Sunteți pe pagina 1din 5

SECTIUNE LONGITUDINALA A-A

B C
bp/2 bp/2

8.00
Cadre prefabricate tip P2
Element de capat tip CP2 Element de capat tip CP2

COTA CALE
4% 2.5% 2.5% 4%
3 2:3
2:

23
23
Saltea din Saltea din
piatra bruta 120 piatra bruta

115
Ax drum
115
20

20
1%
20 30
50

30
30
100

100
70

70
60 105 80 80 105 60
7.40

B C

NUME SEMNATURA CERINTA REFERAT / EXPERTIZA DATA


VERIFICATOR ING. CERCEL C-TIN FLORIN A4,B2,D 2017
DENUMIREA PROIECTULUI: PROIECT
Nr.
2779/2017

Faza:
Pth + D.D.E.

PROIECTAT Ing. Ifrim Ionela SCARA :


DESENAT Ing. Lupu Marius - Catalin 1:50
SECTIUNE LONGITUDINALA PLANSA

DATA
PODET DIN CADRE
SEF PROIECT Ing. Ifrim Ionela
2017
SECTIUNE TRANSVERSALA C-C VEDERE B-B
Hidroizolatie
A
Element de capat tip CP2

Cadru prefabricat tip P2

C20/25

1.94/2

Ax drum
Dren din piatra bruta

40

Rigola dren

Mortar de ciment M100

3.20/2 4.20/2

Pereu din piatra bruta 20 cm grosime

A
NUME SEMNATURA CERINTA REFERAT / EXPERTIZA DATA
VERIFICATOR ING. CERCEL C-TIN FLORIN A4,B2,D 2017
CONVOI DE CALCUL A30, V80 DENUMIREA PROIECTULUI: PROIECT
Nr.
2779/2017

Faza:
Pth + D.D.E.

PROIECTAT Ing. Ifrim Ionela SCARA :


DESENAT Ing. Lupu Marius - Catalin 1:50 SECTIUNE TRANSVERSALA PLANSA
PL. 6.3
DATA
PODET DIN CADRE
SEF PROIECT Ing. Ifrim Ionela PREFABRICATE TIP P2
2017
PLAN ARMARE CADRU PREFABRICAT TIP P2
VEDERE A-A VEDERE B-B SECTIUNE e-e

234
224

2,5
SECTIUNE c-c

160
160

152,5

152,5
SECTIUNE a-a

120 17

SECTIUNE d-d

PREFABRICAT TIP P2

SECTIUNE b-b

DETALIU DE INCASTRARE A
ELEMENTULUI PREFABRICAT
IN FUNDATIE

EXTRAS DE ARMATURA

NUME SEMNATURA CERINTA REFERAT / EXPERTIZA DATA


VERIFICATOR ING. CERCEL C-TIN FLORIN A4,B2,D 2017
DENUMIREA PROIECTULUI: PROIECT
Nr.
2779/2017

Faza:
Pth + D.D.E.

PROIECTAT Ing. Ifrim Ionela SCARA :


PLAN COFRAJ - ARMARE PLANSA
DESENAT Ing. Lupu Marius - Catalin 1:100
PL. 6.4
DATA
PODET DIN CADRE
SEF PROIECT Ing. Ifrim Ionela
2017 PREFABRICATE TIP P2
C VEDERE B -B
SECTIUNE A-A PLAN COFRAJ ELEMENT DE CAPAT TIP CP 2 SECTIUNE C-C
Sc. 1:25 A Sc. 1:25
B
BETON Bc25 2.11 mc

C20/25 OTEL PC 52 119.0 kg


OTEL OB 37 56.0 kg
C20/25 2:
3
GREUTATE 5.0 t

E E

C20/25

C
SECTIUNE E-E
Sc. 1:25 B
A SECTIUNE G-G
Sc. 1:25
G

DETALIU DE REZEMARE A
ELEMENTULUI PREFABRICAT PE FUNDATII
SECTIUNE
C20/25
Sc. 1:50
Tronson de capat

~ ~
Mortar de pozare
M100
C20/25

Bc25

Bc25
Bc10 Bc10

PLAN

Fundatii podet

~ ~ NUME SEMNATURA CERINTA REFERAT / EXPERTIZA DATA


C20/25

VERIFICATOR ING. CERCEL C-TIN FLORIN A4,B2,D 2017


DENUMIREA PROIECTULUI: PROIECT
Nr.
2779/2017

Faza:
Pth + D.D.E.

G PROIECTAT Ing. Ifrim Ionela SCARA :


PLAN COFRAJ PLANSA
DESENAT Ing. Lupu Marius - Catalin 1:50/1:25
PL. 6.5
DATA
ELEMENT DE CAPAT
SEF PROIECT Ing. Ifrim Ionela PREFABRICAT TIP CP2
2017
PLAN ARMARE ELEMENT DE CAPAT TIP CP 2
SECTIUNE A-A SECTIUNE B-B
Sc. 1:25 Sc. 1:25
A
22 23
2.28
22
50 10

40
b 23 E SECTIUNE F - F
a 23 Sc. 1:25
21
2
1 24

2
3 F 24
a b 16
1' 2' 25 L=0.35 n=2x4 buc
c c 2'

69

69
7 8 3
3
5
C C 40
1 14 .65

14
0
2 6 3 L=

12
1' 2' 42
3 6
57.5

5 36
21 20
18 17
13
8
1 2'
1' 2 19

8 1 2
9 d D D
50

EXTRAS DE ARMATURA
17
1 2 8 d 4' 3 1' 2' OTEL PC52 OTEL OB37
L/Buc.
SECTIUNE D-D SECTIUNE E - E M N
A SECTIUNE 24 Sc. 1:25 12 2 6.05 12.10
E F 12 4 6.05 24.20
15-11
Sc. 1:25

15
3 12 2 7.90 15.80
11 15
12 4 1.90 7.60

40
5 19
121 5

40
3 85 5 5 12 2 1.80 3.60
5 Lm=3.40m 6 8 6 1.50 9.00
58 121 r=10 20
7 r=10 7 8 12 0.70 8.40

69-1.79

69-1.79
66 12 15
5 r=10 23 8 8 35 0.50 17.50
9 6 12 0.20 2.40
18
18

137
36

46 16
r=10 5 10 12 4 2.75 11.0
11
12 11 10 22 0.95 20.90
36

157
15
129

26 12 10 10 1.50 15.00
5
15 1 5. 13 10 12 2.15 25.80
.5 5
129

4 4'
1.48

14
26 14 10 2 0.65 1.30
5 1.80 5 15 8 10 2.30 23.00
14-10 16 8 10 3.20 32.00
36.5

15
36.5

8-12

-1.80 17 8 4 3.40 13.60


1.00 14 17 24
57 L=0.20 18 8 21 0.80 16.80
n=2x7buc 19 6 16 3.40 54.40
14 5
14 13 2.05 20 6 2 2.65 5.30
5 5
5 21 6 2 0.80 1.60
1.70 13
4 22 8 6 1.35 8.10
11
23 6 8 1.65 13.20
36

36

4
9 24 6 14 0.20 2.80
1'

25 6 8 0.35 2.80
2'

16

35
10-13

35
r=10 Lm=0.20

24

41
r=10
6

206 74.30 63.00 34.90 82.5 94.0


1

r=10
17
r=10 137 0.888 0.617 0.395 0.222 0.395
18

157
46 66 66.0 39.0 14.0 18.0 38.0
18

TOTAL PC52 119.0 KG


16 1.89
1.89 TOTAL OB38 56.0 KG
17

57
SECTIUNE CERINTA REFERAT / EXPERTIZA DATA
57 NUME SEMNATURA
Sc. 1:25 A4,B2,D 2017
VERIFICATOR ING. CERCEL C-TIN FLORIN
a-a b-b NOTA: Grosimea minima a stratului de beton DENUMIREA PROIECTULUI:
c-c d-d PROIECT
pentru acoperirea armaturilor este de 2 cm. Nr.
2 3 1 3 2 4 3 3 4
2 3 1 3 2 2 1 2 2779/2017

Faza:
Pth + D.D.E.

4' 3 3 4'
6 6 6 2' 1' 2' 2.2' 5 1.1' 5 2.2' PROIECTAT Ing. Ifrim Ionela SCARA :
8 PLAN ARMARE PLANSA
50 DESENAT Ing. Lupu Marius - Catalin 1:25
PL. 6.6
DATA
ELEMENT DE CAPAT
SEF PROIECT Ing. Ifrim Ionela
2017 PREFABRICAT TIP CP2