Documente Academic
Documente Profesional
Documente Cultură
Beneficiar:
Executant:
Proiectant:
Obiectivul:
Obiectul:
Stadiul fizic:
eDevize
OAMGMAMR
SC INDEX SRL
OAMGMAMR
ARH Lucrari de architectura
LA Lucari de arhitectura
Formular F3
Lista cu cantitati de lucrari pe categorii de lucrari
SECTIUNEA TEHNICA
Nr.
Capitol de lucrari
1.1
2.1
SECTIUNEA FINANCIARA
U.M.
Cantitatea
Pretul unitar
(fara TVA)
- Lei -
TOTALUL
(fara TVA)
- Lei -
5=3x4
mc
mc
mp
4.90
260.71
1,277.49
material:
175.04
857.70
manopera:
85.67
419.79
utilaj:
0.00
0.00
transport:
0.00
0.00
0.54
229.44
123.67
30.90
20.58
635.94
material:
5.99
184.96
manopera:
14.59
450.98
utilaj:
0.00
0.00
transport:
0.00
0.00
mc
0.71
227.46
161.66
mp
655.00
16.32
10,692.67
material:
3.30
2,161.90
manopera:
13.00
8,517.12
utilaj:
0.02
13.64
transport:
0.00
0.00
655.00
10.93
7,159.49
mp
mp
mp
material:
4.93
3,231.85
manopera:
6.00
3,927.64
utilaj:
0.00
0.00
transport:
0.00
0.00
52.00
25.04
1,301.98
material:
15.04
782.00
manopera:
10.00
519.98
utilaj:
0.00
0.00
transport:
0.00
0.00
125.00
9.60
1,200.00
material:
0.50
62.50
manopera:
4.50
562.50
utilaj:
4.60
575.00
transport:
0.00
0.00
Pagina 1 din 2
Antet stanga
eDevize
SECTIUNEA TEHNICA
Nr.
SECTIUNEA FINANCIARA
Capitol de lucrari
7.1
v.751-3 ntr
90-
U.M.
Cantitatea
Pretul unitar
(fara TVA)
- Lei -
TOTALUL
(fara TVA)
- Lei -
5=3x4
mp
1.00
14.25
14.25
material:
6.00
6.00
manopera:
8.25
8.25
utilaj:
0.00
0.00
transport:
0.00
0.00
kg
0.36
12.00
4.32
mp
1.00
4.84
4.84
mp
mp
material:
0.00
0.00
manopera:
4.84
4.84
utilaj:
0.00
0.00
transport:
0.00
0.00
1.00
4.95
4.95
material:
1.50
1.50
manopera:
3.45
3.45
utilaj:
0.00
0.00
transport:
0.00
0.00
1.00
10.00
10.00
material:
3.68
3.68
manopera:
6.32
6.32
utilaj:
0.00
0.00
transport:
0.00
0.00
22,301.59
(24.00%)
5,352.38
Director
27,653.97
Sef proiect
Ofertant
Pagina 2 din 2