Sunteți pe pagina 1din 3

OBIECTIV :

MODERNIZARE STRAZI
ORASUL TAUTII STRADA 107
MAGERAUS LOT2- LOT 1
NISTRU
LISTE DE CANTITATI DE LUCRARI P.T. + D.E. DS1 SIT ACTUALA DATA PUNERII
SI EVALUARI IN OPERA POZITIE KM OBS
215ml 312.2ml

LUCRARI
PREGATITOARE
Spargerea betonului simplu 10mc 10mc 10mc 04.09.2019 0+0.006KM rep podet
Spargerea betonului simplu 15mc 15mc 0 04.09.2019 0+0.006KM rep podet
Aducere la cota canale 0 0 0 x
PROTECTIE
TALUZURI

Pamant vegetal pe taluzuri 43mc 62.44mc 62.44mc 10.10.2019


0- 0+0.312.2km
TERASAMENTE

Sapatura in corpul drumului 741.68mc 1430.86mc 1430.86mc 03.09.2019 0.009-0.042; 33mL x 5mlx 1.3m= 214.5mc;
0.065- 0.183; 118mLx5ml x 1.4m=826mc;
0.215-0.299; 85mLx5mlx1.2m=412.1mc; T=1452.6mc

Umplutura 111.25mc 214.63mc 214.63mc 03.09.2019 0.042-0.065; 23mL x 5ml x 0.6=69mc; 32mL x
0.183-0.215; 5ml x 0.8=128mc;
0.299-0.312 13mLx5mlx0.4m=26mc; T=223mc
Derocari 0 0 0 x

LUCRARI DE DRUM

Imbunatatire teren de fundare


90.15mp 130.2mp 130.2mp 10.09.2019 0.070km-
blocaj de piatra 50 cm
0.090km
Compaactarea si nivelarea
923.5mp 1336.3mp 1336.3mp 10.09.2019
patului drumului 0-0+0.312 312.2mL x 4.28pat drum= 1336.3mp
Strat de balast 30 cm 257.7mc 372.79mc 372.79mc 05.10.2019 0-0+0.312 312.2mL x 0.3m x 4ml = 374.64mc
Scarificare si reprofilare 0 0 0 x
adaos de balast 0-10cm 0 0 0 x
Strat de piatra sparta imapnata 146mc 211.06mc 211.06mc 09.10.2019
20cm 0-0+0.312 312.2mL X 0.2m X 3.4m= 212.3mc
Strat egalizare BA8 0 0 0 x
Geocompozit 0 0 0 x

Amorsare cu emulsie catatonica 665.5mp 961.66mp 961.66mp 31.10.09


0-0+0.312 312.2 mL X 2.75ml +10%(accese)

BAD 22.4 6cm 92.02to 132.95to 132.95to 31.10.19


312.2 ml X 2.75ml X 0.06 x 2.25t/mc=115.9t +
0-0+0.312 18.01t(accese)= 133.91t

Amorsare cu emulsie catatonica 618mp 892.98mp 0 x

BA16 4cm 601mp 868mp 0 x


ACOSTAMENTE

Strat de balast 31.39mc 22.66mc 0 x

Strat de piatra sparta imapnata 15.48mc 11.17mc 0 x


10cm
DRUMURI
LATERALE
0 0 0 x
Imbunatatire teren de fundare
blocaj de piatra 50 cm
Compaactarea si nivelarea 0 0 0 x
patului drumului
Strat de balast 30 cm 0 0 0 x

Strat de piatra sparta impanata 0 0 0 x


20 cm

0 0 0 x
Amorsare cu emulsie catatonica
BAD 22.4 6cm 0 0 0 x

0 0 0 x
Amorsare cu emulsie catatonica
BA16 4cm 0 0 0 x
PLATFORME DE
INCRUCISARE

0 17.85mc 17.85mc 10.09.19


Imbunatatire teren de fundare 0.297km-
blocaj de piatra 50 cm 0.312km L=15m, l=7.93m
Compaactarea si nivelarea 0 119mp 119mp 10.09.2019 0.297km-
patului drumului 0.312km L=15m, l=7.93m
0.297km-
0 35.7mc 35.7mc 05.10.2019
Strat de balast 30 cm 0.312km 119mp X 0.3m
Strat de piatra sparta impanata 0.297km-
0 23.8mc 23.8mc 09.10.2019 0.312km
20 cm 119mp x 0.2m

0 119mp 119mp 31.10.2019 0.297km-


Amorsare cu emulsie catatonica 0.312km 119mp
0.297km-
0 16.78to 16.78to 31.10.2019
BAD 22.4 6cm 0.312km 119mp x 0.068 x 2.25to/mc
0.297km-
0 119mp 0 x
Amorsare cu emulsie catatonica 0.312km
0.297km-
0 119mp 0 x
BA16 4cm 0.312km

Dispozitive de
scurgere a apelor
pluviale. Podete

0+0.010 - 6.21 mc beton c30/37; 6.21 mc balast; 6.21


Santuri pereate cu beton 199ml 46ml 46 10.10.2019
0+0.056 km mp cofraje
Rigola ranforsata din beton 0 80ml 80ml 10.10.2019 0.07-150
C30/37 118mp cofraje, 22mc beton c30/37
0.050-0.070;
0 77ml 77ml 09.10.2019
Rigola de acostament 0.150-0.207; 11.55mp cofraje; 11.55mc beton c30/37

0 1 1 8.10.2019 0+0.052KM
Podete tubulare d=0.4m L=6m

0 0 0 x
Podete tubulare d=0.6m L=5m

0 0 0 x
Podete tubulare d=0.6m L=6m

0 1 1 8.10.2019 0+0.052km
Podete tubulare d=0.6m L=7.5m

0 0 0 x
Podete tubulare d=0.8m L=5m

0 0 0 x
Podete tubulare d=0.8m L=6m

0 0 0 x
Podete tubulare d=0.8m L=7.5m
0 0 0 x
Podete tubulare d=0.8m L=10m
Podete tubulare d=0.6 L=7.5m dr 0 0 0 x
laterale
Podete tubulare d=0.6 L=10m dr 0 0 0 x
laterale
Reparatii podetul existent 1 1 1 15.10.2019 0+0.006km
0+0.006
Semnalizare
rutiera
Marcaj longitudinal 0.22kmech 0.31kmech 0 x

Indicatoare rutiere 1 1 0 x

Parapet rutier N2 0 0 0 x

elemente de capat N2 0 0 0 x