. 2.000 144.81 289.62
CAMIN DE VANE CIRCULAR DIN ELEMENTE 27.00 54.00
PREFABRICATE CUPRINZIND ELEMENT BAZA, 15.00 30.00
ELEMENT DREPT, PLACA ACOPERIRE, INEL DE 0.00 0.00
ADUCERE LA COTA Total= 373.62
0.013 0

001 7502203 BUC. 2.000 1401.00 2802.00


CAMIN PREFABRICAT DE VANE DINT=1000 MM 0.00 0.00
0.00 0.00
0.00 0.00
0.400 1 Total= 2802.00

002 ACD02A1 BUC. 10.000 17.95 179.50


TREPTE DIN OTEL BETON D=20 MM PT CAMINE 2.52 25.20
DIN TUBURI BETON LA RETELE DE CONDUCTE 0.00 0.00
0.00 0.00
0.002 0 Total= 204.70

003 ACD01L1 [ 6] BUC. 2.000 894.59 1789.18


CAPAC SI RAMA SREN 124-1996, CLASA D400 39.60 79.20
0.00 0.00
0.00 0.00
0.543 1 Total= 1868.38

004 ACE05A1 [ 7] TONA 0.040 0.00 0.00


PIESA DE TRECERE ETANSA A CONDUCTELOR 2058.12 82.32
PRIN PERETI CU GREUT.PINA LA 50 KG 48.00 1.92
INCLUSIV 0.00 0.00
0.000 0 Total= 84.24

004 4124414 KG 40.000 8.30 332.00


PIESA LEGATURA FONTA TRECERE OTEL 0.00 0.00
CONDUCTA G= 6,3 G= 50 KG BAREM PRET 0.00 0.00
0.00 0.00
0.001 0 Total= 332.00
185911 pag 35
=================================================================
005 CL21A1 [ 1] KG 50.000 0.50 25.00
MONTAREA CONFECTIILOR METALICE DIVERSE 2.34 117.00
INGLOBATE TOTAL SAU PARTIAL IN BETON DIN 0.00 0.00
PROFILE LAMINATE , TABLA, TABLA STRIATA, 0.00 0.00
OTEL BETON, TEVI PENTRU SUSTINERI SAU Total= 142.00
ACOPERIRI
0.000 0

005 6309886 KG 50.000 7.23 361.50


CONFECTII METALICE INGLOBATE IN BETON 0.00 0.00
0.00 0.00
0.00 0.00
0.001 0 Total= 361.50

006 TRA04A10 TONA 5.340 0.00 0.00


TRANSPORT RUTIER MATER.SEMIFABR. CU 0.00 0.00
AUTOREMORCHERE CU REMORCI TREILER SUB 0.00 0.00
20T PE DIS.10 KM.* 7.20 38.45
0.000 0 Total= 38.45

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.022 5778.80 357.72 31.92 38.45 6206.89
Din care:
Valoare aferenta utilaje termice = 1.92
Valoare aferenta utilaje electrice = 30.00

Detaliere transporturi:
-Articole TRA 38.45

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 357.72 + 31.92 * 0.000 +
38.45 * 0.000) * 0.003375 = 1.21

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


2.022 5778.80 358.93 31.92 38.45 6208.10

Cheltuieli indirecte:
6208.10 * 0.08000 = 496.65
Profit:
6704.75 * 0.02000 = 134.09

TOTAL GENERAL DEVIZ: 6 838.84


TVA 6838.84 * 19.0% = 1 299.38
TOTAL cu TVA 8 138.22
PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185912 pag 36
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185912 TERASAMENTE-CONDUCTE STATIE DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 TSC02A2 [ 2] 100 MC. 0.540 0.00 0.00
SAPATURA CU EXCAVAT.PE PNEURI 0,12-0,39 0.00 0.00
MC PAMINT IMBIB.CU APA DESC.DEP.TER.CAT. 419.40 226.48
2 0.00 0.00
0.000 0 Total= 226.48

002 TSA12E2 [ 2] M.C. 9.800 0.00 0.00


SAP.MAN.IN GROPI CU LARG.1-1,5M CU 102.42 1003.72
SPRIJ.EVAC.MAN.IN PAM.IMBIB.CU APA LA 0.00 0.00
ADINC.0-2M,T.MIJLOCIU 0.00 0.00
0.000 0 Total= 1003.72

003 ACE08A1 M.C. 10.710 25.63 274.50


UMPLUTURA IN SANT.LA COND.DE ALIM.CU APA 10.98 117.60
SI CANALIZARE CU: NISIP 0.00 0.00
0.00 0.00
0.000 0 Total= 392.09

004 TSD01B1 M.C. 50.750 0.00 0.00


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 5.51 279.63
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0.00
BULG.TEREN MIJL. 0.00 0.00
0.000 0 Total= 279.63

005 TSD05B1 100 MC. 0.510 0.00 0.00


COMPACTARE CU MAI.MEC.DE 150-200KG A 158.76 80.97
UMPL.IN STRAT.DE 20-30CM EXCLUSIV UDARE 47.15 24.05
STRAT DIN PAM.COEZI 0.00 0.00
0.000 0 Total= 105.01

006 TSD14A1 M.C. 7.000 0.50 3.50


UDAREA CU AUTOCIST.DE 5-8T CU DISP.DE 0.00 0.00
STROP.STR. 2.50 17.50
0.00 0.00
0.000 0 Total= 21.00
185912 pag 37
=================================================================
007 TSC35A3 [ 2] 100 MC. 0.130 0.00 0.00
EXCAVAT, TRANSPORT, INCARC. AUTO CU 0.00 0.00
INCARC. PE PNEURI CUPA 2,4-3,9 MC TEREN 115.20 14.98
LA DIST. < 10 M 0.00 0.00
0.000 0 Total= 14.98

008 TRA01A05P TONA 19.430 0.00 0.00


TRANSPORTUL RUTIER AL PAMINTULUI SAU 0.00 0.00
MOLOZULUI CU AUTOBASCULANTA DIST.= 5 KM 0.00 0.00
3.83 74.42
0.000 0 Total= 74.42

009 TRA01A10 TONA 17.564 0.00 0.00


TRANSPORTUL RUTIER AL MATERIALELOR, 0.00 0.00
SEMIFABRICATELOR CU AUTOBASCULANTA PE 0.00 0.00
DIST.= 10 KM. 6.00 105.38
0.000 0 Total= 105.38

010 TRA05A10 TONA 7.000 0.00 0.00


TRANSPORT RUTIER MATERIALE,SEMIFABRICATE 0.00 0.00
CU AUTOVEHIC.SPECIALE(CISTERNA,BETON. 0.00 0.00
ETC)PE DIST.DE 10 7.20 50.40
0.000 0 Total= 50.40

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 278.00 1481.91 283.00 230.20 2273.11
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 283.00

Detaliere transporturi:
-Articole TRA 230.20

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 1481.91 + 283.00 * 0.000 +
230.20 * 0.000) * 0.003375 = 5.00

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.000 278.00 1486.91 283.00 230.20 2278.11

Cheltuieli indirecte:
2278.11 * 0.08000 = 182.25
Profit:
2460.36 * 0.02000 = 49.21

TOTAL GENERAL DEVIZ: 2 509.57


TVA 2509.57 * 19.0% = 476.82
TOTAL cu TVA 2 986.38

PROIECTANT CONTRACTANT (OFERTANT)


185912 pag 38
=================================================================
DEVIZIER
185913 pag 39
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185913 INSTALATII SANITARE STATIA DE
EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 ACA08A1# [ 4] BUC. 30.000 0.25 7.50
CONDUCTA PVC PT CANALIZARE D=250 MM L=1M 5.40 162.00
0.01 0.30
0.00 0.00
0.001 0 Total= 169.80

001 7502198 M 30.000 30.00 900.00


CONDUCTA DIN PVC MULTISTRAT, SN 4, D=250 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.002 0 Total= 900.00

002 ACA08A1# [ 1] BUC. 20.000 0.25 5.00


CONDUCTA PVC PT.CANALIZARE D=160 MM, L= 5.40 108.00
1M 0.01 0.20
0.00 0.00
0.001 0 Total= 113.20

002 3271123 BUC. 20.000 14.50 290.00


TEAVA PVC KG DN=160 1M 0.00 0.00
0.00 0.00
0.00 0.00
0.001 0 Total= 290.00

003 ACA08A1# [ 4] BUC. 20.000 0.25 5.00


CONDUCTA PVC PT CANALIZARE D=250 MM L=1M 5.40 108.00
0.01 0.20
0.00 0.00
0.001 0 Total= 113.20

003 7502198 M 20.000 30.00 600.00


CONDUCTA DIN PVC MULTISTRAT, SN 4, D=250 0.00 0.00
MM 0.00 0.00
0.00 0.00
0.002 0 Total= 600.00
185913 pag 40
=================================================================
004 DF26A1 [ 9] M 70.000 0.60 42.00
BANDA AVERTIZOARE CU CONDUCTOR DE INOX 1.01 70.70
INCORPORAT CANALIZARE 0.00 0.00
0.00 0.00
0.000 0 Total= 112.70

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.190 1849.50 448.70 0.70 0.00 2298.90
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 0.70

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 448.70 + 0.70 * 0.000 +
0.00 * 0.000) * 0.003375 = 1.51

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


0.190 1849.50 450.21 0.70 0.00 2300.41

Cheltuieli indirecte:
2300.41 * 0.08000 = 184.03
Profit:
2484.45 * 0.02000 = 49.69

TOTAL GENERAL DEVIZ: 2 534.14


TVA 2534.14 * 19.0% = 481.49
TOTAL cu TVA 3 015.62

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185915 pag 41
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185915 TERASAMENTE -SUBTRAVERSARI

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 GA09B1 [ 3] M 49.000 501.06 24551.94
SAPARE TUNEL SI INTROD CONCOM A TEVII DE 67.14 3289.86
PROT PE SUB DRUM SAU CF CU AJUT FREZEI 88.55 4338.95
TEAVA AVIND 356,6X8MM 0.00 0.00
0.087 4 Total= 32180.75

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.263 24551.94 3289.86 4338.95 0.00 32180.75
Din care:
Valoare aferenta utilaje termice = 0.00
Valoare aferenta utilaje electrice = 4338.95

Alte cheltuieli directe:

-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%


( 3289.86 + 4338.95 * 0.000 +
0.00 * 0.000) * 0.003375 = 11.10

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


4.263 24551.94 3300.96 4338.95 0.00 32191.85

Cheltuieli indirecte:
32191.85 * 0.08000 = 2 575.35
Profit:
34767.20 * 0.02000 = 695.34

TOTAL GENERAL DEVIZ: 35 462.55


TVA 35462.55 * 19.0% = 6 737.88
TOTAL cu TVA 42 200.43
PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER
185914 pag 42
=================================================================
Formularul F3

Obiectivul: 0185 000000186 ACTIUNEA 2- PRIMA INFIINTARE A


SISTEMULUI DE CANALIZARE
MENAJERA IN SATUL GROJDIBODU
Obiectul: 0009 9 LUCRARI NEELIGIBILE
Lista cu cantitatile de lucrari
Deviz oferta 185914 INSTALATII ELECTRICE- ILUMINAT
STATIA DE EPURARE

Categoria de lucrari: 0184


Preturile sunt exprimate in RON
=================================================================
= NR. SIMBOL ART. CANTITATE UM PU MAT VAL MAT =
= D E N U M I R E PU MAN VAL MAN =
= A R T I C O L PU UTI VAL UTI =
= PU TRA VAL TRA =
= SPOR MAT MAN UTI GR./UA GR.TOT. T O T A L =
=================================================================
001 W2A16A# BUC. 6.000 0.00 0.00
Stalp pentru iluminat public stradal din 25.38 152.28
teava de otel, montat cu automacaraua in 0.00 0.00
fundatie turnata stalp de 5m 0.00 0.00
0.000 0 Total= 152.28

001 6500935 BUC. 6.000 1936.00 11616.00


STILP TEAVA OL.37 L= 9 M 133X 4 MM 0.00 0.00
PENTRU ILUMINAT PUBLIC 0.00 0.00
0.00 0.00
0.123 1 Total= 11616.00

002 W2F02A# BUC. 6.000 0.00 0.00


Corp de iluminat stradal pt. lampa cu 14.04 84.24
vapori de mercur sau sodiu montat pe 27.00 162.00
stalpi cu platforma ridicatoare cu brat 0.00 0.00
0.000 0 Total= 246.24

002 5104013 BUC. 6.000 506.76 3040.56


Corp de iluminat rutier Malaga HGS 101/ 0.00 0.00
080-125 0.00 0.00
0.00 0.00
0.015 0 Total= 3040.56

003 W2F05B# BUC. 6.000 24.29 145.74


Dispozitiv din carja si cu bratari pt. 74.88 449.28
fixarea corpurilor de iluminat, inclusiv 0.00 0.00
conductoarele, pe stalp de lemn sau 0.00 0.00
beton, dispozitivul fiind format din: 1 Total= 595.02
carja mica cu 2 bratari simple montat cu
scara manuala
0.001 0

003 6311695 BUC. 6.000 123.00 738.00


CIRJA MICA DIN TEAVA OTEL LAMINATA LA 0.00 0.00
CALD D=42X3MM;L=1,10M 0.00 0.00
0.00 0.00
0.003 0 Total= 738.00
185914 pag 43
=================================================================
003 6311805 BUC. 12.000 18.00 216.00
Bratara zincata simpla pentru carja mica 0.00 0.00
pe stalp de metal de 9m 0.00 0.00
0.00 0.00
0.001 0 Total= 216.00

004 W2F11A# BUC. 6.000 0.00 0.00


Cutie de derivatie pentru iluminat 16.20 97.20
public, montata pe stalp pentru 0.00 0.00
alimentare subterana intrare-iesire 0.00 0.00
0.000 0 Total= 97.20

004 7312801 BUC. 6.000 89.00 534.00


Cutie de derivatie pentru iluminat 0.00 0.00
public pentru 2 cable cu 2 sigurante LF 0.00 0.00
25A 0.00 0.00
0.004 0 Total= 534.00

004 6311041 BUC. 6.000 38.00 228.00


Bratara cutie de derivatie pe stalp 0.00 0.00
centrifugat de iluminat de 9m 0.00 0.00
0.00 0.00
0.000 0 Total= 228.00

005 W2F14A# BUC. 6.000 0.00 0.00


Lampi cu vapori de mercur sau sodiu de 2.70 16.20
inalta presiune 0.00 0.00
0.00 0.00
0.000 0 Total= 16.20

005 5102343 BUC. 6.000 41.00 246.00


Lampa cu vapori de sodiu ovoidala SON 0.00 0.00
50I soclu E27 0.00 0.00
0.00 0.00
0.000 0 Total= 246.00

006 W2G01A# M 733.200 0.00 0.00


Cablu de energie electrica armat, cu 0.63 461.92
conductoare din aluminiu de 1KV, pozat 0.00 0.00
in sant pe pat de nisip, cu tractiune 0.00 0.00
manuala sectiunea pana la 4x16mmp, fara Total= 461.92
obstacole sau cu greutatea specifica
pana la 1,1kg/m
0.000 0

006 4806804 M 318.980 7.43 2370.02


CABLU ENERGIE ACYABY 0,6/ 1KV 4X 4 U S 0.00 0.00
8778 0.00 0.00
0.00 0.00
0.001 0 Total= 2370.02

006 4806828 M 432.550 9.56 4135.18


CABLU ENERGIE ACYABY 0,6/ 1KV 4X 10 U S 0.00 0.00
8778 0.00 0.00
0.00 0.00
0.001 0 Total= 4135.18
185914 pag 44
=================================================================
007 W2G01C# M 107.000 0.00 0.00
Cablu de energie electrica armat, cu 1.53 163.71
conductoare din aluminiu de 1KV, pozat 0.00 0.00
in sant pe pat de nisip, cu tractiune 0.00 0.00
manuala sectiunea de la 3x70+35 pana la Total= 163.71
3x95+50 fara obstacole sau cu greutatea
specifica 1,501 -2,600kg/m
0.000 0

007 4806971 M 109.680 26.59 2916.39


CABLU ENERGIE ACYABY 0,6/ 1KV 3X 70 + 35 0.00 0.00
M S 8778 0.00 0.00
0.00 0.00
0.002 0 Total= 2916.39

007 6718417 BUC. 11.000 0.80 8.80


Eticheta din aluminiu pentru marcare 0.00 0.00
traseului de cable (200x20x2) FAl - 1 0.00 0.00
0.00 0.00
0.000 0 Total= 8.80

008 W2G08A# M 480.000 0.00 0.00


Cablu de energie electrica armat, cu 0.90 432.00
conductoare din cupru de 1KV, pozat in 0.10 48.00
sant cu trecere prin tevi de protectie, 0.00 0.00
cu tractiune mecanica sectiunea pana la Total= 480.00
4x16mmp, fara obstacole sau cu greutatea
specifica pana la 1,4kg/m
0.000 0

008 4810233 M 492.000 5.28 2597.76


CABLU CSYABY MASIV 5 X 1,5 S 8779 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 2597.76

008 6718417 BUC. 48.000 0.80 38.40


Eticheta din aluminiu pentru marcare 0.00 0.00
traseului de cable (200x20x2) FAl - 1 0.00 0.00
0.00 0.00
0.000 0 Total= 38.40

009 W2G15A# BUC. 7.000 0.00 0.00


Asezarea tamburului pe capra cu 14.94 104.58
greutatea pana la 500kg 0.00 0.00
0.00 0.00
0.000 0 Total= 104.58

010 W2G21A# BUC. 9.000 22.00 198.00


Borna din beton pentru marcarea 9.18 82.62
traseului de cable 0.00 0.00
0.00 0.00
0.012 0 Total= 280.62
185914 pag 45
=================================================================
011 W2G22B# M 32.800 0.00 0.00
Teava nefiletata fara mufa din otel 4.68 153.50
zincat pentru protectia cablului, teava 0.00 0.00
avand diametrul de 2" montata in sant, 0.00 0.00
cablu cu sectiunea de 16-50mmp Total= 153.50
0.000 0

011 3305918 M 11.630 33.00 383.79


TEAVA INSTALATII ZINCATA NEFILETATA UI - 0.00 0.00
50(2 ) OL 32 1 S 7656 0.00 0.00
0.00 0.00
0.004 0 Total= 383.79

011 3306247 M 21.830 16.02 349.72


TEAVA INSTALATII ZINCATA FILET UI - 25(1 0.00 0.00
) OL 32 1 S 7656 0.00 0.00
0.00 0.00
0.002 0 Total= 349.72

012 W2G34A# BUC. 39.000 7.50 292.50


Cap terminal uscat de interior pentru 12.60 491.40
cable de energie electrica din aluminiu 0.00 0.00
sau cupru cu izolatie din PVC cu 0.00 0.00
sectiunea pana la 35mmp pt. cablu armat Total= 783.90
0.001 0

012 3809741 KG 19.500 5.84 113.88


Conductor de cupru litat de legare la 0.00 0.00
pamant sect. 6mmp pentru cable pana la 0.00 0.00
35mmp 0.00 0.00
0.000 0 Total= 113.88

013 W2G32B# BUC. 3.000 0.00 0.00


Manson de derivatie pentru cabluri de 95.58 286.74
energie electrica 1KV cu izolatie din 0.00 0.00
HIU cu conductoare din cupru cu 0.00 0.00
sectiunea de 50-70mmp, manson Total= 286.74
termocontractibil
0.000 0

013 4806971 M 4.000 26.59 106.36


CABLU ENERGIE ACYABY 0,6/ 1KV 3X 70 + 35 0.00 0.00
M S 8778 0.00 0.00
0.00 0.00
0.002 0 Total= 106.36

014 W2H02A# M 149.000 4.04 601.96


Profil pentru cable de 1KV cu strat 2.52 375.48
protector din nisip si banda din PVC pt. 0.00 0.00
cable - profil M 0.00 0.00
0.000 0 Total= 977.44

015 W2H02C# M 408.980 8.08 3304.56


Profil pentru cable de 1KV cu strat 4.32 1766.79
protector din nisip si banda din PVC pt. 0.00 0.00
cable - profil 2M 0.00 0.00
0.001 0 Total= 5071.35
185914 pag 46
=================================================================
016 TSA02C1 M.C. 244.200 0.00 0.00
SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ 37.98 9274.72
VERT.NESPR.IN PAM.NECOEZ.SI SL.COEZ. 0.00 0.00
ADINC.<0,75M T.TARE 0.00 0.00
0.000 0 Total= 9274.72

017 TSD01C1 M.C. 244.200 0.00 0.00


IMPRASTIEREA CU LOPATA A PAMINT.AFINAT, 7.79 1902.32
STRAT UNIFORM 10-30CM.GROS CU SFARIM. 0.00 0.00
BULG.TEREN TARE 0.00 0.00
0.000 0 Total= 1902.32

018 W2G01A# M 399.000 0.00 0.00


Cablu de energie electrica armat, cu 0.63 251.37
conductoare din aluminiu de 1KV, pozat 0.00 0.00
in sant pe pat de nisip, cu tractiune 0.00 0.00
manuala sectiunea pana la 4x16mmp, fara Total= 251.37
obstacole sau cu greutatea specifica
pana la 1,1kg/m
0.000 0

018 4802585 M 408.980 3.50 1431.43


CABLU ENERGIE CYABY 0,6/ 1KV 3X 1,5 U S 0.00 0.00
8778 0.00 0.00
0.00 0.00
0.000 0 Total= 1431.43

019 W2G01A# M 342.000 0.00 0.00


Cablu de energie electrica armat, cu 0.63 215.46
conductoare din aluminiu de 1KV, pozat 0.00 0.00
in sant pe pat de nisip, cu tractiune 0.00 0.00
manuala sectiunea pana la 4x16mmp, fara Total= 215.46
obstacole sau cu greutatea specifica
pana la 1,1kg/m
0.000 0

019 4810178 M 350.550 3.72 1304.05


CABLU CSYABY MASIV 3 X 1,5 S 8779 0.00 0.00
0.00 0.00
0.00 0.00
0.000 0 Total= 1304.05

020 W2G08A# M 25.650 0.00 0.00


Cablu de energie electrica armat, cu 0.90 23.09
conductoare din cupru de 1KV, pozat in 0.10 2.56
sant cu trecere prin tevi de protectie, 0.00 0.00
cu tractiune mecanica sectiunea pana la Total= 25.65
4x16mmp, fara obstacole sau cu greutatea
specifica pana la 1,4kg/m
0.000 0

020 4803113 M 26.290 84.53 2222.29


CABLU ENERGIE CYABY 0,6/ 1KV 4X 35 M S 0.00 0.00
8778 0.00 0.00
0.00 0.00
0.004 0 Total= 2222.29
185914 pag 47
=================================================================
021 W2I04C# KG 142.500 8.76 1248.30
Montare electrod orizontal din platbanda 37.62 5360.85
zincata pentru priza de pamant in teren 0.00 0.00
foarte tare 0.00 0.00
0.001 0 Total= 6609.15

022 W2I05C# M 51.300 48.03 2463.94


Montare electrod vertical din teava de 23.76 1218.89
otel zincata de 2 1/2" pentru priza de 1.00 51.30
pamant in teren foarte tare 0.00 0.00
0.000 0 Total= 3734.13

023 W2J04A# BUC. 3.000 0.00 0.00


Verificarea si incercarea tablourilor, 39.24 117.72
firidelor de distributie, cutiilor de 0.00 0.00
distributie 0.00 0.00
0.000 0 Total= 117.72

024 EG01L1 BUC. 1.000 1986.82 1986.82


TIJA CAPTARE PT.INST.PARATRASNET,TIP PV- 357.66 357.66
4 DE 11M 0.00 0.00
0.00 0.00
0.281 0 Total= 2344.48

025 EG08C1 [ 1] M 190.000 11.57 2198.30


COND.LEG.PAM.INST.PARATRASNET PROT.LEG. 30.42 5779.80
PAMINT MONT.PAM.BANDA OL ZINC.40X4MM 0.00 0.00
MONT.IN TEREN F.TARE 0.00 0.00
0.002 0 Total= 7978.10

026 EG10A1 BUC. 15.000 71.40 1071.00


CUTIE CU ECLISA DE LEGATURA PT.CENTURA 24.84 372.60
DE INPAMINTARE 0.00 0.00
0.00 0.00
0.005 0 Total= 1443.60

027 W2A16A# BUC. 1.000 0.00 0.00


Stalp pentru iluminat public stradal din 25.38 25.38
teava de otel, montat cu automacaraua in 0.00 0.00
fundatie turnata stalp de 5m 0.00 0.00
0.000 0 Total= 25.38

027 6500935 BUC. 1.000 1936.00 1936.00


STILP TEAVA OL.37 L= 9 M 133X 4 MM 0.00 0.00
PENTRU ILUMINAT PUBLIC 0.00 0.00
0.00 0.00
0.123 0 Total= 1936.00

Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.620 50043.74 30017.79 263.87 0.00 80325.40
Din care:
Valoare aferenta utilaje termice = 50.56
Valoare aferenta utilaje electrice = 213.30

Alte cheltuieli directe:


185914 pag 48
=================================================================
-CONTRIBUTIE ASIGURATOR PTR.MUNCA 0,3375%
( 30017.79 + 263.87 * 0.000 +
0.00 * 0.000) * 0.003375 = 101.31

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL


3.620 50043.74 30119.10 263.87 0.00 80426.71

Cheltuieli indirecte:
80426.71 * 0.08000 = 6 434.14
Profit:
86860.85 * 0.02000 = 1 737.22

TOTAL GENERAL DEVIZ: 88 598.06


TVA 88598.06 * 19.0% = 16 833.63
TOTAL cu TVA 105 431.70

PROIECTANT CONTRACTANT (OFERTANT)

DEVIZIER

SISTEM INFORMATIC PROIECTAT DE FIRMA I N F S E R V (Tel:2109807)

S-ar putea să vă placă și