Documente Academic
Documente Profesional
Documente Cultură
soto ra
cing
LOKASI :
Perum Tirta Wijaya
GAMBAR :
DENAH SITUASI
NOTASI :
= RUMAH
= JALAN
= LAPANGAN
= LAHAN KOSONG
NPM 202201489
DI SETUJUI
Rio Aditya Permana, S.T., M.T.
SKALA
1 5
P1
85,30
PEKERJAAN :
25,10
P3
P7
6,97 P2
PEMASANGAN PIPA DISTRIBUSI
18,76
121,69
P6
P5
63,84
LOKASI :
21,91
P4
21,07
Perum Tirta Wijaya
P8
P9
65,28
P10
GAMBAR :
17,33
7,86
P11
P13
19,58 P14 P12
21,50 81,49
P15 SITEPLAN JARINGAN PERPIPAAN
37,14
P16
NOTASI :
56,33
21,55
P19
P17
58,07
17,32
P20
P18
56,83
P21
31,37
56,50
P22
55,99
P23
55,05
P24
= PIPAØ 50 mm
P25
28,28 P26 = PIPAØ 75 mm
21,56 P27
37,18 = PIPA Ø 100 mm
P28
21,55 P29
17,33
No. Pipa Panjang Pipa (m) Ø Pipa (mm) Jenis Pipa 13 P13 19,5800 100 PE 26 P26 21,5600 50 PE DIRENCANAKAN Dika Pranata
1 P1 85,3000 100 PE 14 P14 21,5000 100 PE 27 P27 37,1800 50 PE
2 P2 121,600 100 PE 15 P15 37,1400 100 PE 28 P28 21,5500 50 PE
NPM 202201489
3 P3 25,1000 75 PE 16 P16 21,5500 100 PE 29 P29 17,3300 50 PE
4 P4 21,9100 75 PE 17 P17 17,3200 100 PE
18 P18 31,3700 100 PE DI PERIKSA Rio Aditya Permana, S.T., M.T.
5 P5 63,8400 50 PE
6 P6 18,7600 50 PE 19 P19 56,3300 50 PE
7 P7 6,9700 50 PE 20 P20 58,0700 50 PE
DI SETUJUI
Rio Aditya Permana, S.T., M.T.
8 P8 21,0700 75 PE 21 P21 56,8300 50 PE
56,5000
9
10
P9
P10
65,2800
7,8600
75
75
PE
PE
22
23
P22
P23 55,9900
50
50
PE
PE Siteplan Jaringan Perpipaan SKALA
24 P24 55,0500 50 PE
11
12
P11
P12
17,3300
81,4900
75
75
PE
PE 25 P25 28,2800 50 PE SKALA 1:1000
1 : 1000
NOMOR LEMBAR : JUMLAH LEMBAR :
3 5
= PIPAØ 50 mm
= PIPAØ 75 mm
= PIPA Ø 100 mm
Dika Pranata
202201489
Detail Aksesoris
1 2 3
Keterangan :
1. Knee 90º Ø 75 X 75 mm = 1 Keterangan :
Keterangan :
1. Tee 100 X 100 X 75 mm= 1 1. Tee 75x75x75 mm =1
2. Gate Valve Ø 75 mm = 1 2. Gate Valve Ø 50 mm =1
3. Giboult Joint Ø 75 mm = 2 3. Giboult Joint Ø 75 mm =2
4. Reducer 100 to 50 mm =1
Keterangan :
1. Tee 100x100x100 mm =1
2. Gate Valve Ø 100 mm =2
3. Giboult Joint Ø 100 mm =6
4. Reducer 10 to 100 mm =1
5. Meteran induk 150 mm =1