Documente Academic
Documente Profesional
Documente Cultură
CTA3-CL-DWG-PAC-03-RE03-DSG-001-WB01 - Rampă de Intrare - Dispozitie Generala-1
CTA3-CL-DWG-PAC-03-RE03-DSG-001-WB01 - Rampă de Intrare - Dispozitie Generala-1
B ț
Var.1.76-3.00
Var.2.06-3.30
N
0.30
0.20 0.30 Var. 0.30 0.20
Var.
RAMPĂ
FS 573+400
DE INT Beton de egalizare
RARE
B Lean concrete 10cm
Intervale strat
/ ENTR
0.2
ANCE
Adancime
RAMP
Stratigrafie
PASAJ
INFER
IOR - IN
TRAR
E PAR Descrierea straturilor
CARE
- L=24
.77m
m m
G 0.00
as
po
0
6.5
da 0.50
0
ria
6.9
ap Umplutura din material argilos NOTA:
1.00
4m a 0.00 - 1. Prezentul plan s-a intocmit in baza urmatoarelor date:
9.6 cu resturi de caramizi si
0
L= 1.50 2.60
0.3
materiale de constructii - studiu topografic;
0
2-
0.5
SECTIUNE TRANSVERSALA E-E / TRANSVERSAL SECTION E-E
0
PE 2.00 - studiu geotehnic;
0.2
L TY 2. La executie se vor respecta cu strictete prevederile din:
AL Scara / Scale 1:50 2.50
- Codul de practica pentru executarea lucrarilor din beton, beton armat si beton precomprimat, indicativ
W
70
0
2/ 2.60 -
0.2
3.00 Nisip cenusiu
6.
TI
P 3.30 NE 012;
B
R
S
0
E
T
E
M
00
00
0
0
0
0
0
³m
0.2
0
E - Codul de practica pentru executarea elementelor prefabricate din beton, beton armat si beton
0.3
xis
R ET 3.50
nt a
0
aP O2
k= Hm
2
D
01
x
01
4
20
8
6
4.00
0.
5.5
B - Normativul pentru verificarea calitatii si receptia lucrarilor de constructii aferente, indicativ C56-85
/Joi
4.50 - Caietul de sarcini.
Argila cenusie-verzuie, plastic
t
3.30 -
os
E 3. Conform H.G. 766/1997 lucrarea se incadreaza in categoria "B" a constructiilor de importanta
20
xr
Sapa de protectie 5.00 6.40 consistenta
0.
A
deosebita.
8
5.5
a hidroizolatiei C25/30/ 5.50
4. Proiectul va fi verificat de verificatori atestati MLPAT la exigentele A.4, B.2 si D.2.
30
Waterproofing protection
0
8
0.
6.00
0.3
6.5
50
50
0.
0
0m 6.50
6.
0.5
0.2
90
=1 Hidroizolatie/
6.
7.00 NOTE:
0.2
-L
0.50
0.50
CORPUL 4 PASARELĂ Hydroisolation
1 6.40 -
E (DISTRIBUŢIE SPRE STRADA NERA ) Nisip cenusiu 1. This plan was prepared based on the next data:
0
YP 7.50
0
0.3
T - Topographic study;
0
L
is
0.2
AL
0
Drainage sistem 8.00
is
ax
0.3
- Geotechnical study;
ax
/W
50
int
1
nt
8.50 2. During execution there will be strictly observed the provisions of:
5.
/Jo
P
TI
oi
20
/J
Umplutura compactata
st
0.
st
RE
9.00
ro
cu material drenant/
ro
K Argila cenusie, plastic
PE AL PE F - Practice code concerning execution of concrete, r.c. and pre-stressed concrete elements, indicative NE 013;
Ax
Ax
Compacted filling 8.60 -
0
EW RE 9.50 consistenta cu concretiuni
2
- Normative concerning the quality check and taking-over of afferent construction work, indicative C56-85
5
6.10
0.
ID TE 10.50
30
with draining material
6.7
/S calcaroase
0.
R TI 0.60 5.50 0.60 10.00 - Technical Specifications.
5
P
UA
5.7
2 3. Complying with H.G. 766/1997 this structure belongs to category "B" of importance.
OT
50
/W 10
10.50
3.10
3.10
4.20
4.20
TR
09
0.
AL 08 4. The project will be verified at A.4, B.2 and D.2 requirements.
L 11.00
TY 07
B D TR PE 05
06 Cuneta dren din beton C12/15
11.50
O 2 4.00 Trotuar /Sidewalk Concrete drain foundation
TU -L 04
AR =1 03
1.50 12.00
8. 2.00 2.00
0
02
92
0.3
/S m
01
10.50
ID Umplutura cu 12.50 Nisip argilos cenusiu, cu rar
0
EW -
0.2
14.00
t
0.60
0.60
oin
AX
t /J
C 14.50
F
s
/R
ro
W 15.00
Ax
03
AX 04
IS 05
06
08
07
Beton de egalizare
Lean concrete 15 cm
F 09
KIERUNEK PRZEPŁYWU
10
B
B
AX
CLASA DE INCARCARE: CONVOAIE DE CALCUL CONFORM
CF
SR EN 1991-2 CATEGORIA DE IMPORTANTA: "B"
/R
W
EXIGENTA DE VERIFICARE: A4, B2, D
AX
IS
ZONA SEISMICA: 7, CONFORM SR 11100/1-93
ag=0.20g, Tc=0.7s, CONFORM P100-1/2013
is
ax
nt
oi
/J
SECTIUNE TRANSVERSALA F-F / TRANSVERSAL SECTION F-F
st
ro
a
Ax
t Scara / Scale 1:50
ta
ELEVATIE B-B / ELEVATION B-B
c e 0.30 5.50
B
0.30
1.00
e d 0.20 0.20 - All concrete surfaces in contact with soil will be coated with 2
bituminuous layers.
Var.2.75 - 4.89
C NOTA:
Var.3.35 - 5.49
e In timpul executiei sapaturilor se va acorda o atentie deosebita
Var.1.75 - 3.89
i
Ax nou CF /
Ax nou CF /
A A
0.60
0.30 3.28 0.30
0.50
2.75
0.60 6.90
3.35
- Convoi de calcul LM71 și SW/2.
0.90
0.90
0.50
4.89
3.00
1.76
5.49
3.30
2.06
0.60
3.39
4.49
5.61
12.35
4.00
5.10
2.60
0.30
2.72
Drum Drum
3.10
4.20
0.30
18.82 5.93
0.61
0.60
0.60
Beton de egalizare / Beton de egalizare / Parcare supraterană
Lean concrete 10cm Lean concrete 10cm
0.60
0.60
0.60
Beton de egalizare /
Lean concrete 15cm
PERETE TIP 1 / WALL TYPE 1 - L=10.19m PERETE TIP 2 / WALL TYPE 2 - L=9.64m PASAJ INFERIOR FEROVIAR / UNDERPASS - L=24.77m PERETE TIP 2 / WALL TYPE 2 - L=18.92m
CONTRACT: 124/04.11.2022 DATA: FEBRUARIE 2024 FAZA: P.A.C. REVIZIA DATA COMENTARII
SPECIFICATIE NUME SEMNATURA DENUMIRE PROIECT: WB01 Feb. 2024 Prima editie
PROIECTARE SI EXECUTIE LUCRARI AFERENTE OBIECTIVULUI DE
D E F BENEFICIAR
Manager de proiect ing.Massimiliano Cipolletti INVESTITII MODERNIZAREA LINIEI FEROVIARE CARANSEBES-
ANTREPRENOR SI PROIECTANT GENERAL PROIECTANT DE SPECIALITATE TIMISOARA – ARAD - LOT 3 TIMISOARA EST - RONAT TRIAJ GR. D
Proiectat ing.Marcello Colasanti
SCARA: DENUMIRE DESEN:
Verificat ing.Madalin Voica 1:100 STATIA TIMISOARA NORD
Codificare plansa CTA3-CL-DWG-PAC-03-RE03-DSG-001-WB01 1:50 Strada Nera - Rampa de intrare - Dispozitie generala
COMPANIA NAȚIONALĂ DE CĂI FERATE