Beneficiar:
Executant:
Proiectant:
Obiectivul:
Obiectul:
Stadiul fizic:
eDevize
GAFINCU PETRU
ADAM ROBERT
PUNGUTA IONUT
CONSTRUIRE LOCUINTA SI ANEXA
01 C1
01 INFRASTRUCTURA
Formular F3
Lista cu cantitati de lucrari pe categorii de lucrari
SECTIUNEA TEHNICA
Nr.
Capitol de lucrari
SECTIUNEA FINANCIARA
U.M.
Cantitatea
Pretul unitar
(fara TVA)
- Lei -
TOTALUL
(fara TVA)
- Lei -
5=3x4
100
mc
100
mc
100
mp
mc
mc
kg
kg
0.57
229.87
131.03
material:
0.00
0.00
manopera:
0.00
0.00
utilaj:
229.87
131.03
transport:
0.00
0.00
0.80
444.81
355.84
material:
0.00
0.00
manopera:
0.00
0.00
utilaj:
444.81
355.84
transport:
0.00
0.00
1.21
113.95
137.88
material:
0.00
0.00
manopera:
113.95
137.88
utilaj:
0.00
0.00
transport:
0.00
0.00
3.70
170.68
631.51
material:
140.78
520.90
manopera:
23.44
86.71
utilaj:
6.46
23.90
transport:
0.00
0.00
3.70
44.52
164.74
material:
0.02
0.09
manopera:
43.71
161.71
utilaj:
0.79
2.94
transport:
0.00
0.00
370.00
0.59
219.18
material:
0.00
0.00
manopera:
0.59
219.18
utilaj:
0.00
0.00
transport:
0.00
0.00
4,285.00
0.40
1,712.34
material:
0.00
0.00
manopera:
0.40
1,712.34
utilaj:
0.00
0.00
transport:
0.00
0.00
Pagina 1 din 3
Antet stanga
eDevize
SECTIUNEA TEHNICA
Nr.
Capitol de lucrari
U.M.
2
9.1
SECTIUNEA FINANCIARA
kg
mc
Pretul unitar
(fara TVA)
- Lei -
TOTALUL
(fara TVA)
- Lei -
5=3x4
4,655.00
0.34
1,571.09
material:
0.06
299.47
manopera:
0.27
1,271.62
utilaj:
0.00
0.00
transport:
0.00
0.00
90.00
195.29
17,576.46
material:
187.26
16,853.68
manopera:
7.82
704.19
utilaj:
0.21
18.59
transport:
0.00
0.00
mc
90.72
185.54
16,831.80
mp
254.00
33.48
8,504.95
material:
18.31
4,650.23
manopera:
15.18
3,854.72
mp
mc
100
mc
mc
15 TSD16XB - Strat repartitie balast granulatie 07mm,prevaz.sub prisma de balastare,cu placa vibratoare
de 650kg
mc
Cantitatea
utilaj:
0.00
0.00
transport:
0.00
0.00
12.00
18.30
219.64
material:
3.06
36.68
manopera:
15.25
182.96
utilaj:
0.00
0.00
transport:
0.00
0.00
67.00
4.11
275.36
material:
0.00
0.00
manopera:
4.11
275.36
utilaj:
0.00
0.00
transport:
0.00
0.00
0.67
294.12
197.06
material:
0.00
0.00
manopera:
60.44
40.49
utilaj:
233.69
156.57
transport:
0.00
0.00
6.70
7.49
50.18
material:
0.24
1.61
manopera:
7.25
48.57
utilaj:
0.00
0.00
transport:
0.00
0.00
19.00
76.41
1,451.79
material:
55.80
1,060.18
manopera:
18.22
346.18
utilaj:
2.39
45.43
transport:
0.00
0.00
Pagina 2 din 3
Antet stanga
eDevize
SECTIUNEA TEHNICA
Nr.
Capitol de lucrari
U.M.
2
16.1
SECTIUNEA FINANCIARA
18.1
18.2
mp
Cantitatea
Pretul unitar
(fara TVA)
- Lei -
TOTALUL
(fara TVA)
- Lei -
5=3x4
190.00
19.89
3,779.16
material:
17.33
3,293.24
manopera:
2.56
485.92
utilaj:
0.00
0.00
transport:
0.00
0.00
mp
191.90
17.16
3,293.24
mp
190.00
1.51
286.44
kg
material:
0.66
124.84
manopera:
0.85
161.61
utilaj:
0.00
0.00
transport:
0.00
0.00
846.00
0.65
546.37
material:
0.24
202.83
manopera:
0.41
343.54
utilaj:
0.00
0.00
transport:
0.00
0.00
kg
854.46
0.00
0.00
buc
253.80
0.57
143.64
tona
75.00
2.81
210.93
material:
0.00
0.00
manopera:
2.81
210.93
utilaj:
0.00
0.00
transport:
0.00
0.00
38,021.96
(20.00%)
7,604.39
Director
45,626.36
Sef proiect
Ofertant
Pagina 3 din 3