ANALIZA TACTULUI DE FABRICA

Project: Cheie reglbilă pentru ţevi

TIMPUL DE LUCRU DISPONIBIL


1
Nunarul de schmburi dispnibile
schimb
Zile lucratoredisponibile /an 226 Timp disponibil /zi 480
Zile lucratore disponibile /sapt 5 Pauze/zi 30
Saptamani lucratore/an 45.2 Timp planificat/zi 15
Timp de munca/zi
435
(Minutes / Day)
(Minutes/ saptamana 2175

SRT Calculation Assumptions:


Timp disponibil: 480 min-8x60min/ora
Pauze: 30 min-1 pauza/schimb
Planned Down Time: 15 min-5 min inspectia de start, 10 min curatirea locului de munca

Volume Info Source:

(Reference Document Number)

FORECASTED CUSTOMER TAKT TIME TAB


Timpul de Ciclu
Volumul (Secunde/Piesa)
an Volumul
zilnic
annual
1
Shift 2
Shift 3
Shift 4
Shift
Model Year Operation Operation Operation Operation
2017 240,000 106 245.8 491.6 737.3

Number of shifts the system will be operated (as defined on Machine B


Key:
CON= Timp de pauza
Pln DT = Timp de oprire planificat(Preventative Maintenance, Group Meetings, etc)
SRT = Timp de lucru efectiv

SCHEDULED RUN TIME TABLE (Less than 3 shifts


1 or
2 Monday Tuesday Wednesday Thursday Friday
Shif
ts

Avail Pln Avail Pln Avail Pln Avail Pln Avail


Shift Time Con DT SRT Time Con DT SRT Time Con DT SRT Time Con DT SRT Time
1 480 30 15 435 480 30 15 435 480 30 15 435 480 30 15 435 480
2 480 30 15 435 480 30 15 435 480 30 15 435 480 30 15 435 480
Dail
y 960 60 30 870 960 60 30 870 960 60 30 870 960 60 30 870 960
Tota minutes/day minutes/day minutes/day minutes/day minutes/day
l

SCHEDULED RUN TIME TABLE ( 3 shifts or more)


3 or
> Monday Tuesday Wednesday Thursday Friday
Shif
ts

Avail Pln Avail Pln Avail Pln Avail Pln Avail


Shift Time Con DT SRT Time Con DT SRT Time Con DT SRT Time Con DT SRT Time
1 480 30 15 435 480 30 15 435 480 30 15 435 480 30 15 435 480
2 480 30 15 435 480 30 15 435 480 30 15 435 480 30 15 435 480
3 480 30 15 435 480 30 15 435 480 30 15 435 480 30 15 435 480
4 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dail
y ### 90 45 ### ### 90 45 ### ### 90 45 ### ### 90 45 ### ###
Tota minutes/day minutes/day minutes/day minutes/day minutes/day
l
I DE FABRICATIE
Date: 28.12.2017

U DISPONIBIL
1 2 3 sau 4 schimburi
(Cumulative times)
schimb schimburi 1 2 3 4
480 960 480 960 1440
30 60 30 60 90 0
15 30 15 30 45 0
435 870 435 870 1305 0
2175 4350 2175 4350 6525 0

Assumptions:

tirea locului de munca la sfarsitul schimbului

ER TAKT TIME TABLE


clu Timpul de ciclu cu celule multiple
sa) numarul de celule, if >1:

4
Shift 1
Shift 2
Shift 3
Shift 4
Shift
Operation Operation Operation Operation Operation

defined on Machine Balance) = #REF!


E (Less than 3 shifts)

Cumulative Times
Friday Saturday Sunday Sch Total per Week
Days SRT per
per Week
Wee (Minutes
k )
Pln Avail Pln Avail Pln Avail
Con DT SRT Time Con DT SRT Time Con DT SRT Time Con
30 15 435 0 0 5 2,175 ### 150
30 15 435 0 0 5 2,175 ### 300
60 30 870 0 0 0 0 0 0 0 0 4,350
minutes/day minutes/day minutes/day min/wk

E ( 3 shifts or more)

Friday Saturday Sunday Sch Total


Days SRT per
per Week
Wee (Minutes
k )
Pln Avail Pln Avail Pln
Con DT SRT Time Con DT SRT Time Con DT SRT
30 15 435 0 0 5 2,175 ### 150
30 15 435 0 0 5 2,175 ### 300
30 15 435 0 0 5 2,175 ### 450
0 0 0 0 0 0 0 0 0
90 45 ### 0 0 0 0 0 0 0 0 6,525 Minutes per Week
minutes/day minutes/day minutes/day min/wk

Vol Basis Options


Calendar Year
Model Year
Cumulative Times Cumulative
per Week Daily Average Times

Pln Pln
DT SRT Avail Con DT SRT
75 ### 480 30 15 435 1 Shift
150 ### 960 60 30 870 2 Shifts

75 ### 480 30 15 435 1 Shift


150 ### 960 60 30 870 2 Shifts
225 ### ### 90 45 ### 3 Shifts
0 0 4 Shifts
Minutes per Week Minutes per Day