Sunteți pe pagina 1din 1

RevNo Revision note Date Signature Checked

3
(P, PE, N) 6 (3P, PE, 2N) 7
(3P, HP, PE, 2N)

(P, N) 2 C D
3 (P, PE, N)

5 (3P, HP, N) 5 (2P, 3HP) 5 (2P, PE, 2N) 5


(2P, PE, N, HP)
C1

B C C1
3 (P, PE, N) (D)D
3
(P, PE, N) A
2 (P, N) 2 (P, N) 3 (P, PE, N)

B (D)D

(P, HP) 2 2 (P, HP)

6 (3P, N, 2HP)

(B)B (B)B 6 F
(3P, PE, N, HP)

PANEL
4 (2P, 2HP) 3 (2P, HP)

A B A B F
F F

3 (P, PE, N)
3 (P, PE, N) 3
(P, PE, N)
3
(P, PE, N)

KETERANGAN :
P : PHASA
HP : HANTARAN PHASA
N : NETRAL
PE : PROTECTION EARTH

Itemref Quantity Title/Name, designation, material, dimension etc Article No./Reference

Designed by Checked by Aproved by - date File name Date Scale


32_Wendi Ibnu Alfarisi 11-10-2021

INSTALASI PENERANGAN
POLITEKNIK NEGERI BANDUNG
Edition Sheet
PRATIKUM

S-ar putea să vă placă și