INDICI DE ACTUALIZARE A COSTURILOR ELEMENTELOR SUBSISTEMELOR STRUCTURALE


TABELE CORECTATE CU INDICII 2016 - 2017
FUNDAII CONTINUE FUNDAII CU SUBSOL PARIAL SAU TOTAL

Tip fundaie Varianta pre indice cost actualizat Tip fundaie pre indice cost actualizat
carte 2016- 2017 2016 - 2017 carte 2016 - 2017 2016 - 2017
Beton simplu V1 359,3 1,1045 396,8 Subsol parial
FCBS V2 475,0 1,1045 524 ,6 FSUBSPAR 1.178,60 1,0122 1.193 ,0
V3 583,2 1,1045 644 ,1
Beton simplu V1 395,2 1,0521 415,8 Subsol total
si cuzine i arma i V2 507,4 1,0521 533 ,8 FSUBSTOT 1.795,40 1,0122 1.817 , 3
FC V3 649,4 1,0521 683 ,2
Izolat n trepte V1 509,0 1 ,0507 534 ,8
sub stlp V2 629,3 1,0507 661,2
FI V3 695,3 1,0507 730 ,6
Grind V1 624,0 1,0512 655,9
continu V2 761,2 1,0512 800 ,2
GRFUN V3 910,4 1,0512 957 ,0 pag. carte: 11 i 13

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.

Exemplu: Pentru o cldire cu Sc = 90 mp , avnd o fundaie de tip FC - V2 , amplasat ntr -o localitate cu treapta lll-a de salarizare i la
10 Km distan de transport materiale, costul de nlocuire de nou al fundaiei devine:

Cost de nou = 90 mp x 533,80 lei/ mp =48.042 lei (TVA inclus ).

Not : pentru cazul infrastructurilor cu variante diferite de fundare, cum ar fi fundaiile cu susbsol par ial sau fundaiile de beton
simplu adiacente fundaiilor continui de beton armat, se vor utiliza indicii de actualizare specifici tipului de fundaie existent.
STRUCTURA CLDIRE PARTER (FARA SCARA) GRADUL SEISMIC 6 AUGUST 2016 - IULIE 2017
Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zid rie 24 6ZIDCAR24PFS 638,2 1,1222 716 , 2
cr mid 30 6 ZIDCAR 30 PFS 670,1 1,1132 746 ,0
37,5 6ZIDCAR 37 PFS 791,8 1,1043 874 ,4
Zid rie 24 6 ZBCA24 PFS 611,5 0 , 9371 573 ,0 pag. carte: 15
BCA 30 6 ZBCA30PFS 616,2 0 , 9608 592 ,0
35 6 ZBCA35PFS 644,8 0 , 9844 634 ,7
Zidrie 24 6 ZBOL24PFS 529,6 0,9883 523 ,4
bolari 29 6 ZBOL29PFS 564,6 0,9883 558 ,0
Zidrie 24 6ZPOROT 24PFS 599,7 0 , 9670 579 ,9
porotherm 30 6ZPOROT30PFS 677,2 1,0127 685,8

STRUCTUR CLDIRE PARTER (FR SCAR) GRADUL SEISMIC 7


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 7ZIDCAR24PFS 656,9 1,1049 725,8
crmid 30 7ZIDCAR 30PFS 688,8 1,0993 757 ,2
37,5 7ZIDCAR 37PFS 810,6 1,0936 886 ,5
Zidrie 24 7ZBCA24PFS 630,2 0,9423 593 ,8 pag. carte: 16
BCA 30 7ZBCA30PFS 634,0 0,9796 621 ,1
35 7ZBCA35PFS 662,7 1,0169 673,9
Zidrie 24 7ZBOL24PFS 547,5 0,9883 541,1
bolari 29 7ZBOL29PFS 583,4 0,9883 576,6
Zidrie 24 7ZPOROT 24PFS 617,6 0,9568 590,9
porotherm 30 7ZPOROT 30PFS 696,0 1, 0136 705,5

STRUCTUR CLDIRE PARTER (FR SCAR) GRADUL SEISMIC 8


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 8ZIDCAR24PFS 675,7 1, 0875 734 ,8
crmid 30 8ZIDCAR 30 PFS 707,6 1, 0852 767 ,9
37,5 8ZIDCAR 37 PFS 829,3 1, 0829 898 ,0
Zidrie 24 8ZBCA24PFS 649,0 0,9476 615,0 pag. carte : 17
BCA 30 8ZBCA30PFS 651,9 0,9985 650,9
35 8ZBCA35PFS 680,5 1,0494 714,1
Zidrie 24 8ZBOL24PFS 565,5 0,9883 558 ,9
bolari 29 8ZBOL29PFS 602,3 0,9883 595,3
Zidrie 24 8ZPOROT 24PFS 635,5 0 , 9467 601 ,6
porotherm 30 8ZPOROT 30PFS 714,8 1,0146 725,2

STRUCTUR CLDIRE PARTER (FR SCAR) GRADUL SEISMIC 9


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zid rie 24 9 ZIDCAR24PFS 694,5 1,0962 761 , 3
crmid 30 9 ZIDCAR 30PFS 726,4 1,0922 793 ,4
37,5 9 ZIDCAR 37PFS 848,1 1,0883 922,9
Zidrie 24 9ZBCA24PFS 667,8 0, 9772 652 ,6 pag. carte: 18
BCA 30 9ZBCA30PFS 669,8 0,9891 662 ,5
35 9ZBCA35PFS 698,4 1,0331 721 ,5
Zidrie 24 9ZBOL24PFS 583,4 0,9883 576 ,6
bolari 29 9ZBOL29PFS 621,1 0,9883 613 ,8
Zidrie 24 9ZPOROT24PFS 653,4 0,9517 621 ,8
porotherm 30 9ZPOROT30PFS 733,6 1,0141 743 ,9

STRUCTUR CLDIRE PARTER (CU SCAR) GRADUL SEISMIC 6


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 6 ZIDCAR24PS 665,0 1,1049 734 ,8
crmid 30 6 ZIDCAR 30 PS 696,9 1,1045 769 ,7
37,5 6 ZIDCAR 37PS 818,6 1,1042 903 ,9
Zidrie 24 6 ZBCA24PS 638,3 0 , 9495 606 ,1 pag. carte: 19
BCA 30 6 ZBCA30PS 643,0 1,0164 653 ,5
35 6 ZBCA35PS 671,6 1,0834 727 ,6
Zidrie 24 6 ZBOL24PS 556,4 0 , 9728 541 ,3
bolari 29 6 ZBOL29PS 591,4 0 , 9728 575,3
Zidrie 24 6 ZPOROT 24PS 626,5 0 , 9518 596 ,3
porotherm 30 6 ZPOROT 30PS 704,0 0 , 9161 644 ,9

STRUCTUR CLDIRE PARTER (CU SCAR) GRADUL SEISMIC 7


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 7 ZIDCAR24PS 683,6 1, 1020 753 ,3
crmid 30 7 ZIDCAR 30PS 715,5 1, 1000 787 ,1
37,5 7 ZIDCAR 37PS 837,2 1, 0980 919 , 2
Zidrie 24 7ZBCA24 PS 656,9 0 , 9189 603 ,6 pag. carte : 20
BCA 30 7ZBCA30 PS 659,4 0 , 9933 655,0
35 7ZBCA35PS 688,0 1,0678 734 ,6
Zidrie 24 7ZBOL24PS 573,0 0 , 9728 557 ,4
bolari 29 7ZBOL29PS 610,1 0,9728 593 ,5
Zid rie 24 7ZPOROT 24PS 643,0 0,9486 609 ,9
porotherm 30 7ZPOROT30PS 722,6 0,9257 668 ,9

STRUCTUR CLDIRE PARTER (CU SCAR) GRADUL SEISMIC 8


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 8 ZIDCAR24PS 702,4 1,0991 772,0
crmid 30 8 ZIDCAR 30PS 734,3 1,0955 804 ,4
37,5 8 ZIDCAR 37PS 856,0 1,0918 934 ,6
Zidrie 24 8ZBCA24PS 675,7 0,8884 600 , 3 pag. carte: 21
BCA 30 8ZBCA30PS 677,3 0,9703 657 ,2
35 8ZBCA35PS 705,9 1,0523 742,8
Zidrie 24 8ZBOL24PS 590,9 0,9665 571 ,1
bolari 29 8ZBOL29PS 629,0 0, 9965 626 ,8
Zidrie 24 8ZPOROT 24PS 660,9 0 , 9455 624 ,9
porotherm 30 8ZPOROT 30PS 741,4 0, 9353 693 ,4

STRUCTUR CLDIRE PARTER CU SCAR) GRADUL SEISMIC 9


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zid rie 24 9 ZIDCAR24FPS 721,2 1,1055 797 , 3
crmid 30 9 ZIDCAR 30FPS 753,1 1,0977 826 ,7
37,5 9 ZIDCAR 37FPS 874,7 1,0949 957 ,7
Zid rie 24 9ZBCA24FPS 694,5 0 , 9037 627 ,6 pag. carte : 22
BCA 30 9ZBCA30FPS 695,2 0 , 9818 682,5
35 9ZBCA35FPS 723,8 1,0600 767 ,2
Zidrie 24 9ZBOL24FPS 608,8 0 , 9603 584 ,6
bolari 29 9ZBOL29FPS 647,8 0,9603 622,1
Zidrie 24 9ZPOROT 24 PFS 678,8 1,0678 724,8
porotherm 30 9ZPOROT30 PFS 760,2 1,0678 811,7

STRUCTUR ETAJ (F R SCAR) GRADUL SEISMIC 6


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 6 ZIDCAR24EFS 638,2 1, 1222 716 , 2
crmid 30 6 ZIDCAR 30 EFS 670,1 1,1132 746 ,0
37,5 6 ZIDCAR 37EFS 791,8 1,1043 874 ,4
Zid rie 24 6 ZBCA24 EFS 611,5 0 , 9371 573 ,0 pag. carte : 23
BCA 30 6 ZBCA30 EFS 616,2 0, 9608 592 ,0
35 6 ZBCA35EFS 644,8 0,9844 634 ,7
Zidrie 24 6 ZBOL24EFS 529,6 0,9883 523 ,4
bolari 29 6 ZBOL29EFS 564,6 0,9883 558 ,0
Zid rie 24 6 ZPOROT24EFS 599,7 0,9670 579 ,9
porotherm 30 6 ZPOROT 30EFS 677,2 1,0127 685,8

STRUCTUR ETAJ (FR SCAR) GRADUL SEISMIC 7


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 7ZIDCAR24EFS 656,9 1,1049 725,8
crmid 30 7ZIDCAR 30EFS 688,8 1,0993 757 ,2
37,5 7ZIDCAR 37EFS 810,6 1,0936 886 ,5
Zidrie 24 7ZBCA24EFS 630,2 0,9423 593 ,8 pag. carte: 24
BCA 30 7ZBCA30EFS 634,0 0, 9796 621 ,1
35 7ZBCA35EFS 662,7 1,0169 673 ,9
Zidrie 24 7ZBOL24EFS 547,5 0 , 9883 541 ,1
bolari 29 7ZBOL29EFS 583,4 0 , 9883 576 ,6
Zidrie 24 7ZPOROT 24EFS 617,6 0 , 9568 590 ,9
porotherm 30 7ZPOROT 30 EFS 696,0 1,0136 705,5

STRUCTUR ETAJ (FR SCAR) GRADUL SEISMIC 8


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zid rie 24 8 ZIDCAR24EFS 675,7 1,0875 734 ,8
crmid 30 8 ZIDCAR 30 EFS 707,6 1, 0852 767 ,9
37,5 8 ZIDCAR 37EFS 829,3 1,0829 898 ,0
Zid rie 24 8ZBCA24EFS 649,0 0 , 9476 615,0 pag. carte : 25
BCA 30 8ZBCA30 EFS 651,9 0 , 9985 650 ,9
35 8ZBCA35EFS 680,5 1,0494 714,1
Zidrie 24 8ZBOL24EFS 565,5 0, 9883 558 ,9
bolari 29 8ZBOL29EFS 602,3 0,9883 595,3
Zidrie 24 8ZPOROT 24 EFS 635,5 0 , 9467 601 ,6
porotherm 30 8ZPOROT30 EFS 714,8 1,0146 725, 2

STRUCTUR ETAJ (F R SCAR) GRADUL SEISMIC 9


| Tip zidrie |
Grosime | Simbol | pre | indice | cost actualizat |
carte 2016 - 2017 2016 - 2017
Zidrie 24 9 ZIDCAR24EFS 694,5 1,0962 761 ,3
crmid 30 9 ZIDCAR 30EFS 726,4 1,0922 793 ,4
37,5 9 ZIDCAR 37EFS 848,1 1,0883 922,9
Zid rie 24 9ZBCA24 EFS 667,8 0 , 9772 652,6 pag. carte : 26
BCA 30 9ZBCA30 EFS 669,8 0 , 9891 662,5
35 9ZBCA35EFS 698,4 1,0331 721 ,5
Zidrie 24 9ZBOL24EFS 583,4 0 , 9883 576 ,6
bolari 29 9ZBOL29EFS 621,1 0,9883 613 ,8
Zidrie 24 9ZPOROT 24EFS 653,4 0, 9517 621 ,8
porotherm 30 9ZPOROT 30EFS 733,6 1,0141 743 ,9

STRUCTUR ETAJ (CU SCAR) GRADUL SEISMIC 6


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 6 ZIDCAR24ES 665,0 1, 1049 734 ,8
crmid 30 6 ZIDCAR 30 ES 696,9 1, 1045 769 ,7
37,5 6 ZIDCAR 37ES 818,6 1,1042 903 ,9
Zidrie 24 6 ZBCA24ES 638,3 0 , 9495 606 ,1 pag. carte: 27
BCA 30 6 ZBCA30ES 643,0 1,0164 653 ,5
35 6 ZBCA35ES 671,6 1,0834 727 ,6
Zidrie 24 6 ZBOL24ES 556,4 0 , 9728 541 ,3
bolari 29 6 ZBOL29ES 591,4 0 , 9728 575, 3
Zid rie 24 6 ZPOROT 24ES 626,5 0 , 9518 596 ,3
porotherm 30 6 ZPOROT 30ES 704,0 0 , 9161 644,9

STRUCTUR ETAJ (CU SCAR) GRADUL SEISMIC 7


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 7 ZIDCAR24ES 683,6 1, 1020 753 ,3
crmid 30 7 ZIDCAR 30 ES 715,5 1, 1000 787 ,1
37,5 7 ZIDCAR 37ES 837,2 1, 0980 919 ,2
Zidrie 24 7ZBCA24ES 656,9 0 , 9189 603 ,6 pag. carte: 28
BCA 30 7ZBCA30ES 659,4 0 , 9933 655,0
35 7ZBCA35ES 688,0 1, 0678 734,6
Zidrie 24 7ZBOL24ES 573,0 0 , 9728 557 ,4
bolari 29 7ZBOL29ES 610,1 0 , 9728 593 ,5
Zidrie 24 7ZPOROT 24ES 643,0 0 , 9486 609 ,9
porotherm 30 7ZPOROT 30ES 722,6 0 , 9257 668 ,9
STRUCTUR ETAJ (CU SCAR ) GRADUL SEISMIC 8
Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zid rie 24 8 ZIDCAR24 ES 702,4 1,0991 772,0
crmid 30 8 ZIDCAR 30 ES 734,3 1,0955 804 ,4
37,5 8 ZIDCAR 37ES 856,0 1,0918 934 ,6
Zid rie 24 8ZBCA24 ES 675,7 0, 8884 600 , 3 pag. carte: 29
BCA 30 8ZBCA30ES 677,3 0 , 9703 657 ,2
35 8ZBCA35ES 705,9 1,0523 742,8
Zidrie 24 8ZBOL24ES 590,9 0,9665 571 ,1
bolari 29 8ZBOL29ES 629,0 0,9965 626 ,8
Zidrie 24 8ZPOROT24ES 660,9 0,9455 624 ,9
porotherm 30 8ZPOROT 30ES 741,4 0,9353 693 ,4

STRUCTUR ETAJ (CU SCAR) GRADUL SEISMIC 9


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 9 ZIDCAR24ES 721,2 1,1055 797 ,3
crmid 30 9 ZIDCAR 30 ES 753,1 1,0977 826 ,7
37,5 9 ZIDCAR 37ES 874,7 1,0949 957 ,7
Zidrie 24 9ZBCA24ES 694,5 0 , 9037 627 ,6 pag. carte: 30
BCA 30 9ZBCA30ES 695,2 0 , 9818 682,5
35 9ZBCA35ES 723,8 1,0600 767 ,2
Zidrie 24 9ZBOL24ES 608,8 0 , 9603 584 ,6
bolari 29 9ZBOL29ES 647,8 0 , 9603 622,1
Zidrie 24 9ZPOROT 24ES 678,8 0 , 9486 643 ,9
porotherm 30 9ZPOROT 30ES 760,2 0 , 9449 718 ,3

MANSARD GRADUL SEISMIC 6


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 6ZIDCAR24M 300,3 1,0216 306 ,8
crmid 30 6 ZIDCAR 30 M 337,5 1,0087 340,4
37,5 6 ZIDCAR37M 378,8 0 , 9957 377 ,2
Zidrie 24 6 ZBCA24 M 285,0 0 , 9602 273 ,7 pag. carte : 31
BCA 30 6 ZBCA30 M 315,8 0 , 9982 315, 2
35 6 ZBCA35M 347,8 1, 0362 360,4
Zidrie 24 6 ZBOL24 M 250,2 1, 0139 253 ,7
bolari 29 6 ZBOL29 M 272,2 1,0139 276 ,0
Zid rie 24 6 ZPOROT 24 M 292,7 0 , 9048 264 ,8
porotherm 30 6 ZPOROT30M 320,4 0, 9435 302, 3

MANSARD GRADUL SEISMIC 7


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zid rie 24 7ZIDCAR 24M 302,5 1,0331 312,5
crmid 30 7ZIDCAR 30M 342,1 1,0488 358 ,8
37,5 7ZIDCAR37M 381,2 1,0301 392,7
Zidrie 24 7ZBCA24M 295,3 0,9324 275, 3 pag. carte: 32
BCA 30 7ZBCA30M 331,7 0,9798 325,0
35 7ZBCA35M 363,5 1,0272 373 ,4
Zidrie 24 7ZBOL24M 252,3 1,0238 258 , 3
bolari 29 7ZBOL29M 274,3 1,0238 280,8
Zidrie 24 7ZPOROT 24M 294,8 0 , 905 266 ,8
porotherm 30 7ZPOROT 30M 322,5 0, 9477 305,6

MANSARD GRADUL SEISMIC 8


Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zid rie 24 8ZIDCAR24M 307,0 1,0444 320,6
crmid 30 8ZIDCAR 30 M 354,5 1,0544 373 ,8
37,5 8ZIDCAR 37 M 386,1 1,0645 411 ,0
Zid rie 24 8ZBCA24M 316,1 0, 9047 286 ,0 pag. carte : 33
BCA 30 8ZBCA30M 346,9 0 , 9615 333 ,5
35 8ZBCA35M 374,0 1, 0183 380,8
Zidrie 24 8 ZBOL24M 256,6 1, 0337 265,2
bolari 29 8 ZBOL29M 278,6 1,0337 288 ,0
Zid rie 24 8ZPOROT 24M 299,1 0 , 9052 270,7
porotherm 30 8ZPOROT 30M 326,8 0,9519 311 ,1
MANSARDA GRADUL SEISMIC 9
Tip zidrie Grosime Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Zidrie 24 9ZIDCAR24M 309,2 1, 0557 326 ,4
crmid 30 9ZIDCAR 30 M 355,8 1, 0645 378 ,7
37,5 9ZIDCAR37 M 388,5 1, 0732 416 ,9
Zidrie 24 9ZBCA24 M 326,3 1, 0115 330,1 pag. carte : 34
BCA 30 9ZBCA30 M 379,2 1, 0209 387 ,1
35 9ZBCA35 M 410,5 1,0337 424 , 3
Zidrie 24 9 ZBOL24M 258,7 1,0436 270 ,0
bolari 29 9 ZBOL29M 280,7 1,0436 292,9
Zid rie 24 9ZPOROT 24M 301,1 0 , 9052 272,6
porotherm 30 9ZPOROT30M 328,9 0,9561 314 ,5

NVELITORI l TERASE
Tip nvelitoare / teras pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Tnvelitoare tabl zincat (INVTZ) 226,4 1,3887 314 ,4
nvelitare tabl Lindab (INVTL) 340,4 1,1335 385,8 pag. carte: 35
nvelitoare igl profilat ceramic (INVTIG) 363,4 1,0704 389 ,0
Teras necirculabil (TERNE) 439,4 1,0445 459 ,0
Teras circulabil cu balustrad din inox (TERCIRC) 952,5 1,0233 974 ,7
FINISAJE INTERIOARE SI EXTERIOARE
Tip finisaj pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Finisaj obi nuit fr scar (FOBFS) 918,1 1, 0348 950,0 pag. carte: 35
Finisaj superior fr scar (FSUPFS) 1.253,6 1,0000 1.252,9
Finisaj obinuit mansard cu tavan gipscarton (FOMANS) 608,3 1,0017 609 , 3
FINISAJE SCARA
Tip scar pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Scar obinuit cu trepte mozaicate i parapet din laminate (SCAMOZ ) 3.563,5 0 , 9822 3.500,1
Scar obinuit cu trepte gresie i parapet din lemn (SCAGRES ) 3.662,2 0 , 9672 3.542,1 pag. carte: 35
Scar superioar cu trepte stejar i balustrad din inox (SCASTEJA) 10.887,6 1,1129 12.116,8
Scar superioar cu trepte marmur i balustrad din inox ( SCAMARM ) 15.413,6 1,0046 15.484,5
COSTUL DE EXECUIE AFERENT FINISAJELOR DE FA ADA
Denumire faad pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Finisaj similipiatr cu asize de 3 cm 403,8 1,0000 403 ,8
Placare cu crmid bratca 384,5 1,0031 385,7
Finisaj termosistem la soclu faad ( polistiren extrudat de 10 cm ) 329,0 0,9748 320,7 pag. carte : 36
Finisaj similipiatr cu asize de 1 cm 238,9 1, 0146 242,4
Faad cu terasit 222,4 0 , 9969 221 ,7
Faad cu praf de piatr 221,3 1, 0443 231 ,1
Tencuial tip strop cu ciment alb 218,5 1, 0387 227 ,0
Finisai termosistem la fa ad (polistiren expandat de 5 cm ) 165,2 1, 0054 166 ,1
Finisaj cu tencuial dri cuit i vinarom 149,4 0,9334 139 ,4
Fa ad placat cu alucobond 449,8 1, 0554 474 ,7
Finisaj termosistem la fa ad ( polistiren expandat de 10 cm grosime ) 251,6 1,0077 253 ,5 nou

INSTALAII FUNCIONALE
Electrice
Tip instalaie electric pre carte indice cost actualizat
Instalaii electrice de iluminat, prize monofazate i trasee de curen i pag. carte: 37
slabi (ELINGR ) 82,4 1,0529 86 ,8
nclzire
Tip instalaie de nclzire pre carte indice cost actualizat
nclzire cu convectoradiatoare (INCCONV) 113,1 1,0043 113 ,6
nclzire cu traseu eav cupru i corp static din font, bimetal pag. carte: 37
(INCELFS) 172,5 0,8874 153 ,1
Sanitare
Tip insalaie sanitar pre carte indice cost actualizat
Chiuvet font + baterie amestec
(sanitare obinuite) CHFOBO 1.159,7 0, 9665 1.120,9
Chiuvet inox + baterie amestec
(sanitare cal.superioar) CHINOX 1.705,5 0 , 9982 1.702,4
Lavoar + WC
(sanitare obinuite) LAVWC 1.424,6 1,0219 1.455,8
Lavoar + WC
(sanitare cal.superioar) LAVWCSUP 5.460,3 1,0112 5.521,5
Cuv du + lavoar + WC
(sanitare obi nuite) DUSLAWC 2.561,8 1,0002 2.562,3
Du + cabin + lavoar + WC
(sanitare cal.superioar) DUSLAWCS 6.544,0 0 , 9443 6.179,5
Cad font + lavoar + WC
(sanitare obi nuite) CALAWC 3.642,0 1, 1431 4.163,2
Cada jacuzzi + lavoar + WC
(sanitare cal.superioar) CAJALAWC 11.366,3 1,1043 12.551,8

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


STRUCTUR BLOC P+4E+SUBSOL TEHNIC AUGUST 2016 - IULIE 2017
Denumire Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Gradul seismic 6 6BLOC4E 1.007,1 1,0419 1.049 , 3
Gradul seismic 7 7 BLOC4E 1.048,6 1,0419 1.092,5 pag. carte : 39
Gradul seismic 8 8 BLOC4E 1.095,3 1,0419 1.141 , 2
Gradul seismic 9 9 BLOC4E 1.189,9 1,0419 1.239 ,8

TERAS,FINISAJE l INSTALAII FUNC IONALE ELECTRICE l DE NCLZIRE BLOC P+4E+SUBSOL TEHNIC


Denumire Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
Teras
Teras necirculabil TERNE4E 87,9 1,0648 93,6
Finisaj pag. carte: 40
Finisaj obi nuit fr scar FOBFS4E 918,1 1,0413 956,0
Finisaj superior fr scar FSUPFS4E 1.253,6 0,9190 1.152,1
Instalaii electrice
Instalaii electrice de iluminat, prize
monofazate i trasee de curen i slabi ELINGR4E 82,4 1,0425 85,9
Instalaii de nclzire
nclzire cu convectoradiatoare INCCONV4E 113,1 0,9921 112,2
nclzire cu traseu din eav cupru i corp static
din font , bimetal INCELFS4E 172,5 0,9250 159,6
FINISAJ SCARA BLOC P+4E+SUBSOL TEHNIC
* costuri aferente scar cot parte pe apartament
Nr.apartamente pe palier / Simbol Finisaj pre cost actualizat
carte 2016 - 2017 2016 - 2017
2 apartamente pe nivel obi nuit 1.781,7 1,0413 1.855,2
FINSC2AP4E superior 7.706,8 0,9190 7.082,9
3 apartamente pe nivel obinuit 1.187,8 1,0413 1.236 ,8
FINSC3AP4E superior 5.137,9 0,9190 4.722,0
4 apartamente pe nivel obi nuit 890,9 1,0413 927,7
FINSC4AP4E superior 3.853,4 0,9190 3.541 ,5
6 apartamente pe nivel obi nuit 593,9 1,0413 618,4
FINSC6AP4E superior 2.568,9 0,9190 2.360,9

ANSAMBLURI OBIECTE SANITARE OBINUITE BLOC P+4E+SUBSOL TEHNIC


* costuri pe ansamblu sanitar
| Tipuri obiecte sanitare | Simbol | pre | | |
I I carte | |
1 CAMERA
Chiuvet font + baterie amestec CHF0B 04E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC 4E 3.642,0 1,1930 4.344,8
TOTAL ANSAMBLURI 4.801,7 5.455, 2
2 CAMERE
Chiuvet font + baterie amestec CHF0B04E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC4E 3.642,0 1,1930 4.344,8
TOTAL ANSAMBLURI 4.801,7 5.455, 2
3 CAMERE V1 pag. carte: 41
Chiuvet font + baterie amestec CHF0B04E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC4E 3.642,0 1,1930 4.344,8
TOTAL ANSAMBLURI 4.801,7 5.455,2
3 CAMERE V2
Chiuvet font + baterie amestec CHF0B04E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC4E 3.642,0 1,1930 4.344,8
Lavoar + WC LAVWC4E 1.424,6 1,0248 1.459 ,9
TOTAL ANSAMBLURI 6.226,3 6.915,1
4 CAMERE V1
Chiuvet font + baterie amestec CHF0B04E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC4E 3.642,0 1,1930 4.344,8
Lavoar + WC LAVWC4E 1.424,6 1,0248 1.459 ,9
TOTAL ANSAMBLURI 6.226,3 6.915,1
4 CAMERE V2
Chiuvet font + baterie amestec CHF0B04E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC4E 3.642,0 1,1930 4.344,8
Cuv du + lavoar + WC DUSLAWC4E 2.561,8 0 , 9925 2.542,6
TOTAL ANSAMBLURI 7.363,5 7.997 ,9

ANSAMBLURI OBIECTE SANITARE CALITATE SUPERIOAR BLOC P+4E+SUBSOL TEHNIC


* costuri pe ansamblu sanitar
Tipuri obiecte sanitare Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
1 CAMERA
Chiuvet inox + baterie amestec CHINOX 4E 1.705 ,5 0,9021 1.538 ,5
Cad iacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,1524 13.099 ,0
TOTAL ANSAMBLURI 13.071,8 14.637 ,5
2 CAMERE
Chiuvet inox + baterie amestec CHINOX 4E 1.705 ,5 0,9021 1.538 ,5
Cad iacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,1524 13.099 ,0
TOTAL ANSAMBLURI 13.071,8 14.637 ,5
3 CAMERE V1 pag. carte : 42
Chiuvet inox + baterie amestec CHINOX 4E 1.705,5 0,9021 1.538 , 5
Cad jacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,1524 13.099 ,0
TOTAL ANSAMBLURI 13.071,8 14.637 ,5
3 CAMERE V2
Chiuvet inox + baterie amestec CHINOX 4E 1.705,5 0,9021 1.538 ,5
Cad jacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,1524 13.099 ,0
Lavoar + WC LAVWCSU4E 5.460,3 0,8920 4.870 ,4
TOTAL ANSAMBLURI 18.532,1 19.507 ,9
4 CAMERE V1
Chiuvet inox + baterie amestec CHINOX 4E 1.705,5 0,9021 1.538 ,5
Cad jacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,1524 13.099 ,0
Lavoar + WC LAVWCSU4E 5.460,3 0,8920 4.870,4
TOTAL ANSAMBLURI 18.532,1 19.507 ,9
4 CAMERE M2
Chiuvet inox + baterie amestec CHINOX4E 1.705,5 0,9021 1.538 ,5
Cad jacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,1524 13.099 ,0
Du + cabin + lavoar + WC DUSLAWCS 4 E 6.544,0 0,9835 6.436 , 3
TOTAL ANSAMBLURI 19.615,8 21.073 ,9

STRUCTUR BLOC P+8E+SUBSOL TEHNIC


Denumire Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
Gradul seismic 6 6BLOC8E 833,4 1,0166 847,2
Gradul seismic 7 7 BLOC8E 867,8 1,0166 882,2 pag. carte: 43
Gradul seismic 8 8 BLOC8E 906,4 1,0166 921 ,4
Gradul seismic 9 9 BLOC8E 984,7 1,0166 1.001 ,0
TERASA,FINISAJE l INSTALAII FUNC IONALE ELECTRICE l DE NCLZIRE BLOC P+8 E +SUBSOL TEHNIC
Denumire Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
Teras
Teras necirculabil TERNE 8E 48,8 1,0648 52,0
Finisaj pag. carte: 44
Finisaj obi nuit fr scar FOBFS8E 918,1 1,0413 956,0
Finisai superior fr scar FSUPFS8E 1.253,6 0 , 9190 1.152,1
Instalaii electrice
Instalaii electrice de iluminat , prize
monofazate i trasee de curen i slabi ELINGR8E 82,4 1,0425 85,9
Instalaii de nclzire
nclzire cu convectoradiatoare INCCONV8E 113,1 0,9921 112,2
nclzire cu traseu din eav cupru i corp static
din font, bimetal INCELFS8E 172,5 0,9250 159,6
FINISAJ SCARA BLOC P+8E+SUBSOL TEHNIC
* costuri aferente scar cot parte pe apartament
Nr.apartamente pe palier / Simbol Finisaj pre cost actualizat
carte 2016 - 2017 2016 - 2017
2 apartamente pe nivel obinuit 1.781,7 1,0413 1.855, 2
FINSC2AP8E superior 7.706,8 0,9190 7.082,9 pag. carte: 44
3 apartamente pe nivel obinuit 1.187,8 1,0413 1.236 ,8
FINSC 3AP8E superior 5.137,9 0,9190 4.722,0
4 apartamente pe nivel obinuit 890,9 1,0413 927,7
FINSC4AP8E superior 3.853,4 0,9190 3.541 ,5
6 apartamente pe nivel obinuit 593,9 1,0413 618,4
FINSC 6AP8E superior 2.568,9 0,9190 2.360 ,9

ANSAMBLURI OBIECTE SANITARE OBINUITE BLOC P+8E+SUBSOL TEHNIC


* costuri pe ansamblu sanitar
Tipuri obiecte sanitare Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
1 CAMERA
Chiuvet font + baterie amestec CHFOB08E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC8E 3.642,0 1,1930 4.344,8
TOTAL ANSAMBLURI 4.801,7 5.455,2
2 CAMERE
Chiuvet font + baterie amestec CHFOB08E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC8E 3.642,0 1,1930 4.344,8
TOTAL ANSAMBLURI 4.801,7 5.455, 2
3 CAMERE V 1 pag. carte : 45
Chiuvet font + baterie amestec CHFOB08E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC8E 3.642,0 1,1930 4.344,8
TOTAL ANSAMBLURI 4.801,7 5.455,2
3 CAMERE V2
Chiuvet font + baterie amestec CHFOB08E 1.159,7 0, 9575 1.110,4
Cad font + lavoar + WC CALAWC8E 3.642,0 1,1930 4.344,8
Lavoar + WC LAVWC8E 1.424,6 1,0248 1.459 ,9
TOTAL ANSAMBLURI 6.226,3 6.915,1
4 CAMERE V 1
Chiuvet font + baterie amestec CHFOB08E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC8E 3.642,0 1,1930 4.344,8
Lavoar + WC LAVWC8E 1.424,6 1,0248 1.459 ,9
TOTAL ANSAMBLURI 6.226,3 6.915,1
4 CAMERE V2
Chiuvet font + baterie amestec CHF0B08E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC8E 3.642,0 1,1930 4.344 ,8
Cuv du + lavoar + WC DUSLAWC8E 2.561,8 0,9925 2.542,6
TOTAL ANSAMBLURI 7.363,5 7.997 ,9

ANSAMBLURI OBIECTE SANITARE CALITATE SUPERIOAR BLOC P+8E+SUBSOL TEHNIC


* costuri pe ansamblu sanitar
Tipuri obiecte sanitare Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
1 CAMERA
Chiuvet inox + baterie amestec CHINOX8E 1.705,5 0,9021 1.538 ,5
Cad jacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1524 13.099 ,0
TOTAL ANSAMBLURI 13.071,8 14.637 ,5
2 CAMERE
Chiuvet inox + baterie amestec CHINOX8E 1.705 ,5 0,9021 1.538 ,5
Cad iacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1524 13.099 ,0
TOTAL ANSAMBLURI 13.071,8 14.637 ,5
3 CAMERE V1
Chiuvet inox + baterie amestec CHINOX8E 1.705 ,5 0,9021 1.538 , 5
Cad iacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1524 13.099 ,0
TOTAL ANSAMBLURI 13.071,8 14.637 , 5
3 CAMERE V2
Chiuvet inox + baterie amestec CHINOX8E 1.705,5 0, 9021 1.538 , 5
Cad iacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1524 13.099 ,0
Lavoar + WC LAVWCSU 8E 5.460,3 0,8920 4.870,4
TOTAL ANSAMBLURI 18.532,1 19.507 ,9
4 CAMERE V1
Chiuvet inox + baterie amestec CHINOX8E 1.705,5 0, 9021 1.538 , 5
Cad iacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1524 13.099 ,0
Lavoar + WC LAVWCSU8E 5.460,3 0,8920 4.870,4
TOTAL ANSAMBLURI 18.532,1 19.507 ,9
4 CAMERE V2
Chiuvet inox + baterie amestec CHINOX8E 1.705,5 0,9021 1.538 ,5
Cad iacuzzi + lavoar + WC CAJALAWC 8E 11.366,3 0,8920 10.138 ,3
Du + cabin + lavoar + WC DUSLAWCS8 E 6.544,0 0,9835 6.436 ,3
TOTAL ANSAMBLURI 19.615,8 18.113 ,1
STRUCTUR BLOC P+10E+SUBSOL TEHNIC
Denumire Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Gradul seismic 6 6BLOC10E 750,1 1,0304 772,9
Gradul seismic 7 7 BLOC10E 781,0 1,0304 804,7 pag. carte : 47
Gradul seismic 8 8 BLOC10E 815,8 1,0304 840,6
Gradul seismic 9 9 BLOC10E 886,2 1,0304 913,1
TERASA,FINISAJE l INSTALAII FUNC IONALE ELECTRICE l DE NC LZIRE BLOC P+10 E+SUBSOL TEHNIC
Denumire Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
Teras
Teras necirculabil TERNE10E 39,9 1,0648 42,5
Finisaj pag. carte: 48
Finisaj obi nuit fr scar FOBFS10E 918,1 1,0368 951,9
Finisaj superior fr scar FSUPFS10E 1.253,6 0,9190 1.152,1
Instalaii electrice
Instalaii electrice de iluminat, prize
monofazate i trasee de curen i slabi ELINGR 10 E 82,4 1,0425 85,9
Instalaii de nclzire
nclzire cu convectoradiatoare INCCONV10E 113,1 0,9921 112,2
nclzire cu traseu din eav cupru i corp static
din font , bimetal INCELFS10E 172,5 0,9250 159,6
FINISAJ SCARA BLOC P+10E+SUBSOL TEHNIC
* costuri aferente scar cot parte pe apartament
Nr.apartamente pe palier / Simbol Finisaj pre cost actualizat
carte 2016 - 2017 2016 - 2017
2 apartamente pe nivel obi nuit 1.781,7 1,0413 1.855,2
FINSC2AP10E superior 7.706,8 0,9190 7.082,9
3 apartamente pe nivel obi nuit 1.187,8 1,0413 1.236 ,8 pag. carte : 48
FINSC3AP10E superior 5.137,9 0,9190 4.722,0
4 apartamente pe nivel obinuit 890,9 1,0413 927,7
FINSC4AP10E superior 3.853,4 0,9190 3.541 ,5
6 apartamente pe nivel obinuit 593,9 1,0413 618,4
FINSC6AP10E superior 2.568,9 0,9190 2.360,9

ANSAMBLURI OBIECTE SANITARE OBINUITE BLOC P+10E+SUBSOL TEHNIC


* costuri pe ansamblu sanitar
Tipuri obiecte sanitare Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
1 CAMERA
Chiuvet font + baterie amestec CHFOBO10E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC10E 3.642,0 1,1930 4.344 ,8
TOTAL ANSAMBLURI 4.801,7 5.455, 2
2 CAMERE
Chiuvet font + baterie amestec CHFOBO10E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC10E 3.642,0 1,1930 4.344 ,8
TOTAL ANSAMBLURI 4.801,7 5.455, 2
3 CAMERE V1 pag. carte: 49
Chiuvet font + baterie amestec CHFOBO10E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC10E 3.642,0 1,1930 4.344 ,8
TOTAL ANSAMBLURI 4.801,7 5.455,2
3 CAMERE V2
Chiuvet font + baterie amestec CHFOBO10E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC10E 3.642,0 1,1930 4.344 ,8
Lavoar + WC LAVWC10E 1.424,6 1,0248 1.459 ,9
TOTAL ANSAMBLURI 6.226,3 6.915,1
4 CAMERE V1
Chiuvet font + baterie amestec CHFOBO10E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC10E 3.642,0 1,1930 4.345,0
Lavoar + WC LAVWC10E 1.424,6 1,0248 1.459 ,9
TOTAL ANSAMBLURI 6.226,3 6.915,3
4 CAMERE V2
Chiuvet font + baterie amestec CHFOBO10E 1.159,7 0,9575 1.110,4
Cad font + lavoar + WC CALAWC10E 3.642,0 1,1930 4.345,0
Cuv du + lavoar + WC DUSLAWC10 E 2.561,8 0,9925 2.542, 5
TOTAL ANSAMBLURI 7.363,5 7.997 ,9

ANSAMBLURI OBIECTE SANITARE CALITATE SUPERIOAR BLOC P+10E+SUBSOL TEHNIC


* costuri pe ansamblu sanitar
Tipuri obiecte sanitare Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
1 CAMERA
Chiuvet inox + baterie amestec CHINOX10E 1.705,5 0,9021 1.538 , 5
Cad iacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1524 13.099 ,0
TOTAL ANSAMBLURI 13.071,8 14.637 ,5
2 CAMERE
Chiuvet inox + baterie amestec CHINOX10E 1.705,5 0,9021 1.538 ,6
Cad iacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1524 13.098 ,8
TOTAL ANSAMBLURI 13.071,8 14.637 ,4
3 CAMERE V 1 pag. carte : 50
Chiuvet inox + baterie amestec CHINOX10E 1.705,5 0,9021 1.538 ,6
Cad jacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1524 13.098 ,8
TOTAL ANSAMBLURI 13.071,8 14.637 ,4
3 CAMERE V2
Chiuvet inox + baterie amestec CHINOX10E 1.705,5 0,9021 1.538 ,6
Cad jacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1524 13.098 ,8
Lavoar + WC LAVWCSU10E 5.460,3 0,8920 4.870 ,4
TOTAL ANSAMBLURI 18.532,1 19.507 ,8
4 CAMERE V1
Chiuvet inox + baterie amestec CHINOX10E 1.705,5 0,9021 1.538 ,6
Cad jacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1524 13.098 ,8
Lavoar + WC LAVWCSU10E 5.460,3 0,8919 4.870 ,1
TOTAL ANSAMBLURI 18.532,1 19.507 ,5
4 CAMERE V2
Chiuvet inox + baterie amestec CHINOX10E 1.705,5 0,9021 1.538 ,6
Cad jacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1524 13.098 ,8
Du + cabin + lavoar + WC DUSLAWCS10E 6.544,0 0,9835 6.436 , 3
TOTAL ANSAMBLURI 19.615,8 21.073 ,8

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


CLDIRE MONUMENTAL CU FAADA DE INFLUEN NEOCLASIC (INFLUEN FRANCEZ AUGUST 2016 - IULIE 2017
Denumire pre cost actualizat
carte 2016 - 2017 2016 - 2017
Infrastructur cu planeu de bol ioare 3.197,8 0,8439 2.698,6
Suprastructur zidrie portant cu planeu de bolioare 2.049,9 1,0690 2.191,3
nvelitoare igl solzi din tabl armit 604,1 0,9088 549,0 pag. carte: 51
Faad cu metope, ancadramente i basoreliefuri 722,6 0,9982 721,3
Finisaj interior cu stucaturi, ancadramente i profile 3.672,5 1,0091 3.705,9
Instalaie electric 126,7 1,0006 126,8
Instalaie nclzire 84,5 1,2107 102,3
Instalaie sanitar 44,9 1,1401 51,2
TOTAL COSTURI PE MP 10.503,0 10.146,5

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


CLDIRE DIN LEMN ( SISTEM AMERICAN ) FUNDAIE, STRUCTUR , NVELITOARE , FINISAJ, AUGUST 2016 - IULIE 2017
INSTALAII ELECTRICE l INSTALAII DE NCLZIRE
Denumire pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Fundaii de beton simplu i cuzinei arma i FCV1-LEMN 395,2 1,0521 415, 8
Suprastructura CASALEMN 503,6 1,0013 504 , 3 pag. carte: 53
nvelitoare tabl Lindab INVTLCL 340,4 1,0447 355, 6
Finisaj obi nuit fr scar FOBFSCL 658,5 1,0545 694 , 4
Finisaj superior fr scar FSUPFSCL 1.253,6 0,9308 1.166 ,8
Instalaii electrice ELINGRCL 82,4 1,0558 87 , 0
nclzire cu convectoradiatoare INCCONVCL 113,1 1,0048 113 , 6
INSTALAII SANITARE
Tip instalaie sanitara pre cost actualizat
carte 2016 - 2017 2016 - 2017
Chiuveta inox + baterie amestec
( sanitare cal.superioar ) CHINOXCL 1.705 ,5 0,9531 1.625,5
Lavoar + WC
(sanitare obinuite) LAVWCCL 1.424,6 1,0378 1.478 ,5
Lavoar + WC
(sanitare cal.superioar ) LAVWCSUCL 5.460,3 0,9033 4.932 ,2
Cad font + lavoar + WC
(sanitare obinuite) CALAWCCL 3.642,0 1,1671 4.250,6
FINISAJ SCARA
Tip scar pre cost actualizat
carte 2016 - 2017 2016 - 2017
Scar obinuit cu trepte gresie i parapet din lemn
SCAGRESCL 3.662,2 0,9941 3.640,7
Scar superioar cu trepte stejar i balustrad din inox
SCASTEJACL 10.887,6 1,1981 13.044,2

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


CLDIRE DIN PAIANT AUGUST 2016 - IULIE 2017
Denumire pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Fundaii i structura 705,4 0 , 9640 680,0
Finisaj 486,1 0 , 9767 474,8 pag. carte: 55
Instalaia electric i 3 sobe 65,0 0 , 9317 60,6

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA AUGUST 2016 - IULIE 2017
CU ST LPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 6 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6 STR 1 D6H6 766,2 1,0088 772 , 9
Grad 6 2 6 STR2D6 H6 627,0 1,0161 637,1
3 6STR3 D6 H6 580,3 1,0040 582 ,6
1 7STR 1 D6 H 6 797,8 1,0088 804 ,8
Grad 7 2 7STR2D6H6 652,9 1,0161 663 ,4
3 7STR3 D6 H6 604,2 1,0040 606 ,6
1 8STR 1 D6 H6 833,3 1,0088 840 ,6
Grad 8 2 8STR2D6H6 682,0 1,0161 693 ,0
3 8STR3 D6H6 631,2 1,0040 633 ,7
1 9STR 1D6H6 905,3 1,0088 913 , 3
Grad 9 2 9STR2D6H6 740,8 1,0161 752,7
3 9STR3 D6H6 685,7 1,0040 688 ,4

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 6 M
Gradul Numr de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D6 H 8 1.121 , 1 1,0036 1.125, 1
Grad 6 2 6STR2D6 H 8 984,0 0,9666 951,1
3 6STR3 D6 H 8 962,1 0,9345 899 , 1
1 7 STR 1 D6 H 8 1.167,3 1,0036 1.171,5
Grad 7 2 7STR2D6H 8 1.024,5 0,9666 990 ,3
3 7STR3 D6 H 8 1.001,7 0,9345 936 , 1
1 8STR 1 D6 H 8 1.219,3 1,0036 1.223 , 7
Grad 8 2 8STR2D6 H 8 1.070,2 0,9666 1.034 , 5
3 8STR3 D6 H 8 1.046,4 0,9345 977 , 9
1 9STR 1 D6 H 8 1.324,6 1,0036 1.329 , 4
Grad 9 2 9STR2D6 H 8 1.162,6 0,9666 1.123 , 8
3 9STR3 D6 H 8 1.136,7 0,9345 1.062, 2

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 10 M NLIME, CU 1 , 2 SAU 3 DESCHIDERI DE 6 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D6H10 1.820,7 0,9541 1.737 , 1
Grad 6 2 6STR2D6H10 1.452,7 0,9635 1.399 , 7
3 6STR3 D6H10 1.372,4 0,9402 1.290 , 3
1 7STR 1D6H10 1.895 ,7 0,9541 1.808 , 7 pag. carte: 18
Grad 7 2 7STR2D6H10 1.512,6 0,9635 1.457 , 4
3 7STR3 D6H10 1.429,0 0,9402 1.343 , 5
1 8STR 1 D6H10 1.980,2 0,9541 1.889 , 3
Grad 8 2 8STR2D6H10 1.580,0 0,9635 1.522, 3
3 8STR3 D6H10 1.492,7 0,9402 1.403 , 4
1 9STR 1D6H10 2.151,1 0,9541 2.052, 4
Grad 9 2 9STR2D6H10 1.716,4 0,9635 1.653 , 8
3 9STR3D6H10 1.621,5 0,9402 1.524 , 5

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 9 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1D9 H 6 725,1 0,9513 689 ,8
Grad 6 2 6STR2D9 H 6 598,5 0,9790 585 , 9
3 6STR3D9 H 6 556,1 0,9915 551 ,4
1 7STR 1 D9 H 6 755,0 0,9513 718 ,2
Grad 7 2 7STR2D9 H 6 623,2 0,9790 610,1
3 7STR3D9 H 6 579,0 0,9915 574,1
1 8STR 1 D9 H 6 788,6 0,9513 750 ,2
Grad 8 2 8STR2D9 H 6 650,9 0,9790 637 ,2
3 8STR3D9 H 6 604,8 0,9915 599 ,7
1 9STR 1D9H 6 856,7 0,9513 815 ,0
Grad 9 2 9STR2D9 H 6 707,1 0,9790 692 ,3
3 9STR3 D9 H 6 657,0 0,9915 651 ,4

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 8 M NL IME, CU 1, 2 SAU 3 DESCHIDERI DE 9 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6 STR 1 D9 H 8 1.097,6 0,9513 1.044 ,1
Grad 6 2 6 STR2D9 H 8 949,0 0,9790 929 , 1
3 6STR3 D9 H 8 912,2 0,9915 904 ,4
1 7STR 1 D9 H 8 1.142,8 0,9513 1.087 ,1
Grad 7 2 7STR2D9 H 8 988 , 1 0,9790 967 ,3
3 7STR3 D9 H 8 949,8 0,9915 941 ,7
1 8STR 1 D9 H 8 1.193,7 0,9513 1.135, 6
Grad 8 2 8STR2D9 H 8 1.032,1 0,9790 1.010, 4
3 8STR3 D9 H 8 992,2 0,9915 983 ,8
1 9STR 1D9 H 8 1.296,8 0,9513 1.233 , 6
Grad 9 2 9STR2D9 H 8 1.121,3 0,9790 1.097 ,8
3 9STR3 D9 H 8 1.077,8 0,9915 1.068 , 6

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 9 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1D9H10 1.676,1 0,9513 1.594 , 5
Grad 6 2 6STR2D9H10 1.334,5 0,9790 1.306, 5
3 6STR3D9H10 1.256,6 0,9915 1.245,9
1 7STR 1D9H10 1.745 ,1 0,9513 1.660 ,1
Grad 7 2 7STR2D9H10 1.389,5 0,9790 1.360 , 3
3 7STR3D9H10 1.308,4 0,9915 1.297 ,3
1 8STR 1D9 H10 1.822,9 0,9513 1.734 , 1
Grad 8 2 8STR2D9 H10 1.451,4 0,9790 1.420, 9
3 8STR3D9 H10 1.366,7 0,9915 1.355, 1
1 9STR 1 D9 H10 1.980,3 0,9513 1.883 , 9
Grad 9 2 9STR2D9 H10 1.576,7 0,9790 1.543 , 6
3 9STR3 D9H10 1.484,7 0,9915 1.472, 1

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 12 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D12H6 684,0 1,0365 709 ,0
Grad 6 2 6STR2D12H6 570,0 1,0486 597 ,7
3 6STR3 D12H6 531,9 1,0144 539 ,6
1 7STR 1 D12H6 712,2 1,0365 738 ,2
Grad 7 2 7STR2D12H6 593 , 4 1,0486 622 ,2
3 7STR3 D12H6 553,8 1,0144 561 ,8
1 8 STR 1 D12H6 743,9 1,0365 771,1
Grad 8 2 8 STR2D12H6 619,9 1,0486 650 ,0
3 8STR3D12H6 578,5 1,0144 586 ,8
1 9STR 1 D12H6 808,2 1,0365 837 ,7
Grad 9 2 9STR2D12H6 673,4 1,0486 706 , 1
I 3 9STR3 D12H6 628,4 1,0144 637 ,4

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 12 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D12H8 1.074,0 1,0268 1.102, 8
Grad 6 2 6STR 2D12H 8 914,0 1,0332 944 , 3
3 6STR3D12H 8 862,4 1,0439 900 ,3
1 7STR 1 D12H 8 1.118,3 1,0268 1.148 ,3
Grad 7 2 7STR2D12H 8 951,7 1,0332 983 , 3
3 7STR3D12H 8 897,9 1,0439 937 , 3
1 8STR 1D12H 8 1.168,1 1,0268 1.199 , 4
Grad 8 2 8STR2D12H8 994,1 1,0332 1.027 ,1
3 8STR3D12H8 937,9 1,0439 979 , 1
1 9STR 1D12H8 1.269,0 1,0268 1.303 ,0
Grad 9 2 9STR2D12H8 1.079,9 1,0332 1.115, 8
3 9STR3D12H8 1.018,9 1,0439 1.063 , 6

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 12 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D12H10 1.531,9 1,0121 1.550, 4
Grad 6 2 6STR2D12H10 1.216,1 1,0472 1.273 , 5
3 6STR3 D12H10 1.140,8 0,9862 1.125, 1
1 7STR 1D12H10 1.595 ,0 1,0121 1.614 ,3
Grad 7 2 7STR2D12H10 1.266,2 1,0472 1.326, 0
3 7STR3 D12H10 1.187,8 0,9862 1.171,4
1 8STR 1 D12H10 1.666,1 1,0121 1.686,3
Grad 8 2 8STR2D12H10 1.322,6 1,0472 1.385, 0
3 8STR3 D12H10 1.240,8 0,9862 1.223 , 7
1 9STR 1 D12H10 1.810,0 1,0121 1.831,9
Grad 9 2 9STR2D12H10 1.436,8 1,0472 1.504 , 6
3 9STR3D12H10 1.347,9 0,9862 1.329 ,3

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 6 M NL IME, CU 1, 2 SAU 3 DESCHIDERI DE 15 M
| Gradul | Numr de | Simbol | pre | indice | cost actualizat |
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D15 H6 642,9 0,9601 617,2
Grad 6 2 6STR2D15 H6 541,4 0,9428 510 ,4
3 6STR3 D15 H6 507,6 0,9535 484,0
1 7STR 1 D15 H6 669,4 0,9601 642,7 pag. carte: 32
Grad 7 2 7STR2D15H6 563,7 0,9428 531 ,5
3 7STR3D15H6 528,5 0,9535 503 , 9
1 8STR 1 D15 H6 699,3 0,9601 671,4
Grad 8 2 8STR2D15H6 588,9 0,9428 555 ,2
3 8STR3D15H6 552,1 0,9535 526 ,4
1 9STR 1D15 H6 759,6 0,9601 729 , 3
Grad 9 2 9STR2D15 H6 639,7 0,9428 603 , 1
3 9STR3D15 H6 599,8 0,9535 571, 9

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 15 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D15 H8 1.050,5 0,9049 950 ,6
Grad 6 2 6STR2D15 H8 879,1 0,9176 806 ,7
3 6STR3D15 H8 812,6 0,9297 755 ,5
1 7STR 1 D15 H8 1.093,8 0,9049 989 ,8
Grad 7 2 7STR2D15 H8 915,3 0,9176 839 , 9
3 7STR3 D15 H8 846,0 0,9297 786 ,5
1 8STR 1 D15 H8 1.142,5 0,9049 1.033 , 8
Grad 8 2 8STR2D15 H8 956,1 0,9176 877 ,3
3 8STR3 D15 H8 883,7 0,9297 821 ,6
1 9STR 1 D15 H8 1.241,2 0,9049 1.123 , 2
Grad 9 2 9STR2D15 H8 1.038,6 0,9176 953 ,0
3 9STR3 D15 H8 960,0 0,9297 892 ,5
TABEL CENTRALIZATOR COSTURI STRUCTURA HALA INDUSTRIALA
CU ST LPI PREFABRICAI DE 10 M NL IME, CU 1 , 2 SAU 3 DESCHIDERI DE 15 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6 STR 1 D15 H10 1.386,9 0,9134 1.266, 8
Grad 6 2 6 STR2D15 H10 1.098,0 0,9828 1.079 , 1
3 6STR3D15 H10 1.025 ,0 0,9928 1.017 , 6
1 7STR 1 D15 H10 1.444,0 0,9134 1.318 , 9 pag. carte: 36
Grad 7 2 7STR2D15 H10 1.143,2 0,9828 1.123 , 5
3 7STR3 D15 H10 1.067,3 0,9928 1.059 , 6
1 8STR 1 D15 H10 1.508,4 0,9134 1.377 ,8
Grad 8 2 8STR2D15 H10 1.194,1 0,9828 1.173 , 6
3 8STR3 D15 H10 1.114,8 0,9928 1.106, 8
1 9STR 1 D15 H10 1.638,6 0,9134 1.496, 7
Grad 9 2 9STR2D15 H10 1.297,2 0,9828 1.274 , 9
3 9STR3 D15 H10 1.211,1 0,9928 1.202,4

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 18 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1D18H6 601,9 1,0019 603 ,0
Grad 6 2 6STR2D18H6 512,9 1,0404 533 ,6
3 6STR3D18H6 483,4 1,0561 510 ,5
1 7STR 1D18H6 626,7 1,0019 627 , 9
Grad 7 2 7STR2D18H6 534,0 1,0404 555 ,6
3 7STR3D18H6 503,3 1,0561 531 ,5
1 8STR 1 D18H6 654,6 1,0019 655 ,8
Grad 8 2 8STR2D18H6 557,8 1,0404 580 ,3
3 8STR3D18H6 525,7 1,0561 555 ,2
1 9STR 1 D18H6 711,1 1,0019 712 ,5
Grad 9 2 9STR2D18H6 606,0 1,0404 630 ,5
3 9STR3D18H6 571,1 1,0561 603 , 1
TABEL CENTRALIZATOR COSTURI STRUCTURA HALA INDUSTRIALA
CU ST LPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 18 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D18H8 1.027,0 1,0197 1.047 , 2
Grad 6 2 6STR2D18H8 844 , 1 1,027 866 , 9
3 6STR3 D18H8 762,7 1,0579 806 , 9
1 7STR 1 D18H8 1.069,3 1,0197 1.090,4
Grad 7 2 7STR2D18H8 878,9 1,027 902 ,6
3 7STR3D18H8 794,1 1,0579 840 ,1
1 8STR 1 D18H8 1.117,0 1,0197 1.139 , 0
Grad 8 2 8STR2D18H8 918 , 1 1,027 942 , 9
3 8STR3 D18H8 829,5 1,0579 877 ,5
1 9STR 1 D18H8 1.213,4 1,0197 1.237 ,3
Grad 9 2 9STR2D18H8 997,3 1,027 1.024 , 2
I 3 9STR3 D18H8 901,2 1,0579 953 ,4

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 18 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D18 H10 1.242,6 1,0128 1.258 , 5
Grad 6 2 6STR2D18 H10 979,6 1,0510 1.029 , 6
3 6STR3D18H10 909,2 1,0471 952 ,0
1 7STR 1 D18H10 1.293,8 1,0128 1.310,4
Grad 7 2 7STR2D18H10 1.020,0 1,0510 1.072, 0
3 7STR3D18H10 946,7 1,0471 991 , 3
1 8STR 1D18H10 1.351,5 1,0128 1.368 , 8
Grad 8 2 8STR2D18H10 1.065 ,5 1,0510 1.119 ,8
3 8STR3D18H10 988,9 1,0471 1.035, 5
1 9STR 1D18H10 1.468,2 1,0128 1.487 ,0
Grad 9 2 9STR2D18H10 1.157,5 1,0510 1.216, 5
3 9STR3D18H10 1.074,3 1,0471 1.124, 9

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 21 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D21H6 560,8 0,9979 559 ,6
Grad 6 2 6STR2D21H6 484,4 1,0109 489 ,7
3 6STR3 D21H6 459,1 1,0205 468 ,5
1 7STR 1D21H6 583,9 0,9979 582 ,7
Grad 7 2 7STR2D21H6 504,3 1,0109 509 ,8
3 7STR3 D21H6 478 , 1 1,0205 487 , 9
1 8STR 1 D21H6 609,9 0,9979 608 ,6
Grad 8 2 8STR2D21H6 526,8 1,0109 532 ,5
3 8STR3 D21H6 499 , 4 1,0205 509 ,6
1 9STR 1 D21H6 662,5 0,9979 661,1
Grad 9 2 9STR2D21H6 572,3 1,0109 578 ,5
3 9STR3 D21H6 542,5 1,0205 553 ,6

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 8 M NL IME, CU 1, 2 SAU 3 DESCHIDERI DE 21 M
| Gradul | Numr de | Simbol | pre | indice | cost actualizat |
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D21H8 1.003,5 1,0144 1.018 , 0
Grad 6 2 6STR2D21H8 809,2 1,0179 823 ,7
3 6STR3 D21H8 712,9 1,0316 735 ,4
1 7STR 1 D21H8 1.044,8 1,0144 1.059 , 8 pag. carte: 46
Grad 7 2 7STR2D21H8 842,5 1,0179 857 ,6
3 7STR3 D21H8 742,3 1,0316 765 ,8
1 8STR 1 D21H 8 1.091,4 1,0144 1.107 ,1
Grad 8 2 8STR2D21H8 880,1 1,0179 895 , 9
3 8STR3D21H 8 775,3 1,0316 799 ,8
1 9STR 1D21H 8 1.185 ,6 1,0144 1.202, 7
Grad 9 2 9STR2D21H8 956,0 1,0179 973 , 1
3 9STR3D21H 8 842,3 1,0316 868 , 9

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 21 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D21H10 1.214,2 0,9864 1.197 , 7
Grad 6 2 6STR2D21H10 979,1 1,0155 994 ,3
3 6STR3D21H10 862,6 1,0212 880 , 9
1 7STR 1 D21H10 1.264,2 0,9864 1.247 ,0
Grad 7 2 7STR2D21H10 1.019,4 1,0155 1.035, 2
3 7STR3 D21H10 898,1 1,0212 917,1
1 8STR 1 D21H10 1.320,5 0,9864 1.302, 5
Grad 8 2 8STR2D21H10 1.064,8 1,0155 1.081,3
3 8STR3 D21H10 938,1 1,0212 958 ,0
1 9STR 1 D21H10 1.434,5 0,9864 1.415, 0
Grad 9 2 9STR2D21H10 1.156,8 1,0155 1.174,7
3 9STR3 D21H10 1.019,1 1,0212 1.040,7

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 24 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6 STR 1 D24H6 519,7 0,9919 515 ,5
Grad 6 2 6STR2D24H6 455,8 1,0110 460 ,8
3 6STR3 D24H6 434,9 1,0291 447 ,6
1 7STR 1 D24H6 541,1 0,9919 536 ,7 pag. carte: 50
Grad 7 2 7STR2D24H6 474,6 1,0110 479 ,8
3 7STR3 D24H6 452,8 1,0291 466 ,0
1 8STR 1D24H6 565,2 0,9919 560 ,6
Grad 8 2 8STR2D24H6 495,8 1,0110 501 , 3
3 8STR3 D24H6 473,0 1,0291 486 ,8
1 9STR 1 D24H6 614,0 0,9919 609 ,0
Grad 9 2 9STR2D24H6 538,6 1,0110 544 ,5
3 9STR3 D24H6 513,8 1,0291 528 ,8

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 24 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1D24H8 980,0 0,9976 977 ,6
Grad 6 2 6STR2D24H8 774,2 1,0134 784,6
3 6STR3D24H8 663,0 1,0480 694 ,8
1 7STR 1D24H8 1.020,3 0,9976 1.017 , 9
Grad 7 2 7STR2D24H8 806,1 1,0134 816 , 9
3 7STR3D24H8 690,4 1,0480 723 ,5
1 8STR 1 D24H8 1.065 ,8 0,9976 1.063 , 2
Grad 8 2 8STR2D24H8 842,0 1,0134 853 ,3
3 8STR3D24H8 721,1 1,0480 755 ,7
1 9STR 1 D24H8 1.157,8 0,9976 1.155, 0
Grad 9 2 9STR2D24H8 914,7 1,0134 927 ,0
3 9STR3D24H8 783,4 1,0480 821,0

TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA


CU ST LPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 24 M
Gradul Num r de Simbol pre indice cost actualizat
seismic deschideri carte 2016 - 2017 2016 - 2017
1 6STR 1 D24H10 1.153,3 1,0091 1.163 , 8
Grad 6 2 6STR2D24H10 899,2 1,0214 918 ,4
3 6STR3 D24H10 819,9 1,0449 856 ,7
1 7STR 1 D24H10 1.200,8 1,0091 1.211,7
Grad 7 2 7STR2D24H10 936,3 1,0214 956 ,3
3 7STR3 D24H10 853,6 1,0449 891 , 9
1 8STR 1 D24H10 1.254,3 1,0091 1.265, 7
Grad 8 2 8STR2D24H10 978,0 1,0214 998 , 9
3 8STR3 D24H10 891,7 1,0449 931 ,7
1 9STR 1 D24H10 1.362,6 1,0091 1.375, 0
Grad 9 2 9STR2D24H10 1.062,4 1,0214 1.085,1
3 9STR3 D24H10 968,7 1,0449 1.012, 2

TABEL CENTRALIZATOR COSTUI l STRUCTURA HAL INDUSTRIAL CU ST LPI


*
PREFABRICAI DE 6 l 8 M NL] IME AVND DESCHIDERILE DE 9 M l 12 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6S2D912H68 1.014,7 1,0549 1.070 , 4
deschiderilor:
1 x 9m + 1 x12m Grad 7 7S2D912H68 1.056,5 1,0549 1.114 , 5 pag. carte: 56
Numrul i
nlimea Grad 8 8S2D912H68 1.103,6 1,0549 1.164 , 2
stlpilor:
1x6m+2 x8m Grad 9 9S2D912H68 1.198,8 1,0549 1.264 ,6
Numrul i
dimensiunea Grad 6 6S3D912H68 903,2 1,0849 979 , 9
deschiderilor:
2x 9m + 1 x12m Grad 7 7S3D 912H68 940,4 1,0849 1.020, 2
Numrul i
nlimea Grad 8 8S3 D 912H68 982,3 1,0849 1.065, 7
stlpilor:
2x 6m+2 x8m Grad 9 9S3 D 912H68 1.067,1 1,0849 1.157 ,7

TABEL CENTRALIZATOR COSTURI STRUCTURA HAL INDUSTRIAL CU STLPI


PREFABRICAI DE 6 l 10 M NLIME AVND DESCHIDERILE DE 9 M l 12 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6S2D 912H610 1.199,6 1,0145 1.217 ,0
deschiderilor:
1 x 9m + 1 x12m Grad 7 7S2D 912H610 1.249,0 1,1045 1.379 , 5 pag. carte: 57
Numrul i
nlimea Grad 8 8S2D 912H610 1.304,7 1,0145 1.323 , 6
stlpilor:
1x 6m+2 x10m Grad 9 9S2D 912H610 1.417,4 1,0145 1.438 , 0
Numrul i
dimensiunea Grad 6 6S3 D 912H610 1.046,1 1,0199 1.066, 9
deschiderilor:
2x 9m + 1 x12m Grad 7 7S3 D 912H610 1.089,2 1,0199 1.110 , 9
Numrul i
nlimea Grad 8 8S3 D 912H610 1.137,7 1,0199 1.160 , 3
stlpilor:
2x 6m+2 x10m Grad 9 9S3 D 912H610 1.235 ,9 1,0199 1.260 , 5

TABEL CENTRALIZATOR COSTUIRl STRUCTURA HAL INDUSTRIAL CU ST LPI


PREFABRICAI DE 6 l 8 M NL1TE AVND DESCHIDERILE DE 9 M l 15 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6S2D915H68 979,8 0,9871 967 ,2
deschiderilor:
1 x 9m + 1 x15m Grad 7 7S2D915H68 1.020,1 0,9871 1.006, 9 pag. carte: 58
Numrul i
nlimea Grad 8 8S2D915H68 1.065 ,6 0,9871 1.051,9
stlpilor:
1x6m+2 x8m Grad 9 9S2D915H68 1.157,6 0,9871 1.142, 7
Numrul i
dimensiunea Grad 6 6S3D 915H68 885,3 1,0415 922 ,0
deschiderilor:
2x 9m + 1 x15m Grad 7 7S3 D 915H68 921,8 1,0415 960,1
Numrul i
nlimea Grad 8 8 S3 D 915H68 962,9 1,0415 1.002, 9
stlpilor:
2x 6m+2 x8m Grad 9 9S3D 915H68 1.046,0 1,0415 1.089 ,4

TABEL CENTRALIZATOR COSTURI STRUCTURA HAL INDUSTRIAL CU STLPI


PREFABRICAI DE 6 l 10 M NL IME AVND DESCHIDERILE DE 9 M l 15 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6 S 2 D915H610 1.141,8 1,0326 1.179 , 0
deschiderilor:
1 x 9m + 1 x15m Grad 7 7S 2 D915H610 1.188,9 1,0326 1.227 , 7 pag. carte: 59
Numrul i
nlimea Grad 8 8 S 2 D915H610 1.241,8 1,0326 1.282,3
stlpilor:
1x 6m+2 x10m Grad 9 9 S 2 D915H610 1.349,1 1,0326 1.393 , 1
Numrul i
dimensiunea Grad 6 6 S3 D915H610 995,8 1,0217 1.017 , 4
deschiderilor:
2x 9m + 1 x15m Grad 7 7S3D915H610 1.036,9 1,0217 1.059 , 4
Numrul i
nlimea Grad 8 8S3D915H610 1.083,1 1,0217 1.106, 6
stlpilor:
2x 6m+2 x10m Grad 9 9S3D915H610 1.176,6 1,0217 1.202, 1

TABEL CENTRALIZATOR COSTURI STRUCTURA HAL INDUSTRIAL CU STLPI


PREFABRICAI DE 6 l 8 M NLIME AVND DESCHIDERILE DE 9 M l 18 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6S2D918H68 967,4 1,0246 991,2
deschiderilor:
1 x 9m + 1 x18m Grad 7 7S2D918H68 1.007,2 1,0246 1.032,0 pag. carte: 60
Numrul i
nlimea Grad 8 8 S 2 D918 H68 1.052,1 1,0246 1.078 , 0
stlpilor:
1x6m+2 x8m Grad 9 9 S 2 D918 H68 1.143,0 1,0246 1.171,1
Numrul i
dimensiunea Grad 6 6 S3 D918 H68 878,7 1,0218 897 , 9
deschiderilor:
2x 9m + 1 x18m Grad 7 7S3D918H68 915,0 1,0218 934 , 9
Numrul i
nlimea Grad 8 8 S3 D918 H68 955,7 1,0122 967 ,3
stlpilor:
2x 6m+2 x8m Grad 9 9 S3 D918 H68 1.038,2 1,0218 1.060, 8

TABEL CENTRALIZATOR COSTURI STRUCTURA HAL INDUSTRIAL CU STLPI


PREFABRICAI DE 6 l 10 M NL IME AVND DESCHIDERILE DE 9 M l 18 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6 S 2 D918H610 1.124,7 0,9739 1.095,3
deschiderilor:
1 x 9m + 1 x18m Grad 7 7S 2 D918H610 1.171,1 0,9739 1.140, 5 pag. carte: 61
Numrul i
nlimea Grad 8 8 S 2 D918 H610 1.223,2 0,9739 1.191,3
stlpilor:
1x 6m+2 x10m Grad 9 9 S 2 D918 H610 1.328,9 0,9739 1.294 , 2
Numrul i
dimensiunea Grad 6 6 S3 D918 H610 977,1 1,0254 1.001,9
deschiderilor:
2x 9m + 1 x18m Grad 7 7S3D918H610 1.017,4 1,0254 1.043 , 2
Numrul i
nlimea Grad 8 8 S3 D918 H610 1.062,7 1,0254 1.089 , 7
stlpilor:
2x 6m+2 x 10m Grad 9 9 S3 D918 H610 1.154,5 1,0254 1.183 , 8

TABEL CENTRALIZATOR COSTUI l STRUCTURA HAL INDUSTRIAL CU STLPI


*
PREFABRICAI DE 6 l 8 M NL] IME AVND DESCHIDERILE DE 9 M l 21 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6S2D921H68 955,0 1,0263 980,1
deschiderilor:
1 x 9m + 1 x21m Grad 7 7 S 2 D921H68 994,4 1,0263 1.020, 6 pag. carte: 62
Numrul i
nlimea Grad 8 8 S 2 D921H68 1.038,7 1,0263 1.066, 0
stlpilor:
1x 6m+2 x8m Grad 9 9 S 2 D921H68 1.128,4 1,0263 1.158 , 1
Numrul i
dimensiunea Grad 6 6 S3 D921H68 872,2 1,0322 900 ,3
deschiderilor:
2x 9m + 1 x21m Grad 7 7S3 D921H68 908,1 1,0322 937 ,3
Numrul i
nlimea Grad 8 8 S3 D921H68 948,6 1,0322 979 , 1
stlpilor:
2x 6m+2 x8m Grad 9 9 S3 D921H68 1.030,5 1,0322 1.063 , 7

TABEL CENTRALIZATOR COSTURI STRUCTURA HAL INDUSTRIAL CU STLPI


PREFABRICAI DE 6 l 10 M NL IME AVND DESCHIDERILE DE 9 M l 21 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6 S 2D921H610 1.107,6 1,0289 1.139 , 6
deschiderilor:
1 x 9m + 1 x 21m Grad 7 7 S 2 D921H610 1.153,2 1,0289 1.186, 5 pag. carte: 63
Numrul i
nlimea Grad 8 8 S 2 D921H610 1.204,6 1,0289 1.239 , 4
stlpilor:
1x 6m+2 x10m Grad 9 9 S 2 D921H610 1.308,6 1,0289 1.346, 4
Numrul i
dimensiunea Grad 6 6 S3 D921H610 958,4 1,0298 987 ,0
deschiderilor:
2x 9m + 1 x 21m Grad 7 7S3D921H610 997,9 1,0298 1.027 , 6
Numrul i
nlimea Grad 8 8 S3 D921H610 1.042,4 1,0298 1.073 , 5
stlpilor:
2x6m+2 x 10m Grad 9 9 S3 D921H610 1.132,4 1,0298 1.166, 1

TABEL CENTRALIZATOR COSTUI l STRUCTURA HAL INDUSTRIAL CU STLPI


*
PREFABRICAI DE 6 l 8 M NL] IME AVND DESCHIDERILE DE 9 M l 24 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6S2D924H68 942,7 1,0316 972 ,5
deschiderilor:
1 x 9m + 1 x24m Grad 7 7S2D924H68 981,5 1,0316 1.012, 5 pag. carte: 64
Numrul i
nlimea Grad 8 8S2D924H68 1.025 ,2 1,0316 1.057 , 6
stlpilor:
1x 6m+2 x8m Grad 9 9S 2 D924H68 1.113,7 1,0316 1.148 , 9
Numrul i
dimensiunea Grad 6 6 S3 D924H68 865,6 1,0301 891,7
deschiderilor:
2x 9m + 1 x 24m Grad 7 7S3D924H68 901,3 1,0301 928 ,4
Numrul i
nlimea Grad 8 8S3 D924H68 941,5 1,0301 969 ,8
stlpilor:
2x 6m+2 x8m Grad 9 9 S3 D924H68 1.022,7 1,0301 1.053 , 5

TABEL CENTRALIZATOR COSTURI STRUCTURA HAL INDUSTRIAL CU STLPI


PREFABRICAI DE 6 l 10 M NL IME AVND DESCHIDERILE DE 9 M l 24 M
Caracteristici Gradul Simbol pre indice cost actualizat
structura seismic carte 2016 - 2017 2016 - 2017
Numrul i
dimensiunea Grad 6 6 S 2 D924H68 1.090,5 1,0233 1.115, 9
deschiderilor:
1 x 9m + 1 x 24m Grad 7 7S 2 D924H68 1.135 ,4 1,0233 1.161,9 pag. carte: 65
Numrul i
nlimea Grad 8 8S 2D924H68 1.186,0 1,0233 1.213 , 6
stlpilor:
1x 6m+2 x10m Grad 9 9S 2D924H68 1.288,4 1,0233 1.318 , 4
Numrul i
dimensiunea Grad 6 6 S3D924 H68 939,7 1,0179 956 ,5
deschiderilor:
2x 9m + 1 x 24m Grad 7 7S3D924 H68 978,5 1,0179 996 ,0
Numrul i
nlimea Grad 8 8S3D924H68 1.022,1 1,0179 1.040,4
stlpilor:
2x6m+2 x 10m Grad 9 9S3D924H68 1.110,3 1,0179 1.130, 2

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI ACOPERI URI PENTRU HALE INDUSTRIALE AUGUST 2016 - IULIE 2017
Denumire Dimensiuni Simbol pre indice cost actualizat
acoperi deschidere carte 2016 - 2017 2016 - 2017
1 ) Acoperi cu 9m 9 ECPHT 5 564,2 0 ,9926 560 ,0
elemente
prefabricate de 12 m 12ECPHT 5 566,5 0 ,9926 562 , 3
tip ECP +
hidroizolaie + 15 m 15 ECPHT5 565 ,5 0 ,9926 561,3
termoizolaie
de 5 cm 18 m 18 ECPHT5 566,4 0 ,9926 562 ,2
2 ) Ferme 6m 6FZBRATH5 621,1 1,0404 646 ,2
metalice cu 9m 9 FZBRATH5 621,1 1,0404 646 ,2
zbrele + 12 m 12 FZBRATH5 621,1 1,0404 646 ,2
cheson + 15 m 15FZBRATH5 621,1 1,0404 646 ,2
hidroizolaie + 18 m 18FZBRATH5 621,1 1,0404 646 ,2
termoizolaie 21 m 21FZBRATH5 621,1 1,0404 646 ,2
de 5 cm 24 m 24 FZBRATH 5 621,1 1,0404 646 ,2
grosime
3) Grinzi 6m 6GPRECHT5 606,2 1,0275 622, 9
precomprimate + 9m 9 GPRECHT 5 606,2 1,0275 622 , 9
cheson + 12 m 12GPRECHT5 606,2 1,0275 622 , 9
hidroizolaie + 15 m 15GPRECHT5 606,2 1,0275 622 , 9
termoizolaie 18 m 18 GPRECHT 5 606,2 1,0275 622 , 9
de 5 cm
grosime
4 ) Ferme 6m 6FZBRATZN 450,6 1,0097 455,0
metalice + 9m 9 FZBRATZN 450,6 1,0097 455,0
contravntuiri + 12 m 12FZBRATZN 450,6 1,0097 455 ,0
nvelitoare 15 m 15FZBRATZN 450,6 1,0097 455 ,0
tabl zincat 18 m 18 FZBRATZN 450,6 1,0097 455,0
cutat 21 m 21FZBRATZN 450,6 1,0097 455 ,0
24 m 24FZBRATZN 450,6 1,0097 455,0
5 ) Ferme 6m 6 FZBRATNV 440,0 0,9861 433 , 9
metalice + 9m 9 FZBRATNV 440,0 0,9861 433 , 9
contravntuiri + 12 m 12 FZBRATNV 440,0 0,9861 433 , 9
nvelitoare 15 m 15 FZBRATNV 440,0 0,9861 433 , 9
tabl neagr 18 m 18 FZBRATNV 440,0 0,9861 433 , 9
vopsit 21 m 21FYBRATNV 440,0 0,9861 433 , 9
24 m 24 FZBRATNV 440,0 0,9861 433 , 9
TABEL CENTRALIZATOR COSTURI CENTRAL NECIRCULAR CU TERMOIZOLAIE
VAT MINERAL
Denumire Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Teras necirculabil cu vat
mineral | TERASANE 184,9 1,1707 216 ,5 pag.carte: 68
TABEL CENTRALIZATOR COSTURI LUMINATOR STRUCTURA METALICA l GEAM ARMAT
Denumire Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
Luminator cu geam armat TLUMINAT 508,9 0 ,9882 502 , 9
TABEL CENTRALIZATOR COSTURI NCHIDERE LATERALA EXTERIOARA CU CRMID
DE 24 CM GROSIME, FINISAT INTERIOR l EXTERIOR
Tipul nlime Simbol pre cost actualizat
de nchidere carte 2016 - 2017 2016 - 2017
Cu geam H=6m ICARA24GH6 313,2 1,1096 347,5
Cu geam H=7m ICARA24 GH7 311,3 1,1096 345,4 pag.carte: 69
Cu geam H=8m ICARA24 GH8 309,3 1,1096 343,2
Cu geam H=9m ICARA24 GH9 307,3 1,1096 341,0
Cu geam H = 10 m ICARA24 GH10 305 ,4 1,1096 338 , 9
Fr geam ICARA24P 608,7 1,1414 694,8
TABEL CENTRALIZATOR COSTURI NCHIDERE LATERALA EXTERIOARA CU B.C.A.
DE 24 CM GROSIME, FINISAT INTERIOR l EXTERIOR
Tipul nlime Simbol pre cost actualizat
de nchidere carte 2016 - 2017 2016 - 2017
Cu geam H=6m IBCA24 GH6 300,6 1,1051 332 ,2
Cu geam H=7m IBCA24 GH7 298,8 1,1051 330,2 pag.carte: 70
Cu geam H=8m IBCA24 GH8 296,9 1,1051 328,1
Cu geam H=9m IBCA24 GH 9 295 ,1 1,1051 326,1
Cu geam H = 10 m IBCA24 GH10 293,2 1,1051 324,0
Fr geam IBCA24P 595 ,3 0,9868 587,4

TABEL CENTRALIZATOR COSTURI NCHIDERE LATERAL EXTERIOAR CU FASII B.C.A.


DE 20 CM GROSIME, FINISAT INTERIOR l EXTERIOR
Tipul nlime Simbol pre cost actualizat
de nchidere carte 2016 - 2017 2016 - 2017
Cu geam H=6m IBCA24 GH6 356,7 1,0567 376 , 9
Cu geam H=7m IBCA24 GH7 339,7 1,0567 359 ,0
Cu geam H=8m IBCA24 GH 8 322,7 1,0567 341,0
Cu geam H=9m IBCA24 GH 9 305 ,6 1,0567 322 , 9
|Cu geam H = 10 m IBCA24 GH10 288,6 1,0567 305 ,0
|Fr geam IBCA24 P 552,0 1,0545 582,1
TABEL CENTRALIZATOR COSTURI FINISAJE PENTRU HALE INDUSTRIALE
Tip finisaj Simbol pre indice cost actualizat
carte 2016 - 2017 2016 - 2017
Finisaj interior FINIHALA 140,0 1,1321 158 ,5
Finisaj obi nuit pentru vestiar FINIVEST 472,2 1,0788 509 ,4
TABEL CENTRALIZATOR COSTURI INSTALAII FUNCIONALE PENTRU HALE INDUSTRIALE
Tip instalaie Simbol pre cost actualizat
carte 2016 - 2017 2016 - 2017
Instalaii electrice (220v ) ELHALAC 56,8 1,0377 58,9
Instalaii sanitare SAHALAC 69,5 0,8792 61,1
Instalaii sanitare vestiar SAHALAVE 17,7 0 ,9939 17,6
Instalaii de nclzire INCHALAC 109,8 0 ,9941 109,2

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI HAL DE DEPOZITARE CU STRUCTUR PE CADRE AUGUST 2016 - IULIE 2017
DIN BETON ARMAT l NCHIDERE CU PANOURI IZOLATOARE DE TIP ISOPAN
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Infrastructur Grad 6 6INFHDSC 538,6 1,0398 560,0
Grad 7 7INFHDSC 560,8 1,0398 583,1 pag.carte: 73
Grad 8 8INFHDSC 585,8 1,0398 609,1
Grad 9 9INFHDSC 636,4 1,0398 661,7
Suprastructura Grad 6 6 SHDSC 475,5 1,0176 483,9
Grad 7 7SHDSC 495,1 1,0176 503,8
Grad 8 8SHDSC 517,1 1,0176 526,2
Grad 9 9SHDSC 561,8 1,0176 571,7
Finisaj FINHDSC 594,6 1,0347 615,2
Instalaii electrice ELHDSC 48,8 1,0777 52,6
Instalaii sanitare SAHDSC 99,0 1,0886 107,8
Instalaii de nclzire IVHDSC 13,1 0,9935 13,0
TABEL CENTRALIZATOR COSTURI HALA INDUSTRIALA DIN EUROPROFILE ZINCATE
CU O DESCHIDERE DE 12 M
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN1 D12 1.897,8 0,8691 1.649,4
Grad 7 7EPZN1 D12 1.976,1 0,8691 1.717,4 pag.carte: 76
Grad 8 8 EPZN1 D12 2.064,1 0,8691 1.793,9
Grad 9 9 EPZN1 D12 2.242,2 0,8691 1.948,7
Finisaj FIEPZN1D 231,6 0,9962 230,7
Instalaii electrice ELEPZN1 D 29,9 1,1097 33,2
Instalaii sanitare SEPZN1 D 8, 2 1,0344 8,5
Instalaii de nclzire IEPZN1D 31,2 1,0028 31,3

TABEL CENTRALIZATOR COSTURI HAL INDUSTRIAL DIN EUROPROFILE ZINCATE


CU O DESCHIDERE DE 14 M
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN1D14 1.784,2 0,9865 1.760,1
Grad 7 7EPZN1 D14 1.857,8 0,9865 1.832,7 pag.carte: 77
Grad 8 8 EPZN1 D14 1.940,6 0,9865 1.914,4
Grad 9 9 EPZN1 D14 2.108,0 0,9271 1.954,3
Finisaj FIEPZN1D 231,6 0,9962 230,7
Instalaii electrice ELEPZN1 D 29,9 1,1097 33,2
Instalaii sanitare SEPZN1 D 8, 2 1,0344 8,5
|Instalaii de nclzire IEPZN1D 31,2 1,0028 31,3
TABEL CENTRALIZATOR COSTURI HALA INDUSTRIALA DIN EUROPROFILE ZINCATE
CU O DESCHIDERE DE 17 M
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN1 D17 1.669,5 0,8076 1.348,3
Grad 7 7EPZN1 D17 1.738,5 0,8076 1.404,0 pag.carte: 78
Grad 8 8 EPZN1 D17 1.815,9 0,8076 1.466,5
Grad 9 9EPZN1 D17 1.972,5 0,8076 1.593,0
Finisaj FIEPZN1D 231,6 0,9962 230,7
Instalaii electrice ELEPZN1 D 29,9 1,1097 33,2
Instalaii sanitare SEPZN1 D 8, 2 1,0344 8,5
Instalaii de nclzire IEPZN1D 31,2 1,0028 31,3
TABEL CENTRALIZATOR COSTURI HALA INDUSTRIALA DIN EUROPROFILE ZINCATE
CU O DESCHIDERE DE 20 M
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN1 D 20 1.556,5 0,9596 1.493,6
Grad 7 7EPZN1 D 20 1.620,8 0,9596 1.555,3 pag.carte: 79
Grad 8 8 EPZN1 D 20 1.692,9 0,9596 1.624,5
Grad 9 9 EPZN1 D 20 1.839,0 0,9596 1.764,7
Finisaj FIEPZN1D 231,6 0,9962 230,7
Instalaii electrice ELEPZN1 D 29,9 1,1097 33,2
Instalaii sanitare SEPZN1 D 8, 2 1,0344 8,5
Instalaii de nclzire IEPZN1D 31,2 1,0028 31,3

TABEL CENTRALIZATOR COSTURI HAL INDUSTRIAL DIN EUROPROFILE ZINCATE


CU DOU DESCHIDERI DE 12 M 2X 12
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN2 D12 1.707,6 0,9513 1.624,4
Grad 7 7EPZN2 D12 1.777,8 0,9513 1.691,2 pag.carte: 80
Grad 8 8 EPZN2 D12 1.857,1 0,9513 1.766 ,7
Grad 9 9 EPZN2D12 2.017,5 0,9513 1.919,2
Finisaj FIEPZN2 D 130,2 1,0134 131, 9
Instalaii electrice ELEPZN2 D 26,9 1,0701 28,8
Instalaii sanitare SEPZN2 D 15,2 0,9046 13,7
Instalaii de nclzire IEPZN2 D 25,9 0,9881 25,6
TABEL CENTRALIZATOR COSTURI HAL INDUSTRIAL DIN EUROPROFILE ZINCATE
CU DOU DESCHIDERI DE 14 M 2X 14
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN2 D12 1.622,7 0,8867 1.438 ,8
Grad 7 7 EPZN2 D12 1.689,4 0,8867 1.498,0 pag.carte: 81
Grad 8 8 EPZN2 D 12 1.764,7 0,8867 1.564,8
Grad 9 9 EPZN2 D 12 1.917,2 0,8867 1.700,0
Finisaj FIEPZN2 D 130,2 1,0134 131,9
Instalaii electrice ELEPZN2D 26,9 1,0701 28,8
Instalaii sanitare SEPZN2 D 15,2 0,9046 13,7
Instalaii de nclzire IEPZN2 D 25,9 0,9881 25,6
TABEL CENTRALIZATOR COSTURI HALA INDUSTRIALA DIN EUROPROFILE ZINCATE
CU DOU DESCHIDERI DE 17 M 2X 17
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN2 D17 1.536,6 0,9535 1.465,1
Grad 7 7EPZN2 D17 1.599,8 0,9535 1.525,4 pag.carte: 82
Grad 8 8 EPZN2 D17 1.671,1 0,9535 1.593,4
Grad 9 9EPZN2 D17 1.815,5 0,9535 1.731,1
Finisaj FIEPZN2 D 130,2 1,0134 131,9
Instalaii electrice ELEPZN2D 26,9 1,0701 28,8
Instalaii sanitare SEPZN2D 15,2 0,9046 13,7
Instalaii de nclzire IEPZN2 D 25,9 0,9881 25,6

TABEL CENTRALIZATOR COSTURI HAL INDUSTRIAL DIN EUROPROFILE ZINCATE


CU DOU DESCHIDERI DE 20 M 2X20
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Structura Grad 6 6EPZN2 D 20 1.451,4 1,0234 1.485,4
Grad 7 7 EPZN2 D 20 1.511,1 1,0234 1.546 ,5 pag.carte: 83
Grad 8 8 EPZN2 D 20 1.578,4 1,0234 1.615 ,3
Grad 9 9 EPZN2 D 20 1.714,8 1,0234 1.754, 9
Finisaj FIEPZN2D 130,2 1,0134 131, 9
Instalaii electrice ELEPZN2 D 26,9 1,0701 28,8
Instalaii sanitare SEPZN2 D 15,2 0,9046 13,7
Instalaii de nclzire IEPZN2 D 25,9 0,9881 25,6

TABEL CENTRALIZATOR COSTURI HAL INDUSTRIAL CU PANOURI IZOLATOARE TIP


ISOPAN - GROSIMEA PERETELUI 10 CM l INVELITOAREA DE 10 CM
Denumire leschidere Simbol pre indice cost actualizat
carte 2016-2017 2016-2017
Cldire cu panouri 9m 10PANIZO109 1.232,1 1,1262 1.387,6
izolatoare (Grosime 12 m 10PANIZO1012 1.168,7 1,0476 1.224,3
perete:10 cm 15 m 10PANIZO1015 1.031,0 1,0743 1.107,6
nvelitoare: 10 cm)
Finisai interior FINIZOPAN 130,2 1,0134 131,9
Instalaii electrice ELIZOPAN 26,9 1,0701 28,8
Instalaii sanitare SIZOPAN 15,2 0,9046 13,7
Instalaii de nclzire IIZOPAN 25,9 0,9881 25,6

TABEL CENTRALIZATOR COSTURI HAL INDUSTRIAL CU PANOURI IZOLATOARE TIP


ISOPAN - GROSIMEA PERETELUI 16 CM l INVELITOAREA DE 12 CM
Denumire leschidere Simbol pre indice cost actualizat
carte 2016-2017 2016-2017
Cldire cu panouri 9m 16PANIZ0129 1.256,7 1,3066 1.642,0
izolatoare (Grosime 12 m 16PANIZ01212 1.190,9 1,2459 1.483,7
perete:16 cm 15 m 16PANIZ01215 1.125,2 1,2766 1.436,4
nvelitoare: 12 cm)
Finisai interior FINIZOPAN 130,2 1,0134 131,9
Instalaii electrice ELIZOPAN 26,9 1,0701 28,8
Instalaii sanitare SIZOPAN 15,2 0,9046 13,7
Instalaii de nclzire IIZOPAN 25,9 0,9881 25,6

TABEL CENTRALIZATOR COSTURI HAL DEPOZIT CU ST LPI PREFABRICAI DE 4 M


NCASTRAI N FUNDAII DE TIP PAHAR AVND DESCHIDEREA DE 9 M l ACOPERI
DE TIP CHESON
Gradul Numr de Simbol pre indice cost actualizat
seismic deschideri carte 2016-2017 2016-2017
1 6 DEP1D9 H4 973,5 1,1898 1.158,3
Grad 6 2 6 DEP 2 D9 H4 869,6 1,0814 940,4
3 6 DEP 3D9 H4 844,8 1,0437 881, 7
1 7DEP1D9H4 1.013,6 1,1898 1.206 ,0
Grad 7 2 7 DEP 2 D9 H4 905,4 1,0814 979,1
3 7DEP 3D9 H4 879,6 1,0437 918,0
1 8 DEP1D9H4 1.058,7 1,1898 1.259,6
Grad 8 2 8 DEP 2 D9H4 945,8 1,0814 1.022,8
3 8 DEP 3D9H4 918,8 1,0437 959,0
1 9 DEP1D9H4 1.150,2 1,1898 1.368,5
Grad 9 2 9 DEP 2 D9 H4 1.027,4 1,0814 1.111,0
3 9 DEP 3D9H4 998,1 1,0437 1.041,7

TABEL CENTRALIZATOR COSTURI CLDIRE VECHE INDUSTRIAL Sp+P+1E


(DEPOZITE l ATELIERE DE PRODUCIE)
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Grad 6 6 SCLISP1 1.062,7 1,0851 1.153,1
Structur Grad 7 7SCLISP1 1.106,5 1,0851 1.200,7 pag.carte: 86
Grad 8 8SCLISP1 1.155,8 1,0851 1.254,2
Grad 9 9SCLISP1 1.255,6 1,0851 1.362,5
Finisaj FINSCLISP 1 319,8 1,1221 358,8
Instalaii electrice ELSCLISP1 63,3 1,0904 69,0
Instalaii sanitare SASCLISP1 21,5 0,9588 20,6
Instalaii de nclzire ISCLISP 1 71,5 1,0081 72,1

TABEL CENTRALIZATOR COSTURI CLDIRE P +1E


(HAL DE PRODUCIE + DEPOZIT)
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Grad 6 6 SCLDP1 717,7 1,0489 752,8
Structur Grad 7 7 SCLDP1 747,3 1,0489 783,8 pag.carte: 86
Grad 8 8 SCLDP1 780,6 1,0489 818, 8
Grad 9 9 SCLDP1 848,0 1,0489 889,5
Finisaj FINSCLDP 1 292,2 1,1386 332,7
Instalaii electrice ELSCLDP 1 63,3 1,0904 69,0
Instalaii sanitare SASCLDP 1 21,5 0,9588 20,6
Instalaii de nclzire ISCLDP1 71,5 1,0081 72,1

TABEL CENTRALIZAT DR COSTURI CLDIRE P+2E


(VESTIARE + BIROURI
Denumire Gradul Simbol pre indice cost actualizat
seismic carte 2016-2017 2016-2017
Grad 6 6 CLVEST 872,2 1,0350 902,7
Structur Grad 7 7 CLVEST 883,7 1,0350 914, 6 pag.carte: 87
Grad 8 8 CLVEST 902,9 1,0350 934, 5
Grad 9 9 CLVEST 925,5 1,0350 957,9
Finisaj FINCLVEST 740,9 1,1261 834,3
Instalaii electrice ELCLVEST 63,3 1,0904 69,0
Ilnstalaii sanitare SACLVEST 21,5 0,9588 20,6
llnstalaii de nclzire ICLVEST 71,5 1,0081 72,1

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABELE CENTRALIZATOARE COSTURI TIPURI DE CABLURI AFERENTE INSTALAIEI DE FOR
1. Cabluri cu 3 - 4 fire cu seciunile ntre 4 - 35 mm2
Denumire Dimensiuni pre indice cost actualizat
carte 2016-2017 2016-2017
3x 4 0,6/1 kV 12,2 1,0116 12 , 3
4x 4 0,6/1 kV 14,9 1,0116 15,1 pag.carte: 94
2x 6 0,6/1 kV 12,4 1,0116 12 ,5
3x 6 0,6/1 kV 16,5 1,0116 16,7
4x 6 0,6/1 kV 20,7 1,0116 20,9
2x 10 0,6/1 kV 18 ,0 1,0116 18,2
Cablu electric din cupru tip CYABY 3x10 0,6/1 kV 24,5 1,0116 24,8
4x10 0,6/1 kV 31,4 1,0116 31 ,8
2x16 0,6/1 kV 28 ,8 1,0116 29,1
3x16 0,6/1 kV 40,4 1,0116 40,9
4x16 0,6 /1 kV 52,2 1,0116 52,8
3x25 0,6/1 kV 61,0 1,0116 61,7
4x25 0,6/1 kV 79,8 1,0116 80,7
4x35 0,6/1 kV 107,6 1,0116 108 ,8
2
2. Cabluri cu nul de protecie cu 3 fire, cu sec iunile ntre 25 - 120 mm
Denumire Dimensiuni pre indice cost actualizat
carte 2016-2017 2016-2017
3x 25+16 0,6/1 kV 67,2 0,9969 67 ,0
3x35+16 0,6/1 kV 86,4 0,9969 86 ,1 pag.carte: 94
Cablu electric din cupru tip CYABY 3x50+25 0,6/1 kV 118,5 0,9969 118 , 1
3x 70+35 0,6/1 kV 168,9 0,9969 168 ,4
3x95 +50 0,6/1 kV 230,7 0,9969 230 ,0
3x 120+70 0,6/1 kV 293,2 0,9969 292 ,3
3x 25 +16 0,6/1 kV 60,5 0,9969 60 ,3
3x35 +16 0,6/1 kV 77,6 0,9969 77 ,4
Cablu electric din cupru tip CYY 3x50+25 0,6/1 kV 124,0 0,9969 123 ,6
3x 70+35 0,6/1 kV 147,1 0,9969 146 ,6
3x95 +50 0,6/1 kV 220,8 0,9969 220 , 1
3x 120+70 0,6/1 kV 295 ,6 0,9969 294,7
3x 25+16 0,6/1 kV 63,4 0,9969 63 ,2
3x35 +16 0,6/1 kV 81,0 0,9969 80,7
Cablu electric din cupru tip CYYF 3x50+25 0,6/1 kV 94,9 0,9969 94 ,6
3x 70+35 0,6/1 kV 152,2 0,9969 151,7
3x95 +50 0,6/1 kV 181,8 0,9969 181,2
3x 120+70 0,6/1 kV 232,0 0,9969 231,3
3.Pod tip cablu electric zincat
Dimensiuni pre | indice cost actualizat
carte 2016-2017 2016-2017
50 x110 x0,75 82,9 1,0004 82 , 9
100 x110 x0,75 87,9 1,0004 87,9 pag. carte: 94
200 x 110 x0,75 102,6 1,0004 102 ,6
300 x 110 x0,75 126,1 1,0004 126 ,2
400 x 110 x0,75 148,2 1,0004 148 , 3
500 x 110 x0,75 164,5 1,0004 164 ,6
600 x 110 x0,75 180,8 1,0004 180,9
CLDIRE PARTER F R SUBSOL CU DESTINAIA MAGAZIN AUGUST 2016 - IULIE 2017
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016-2017 2016 -2017
Grad 6 6STRMAGP 734,0 1,0198 748 ,5
Structur Grad 7 7STRMAGP 764,3 1,0198 779 ,4
Grad 8 8STRMAGP 798,3 1,0198 814,1
Grad 9 9STRMAGP 867,2 1,0198 884,4
Finisaj interior FINIEMAGP 482,2 0,9718 468 ,6
Instalaii electrice INELMAGP 290, 8 0 ,8754 254 ,6
Instalaii sanitare ISAMAGP 63,7 0 ,9604 61,2
Instalaii de nclzire INCMAGP 80,3 0 ,9943 79,8
Finisaj faad
Teras necirculabil TERNECIRC 439 ,4 1,0455 459,4
(costuri determinate
pentru suprafa a circulabil TERCIRC 952,5 1,0233 974,7
construit a terasei)
CLDIRE PARTER DE TIP SUPERMARKET
Denumire Simbol pre | indice cost curent
carte 2016-2017 2016-2017
Grad 6 6 STRMARKET 1.017,53 1,0463 1.064, 6
Structur int.+ext. Grad 7 7 STRMARKET 1.059,45 1,0463 1.108 , 5
Grad 8 8 STRMARKET 1.106,67 1,0463 1.157 , 9
Grad 9 9 STRMARKET 1.202,21 1,0463 1.257 , 9
Finisaj fa ad cu Magazin FININTMAG 596,62 0,9296 554,6
isopan Depozit FINDEPOZIT 232,23 1,0672 247 ,8
Instalaii electrice Magazin ELECTRMAG 390,84 1,0298 402 ,5
Depozit ELECTRDEP 48,77 1,0449 51,0
Instalaii sanitare Magazin SANITMAG 120,56 0,9708 117,0
Depozit SANITDEP 99,12 0,8903 88,2
Instalaii de nclzire Magazin INCVENTMAG 203,00 1,0132 205,7
i ventilaie Depozit INCVETDEP 13,50 1,0056 13 ,6

CLDIRE COMERCIAL INDEPENDENT DE TIP MAGAZIN S+P+ 2E


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016-2017 2016 -2017
Grad 6 6IRMAGS2E 1.424,2 1,0204 1.453 ,3
Infrastructura Grad 7 7 IRMAGS 2 E 1.482,8 1,0204 1.513,0 pag.carte: 101
Grad 8 8 IRMAGS 2 E 1.548,9 1,0204 1.580, 5
Grad 9 9 IRMAGS 2 E 1.682,7 1,0204 1.717,0
Grad 6 6 SRMAGS 2 E 632,0 1,0024 633 ,5
Suprastructura Grad 7 7SRMAGS2 E 658,1 1,0024 659,7
Grad 8 8SRMAGS 2 E 687,4 1,0024 689 ,0
Grad 9 9SRMAGS 2 E 746,8 1,0024 748 ,6
Finisaj interior obinuit FOMAGS 2 E 382,0 0 ,9232 352 ,7
superior FSMAGS 2 E 1.253,6 0,8270 1.036,7
Instalaii electrice ELMGS 2E 282,6 0 ,8915 251, 9
Instalaii sanitare SAMAGS 2E 42,4 0 ,9741 41 ,3
Instalaii de nclzire
i ventilaie IVMAGS 2 E 107,5 0 ,9984 107,3
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439 ,4 1,0455 459,4
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

CLDIRE COMERCIAL INDEPENDENT DE TIP MAGAZIN S+P+3E


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016-2017 2016 -2017
Grad 6 6IRMAGS3E 1.370,7 1,0204 1.398,7
Infrastructura Grad 7 7 IRMAGS3 E 1.427,2 1,0204 1.456,3
Grad 8 8 IRMAGS3 E 1.490,8 1,0204 1.521,2
Grad 9 9 IRMAGS3 E 1.619,5 1,0204 1.652,5
Grad 6 6 SRMAGS3 E 608,8 1,0024 610,3
Suprastructura Grad 7 7SRMAGS3 E 633,9 1,0024 635 ,4
Grad 8 8SRMAGS3 E 662,1 1,0024 663 ,7
Grad 9 9 SRMAGS3 E 719,3 1,0024 721,0
Finisaj interior obinuit FOMAGS 3E 382,0 0,9232 352 ,7
superior FSMAGS 3E 1.253,6 0,8270 1.036,7
Instalaii electrice ELMGS3E 282,6 0,8915 251, 9
Instalaii sanitare SAMAGS 3E 42,4 0,9741 41 , 3
Instalaii de nclzire
i ventilaie IVMAGS3 E 107,5 0,9984 107,3
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439, 4 1,0455 459 ,4
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FR CORP EXTINDERE ) AUGUST 2016 - IULIE 2017
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E.
NLIME LIBER MAGAZIN 3 ,25 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM3254E 326,7 1,1433 373,5
Infrastructura Grad 7 7CPSM3254E 340,1 1,1434 388,9 pag.carte : 105
Grad 8 8 CPSM3254E 355,3 1,1439 406,4
Grad 9 9CPSM 3254 E 386,0 1,1433 441,3
Grad 6 6CPPM 3254 E 1.189,7 1,0873 1.293,6
Suprastructura Grad 7 7CPPM3254 E 1.238,7 1,0873 1.346,8
Grad 8 8CPPM3254 E 1.293,9 1,0873 1.406,9
Grad 9 9CPPM3254 E 1.405,6 1,0873 1.528,3
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 4 E 87,9 1,0445 91,8
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FARA CORP EXTINDERE)
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E.
NLIME LIBER MAGAZIN 3 ,50 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM 3504 E 351,8 1,1433 402,2
Infrastructura Grad 7 7CPSM 3504 E 366,3 1,1434 418,8 pag.carte : 106
Grad 8 8 CPSM 3504 E 382,6 1,1439 437,7
Grad 9 9 CPSM 3504 E 415,6 1,1433 475,2
Grad 6 6CPPM 3504 E 1.281,2 1,0873 1.393,0
Suprastructura Grad 7 7CPPM 3504 E 1.333,9 1,0873 1.450,3
Grad 8 8CPPM 3504 E 1.393,4 1,0873 1.515,0
Grad 9 9 CPPM 3504 E 1.513,7 1,0873 1.645,8
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 4 E 87,9 1,0445 91,8
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FR CORP EXTINDERE )
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E.
NLIME LIBER MAGAZIN 3 ,75 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM3754 E 376,9 1,1433 430,9
Infrastructura Grad 7 7CPSM3754 E 392,5 1,1434 448,8 pag.carte : 107
Grad 8 8 CPSM 3754 E 409,9 1,1439 468,9
Grad 9 9CPSM 3754 E 445,3 1,1433 509,1
Grad 6 6CPPM 3754 E 1.372,7 1,0873 1.492,5
Suprastructura Grad 7 7CPPM3754 E 1.429,2 1,0873 1.554,0
Grad 8 8CPPM3754 E 1.492,9 1,0873 1.623,2
Grad 9 9CPPM3754 E 1.621,8 1,0873 1.763,4
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 4 E 87,9 1,0445 91,8
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FARA CORP EXTINDERE)
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E.
NLIME LIBER MAGAZIN 4,00 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM 4004E 402,1 1,1433 459,7
Infrastructura Grad 7 7CPSM 4004E 418,6 1,1434 478,6 pag.carte : 108
Grad 8 8 CPSM 4004E 437,3 1,1439 500,2
Grad 9 9 CPSM 4004E 475,0 1,1433 543,1
Grad 6 6CPPM 4004E 1.464,2 1,0873 1.592,0
Suprastructura Grad 7 7CPPM 4004E 1.524,5 1,0873 1.657,6
Grad 8 8CPPM 4004E 1.592,4 1,0873 1.731,4
Grad 9 9 CPPM 4004E 1.729,9 1,0873 1.880,9
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 4 E 87,9 1,0445 91,8
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FR CORP EXTINDERE )
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+8E.
NLIME LIBER MAGAZIN 3 ,25 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM3258E 231,5 1,1493 266,1
Infrastructura Grad 7 7CPSM3258E 241,0 1,1495 277,0 pag.carte : 109
Grad 8 8 CPSM3258E 251,8 1,1494 289,4
Grad 9 9CPSM 3258 E 273,5 1,1493 314,3
Grad 6 6CPPM 3258 E 1.108,0 1,1059 1.225,3
Suprastructura Grad 7 7CPPM3258 E 1.153,6 1,1059 1.275,8
Grad 8 8CPPM3258 E 1.205,0 1,1059 1.332,6
Grad 9 9CPPM3258 E 1.309,1 1,1059 1.447,7
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 8 E 48,8 1,0445 51,0
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FARA CORP EXTINDERE)
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+8E.
NLIME LIBER MAGAZIN 3 ,50 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM 3508 E 249,3 1,1493 286,5
Infrastructura Grad 7 7CPSM 3508 E 259,6 1,1495 298,4 pag.carte : 110
Grad 8 8CPSM 3508 E 271,1 1,1494 311,6
Grad 9 9 CPSM 3508 E 294,5 1,1493 338,5
Grad 6 6CPPM 3508 E 1.193,2 1,1059 1.319,6
Suprastructura Grad 7 7CPPM 3508 E 1.242,4 1,1059 1.374,0
Grad 8 8CPPM 3508 E 1.297,7 1,1059 1.435,1
Grad 9 9 CPPM 3508 E 1.409,8 1,1059 1.559,1
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 8 E 48,8 1,0445 51,0
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FR CORP EXTINDERE )
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+8E.
NLIME LIBER MAGAZIN 3 ,75 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM3758E 267,1 1,1493 307,0
Infrastructura Grad 7 7CPSM3758 E 278,1 1,1495 319,7 pag.carte : 111
Grad 8 8 CPSM3758E 290,5 1,1494 333,9
Grad 9 9CPSM 3758 E 315,6 1,1493 362,7
Grad 6 6CPPM 3758 E 1.278,4 1,1059 1.413,8
Suprastructura Grad 7 7CPPM3758 E 1.331,1 1,1059 1.472,1
Grad 8 8CPPM3758 E 1.390,4 1,1059 1.537,6
Grad 9 9CPPM3758 E 1.510,5 1,1059 1.670,5
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 8 E 48,8 1,0445 51,0
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FARA CORP EXTINDERE)
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+8E.
NLIME LIBER MAGAZIN 4,00 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM 4008 E 284,9 1,1493 327,4
Infrastructura Grad 7 7CPSM 4008 E 296,6 1,1495 340,9 pag.carte : 112
Grad 8 8 CPSM 4008 E 309,9 1,1494 356,2
Grad 9 9 CPSM 4008 E 336,6 1,1493 386,9
Grad 6 6CPPM 4008 E 1.363,7 1,1059 1.508,1
Suprastructura Grad 7 7CPPM 4008 E 1.419,8 1,1059 1.570,2
Grad 8 8CPPM 4008 E 1.483,1 1,1059 1.640,2
Grad 9 9 CPPM 4008 E 1.611,2 1,1059 1.781,8
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 8 E 48,8 1,0445 51,0
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FR CORP EXTINDERE )
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+10E.
NLIME LIBER MAGAZIN 3 ,25 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM32510 E 217,9 1,1628 253,4
Infrastructura Grad 7 7CPSM 32510 E 226,9 1,1630 263,9 pag.carte : 113
Grad 8 8CPSM 32510 E 237,0 1,1627 275,6
Grad 9 9CPSM 32510 E 257,5 1,1628 299,4
Grad 6 6CPPM 32510 E 1.086,2 1,1622 1.262,4
Suprastructura Grad 7 7CPPM32510 E 1.130,9 1,1622 1.314,3
Grad 8 8CPPM32510 E 1.181,3 1,1622 1.372,9
Grad 9 9CPPM32510 E 1.283,3 1,1622 1.491,5
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 10 E 39,9 1,0445 41,7
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FARA CORP EXTINDERE)
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+10E.
NLIME LIBER MAGAZIN 3 ,50 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM 35010 E 234,7 1,1628 272,9
Infrastructura Grad 7 7CPSM 35010 E 244,3 1,1630 284,1 pag.carte : 114
Grad 8 8 CPSM 35010 E 255,2 1,1627 296,7
Grad 9 9 CPSM 35010 E 277,3 1,1628 322,4
Grad 6 6CPPM 35010 E 1.169,7 1,1622 1.359,4
Suprastructura Grad 7 7CPPM 35010 E 1.217,9 1,1622 1.415,4
Grad 8 8CPPM 35010 E 1.272,2 1,1622 1.478,6
Grad 9 9CPPM 35010 E 1.382,0 1,1622 1.606,2
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM10 E 39,9 1,0445 41,7
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FR CORP EXTINDERE )
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+10E.
NLIME LIBER MAGAZIN 3 ,75 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM37510E 251,4 1,1628 292,3
Infrastructura Grad 7 7CPSM 37510 E 261,8 1,1630 304,5 pag.carte : 115
Grad 8 8CPSM 37510 E 273,5 1,1627 318,0
Grad 9 9CPSM 37510 E 297,1 1,1628 345,5
Grad 6 6CPPM 37510 E 1.253,3 1,1622 1.456,6
Suprastructura Grad 7 7CPPM37510 E 1.304,9 1,1622 1.516,6
Grad 8 8CPPM37510 E 1.363,0 1,1622 1.584,1
Grad 9 9CPPM37510 E 1.480,7 1,1622 1.720,9
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM 10 E 39,9 1,0445 41,7
TABEL CENTRALIZATOR COSTURI SPAIU COMERCIAL (FARA CORP EXTINDERE)
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+10E.
NLIME LIBER MAGAZIN 4,00 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6CPSM 40010 E 268,2 1,1628 311,9
Infrastructura Grad 7 7CPSM 40010 E 279,2 1,1630 324, 7 pag.carte : 116
Grad 8 8CPSM 40010 E 291,7 1,1627 339,2
Grad 9 9 CPSM 40010 E 316,9 1,1628 368,5
Grad 6 6CPPM 40010 E 1.336,8 1,1622 1.553,6
Suprastructura Grad 7 7CPPM 40010 E 1.391,9 1,1622 1.617,7
Grad 8 8CPPM 40010 E 1.453,9 1,1622 1.689,7
Grad 9 9CPPM 40010 E 1.579,4 1,1622 1.835,6
Finisaj interior obinuit FOBMAG 1.008,8 0,9948 1.003,6
superior FSUMAG 1.242,3 0,9477 1.177,3
Instalaii electrice ELMAG 450,8 0,6674 300,9
Instalaii sanitare SAMAG 119,7 0,8589 102,8
Instalaii de nclzire
i ventilaie INMAG 74,8 0,9848 73,7
Taras necirculabil TENEM10 E 39,9 1,0445 41,7
TABEL CENTRALIZATOR COSTURI CORP EXTINDERE SPAIU COMERCIAL
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E, P+8E SAU P+10E
NLIME LIBER CORP EXTINDERE 3,25 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6EXTM 325 1.293,7 1,0161 1.314,5
Structur Grad 7 7EXTM 325 1.347,0 1,0161 1.368,7
(infrastr.+suprastr.) Grad 8 8 EXTM 325 1.407,0 1,0161 1.429,7
Grad 9 9EXTM 325 1.528,5 1,0161 1.553,1
Finisaj interior obinuit FOBEXTM 319,7 0,8866 283,4
superior FSUEXTM 663,0 0,9665 640,8
Instalaii electrice ELEXTM 394,1 0,6672 262,9
Instalaii sanitare SAEXTM 35,6 0,9816 34,9
Instalaii de nclzire IEXTM 203,6 1,0432 212,4
Taras necirculabil TENEXTM 439,4 1,0445 459,0
TABEL CENTRALIZATOR COSTURI CORP EXTINDERE SPAIU COMERCIAL
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E, P+8E SAU P+10E
NLIME LIBER CORP EXTINDERE 3,50 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6EXTM 350 1.340,6 1,0161 1.362,2
Structur Grad 7 7EXTM 350 1.395,9 1,0161 1.418,4
(infrastr.+suprastr.) Grad 8 8EXTM 350 1.458,1 1,0161 1.481,6
Grad 9 9EXTM 350 1.584,0 1,0161 1.609,5
Finisaj interior obinuit FOBEXTM 319,7 0,8866 283,4
superior FSUEXTM 663,0 0,9665 640,8
Instalaii electrice ELEXTM 394,1 0,6672 262,9
Instalaii sanitare SAEXTM 35,6 0,9816 34,9
Instalaii de nclzire IEXTM 203,6 1,0432 212,4
Taras necirculabil TENEXTM 439,4 1,0445 459,0

TABEL CENTRALIZATOR COSTURI CORP EXTINDERE SPAIU COMERCIAL


SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E, P+8E SAU P+10E
NLIME LIBER CORP EXTINDERE 3,75 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6EXTM 375 1.387,5 1,0161 1.409,8
Structur Grad 7 7EXTM 375 1.444,7 1,0161 1.468,0
(infrastr.+suprastr.) Grad 8 8EXTM 375 1.509,1 1,0161 1.533,4
Grad 9 9 EXTM 375
1.639,4 1,0161 1.665,8
Finisaj interior obinuit FOBEXTM319,7 0 8866
, 283,4
superior FSUEXTM663,0 0,9665 640,8

Instala ii electrice ELEXTM394,1 0,6672 262,9
Instalaii sanitare SAEXTM 35,6 0,9816 34,9
Instalaii de nclzire IEXTM 203,6 1,0432 212,4
Taras necirculabil TENEXTM 439,4 1,0445 459,0
TABEL CENTRALIZATOR COSTURI CORP EXTINDERE SPAIU COMERCIAL
SITUAT LA PARTERUL BLOCULUI DE APARTAMENTE TIP P+4E, P+8E SAU P+10E
NLIME LIBER CORP EXTINDERE 4,00 M
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6EXTM400 1.443,9 1,0161 1.467,1
Structur Grad 7 7EXTM400 1.503,3 1,0161 1.527,5
(infrastr.+suprastr.) Grad 8 8EXTM400 1.570,3 1,0161 1.595,6
Grad 9 9EXTM400 1.705,9 1,0161 1.733,4
Finisaj interior obinuit FOBEXTM 319,7 0,8866 283,4
superior FSUEXTM 663,0 0,9665 640,8
Instalaii electrice ELEXTM 394,1 0,6672 262,9
Instalaii sanitare SAEXTM 35,6 0,9816 34,9
Instalaii de nclzire IEXTM 203,6 1,0432 212,4
Taras necirculabil TENEXTM 439,4 1,0445 459,0

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA SHOWROOM + AUGUST 2016 - IULIE 2017
SERVICE AUTO
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INFRSSAUT 411,9 1,0626 437,7
Infrastructura Grad 7 7 INFRSSAUT 428,9 1,0626 455,7
Grad 8 8INFRSSAUT 448,0 1,0626 476,0
Grad 9 9INFRSSAUT 486,7 1,0626 517,2
Grad 6 6SUPRSSAUT 687, 6 1,0297 708,0
Suprastructura Grad 7 7SUPRSSAUT 715,9 1,0297 737,2
Grad 8 8SUPRSSAUT 747,8 1,0297 770,0
Grad 9 9SUPRSSAUT 812,4 1,0297 836,5
Finisaj interior+ext. FINSSAUT 1.194,9 0,9382 1.121,1
Instalaii electrice ELECSSAUT 229,2 1,0261 235,2
Instalaii sanitare SANITSSAUT 66,9 0,8190 54 ,8
Instalaii de nclzire
i ventilaii INVESSAUT 68,2 0,9684 66,0

TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA SHOWROOM AUTO


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6SUTRSAUT 1.037,9 1,0219 1.060,6
Structur Grad 7 7SUTRSAUT 1.080,6 1,0219 1.104,3
Grad 8 8SUTRSAUT 1.128,8 1,0219 1.153,5
Grad 9 9SUTRSAUT 1.226,3 1,0219 1.253,2
Finisaj int.+ext. FINSAUT 1.738,5 0,8351 1.451,8
Instalaii electrice ELECSAUT 298 , 7 0,9321 278,4
Instalaii sanitare SANITSAUT 112,9 0,9752 110,1
Instalaii de nclzire
i ventilaii INVESAUT 153,7 0,9383 144,2

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE DE TIP BENZINRIE AUGUST 2016 - IULIE 2017
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur STRBENZ 613,1 1,1029 676,2
Fa ad(inchid.perimetr.) ILIIZOBENZ 412,5 1,2667 522,5 pag.carte: 125
Finisaj interior FININTBENZ 849,2 0 , 9177 779,3
Instalaii electrice INSTELBENZ 318,4 0 ,8974 285,7
Instalaii sanitare INSTSABENZ 133, 8 0 , 9464 126,6
Instalaii de nclzire INSTINCBENZ 105,3 0 ,9633 101,4

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CHIO C AUGUST 2016 - IULIE 2017
Denumire Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
Chioc metalic CHITBLGFT 1.614,1 1,1851 1.912,9
Chioc pentru florrie CHIFLORA 2.604,4 0,9847 2.564,6
Chioc pentru difuzarea presei CHIOPRESA 2.834,1 1,1374 3.223,5
Instalaie electric chioc ELCHIOSC 629,9 1,4140 890,0

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE DE BIROURI - CLASA A AUGUST 2016 - IULIE 2017
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016-2017 2016-2017
Grad 6 6INFSPBD 1.104,6 1,0518 1.161,8
Infrastructur Grad 7 7INFSPBD 1.150,1 1,0518 1.209,7
Grad 8 8INFSPBD 1.198,6 1,0518 1.260,7
Grad 9 9INFSPBD 1.305,1 1,0518 1.372,7
Grad 6 6 SSTSPBD 714,3 0,9631 687,9
Suprastructur Grad 7 7SSTSPBD 743,7 0 ,9631 716,3
Grad 8 8SSTSPBD 777,1 0 ,9631 748,4
Grad 9 9SSTSPBD 843,9 0 ,9631 812,8
Finisaj interior FINSPBD 1.577,1 0 ,9564 1.508,3
Instalaii electrice ELSPBD 250,7 0 ,9729 243,9
Instalaii sanitare SASPBD 63,6 0 ,9244 58,8
Instalaii de nclzire IVSPBD 125,7 1,0645 133,8
i ventilaii
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE DE BIROURI l SPAII ARHIV - CLASA A


Denumire Gradul Simbol pre cost curent
seismic carte 2016-2017 2016-2017
Grad 6 6INFSPBA 1.104,6 1,0518 1.161, 8
Infrastructura Grad 7 7INFSPBA 1.150,1 1,0518 1.209,7
Grad 8 8INFSPBA 1.198,6 1,0518 1.260,7
Grad 9 9INFSPBA 1.305,1 1,0518 1.372,7
Grad 6 6 SSTSPBA 714,3 0,9631 687,9
Suprastructura Grad 7 7 SSTSPBA 743,7 0,9631 716 ,3
Grad 8 8 SSTSPBA 777,1 0,9631 748 ,4
Grad 9 9 SSTSPBA 843,9 0,9631 812,8
Finisaj zon arhiv FINSPBA 839,9 0,9564 803,3
interior zon birouri FINSPBIR 1.577,1 0,9564 1.508,3
Instalaii electrice ELSPBA 250,7 0,9729 243 , 9
Instalaii sanitare SASPBA 63,6 0,9244 58,8
Instalaii de nclzire
i ventilaii IVSPBA 125,7 1,0645 133 ,8
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE DE BIROURI CU STRUCTUR PE


ZIDRIE PORTANT (PARTER + MANSARDA) - CLASA B
Denumire Gradul Simbol pre cost curent
seismic carte 2016-2017 2016-2017
Grad 6 6 CLBTIPB 812,5 1,0522 854,9
Structur Grad 7 7 CLBTIPB 846,0 1,0522 890,2
Grad 8 8 CLBTIPB 883,7 1,0522 929,8
Grad 9 9 CLBTIPB 960,0 1,0522 1.010,1
Finisaj interior FICLBTIPB 934,7 1,0133 947,1
Instalaii electrice IECLBTIPB 141,5 1,0102 142,9
Instalaii sanitare ISCLBTIPB 107,1 0 ,9285 99,4
Instalaii de nclzire
i ventilaii IVCLBTIPB 132,0 1,0553 139,3
tabl zincat INVTZ 226,4 1,3887 314,4
tabl Lindab INVTL 340,4 1,1335 385,8
igl profilat ceramic INVTIG 363,4 1,0648 386,9
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )
TABEL CENTRALIZATOR COSTURI CLDIRE DE BIROURI P+1E IN INTERIORUL
HALEI INDUSTRIALE (BIROURI CU SUPANT PE STRUCTUR METALIC INDEPENDENT)
Denumire Gradul Simbol pre cost curent
seismic carte 2016-2017 2016 -2017
Grad 6 6 CLBINTH 1.249,5 1,0219 1.276, 9
Structur Grad 7 7 CLBINTH 1.300,9 1,0219 1.329,4 pag.carte: 132
Grad 8 8 CLBINTH 1.358,9 1,0219 1.388,7
Grad 9 9 CLBINTH 1.476,2 1,0219 1.508,5
Finisai interior FCLBINTH 1.034,4 0,9316 963,6
Instalaii electrice ECLBINTH 254,8 0,9190 234,2
Instalaii sanitare SCLBINTH 69,6 0,9397 65,4 65,40312
Instalaii de nclzire ICLBINTH 105,3 1,1025 116,1

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE S +P + 8 E CU DESTINAIA HOTEL 2 STELE AUGUST 2016 - IULIE 2017
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL2S8E 604,3 1,1222 678,1
Infrastructur Grad 7 7INHOTEL2 S8 E 629,2 1,1222 706,1 pag.carte: 133
Grad 8 8INHOTEL2 S8 E 657,2 1,1222 737,5
Grad 9 9INHOTEL2 S8 E 714 1,1222 801,3
Grad 6 6 SHOTEL2S 8 E 674,7 1,0475 706,7
Suprastructur Gradul 7 7SHOTEL2S8E 702,5 1,0475 735,9
Gradul 8 8SHOTEL2S8E 733,8 1,0475 768,7
Gradul 9 9SHOTEL2S 8E 797,1 1,0475 835,0
Finisaj interior FHOTEL2 S8E 1111,1 0 ,9825 1.091,7
Instalaii electrice ELHOTEL2S8E 472,5 0 ,9743 460,4
Instalaii sanitare SAHOTEL2S8E 184,5 1,1439 211,0
Instalaii de nclzire
i ventilaii IVHOTEL2S8E 373,6 0 ,8684 324,4
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE S +P + 8E CU DESTINAIA HOTEL 3 STELE


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL 3S8 E 604,3 1,1222 678,1
Infrastructur Grad 7 7INHOTEL 3S8 E 629,2 1,1222 706,1 pag.carte: 135
Grad 8 8INHOTEL 3S8 E 657,2 1,1222 737,5
Grad 9 9INHOTEL 3S8 E 714,0 1,1222 801,3
Grad 6 6 SHOTEL3S 8 E 674,7 1,0475 706,7
Suprastructur Gradul 7 7 SHOTEL3S 8E 702,5 1,0475 735,9
Gradul 8 8 SHOTEL3S 8 E 733,8 1,0475 768,7
Gradul 9 9 SHOTEL3S 8 E 797,1 1,0475 835,0
Finisai interior FHOTEL 3S8 E 1.242,5 0,9894 1.229,3
Instalaii electrice ELHOTEL3S 8E 562,0 1,0129 569,2
Instalaii sanitare SAHOTEL 3S8E 200,7 1,0900 218 , 8
Instalaii de nclzire
i ventilaii IVHOTEL 3S8 E 373,6 0,9311 347,9
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0233 974, 7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE S +P + 8E CU DESTINAIA HOTEL 4 STELE


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL4S8E 604,3 1,1222 678,1
Infrastructur Grad 7 7INHOTEL 4 S8 E 629,2 1,1222 706,1
Grad 8 8INHOTEL4S8E 657,2 1,1222 737,5
Grad 9 9INHOTEL4 S8E 714,0 1,1222 801,3
Grad 6 6 SHOTEL4S8E 674,7 1,0475 706,7
Suprastructur Gradul 7 7SHOTEL4S8E 702,5 1,0475 735,9
Gradul 8 8SHOTEL4S8E 733,8 1,0475 768,7
Gradul 9 9SHOTEL4S8E 797,1 1,0475 835,0
Finisai interior FHOTEL4S8E 1.490,0 0 ,9963 1.484,5
Instalaii electrice ELHOTEL4S8E 598,2 1,0515 629,0
Instalaii sanitare SAHOTEL4 S8E 279,3 1,0361 289,4
Instalaii de nclzire
i ventilaii IVHOTEL4 S8E 487,8 0 ,9938 484,8
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0233 974, 7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE S +P + 8E CU DESTINAIA HOTEL 5 STELE


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL 5 S8E 604,3 1,1222 678,1
Infrastructur Grad 7 7INHOTEL 5 S8E 629,2 1,1222 706,1
Grad 8 8INHOTEL 5 S8E 657,2 1,1222 737,5
Grad 9 9INHOTEL5 S8E 714,0 1,1222 801,3
Grad 6 6 SHOTEL 5S 8 E 674,7 1,0475 706,7
Suprastructur Gradul 7 7 SHOTEL 5S 8 E 702,5 1,0475 735,9
Gradul 8 8 SHOTEL 5S 8 E 733,8 1,0475 768, 7
Gradul 9 9 SHOTEL 5S 8 E 797,1 1,0475 835,0
Finisai interior FHOTEL 5 S8 E 1.581,0 0,9747 1.541 ,0
Instalaii electrice ELHOTEL 5S 8E 628,7 1,0825 680,6
Instalaii sanitare SAHOTEL 5 S8E 297,9 1,0400 309, 8
Instalaii de nclzire
i ventilaii IVHOTEL 5 S8 E 527,3 0 ,9551 503,6
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE S +P +10E CU DESTINAIA HOTEL 2 STELE


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL2 S10E 544,4 1,0446 568,7
Infrastructur Grad 7 7INHOTEL2S10E 566,8 1,0446 592,1
Grad 8 8INHOTEL2S10E 592,1 1,0446 618,5
Grad 9 9INHOTEL2S10E 643,2 1,0446 671,9
Grad 6 6 SHOTEL2S10 E 607,8 1,0161 617,6
Suprastructur Gradul 7 7SHOTEL2S10E 632,9 1,0161 643,1
Gradul 8 8SHOTEL2S10E 661,1 1,0161 671,7
Gradul 9 9SHOTEL2S10E 718,1 1,0161 729,7
Finisai interior FHOTEL 2 S 10 E 1.111 ,1 0 , 9825 1.091 ,7
Instalaii electrice ELHOTEL2S10E 472,5 0 ,9743 460,4
Instalaii sanitare SAHOTEL2 S10E 184,5 1,1439 211,0
Instalaii de nclzire
i ventilaii IVHOTEL2 S10E 373,6 0,8684 324, 4
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0233 974, 7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE S +P+10E CU DESTINAIA HOTEL 3 STELE


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL 3S10E 544,4 1,0446 568, 7
Infrastructur Grad 7 7INHOTEL 3S10E 566,8 1,0446 592,1 pag.carte: 143
Grad 8 8INHOTEL 3S10E 592,1 1,0446 618,5
Grad 9 9INHOTEL 3S10E 643,2 1,0446 671, 9
Grad 6 6 SHOTEL3S10E 607,8 1,0161 617, 6
Suprastructur Gradul 7 7 SHOTEL3S10 E 632,9 1,0161 643,1
Gradul 8 8 SHOTEL3S10 E 661,1 1,0161 671,7
Gradul 9 9 SHOTEL3S10 E 718,1 1,0161 729 , 7
Finisaj interior FHOTEL 3S10E 1.242,5 0,9894 1.229,3
Instalaii electrice ELHOTEL3S10E 562,0 1,0129 569 , 2
Instalaii sanitare SAHOTEL 3S10E 200,7 1,0900 218,8
Instalaii de nclzire
i ventilaii IVHOTEL 3S10E 373,6 0,9311 347,9
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE S+P+10E CU DESTINAIA HOTEL 4 STELE


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL 4S10E 544,4 1,0446 568,7
Infrastructur Grad 7 7INHOTEL 4 S10E 566,8 1,0446 592,1
Grad 8 8INHOTEL 4 S10 E 592,1 1,0446 618,5
Grad 9 9INHOTEL4S10E 643,2 1,0446 671,9
Grad 6 6 SHOTEL4S10 E 607,8 1,0161 617,6
Suprastructur Gradul 7 7 SHOTEL4S10 E 632,9 1,0161 643,1
Gradul 8 8 SHOTEL 4S10 E 661,1 1,0161 671,7
Gradul 9 9 SHOTEL4S10 E 718,1 1,0161 729,7
Finisaj interior FHOTEL4 S10E 1.490,0 0,9963 1.484,5
Instalaii electrice ELHOTEL4S10E 598,2 1,0515 629,0
Instalaii sanitare SAHOTEL4 S10E 279,3 1,0361 289,4
Instalaii de nclzire
i ventilaii IVHOTEL4 S10E 487,8 0,9938 484, 8
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

TABEL CENTRALIZATOR COSTURI CLDIRE S +P+10E CU DESTINAIA HOTEL 5 STELE


Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6INHOTEL 5 S10E 544,4 1,0446 568, 7
Infrastructur Grad 7 7INHOTEL 5 S10E 566,8 1,0446 592,1 pag.carte: 147
Grad 8 8INHOTEL 5 S10E 592,1 1,0446 618,5
Grad 9 9INHOTEL 5 S10E 643,2 1,0446 671,9
Grad 6 6 SHOTEL 5S10 E 607,8 1,0161 617,6
Suprastructur Gradul 7 7 SHOTEL 5S10 E 632,9 1,0161 643,1
Gradul 8 8SHOTEL 5S10 E 661,1 1,0161 671,7
Gradul 9 9 SHOTEL 5S10 E 718,1 1,0161 729,7
Finisaj interior FHOTEL 5 S10E 1.581,0 0 ,9855 1.558,1
Instalaii electrice ELHOTEL 5S10E 628,7 1,0054 632,1
Instalaii sanitare SAHOTEL 5 S10E 297,9 1,0400 309,8
Instalaii de nclzire
i ventilaii IVHOTEL 5 S10E 527,3 0 ,9551 503,6
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459,0
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA PENSIUNE 2 STELE AUGUST 2016 - IULIE 2017
(2 MARGARETE)
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6 STPENS 2S 831,5 1,0215 849,4
Structur + subsol Grad 7 7STPENS2S 842,5 1,0215 860,6
parial Grad 8 8STPENS 2S 860,8 1,0215 879,3
Grad 9 9STPENS 2S 882,3 1,0215 901,3
Finisaj subsol FINSDAPP 2S 334,6 0,9860 329,9
Finisaj restaurant + FINRRBP 2S 613,1 1,0350 634,6
recepie + buc trie
Finisaj interior cazare FINICAP 2S 319,0 1,0815 345,0
pensiune
Instalaii electrice INSTELP 2S 112,3 0 ,9836 110,5
Sanitare parter INSTSGRP 2S 79,8 1,0140 80,9
(exclusiv obiecte
sanitare)
Instalaii de nclzire INCSTERP 2S 156,7 1,0077 157,9
cu sobe de teracot
tabl zincat INVTZ 226,4 1,3887 314,4
tabl Lindab INVTL 340,4 1,1335 385,8
igl profilat ceramic INVTIG 363,4 1,0704 389,0
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0233 449 ,6
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0445 994, 9
a terasei Sc )
TABEL CENTRALIZATOR COSTURI ANSAMBLURI SANITARE
Tipuri obiecte sanitare Simbol pre indice cost curent
ansamblu sanitar carte 2016 - 2017 2016 - 2017
Chiuvet font + baterie amestec CHFOBO 1.159,7 0,9659 1.120,2
Lavoar + WC LAVWC 1.424,6 0,9659 1.376,0
Cada fonta + lavoar + WC CALAWC 3.642,0 0,9659 3.517, 8
Cuv du + lavoar + WC DUSLAWC 2.561,8 0,9659 2.474,4

TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA PENSIUNE 3 STELE


(3 MARGARETE )
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6 STPENS3S 831,5 1,0215 849 ,4
Structur + subsol Grad 7 7STPENS3S 842,5 1,0215 860 ,6
parial Grad 8 8STPENS3S 860,8 1,0215 879,3
Grad 9 9STPENS3S 882,3 1,0215 901,3
Finisaj subsol FINSDAPP3S 457,5 0,9860 451,1
Finisaj restaurant + FINRRBP3S 968,6 1,0350 1.002,5
recepie + buc trie
Finisaj interior cazare FINICAP3S 604,8 1,0815 654, 1
pensiune
Instalaii electrice INSTELP3S 181,5 0,9836 178,5
Sanitare parter INSTSGRP 3S 160,5 1,0140 162,7
(exclusiv obiecte
sanitare)
Instalaii de nclzire INCVENTP 3S 130,1 1,0077 131,1
i ventilaie
tabl zincat INVTZ 226,4 1,3887 314,4
tabl Lindab INVTL 340,4 1,1335 385,8
igl profilat ceramic INVTIG 363,4 1,0704 389,0
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439 ,4 1,0233 449,6
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0445 994, 9
a terasei Sc )
TABEL CENTRALIZATOR COSTURI ANSAMBLURI SANITARE
Tipuri obiecte sanitare Simbol pre indice cost curent
ansamblu sanitar carte 2016 - 2017 2016 - 2017
Chiuvet font + baterie amestec CHFOBO 1.159,7 0 ,9659 1.120,2
Lavoar + WC LAVWC 1.424,6 0,9659 1.376,0
Cada fonta + lavoar + WC CALAWC 3.642,0 0,9659 3.517, 8
Cuv du + lavoar + WC DUSLAWC 2.561,8 0,9659 2.474,4

TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA PENSIUNE 4 STELE


(4 MARGARETE )
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6 STPENS4S 831,5 1,0215 849 ,4
Structur + subsol Grad 7 7STPENS4S 842,5 1,0215 860,6 pag.carte: 155
parial Grad 8 8STPENS4S 860,8 1,0215 879 ,3
Grad 9 9STPENS4S 882,3 1,0215 901,3
Finisai subsol FINSDAPP 4S 473,8 0,9860 467,2
Finisaj restaurant + FINRRBP 4S 1.025,5 1,0350 1.061,4
recepie + buctrie
Finisaj interior cazare FINICAP 4S 671,5 1,0815 726 ,2
pensiune
Instalaii electrice INSTELP4S 232,4 0 ,9836 228 ,6
Sanitare parter INSTSGRP 4 S 160,5 1,0140 162,7
(exclusiv obiecte
sanitare)
Instalaii de nclzire INCVENTP 4 S 153,2 1,0077 154,4
i ventilaie
tabl zincat INVTZ 226,4 1,3887 314,4
tabl Lindab INVTL 340,4 1,1335 385,8
igl profilat ceramic INVTIG 363,4 1,0704 389,0
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439 ,4 1,0233 449,6
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0445 994, 9
a terasei Sc )
TABEL CENTRALIZATOR COSTURI ANSAMBLURI SANITARE
Tipuri obiecte sanitare Simbol pre indice cost curent
ansamblu sanitar carte 2016 - 2017 2016 - 2017
Chiuvet inox + baterie amestec CHINOX 1.705,5 0 ,9659 1.647,3
Lavoar + WC LAVWCSU 5.460,3 0 ,9659 5.274,1
Cada jacuzzi + lavoar + WC CAJALAWC 11.366,3 0 ,9659 10.978,7
Du + cabin + lavoar + WC DUSLAWCS 6.544,0 0,9659 6.320, 8

TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA PENSIUNE 5 STELE


( 5 MARGARETE)
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6 STPENS5S 831,5 1,0215 849 ,4
Structur + subsol Grad 7 7STPENS5S 842,5 1,0215 860,6 pag.carte: 158
parial Grad 8 8STPENS5S 860,8 1,0215 879 ,3
Grad 9 9STPENS5S 882,3 1,0215 901,3
Finisaj subsol FINSDAPP5S 517,9 0,9860 510,6
Finisaj restaurant + FINRRBP 5S 1.072,3 1,0350 1.109,8
recepie + buctrie
Finisaj interior cazare FINICAP 5S 695,9 1,0815 752,6
pensiune
Instalaii electrice INSTELP5 S 241,3 0,9836 237,3
Sanitare parter INSTSGRP 5 S 160,6 1,0140 162 ,8
(exclusiv obiecte
sanitare)
Instalaii de nclzire INCVENTP 5 S 153,0 1,0077 154 ,2
i ventilaie
tabl zincat INVTZ 226,4 1,3887 314,4
tabl Lindab INVTL 340,4 1,1335 385,8
igl profilat ceramic INVTIG 363,4 1,0704 389,0
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439 ,4 1,0233 449 ,6
determinate pentru
suprafa a construit circulabil TERCIRC 952,5 1,0445 994, 9
a terasei Sc )
TABEL CENTRALIZATOR COSTURI ANSAMBLURI SANITARE
Tipuri obiecte sanitare Simbol pre indice cost curent
ansamblu sanitar carte 2016 - 2017 2016 - 2017
Chiuvet inox + baterie amestec CHINOX 1.705,5 0 ,9659 1.647,3
Lavoar + WC LAVWCSU 5.460,3 0 ,9659 5.274,1
Cada jacuzzi + lavoar + WC CAJALAWC 11.366,3 0 ,9659 10.978,7
Du + cabin + lavoar + WC DUSLAWCS 6.544,0 0 ,9659 6.320,8

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA MOTEL AUGUST 2016 - IULIE 2017
Denumire Gradul Simbol pre indice cost curent
seismic carte 2016 - 2017 2016 - 2017
Grad 6 6 STRMOTEL 1.068,4 1,0931 1.167,9
Structur Grad 7 7STRMOTEL 1.082,5 1,0931 1.183,3
Grad 8 8STRMOTEL 1.106,0 1,0931 1.209,0
Grad 9 9STRMOTEL 1.133,7 1,0931 1.239 ,2
Finisaj restaurant + FINMOTEL 968,6 1,0350 1.002,5
recepie + buc trie
Finisaj interior cazare FINIMOTEL 604,8 1,0815 654 , 1
motel
Instalaii electrice ELMOTEL 181,5 0,9836 178 , 5
Sanitare parter SAMOTEL 160,5 1,0140 162,7
(exclusiv ob.sanitare )
Instalaii de nclzire INMOTEL 130,1 1,0077 131,1
i ventilaie
tabl zincat INVTZ 226,4 1,3887 314 ,4
tabl Lindab INVTL 340,4 1,1335 385, 8
igl profilat ceramic INVTIG 363,4 1,0704 389 , 0
Finisaj faad
Teras (costuri necirculabil TERNECIRC 439,4 1,0445 459 , 0
determinate pentru
suprafaa construit circulabil TERCIRC 952,5 1,0233 974,7
a terasei Sc )
TABEL CENTRALIZATOR COSTURI ANSAMBLURI SANITARE
Tipuri obiecte sanitare Simbol pre indice cost curent
ansamblu sanitar carte 2016 - 2017 2016 - 2017
Chiuvet font + baterie amestec CHFOBO 1.159,7 0,9659 1.120 ,2
Lavoar + WC LAVWC 1.424,6 0,9659 1.376 ,0
Cada fonta + lavoar + WC CALAWC 3.642,0 0,9659 3.517,8
Cuv du + lavoar + WC DUSLAWC 2.561,8 0,9659 2.474,4

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA CAS DE VACAN AUGUST 2016 - IULIE 2017
Denumire Simbol pre indice cost curent
carte 2016- 2017 2016 - 2017
Structur STRCV 892,8 1,0691 954 , 5
Finisaj interior i exterior + verand FINCV 956,2 1,1215 1.072,4
nclzire cu sobe de teracot + co INCCV 107,7 1,3927 150 , 0
Instalaii electrice ELCV 82,4 1,0791 88 , 9
nvelitoare din stuf INVSTCV 80,9 1,2515 101, 2
din i INVSICV 228,2 1,0049 229 , 3
TABEL CENTRALIZATOR COSTURI ANSAMBLURI SANITARE
Chiuvet font + baterie amestec CHFOBO 1.159,7 0,9659 1.120 ,2
Lavoar + WC LAVWC 1.424,6 0,9659 1.376 ,0
Cuv du + lavoar + WC DUSLAWC 2.561,8 0,9659 2.474 ,4

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA CABANA AUGUST 2016 - IULIE 2017
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur zid piatr STRCABP 1.451,7 0,9562 1.388 ,1
lemn ecarisat STRCABL 472,1 1,0247 483 , 8 pag.carte: 164
Finisaj la pereii din FINPCAB 569,8 0,9978 568 , 5
interior zid piatr
la pereii din FINLCAB 650,9 1,1823 769 , 6
lemn masiv
Instalaii electrice ELCAB 82,4 1,0791 88 , 9
nclzire cu sob de teracot + co INCCAB 107,7 1,3927 150 , 0
Tnvelitoare tabl zincat INVTZ 226,4 1,3887 314 , 4
tabl Lindab INVTL 340,4 1,1335 385, 8
igl profilat INVTIG 363,4 1,0704 389 , 0
ceramic
din i
INVSICAB 228,2 1,0049 229 , 3
Finisaj faad
TABEL CENTRALIZATOR COSTURI ANSAMBLURI SANITARE
Tipuri obiecte sanitare Simbol pre indice cost curent
ansamblu sanitar carte 2016 - 2017 2016 - 2017
Chiuvet font + baterie amestec CHFOBO 1.159,7 0,9659 1.120 ,2
Lavoar + WC LAVWC 1.424,6 0,9659 1.376 ,0
Cuv du + lavoar + WC DUSLAWC 2.561,8 0,9659 2.474,4

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA GRAJD PENTRU PORCINE AUGUST 2016 - IULIE 2017
TIP NOU
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Gradul seismic 6 6STRGP 566,0 0,9934 562,3
Structur Gradul seismic 7 7STRGP 589,3 0,9934 585,4
Gradul seismic 8 8STRGP 615,6 0,9934 611,5
Gradul seismic 9 9STRGP 668,7 0,9934 664,3
Zon cretere porcine FINGPC 102,3 1,1118 113,7
Finisaj Zon gesta ie - maternitate FINGPGM 127,3 1,2034 153,2
Zon filtre i vestiare FINGPFV 468,0 1,0785 504,7
Teras TERGP 142,9 0,9365 133,8
Zon cretere porcine C r mid ceramic PGPCPCC 93,3 1,3667 127,5
Pardoseal Zon gesta ie - maternitate Calupuri lemn fag PGPGMCL 127,8 1,2400 158,5
Dulapi lemn PGPGMDL 148,1 1,0431 154,5
Zon canale dejecie Gr tare de beton PGPDGB 357,0 0,9623 343,5
Instalaii electrice INSEL 20,3 1,0103 20,5
Instalaii sanitare INSSANIT 32,3 0,9926 32,1
nclzire zona filtre i vestiare INSINCFV 57,6 1,1553 66,5
TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA GRAJD PENTRU BOVINE l
PORCINE - TIP VECHI
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur STRGVBOV 431,2 1,0943 471,9
Finisai FINGVBOV 137 , 3 0 , 9183 126,1 pag.carte: 169
nvelitoare cu igl INVGVBOV 138,1 1,4270 197,1
Instalaii electrice ELGVBOV 29,6 1, 0573 31,3
Instalaii sanitare SAGVBOV 13,5 0 , 9576 12 ,9

TABEL CENTRALIZATOR CLDIRE CU DESTINAIA GRAJD PENTRU BOVINE - TIP NOU


Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Gradul seismic 6 6STRGNBOV 601 , 8 0 , 9964 599 ,6
Structur Gradul seismic 7 7STRGNBOV 626 ,6 0 , 9964 624,3 pag.carte: 170
Gradul seismic 8 8STRGNBOV 654 , 5 0 , 9964 652,1
Gradul seismic 9 9STRGNBOV 711 , 0 0 , 9964 708 ,4
Finisaj FINGNBOV 87,0 1,1132 96 ,8
azbociment pe pane de beton IAZGNBOV 98 , 7 0 , 9907 97 ,8
nvelitoare azbociment dublu cu vat IAZDGNBOV 193 , 9 1, 0013 194,2
tabl zincat ITZGNBOV 220,5 1,3887 306,2
Pardoseal grtare din beton PGBGNBOV 357 0 , 0 9623
, 343,5
calupuri din lemn PCLGNBOV 127,8 1, 2400 158,5

Instala ii electrice ELGNBOV 24,7 1,0061 24,9
Instalaii sanitare SAGNBOV 13,5 0,9576 12,9
TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA ADAPOST PENTRU P SRI -
TIP VECHI
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur STRAPV 226,0 1,0885 246,0
Finisaj interior i exterior FINAPV 121,0 0,9087 110,0
azbociment pe terne de lemn AZBAPV 182, 8 1,0431 190,7
nvelitoare dou straturi de carton pe astereal CARTAPV 141, 4 0,7961 112,6
azbociment ondulat AZBOAPV 112,5 1,1166 125,6
Pardoseal coji semine floarea soarelui i excremente psri PCFSAPV 8, 8 0,7954 7,0
gr tar din lemn-regie.proprie PGLAPV 25,0 0,9361 23,4
Instalaii electrice ELAPV 5 ,1 1,0225 5 ,2

TABEL CENTRALIZATOR COSTURI HAL PARTER (TIP NOU ) PENTRU CRETEREA


N SISTEM INTENSIV A GINILOR l A PUILOR
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Gradul seismic 6 6STRAPANP 524,9 1,0535 553,0
Structur Gradul seismic 7 7STRAPANP 546,5 1,0535 575,7 pag.carte: 172
Gradul seismic 8 8STRAPANP 570,9 1,0535 601,4
Gradul seismic 9 9STRAPANP 620,2 1,0535 653,4
Finisaj FINAPAN 118,4 1,1428 135,3
Teras necirculabil TENEPGN 198,4 1,1048 219,2
Pardoseal coji semine floarea soarelui i excremente p sri PCFSAPN 8, 8 0 , 7954 7,0
grtar de lemn PGLAPN 25,0 0 , 9361 23 ,4
Instalaii electrice ELAGPN 24 , 7 0 , 9680 23 , 9
Instalaii sanitare SAAPN 13 , 5 0 , 9839 13 ,3
TABEL CENTRALIZATOR COSTURI HALA PARTER + ETAJ (TIP NOU) PENTRU CRETEREA
N SISTEM INTENSIV A GINILOR l A PUILOR
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Gradul seismic 6 6STRAPANE 454,4 1, 0362 470,8
Structur Gradul seismic 7 7STRAPANE 473,1 1, 0362 490,2 pag.carte: 173
Gradul seismic 8 8STRAPANE 494,2 1, 0362 512,1
| Gradul seismic 9 9STRAPANE 536,8 1,0362 556,2
Finisai FINAPAN 118 , 4 1,1428 135,3
Teras necirculabil-pentru Sc TENEAPN 198,4 1,1048 219,2
Pardoseal coji semine floarea soarelui i excremente psri PCFSGAPN 8, 8 0,7954 7,0
grtar de lemn PGLAPN 25,0 0,9361 23 ,4

Instala ii electrice ELAPAN 24,7 0, 9680 23,9
Instalaii sanitare SAAPN 13,5 0 , 9839 13,3

TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA MAGAZIE PENTRU CEREALE


Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Infrastructur INFRMAGC 395,2 1,0447 412,9
Suprastructur SUPRAMAGC 337,5 0, 8937 301,6 pag.carte: 174
Finisaj interior i exterior FINMAGC 180,6 1,1395 205,8
azbociment pe arpant uoar din lemn AZBMAGC 215, 4 1,0632 229,0
nvelitoare dou straturi de carton pe asterel CARTMAGC 141, 4 0,7961 112,6
azbociment ondulat AZBOMAGC 112,5 1,1166 125,6
tabl cutat / ondulat neagr vopsita TCNMAGC 233,6 1,0445 244,0
Instalaii electrice ELMAGC 15,2 1,0160 15,4
TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA SILOZ PENTRU CEREALE
CAPACITATEA 60.000 - 70.000 TONE
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur STRS67T 545,2 1,0103 550 ,8
Finisaj FINS67T 26,7 0,8896 23,8 pag.carte: 175
Instalaii electrice funcionale INELS67T 1,1 1, 2981 1 ,4
TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA SILOZ PENTRU CEREALE
CAPACITATEA 71.000 - 80.000 TONE
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur STRS78T 616 , 4 1, 0103 622 ,7
Finisaj FINS78T 27 , 7 0 , 8896 24 ,6 pag.carte: 176
Instalaii electrice funcionale INELS78T 1,1 1, 2981 1 ,4
TABEL CENTRALIZATOR COSTURI CLDIRE CU DESTINAIA SILOZ PENTRU CEREALE
CAPACITATEA 81.000 - 90.000 TONE
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur STRS89T 645,4 1,0103 652,0
Finisaj FINS89T 28,7 0 , 8896 25 ,5 pag.carte: 177
| INELS89T | | |
|Instalaii electrice funcionale
TABEL CENTRALIZATOR COSTURI CLDIRE DE TIP P TUL PORUMB
T 1, 2981
^
14

Denumire Simbol preindice cost curent


carte 2016 - 2017 2016 - 2017
Structur STRPP 491,2 1,0254 503,7
azbociment ondulat | IAZBOPP 112,5 1,1166 125,6 pag.carte: 179
nvelitoare tabl cutat / ondulat neagr vopsit ITCNPP 233,6 1,0445 244,0
tabl zincat ITZGNPP 220,5 1,3887 306,2
nvelitoare cu igl INVGVPP 138,1 1,4270 197,1
TABEL CENTRALIZATOR COSTURI CLDIRE DE TIP OPRON CU STRUCTURA METALICA
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
1. opron cu stlpi din eav neagr vopsit i nvelitoare din SMIAZFM 410,2 1,0771 441,8 pag.carte: 180
azbociment ondulat + ferme metalice vopsite
2. opron cu stlpi din eav neagr vopsit i nvelitoare din SMITCNV 557,0 1,0556 588,0
tabl cutata neagr vopsit + ferme metalice vopsite
TABEL CENTRALIZATOR COSTURI CLDIRE DE TIP OPRON CU STRUCTURA LEMN
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
3. opron stlpi din lemn i nvelitoare din azbociment ondulat SLIAZFL 360,7 1,0750 387,8 pag.carte: 181
i ferme din lemn
4. opron stlpi din lemn i nvelitoare din tabl cutat neagr SLITCNV 516,0 1,0606 547,3
vopsit i ferme din lemn

TABEL CENTRALIZATOR COSTURI SER NCLZIT


Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Structur | STRSERA 219,7 1, 0839 238 , 1
Instalaia electric INSELSERA 33,5 1, 0545 35,3 pag.carte: 182
Instalaia de ap INSTASERA 21, 9 0 , 9719 21,3
Instalaia de nclzire INSTINCSERA 120,9 1,0274 124,2
TABEL CENTRALIZATOR COSTURI CONSTRUCIE DE TIP SOLAR
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Solar cu folie i structur metalic SOLAR 41 , 4 1, 5677 64 , 9 pag.carte: 183

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI SILOZURI CU STRUCTURA MECANICA GALVANIZATA AUGUST 2016 - IULIE 2017
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
50 tone SILMET50 27.608 0,9973 27.533,5
Silozuri cu structur 100 tone SILMET100 48.128 0,9973 47.998,1 pag.carte : 178
metalic galvanizat 200 tone SILMET 200 89.068 0,9973 88.827,5
300 tone SILMET300 131.248 0,9973 130.893,6
500 tone SILMET500 211.232 0,9973 210.661,7
1.000 tone SILMET1000 399.172 0,9973 398.094,2
2.000 tone SILMET2000 731.616 0,9973 729.640,6
3.000 tone SILMET3000 1.116.899 0,9973 1.113.883 , 4
4.000 tone SILMET4000 1.612.961 0,9973 1.608.606,0
5.000 tone SILMET 5000 1.997.485 0,9973 1.992.091,8

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI S P TURI , UMPLUTURI l SPRIJINIRI MALURI AFERENTE AUGUST 2016 - IULIE 2017
REELELOR EXTERIOARE DE CANALIZARE
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
H=1 m SMFS1M 86,5 1,0426 90,2
fr sprijiniri H = 1,5 m SMFS1,5M 129,8 1,0425 135, 3 pag.carte: 188
S ptur pentru reea H=2m SMFS2M 173,0 1,0429 180,4
de canalizare (sptur L=1,0 H=2m SMCS2M 376,2 0,9808 369 ,0
manual 100% ) L= 1 ,2 cu sprijiniri H=3 m SMCS 3 M 643,2 0,9853 633 ,7
L=1,2 H=4 m SMCS 4 M 857,8 0,9853 845, 2
L=1,6 H=5m SMCS 5 M 1.625,9 1,0014 1.628,2
Sptur pentru re ea L=1,0 m f r sprijin H = 0 - 2 m SMECFS2M 91,3 1,0469 95,6
de canalizare (sptur L=1,4m cu sprijiniri H=3m SMECS 3 M 225,7 0,9479 213 ,9
mecanizat 90% i L=1,4m cu sprijiniri H=4m SMECS4M 301,2 0,9478 285,5
manual 10% ) L=1,4m cu sprijiniri H=5m SMECS5M 376,3 0,9479 356 ,7
TABEL CENTRALIZATOR COSTURI REELE DE CANALIZARE EXECUTATE CU TUBURI DIN
BETON, P.V.C. l FONT
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
dia. 200 mm CTB200MM 118,2 0,9906 117 ,1
Canalizare cu tuburi de beton dia. 300 mm CTB300MM 148,5 1,0192 151 ,4 pag.carte: 188
cu mufa dia. 400 mm CTB400MM 227,9 0,8946 203 , 9
dia. 500 mm CTB500MM 297,4 1,0167 302,4
dia. 800 mm CTB800MM 601,3 0,9148 550,1
Canalizare cu tuburi de P. V.C. dia. 200 mm CTPVC200MM 97,8 1,1663 114,1
dia. 300 mm CTPVC300MM 140,4 0,9896 138 , 9
Canalizare cu tuburi de font dia. 200 mm CTF 200MM 374,8 0, 9496 355, 9
dia. 250 mm CTF 250MM 471,4 0, 9681 456 ,4
dia. 300 mm CTF 300MM 598,3 0, 9625 575, 9

TABEL CENTRALIZATOR COSTURI S P TURI PENTRU CMINE CANALIZARE


Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
Cmin canalizare H=2,75 m cu capac carosabil CCCAR 2.616,2 0, 9559 2.500,8
necarosabil CCNCAR 3.106,6 0,9943 3.088,9 pag.carte: 189
H=2m SCAM 2M 859,2 0, 9559 821 ,3
S ptur pentru cmin H = 2,5 m SCAM 2,5M 1.021,7 0, 9559 976 , 6
H=3 m SCAM 3M 1.184,2 0, 9559 1.132,0
H = 3,5 m SCAM 3 ,5M 1.346,7 0, 9559 1.287,3
H=4 m SCAM4M 1.509,2 0 , 9943 1.500,6
H = 4,5 m SCAM 4 , 5 M 1.696,7 0, 9943 1.687,0
H=5m SCAM 5M 1.884,2 0,9943 1.873,5
H = 5,5 m SCAM 5, 5 M 2.071,7 0,9943 2.059,9
H=6m SCAM 6M 2.259,3 0,9941 2.246,0
TABEL CENTRALIZATOR COSTURI MATERIALE CMINE CANALIZARE DIN TUBURI DE BETON
Elemente componente Dimensiuni Greutate pre indice cost curent
canalizare din tuburi Diametru | nlime (Kg ) carte 2016 - 2017 2016 - 2017
I. Ram capac font
necarosabil 587 120 100 479,6 1,0017 480 ,4 pag.carte: 190
carosabil 670 120 100 834,5 1,0017 835,9
2.Plac acoperire cmin 800 250 214 235,1 1,0017 235,5
3.Inel de ajustare 620 104 65 66,3 1 , 0017 66 ,4

4.Element de reduc ie 1.000 / 650 600 498 263,5 1,0017 263 ,9
1.200 / 650 600 672 347,1 1,0017 347 ,7
5.Element drept 800 250 145 156,2 1,0017 156 ,5
800 500 290 265,0 1,0017 265,5
800 750 435 356,5 1,0017 357 ,1
1.000 250 209 170,4 1,0017 170,7
1.000 500 425 271,3 1,0017 271 ,8
1.000 750 641 372,3 1,0017 372,9
1.000 1.000 856 471,7 1,0017 472, 5
1.200 250 275 206,7 1,0017 207 ,1
1.200 500 557 332,9 1,0017 333 , 5
1.200 750 840 460,7 1,0017 461 , 5
1.200 1.000 1124 585,3 1,0017 586 ,3
6.Element intermediar de
reducie 1.000 / 800 500 322 241,4 1,0017 241 ,8
7.Element de baz 1 1.000 1.000 3.200 1.419,8 1,0017 1.422,2
treapt 1.200 1.100 4.500 1.893,1 1,0017 1.896,3
COST MANOPERA MONTAJ COST UTILAJE l TRANSPORT
pre carte | indice cost curent pre carte indice cost curent
2016 - 2017 2016 - 2017 2016 - 2017 2016 - 2017
602,9 | 1,0580 637 , 9 415,3 1,1169 463 ,8

TABEL CENTRALIZATOR COSTURI RE ELE DE AP


Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
D = 60 mm TNGRIZO60 45 ,2 1,1747 53 ,1
eav neagr izolat D = 76 mm TNGRIZ076 57,6 0 , 9761 56 , 2 pag.carte: 192
ngropat n pmnt D = 89 mm TNGRIZ089 73,8 1,1927 88 ,0
D = 108 mm TNGRIZO108 106,1 0,9883 104 ,9
D = 133 mm TNGRIZ0133 122,9 1,0934 134 ,4
D = 152 mm TNGRIZ0152 141,8 1,1644 165,1
D = 219 mm TNGRIZ0219 309,1 1,0197 315, 2
D = 245 mm TNGRIZ0242 347,5 1,0146 352,6
D = 300 mm TNGRIZO300 470,6 1,1727 551 ,9
1" TZNIZOI 37,7 1,0202 38 ,5
eav zincat izolat 2" TZNIZ02 103,6 0 , 9622 99 ,7
ngropat n p mnt 3" TZNIZ03 132,7 1,0782 143 ,1
4" TZNIZ04 181,6 1,1205 203 ,5
eav font ductil D = 200 mm TFONTA200 371,8 1,0219 379 ,9
Tub premo ngropat D = 200 mm TPREM0200 76,6 1,1815 90 ,5
D = 300 mm TPREMO300 98,4 1,1682 115,0
D = 25 cm TPVC25 19,3 0,9852 19 ,0
eav p.v.c. lipit prin polifuziune D = 32 cm TPVC32 22,0 0,9852 21 ,7
D = 40 cm TPVC40 25,9 0,9852 25, 5
D = 50 cm TPVC50 31,3 0,9852 30 ,8
D = 63 cm TPVC63 38,2 0,9852 37 ,6
D = 75 cm TPVC75 45,4 0,9852 44,7
TABEL CENTRALIZATOR COSTURI CMINE DE APA include sptur i umplutur de p m nt )
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
C min ap + capac carosabil H=1 m CAPAH1 1.426,1 1,2295 1.753,4 pag.carte: 193
H=2m CAPAH2 2.852,2 1,2295 3.506,8

TABEL CENTRALIZATOR COSTURI S P TUR + PAT NISIP + UMPLUTUR AFERENTE


BRAN AMENTELOR DE AP
Denumire Simbol pre indice cost curent
carte 2016 - 2017 2016 - 2017
S ptur + pat nisip + umplutur SAPPNU 53,9 1,1305 60 ,9 pag.carte: 193
TABEL CENTRALIZATOR COSTURI REZERVOR APA l CASA POMPE - REZERVOARE NGROPATE
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
100 mc REZAPAI100 132.969,1 1,1002 146.292,6
Rezervor cu capacitatea de 200 mc REZAPAI200 172.462,4 1,1002 189.743,1 pag.carte: 197
300 mc REZAPAI300 270.757,0 1,1002 297.886,9
500 mc REZAPAI500 435.039,8 1,1002 478.630,8
TABEL CENTRALIZATOR COSTURI REZERVOR AP l CAS POMPE - REZERVOARE SEM NGROPATE
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
100 mc REZAPASI100 128.297,1 1,1140 142.922,9
Rezervor cu capacitatea de 200 mc REZAPASI200 166.442,6 1,1140 185.417,1
300 mc REZAPASI300 261.439,5 1,1140 291.243,6
500 mc REZAPASI500 419.936,5 1,1140 467.809,3
TABEL CENTRALIZATOR COSTURI FOSA SEPTICA VIDANJABILA l DENCANTOR APE UZATE
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Fos septic vidanjabil FOSASEPT 1.350,7 1,1085 1.497,3 pag.carte: 198
Decantor ape uzate DECANTOR 1.869,4 0,9983 1.866,2
TABEL CENTRALIZATOR COSTURI CASTEL DE APA
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Structur de beton + finisaj STRCASTAPA 1.049.353,6 1,1089 1.163.628 ,2 pag.carte: 204
Instalaie electric ELCASTAPA 13.667,6 1,1150 15.239,4
Instalaie sanitar SACASTAPA 21.666,9 1,0875 23.562,8
Cost total 1.084.688,1 1.202.430,3

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI DRUMURI, PLATFORME, ALEI l CALE FERAT INDUSTRIAL AUGUST 2016 - IULIE 2017
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Drum beton de 20 cm pe pat de balast cu acostament DRMBET 223,5 1,0783 241,0
Drum asfaltat cu macadam cilindrat cu acostament DRMASF 161,3 1,1688 188 ,5
Drum beton borduri intre blocuri BRMBRD 270,5 1,1798 319 ,1
Drum asfaltat lime 3,5 m cu borduri DRMASFB 208,3 1,1110 231,4
Alei asfalt ALEIASF 151,9 0,9824 149 ,2
Parcri betonate cu pavele autobocante PBPAB 536,9 0,8678 465 , 9
Pavele 20 cm cu rosturi PLTFR 235,0 1,2745 299,5
Platform betonat cu borduri i asfalt PLTFBA 248,8 0,8915 221,8
Platform dale colorate PLTFDA 322,9 1,0359 334,5
Cale ferat industrial CALEIND 2.265,6 1,1892 2.694 , 3
TABEL CENTRALIZATOR COSTURI SOCLU GARD DIN BETON APARENT
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Soclu gard din beton aparent SOCLUGRD 282,3 1,2000 338 ,8 pag.carte: 201
TABEL CENTRALIZATOR COSTURI FINISAJ SOCLU
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Finisaj soc V1. tencuial i vinarom FINSOCV1 115,9 1,0138 117 ,5 pag.carte: 201
V2. similipiatr FINSOCV2 139,0 0,9548 132 ,7
TABEL CENTRALIZATOR COSTURI MPREJMUIRI
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
mprejmuire din plas zincat IMPPLZN 127,5 1,0304 131,4
mprejmuire scnduri \ ajstlpi lemn IMPSVSL 172,6 0,9961 171,9 pag.carte: 200
bjstlpi eav IMSVST 143,4 1,0737 154,0
mprejmuire din plci c stlpi prefab,
din beton IMPLBA 131,1 0,9134 119 ,7
mprejmuire tabl neagr vopsit IMPTNVOP 176,3 1, 2024 212 ,0
mprejmuire zid de crmid finisat IMPCARA 500,1 1,2945 647 ,4

TABEL CENTRALIZATOR COSTURI PANOURI GARD


Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Panou gard din scnduri PANGC 60,7 1, 2659 76 ,8
Panou gard din plas zincat PANGPZN 25 ,1 0,9883 24,8 pag.carte: 202
mediu PAMGFFM 169,4 1,1794 199 ,8
IPanou gard din fier for simplu PAMGFFSI 131,9 1,1794 155 ,6
superior PAMGFFSU 233,1 1,1794 274 , 9
TABEL CENTRALIZATOR COSTURI ESTACADE
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
H = 0 ,5 m ESTBET05 788,9 0,9860 777,9
Estacad beton H=1m ESTBET1 1.573,6 0,9860 1.551 ,6
H=2m ESTBET2 2.222,3 0,9860 2.191 , 2
H=3m ESTBET3 2.862,9 0,9860 2.822, 8
H = 0,5 m ESTMET05 1.552,0 1,1051 1.715,1
Estacad metalic H=1m ESTMET 1 2.648,0 1,1051 2.926 , 3
H=2m ESTMET 2 3.690,7 1,1051 4.078 ,6
H=3m ESTMET3 5.408,8 1,1051 5.977 , 3

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI COPERTIN METALIC LA BENZINRIE AUGUST 2016 - IULIE 2017
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Copertin metalic la benzinrie COPMBENZ 330,7 1,1734 388,0 pag.carte: 205

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI PUURI FORATE AUGUST 2016 - IULIE 2017
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Pu forat cu tub de beton PUTBETON 148,2 1,1524 170 ,8 pag.carte : 206
Pu forat cu teav p.v.c. PUTPVC 191,3 1,3795 263,9

FUNDAII ST LPI
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Fund,stlpi met+impam+cablu FSTMET 695,6 1,2416 863,7 pag.carte : 207
Pu forat cu teav p.v.c. FSBET 1.078,40 1,2416 1.338,9

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


TABEL CENTRALIZATOR COSTURI S P TUR AFERENT CABLURILOR ELECTRICE AUGUST 2016 - IULIE 2017
Denumire Simbol pre indice cost curent
carte - -
2016 2017 2016 2017
S ptur aferent cabluri electrice SAPCABEL 10,8 2,5185 27,2 pag.carte: 194
COSTURI CABLURI ELECTRICE AFERENTE INSTALAIEI DE FORA
Denumire Dimensiuni pre indice cost curent
carte 2016 - 2017 2016 - 2017
3 x 25 + 16 149,1 0,9603 143,2
Cablu electric tip CYABY 3 x 35 + 16 193,3 0,9603 185,6 pag.carte: 194
3 x 50 + 25 268,1 0,9603 257,5
3 x 70 + 35 385,0 0,9603 369,7
3 x 95 + 50 528,8 0,9603 507,8
3 x 120 + 70 801,0 0,9603 769,2
3 x 185 + 95 1.018,7 0,9603 978,3
3 x 2 4 0 + 1 2 0 1.339,4 0,9603 1.286,2
4 x 16 19,1 0,9252 17,7
Cablu electric tip ACYABY 3 x 25 + 16 37,6 0,9252 34,8
3 x 35 + 16 45,7 0,9252 42,3
3 x 50 + 25 58,0 0,9252 53,7
3 x 70 + 35 86,8 0,9252 80,3
3 x 95 + 50 114,3 0,9252 105,8
3 x 120 + 70 131,3 0,9252 121,5
3 x 150 + 70 148,8 0,9252 137,7
3 x 185 + 95 187,3 0,9252 173,3
3 x 240 + 120 236,8 0,9252 219,1
4x6 45,4 1,0397 47,2
Cablu electric tip CYY 4 x 10 86,8 1,0397 90,2
4 x 16 106,5 1,0397 110,7
5x6 53,3 1,0397 55,4
5 x 10 65,2 1,0397 67 , 8
5 x 16 100,6 1,0397 104, 6
TABEL CENTRALIZATOR COSTURI CANALE DE TERMOFICARE - NGROPATE
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
50 x 50 cm CANAL 50 518,4 1,0008 518, 8
Canal de termoficare 50 x 70 cm CANAL 70 656,8 1,0008 657,3 pag.carte: 195
50 x 90 cm CANAL 90 721,3 1,0008 721, 9

TABEL CENTRALIZATOR COSTURI CONDUCTE DE TERMOFICARE MONTATE N


CANALE TERMICE SUBTERANE
Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Canal de termoficare 57 mm TNEAGRA57 55,4 1,5862 87,9
din eav neagr 63 mm TNEAGRA63 99,3 1,1700 116,2 pag.carte: 196
76 mm TNEAGRA76 104,2 1,1904 124, 0
89 mm TNEAGRA89 111,4 1,3573 151, 2
108 mm TNEAGRA108 118,0 1,3822 163,1
133 mm TNEAGRA133 122,3 1,6315 199,5
159 mm TNEAGRA159 129,6 1,6187 209,8
219 mm TNEAGRA219 169,9 1,6856 286,4
Conducte de termoficare 3/4" TZINC3 /4 62,3 0,8631 53,8
din eav zincat 1" TZINC1 71,8 0,8741 62,8
2" TZINC2 100,3 1,1661 117,0
Conducte de termoficare 48 / 110 TNPREIZ048 152,6 1,2645 193,0
din eav neagr preizolat 57 / 125 TNPREIZ057 184,7 1,2645 233,6
76 / 140 TNPREIZ076 217,1 1,2887 279,8
89 / 160 TNPREIZ089 249,9 1,2546 313 ,5
114 / 200 TNPREIZ 0114 332,9 1,3529 450,4
159 / 250 TNPREIZ 0159 493,8 1,3287 656,1
219 / 315 TNPREIZ0219 781,4 1,3422 1.048,8
Conducte de termoficare 48 / 110 TZPREIZ048 106,6 1,7854 190,3
din eav zincat preizolat 57 / 125 TZPREIZ0125 162,4 1,7043 276,8
76 / 140 TZPREIZO 140 222,6 1,6843 374, 9
89 / 160 TZPREIZ0315 293,7 1,3432 394, 5

ST LPI PENTRU REEA ELECTRIC


Denumire Simbol pre carte indice cost curent
2016 - 2017 2016 - 2017
Fundaii stlpi metalici+ mpmntare +
alimentare cu cablu FSTMET 695,6 1,2416 863,7 pag.carte: 207
Fundaii stlpi beton+mpm ntare +
alimentare cu cablu FSBET 1.078,4 1,2416 1.338,9
SBP E 10 / 2 795,0 1,0955 870,9
Stlpi beton precomprimat SBP E 12 / 2 875,0 1,0955 958, 6
SBPE 14 /2 962,0 1,0955 1.053 , 9
0,0
0,0
Stlpi beton centrifugat Bo 10/4 595,0 1,0955 651, 8
Bo 12/4 655,0 1,0955 717, 6
Bo 14/4 720,0 1,0955 788, 8
0,0
Stlpi din lemn h=6m 348,0 1,1303 393,3
0,0
OLZn8800 225,0 1,1168 251,3
OLZn7800 193,0 1,1168 215,5
OLZn6800 164,0 1,1168 183, 2
Stlpi conici din oel zincat OLZn6000 124,0 1,1168 138,5
pentru reea electric OLZnSOOO 104,0 1,1168 116,1
OLZn4500 90,0 1,1168 100,5
OLZn4000 83,0 1,1168 92,7
OLZn3500 81,0 1,1168 90,5

Stlpi tip Viena 1.648,0 1,1014 1.815,1

Stlpi tip Lyon 2.011,0 1,1014 2.214,9

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
1.1. INFRASTRUCTURI PENTRU O CLDIRE P+1E+ Mp

1.1.1. INFRASTRUCTURA FARA SUBSOL


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
CLDIRE INFRASTR.V 1 ISCADREV1 556,3 1,0049 559 ,0
FARA INFRASTR.V 2 ISCADREV2 614,8 1,0049 617,8 pag.carte: 14
SUBSOL INFRASTR.V 3 ISCADREV3 679,2 1,0049 682 ,5

1.1.2. INFRASTRUCTURA CU SUBSOL AMENAJAT CA GARAJ SI BOXE DEPOZITARE


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUBSOL CU INFRASTRUCTURA GARAJSUBS 1.354,3 1,1252 1.523 , 9
GARAJ SI FINISAJ INTERIOR FINGARAJ 405 ,3 0,9794 397,0
BOXE ELECTRICE FUNCT ELGARAJ 68 ,0 1,0064 68 ,4
TOTAL 1.827,5

1.2. INFRASTRUCTURI CU SUBSOLURI CU FUNCIUNI DE PARCARI SUBTERANE LA CLDIRI PE


CADRE DIN BETON ARMAT CU REGIM DE NLIME P+5E+Et, P+8E+Et SI P+10E+Et

1.2.1. SUBSOL CU UN NIVEL DE PARCARE


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
INFRASTR. INFRASTRUCTURA ISSUBAUTO 1.360,9 1,0831 1.474, 0
BLOC AP. FINISAJ INTERIOR FGARAJSUB 183,7 1,0296 189 ,1
CU ELECTRICE FUNCT. ELPARCARI 44,1 1,1127 49 , 1
PARCARI SANITARE SAPARCARI 21,2 1,1361 24 , 1
AUTO VENTILA II VV PARCARI 32,6 0,9825 32 ,0

1.2.2. SUBSOL CU 2 NIVELURI DE PARCARE


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUBSOL INFRASTRUCTURA PARC2SUBS 1.217,4 1,0879 1.324 ,4
BLOC FINISAJ INTERIOR FGARAJSUB 183,7 1,0296 189 ,1
CU PARCARI ELECTRICE FUNCT . ELPARCARI 44,1 1,1127 49 , 1
AUTOTURISME SANITARE SAPARCARI 21,2 1,1361 24, 1
VENTILA II VV PARCARI 32,6 0,9825 32 ,0
1.2.3. SUBSOL CU NIVEL DE PARCARE AUTO PREVZUT CU PLATFORME CU ELEVATOARE
TIP SISTEM TIP SUBSISTEM Simbol pre indice cost curent
carte 2016 - 2017 2016- 2017
SUBSOL INFRASTRUCTURA PARCELEVAT 1.836,1 1,0932 2.007 , 2
BLOC FINISAJ INTERIOR FGARAJSUB 183,7 1,0296 189 ,1
CU PARCARI ELECTRICE FUNCT. ELPARCARI 44,1 1,1127 49 , 1 pag.carte: 20
AUTOTURISME SANITARE SAPARCARI 21,2 1,1361 24 ,1
VENTILAII VV PARCARI 32,6 0,9825 32 ,0

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
1.3. SUPRASTRUCTURA PE CADRE DIN BETON ARMAT

1.3.1. SUPRASTRUCTURA PE CADRE CU REGIM DE NLIME P+1E


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUPRASTRUCTURA CADRE1386-E1 398,4 1,0000 398 ,4
STRUCTURA SUPRASTRUCTURA SSCADRE7-E1 412,5 1,0169 419 ,5
SUPRASTRUCTURA CADRE1386-E 1 426,5 1,0338 440 ,9
I SUPRASTRUCTURA SSCADRE9-E1 454,8 1,0499 477,5

1.3.2. SUPRASTRUCTURA PE CADRE CU REGIM DE NLIME P+1E+MPARTIALA


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUPRASTRUCTURA SSCLPEM6 289 ,1 1,1569 334,5
STRUCTURA SUPRASTRUCTURA SSCLPEM7 359,0 1,1550 414,6
SUPRASTRUCTURA SSCLPEM8 373,1 1,1558 431,2
I SUPRASTRUCTURA SSCLPEM9 387,2 1,1554 447,4

1.4. SUPRASTRUCTURI PE CADRE DIN BETON ARMAT CU 5, 8, 10ETAJE SI ETAJ TEHNIC

1.4.1. SUPRASTRUCTURA CU P+5E+ETEHNIC

1.4.1.1. SUPRASTRUCTURA P+5E+ETEHNIC, CU 2 DESCHIDERI SI 4 TRAVEI


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUPRASTRUCTURA SUPRAP 5E6 424,8 1,1055 469 ,6
STRUCTURA SUPRASTRUCTURA SUPRAP 5E7 483,2 1,0379 501,5 pag. carte: 24
SUPRASTRUCTURA SUPRAP 5E8 556,1 0,9703 539 ,6
I SUPRASTRUCTURA SUPRAP 5E9 693,5 1,0381 719 , 9

1.4,1,2, SUPRASTRUCTURA PE CADRE P+5E+ETEHNIC, CU 3 DESCHIDERI SI 5 TRAVEI


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUPRASTRUCTURA SUPRAP 5E6 445,9 1,0051 448 ,2
STRUCTURA SUPRASTRUCTURA SUPRAP 5E7 492,2 1,0000 492 ,2
SUPRASTRUCTURA SUPRAP 5E8 522,9 0,9948 520 ,2
I SUPRASTRUCTURA SUPRAP 5E9 538,6 0,9974 537 ,2

1.4.2. SUPRASTRUCTURI P+8/10E+ET CU 3 DESCHIDERI SI 5 TRAVEI, CU PUT DE LIFT SI O


SINGURA SCARA PRINCIPALA

1.4.2.1. SUPRASTRUCTURA CU REGIM DE NLIME P+8E+ETEHNIC, CU 3 DESCHIDERI SI


5 TRAVEI, CU UN PUT DE LIFT SI O SCARA
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUPRASTRUCTURA CADRE8E3D5T6 506,2 0,9967 504 ,5
STRUCTURA SUPRASTRUCTURA CADRE8E3D5T7 539,1 1,0326 556 ,7
SUPRASTRUCTURA CADRE8E3D5T8 571,6 1,0685 610,8
I SUPRASTRUCTURA CADRE8E3D5T9 637,8 1,0423 664 ,8

1.4.2.2. SUPRASTRUCTURA CU REGIM DE NLIME P+10E+ETEHNIC, CU 3 DESCHIDERI SI


5 TRAVEI, CU UN PUT DE LIFT SI O SCARA
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
SUPRASTRUCTURA CADRE10E6 503,8 0,9969 502,2
STRUCTURA SUPRASTRUCTURA CADRE10E7 522,7 1,0476 547,6 pag.carte: 26
SUPRASTRUCTURA CADRE10 E 8 553,8 1,0983 608 ,2
I SUPRASTRUCTURA CADRE10E9 585 ,6 1,0231 646 ,3

1.4.2.3. PUT DE LIFT SI SCARA SECUNDARA, LA SUPRASTRUCTURA PE CADRE


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
PUT LIFT PT.1ETAJ PUTLIFT 5.322,25 0,9971 5.306 , 8
SUPRASTR. P+8E+ETJ.TEHNIC 47.900,24 1,0694 51.224, 5
P+10E+ETJ.TEHNIC 58.544,74 1,0694 62.607 , 7
I SC . SECUND . 1 ETAJ SCARAMON 2.971 , 50 0,9706 2.884 ,1
SUPRASTR. P+8E+ETJ.TEHNIC 26.743,50 0,9706 25.957 , 5
I P+10E+ETJ.TEHNIC 32.686,50 0,9706 31.725 , 5

1.4.2.4. INSTALAIE ELECTRICA DE FOR A PENTRU ALIMENTARE LIFTURI SI CAMERA DE TROLIU


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016- 2017
1 STATIE+COTA AFERENTA CAM.TROLIU EL380-1E 228 ,50 0,9952 227 ,4
LIFT+ CAMERA ELECTR.LIFT PERS . EL380V- 8E 2.056,90 0,9950 2.046 , 6 pag.carte: 27
TROLIU ELECTR.LIFT PERS . EL380V-10E 1.949,50 1,0605 2.067 , 4

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
1.5. NCHIDERI PERIMETRALE SI COMPARTIMENT RI INTERIOARE
LA STRUCTURILE PE CADRE DIN BETON ARMAT

1.5.1. NCHIDERI PERIMETRALE


TIP SISTEM GROSIME Simbol pre cost curent
NCHIDERE ZID NCHIDERE carte 2016- 2017 2016 - 2017
BCA 24 CM ZBCA2467 127,0 1,2468 158 , 3
BCA BCA 30 CM ZBCA3067 154,8 1,2619 195, 3
BCA 24 CM ZBCA2489 135,2 1,2199 164, 9
BCA 30 CM ZBCA3089 163,7 1,2310 201,5
POROTERM 24 CM ZPOR2467 163,3 1,2031 196,5
POROTERM POROTERM 30 CM ZPOR 3067 202,1 1,1849 239,5
POROTERM 24 CM ZPOR2489 195,1 1,1240 219,3
I POROTERM 30 CM ZPOR 3089 243,0 1,1269 273,8

1.5.2. COMPARTIMENT RI INTERIOARE


TIP SISTEM TIP Simbol pre cost curent
COMPARTIM. SUBSISTEM carte 2016- 2017 2016 - 2017
BCA 20 cm si 10 cm COMPBCA 39 ,9 1,1796 47,1
BCA+ZID CAR 20 cm si 12,5 cm COMPBCAZ 54,0 1,1813 63 ,8
POROTERM 20 cm si 10 cm COMPORO 58 ,5 1,1244 65 ,8
alb/ alb+alb/ verde COMPRIGI 29,2 1,2346 36,1
RIGIPS 1 placa roz-rez.la foc RIGFOC 31,2 1,2131 37 ,8
2 placi alb/ alb+verde 2 COMPRIGI 42,4 1,2288 52,1
I 2 placi roz la foc 2RIGFOC 42,9 1,2178 52,2

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
1.6.CLDIRI PARTER PE CADRE DIN BETON ARMAT PENTRU
BAZINE DE NOT OLIMPICE SI SEMIOLIMPICE

1.6.1. CLDIRE CU DESCHIDEREA DE 12 M AFERENTA BAZINULUI


DE NOT SEMIOLIMPIC
TIP TIP Simbol pre cost curent
SISTEM SUBSISTEM carte 2016 - 2017 2016 - 2017
CLDIRE D=12M STRUCTURA NCHIDERI, STRD12H66 1.771,7 1,0776 1.909 ,2
PLANSEU ACOPERI
STRUCTURA STRUCTURA NCHIDERI, STRD12H67 1.844,7 1,0766 1.986,0
PLANSEU ACOPERI
NCHIDERI SI STRUCTURA NCHIDERI, STRD12H68 1.927,0 1,0766 2.074,6
PLANSEU ACOPERI 31
PLANSEU ACOPERI STRUCTURA NCHIDERI, STRD12H69 2.093,2 1,0766 2.253,5
PLANSEU ACOPERI
TERASA NECIRC. TERASA NECIRC. TERNECIRC 450,6 1,0445 470,7
COMPARTIM. COMPART.DEPEND . COMPBCA 39,9 1,1804 47 , 1
FINISAJ FIN.ZONA CL.BAZIN FINBAZSEO 297,4 1,0296 306, 2
INCLUSIV FA ADA FIN.ZONA DEPEND. FINDEPSEO 834,4 1,0238 854 ,3
IN STAL. ELECTRICE ELECTRICE CL.BAZIN ELCLSEOL 68 ,6 0,9984 68 , 5
ELEC.ZONA DEP. ELDEPBSEO 169,7 0,9667 164, 0
SANITARE SANITARE CL.BAZIN SABASEOL 124,7 1,0065 125, 5
SANIT.ZONA DEP. SADEPBSEO 178,7 0,9943 177 ,7
NC LZIRE NCLZIRE CL.BAZIN IBAZSEO 159,6 0,9852 157 , 2
I INCALZ.ZONA DEP. IDEPSEO 165 ,6 0,9923 164,3
STRUCTURA I FINISAJ BAZIN SEMIOLIMPIC
TIP TIP Simbol pre cost curent
CONSTRUCIE SUBSISTEM carte 2016 - 2017 2016 - 2017
STRUCTURA BAZIN PISCIN300 929,4 1, 0372 964, 0
BAZIN SEMIOLIMPIC FINISAJ GRES.VITRIF. FINSEMIOL 866,9 0,9989 865, 9
FINISAJ CU LINER LINERSEMIOL 644,5 1,0077 649 , 5

1.6.2. CLDIRE CU DESCHIDEREA DE 26 M AFERENTA BAZINULUI


DE NOT OLIMPIC
TIP TIP Simbol pre indice cost curent
SISTEM SUBSISTEM carte 2016 - 2017 2016 - 2017
CLDIRE D= 24M STRUCTURA NCHIDERI, STR 26GR6 2.063,2 1, 0803 2.228 , 9
PLANSEU ACOPERI
STRUCTURA CU STRUCTURA NCHIDERI, STR 26GR7 2.148,1 1, 0803 2.320 ,6
PLANSEU ACOPERI
NCHIDERI SI STRUCTURA NCHIDERI, STR 26GR8 2.243,9 1, 0803 2.424,1
PLANSEU ACOPERI
PLANSEU ACOPERI STRUCTURA NCHIDERI, STR 26GR9 2.437,3 1,0803 2.633 ,0
PLANSEU ACOPERI
TERASA NECIRC. TERASA NECIRC. TERNECIRC 450,6 1,0445 470,7
COMPARTIM. COMPART.DEPEND . COMPBCA 39,9 1,1804 47 ,1
FINISAJ FIN.ZONA CL.BAZIN FINBAZSEO 297,4 1,0296 306, 2
INCLUSIV FA ADA FIN.ZONA DEPEND. FINDEPSEO 834,4 1,0238 854 , 3
IN STAL. ELECTRICE ELECTRICE CL.BAZIN ELCLSEOL 68 ,6 0,9984 68 , 5
ELEC.ZONA DEP. ELDEPBSEO 169,7 0,9667 164 , 0
SANITARE SANITARE CL.BAZIN SABASEOL 124,7 1,0065 125, 5
SANIT.ZONA DEP. SADEPBSEO 178 ,7 0,9943 177 ,7
NC LZIRE NC LZIRE CL.BAZIN IBAZSEO 159,6 0,9852 157 , 2
1 INCALZ.ZONA DEP. IDEPSEO 165,6 0,9923 164 , 3
STRUCTURA I FINISAJ BAZIN OLIMPIC
TIP TIP Simbol pre indice cost curent
CONSTRUCIE SUBSISTEM carte 2016 - 2017 2016 - 2017
STRUCTURA BAZIN PISCIN1000 841,6 1,0372 872, 9
BAZIN OLIMPIC FINISAJ GRES.VITRIF. FINOLIMP 706,3 0,9991 705,7
FINISAJ CU LINER LINERSEMIOL 524,9 1,0077 528 , 9

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
CAPITOLUL 2 - CL DIRI SITUATE PE TERENURI IN PANTA

2.1. TERASAMENTE EXECUTATE LA TERENURI IN PANTA


TIP C-TII TIP SUBSISTEM SIMBOL pre cost curent
SPECIALE TERASAMENTE TEREN PANTA carte/mp 2016 - 2017 2016- 2017
TERASAMENTE Hs=0,25 M TERASAM25 6 ,5 1,1228 7,30
TIP C-TII TIP SUBSISTEM SIMBOL pre indice cost curent
SPECIALE TERASAMENTE TEREN PANTA carte/mp 2016- 2017
TERASAMENTE Hs=0,50 M TERASAM50 9,7 1,1228 10,89
TIP C-TII TIP SUBSISTEM SIMBOL pre indice cost curent
SPECIALE TERASAMENTE TEREN PANTA carte/mp 2016- 2017
TERASAMENTE Hs=0,75 M TERASAM75 12,8 1,1228 14,37
TIP C-TII TIP SUBSISTEM SIMBOL pre indice cost curent
SPECIALE TERASAMENTE TEREN PANTA carte/mp 2016- 2017
TERASAMENTE Hs=1,00 M TERASAM100 15,3 1,1228 17,18
TIP C-TII TIP SUBSISTEM SIMBOL pre indice cost curent
SPECIALE TERASAMENTE TEREN PANTA carte/mp 2016- 2017
TERASAMENTE Hs=1,25 M TERASAM125 19,3 1,1228 21,67

2.2. STRUCTURA PE CADRE DE BETON ARMAT A CL DIRII AMPLASATE PE TEREN IN PANTA


TIP SISTEM TIP SUBSISTEM SIMBOL pre cost curent
carte 2016 - 2017 2016- 2017
INFRASTRUCTURA FUNDPANTA 958,0 1, 0978 1.051 ,7
SUPRASTRUCTURA SSCADRE-6 453 ,3 1, 0046 455,4
STRUCTURA SUPRASTRUCTURA SSCADRE-7 456,7 1, 0713 489,3
SUPRASTRUCTURA SSCADRE-8 460,0 1,1381 523,5
SUPRASTRUCTURA SSCADRE-9 476,1 1, 2049 573,7

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
3.1. GRAJDURI PENTRU ANIMALE MARI

3.1.1. GRAJDURI CU PEREII DIN LEMN SI INVELITOARE


IN 5 VARIANTE CONSTRUCTIVE
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
GRAJD STRUCTURA +FINISAJ GRAJDLEMN 304,2 1,0085 306, 8
DIN NVELIT TIGL.PROFIL SATPSPR 136,8 1,3601 186,1 pag.carte: 52
GRINZI NVELIT TIGL.SOLZI SATI1A 301,1 0,9175 276,3
LEMN NVELIT SITA SITA 258,0 1,1451 295, 4
CU NVELIT. AZBOCIMENT SAAZB 156,0 0,8367 130, 5
INVELITOARE NVELIT.CARTON ASF SARPAST 109,0 1,2044 131, 3

3.1.1. GRAJDURI CU PEREII DIN ZIDRIE SI INVELITOARE


IN 5 VARIANTE CONSTRUCTIVE
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
GRAJD STRUCTURA +FINISAJ GRAJDZID 752,8 1,0374 781, 0
DIN NVELIT TIGL.PROFIL SATPSPR 136,8 1,3601 186,1 pag.carte: 52
CRMID NVELIT TIGL.SOLZI SATI1A 301,1 0,9175 276,3
CU NVELIT SITA SITA 258,0 1,1451 295, 4
INVELITOARE NVELIT. AZBOCIMENT SAAZB 156,0 0,8367 130, 5
INVELIT.CARTON ASF SARPAST 109,0 1,2044 131,3

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
3.2. MAGAZII DIN SCNDURI, PANOURI OSB , PAIANTA, CR MID, B.C.A.,
CU INVELITORI UOARE

MAGAZII CU STRUCTURI LEMN ECARISAT /ROTUND SI NCHIDERI CU SC NDURI SI


PLACI OSB EXCL. ACOPERI
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
MAG.PEREI STR.LEMN ECARISAT MAGLECAR 160,0 1,0276 164 ,4
SC NDURI STR.LEMN ROTUND MAGLROTUND 128,7 1,0993 141,5
MAG.PEREI STR.LEMN ECARISAT MAGLECAR 178,5 1,0015 178 ,8
PLACI OSB STR.LEMN ROTUND MAGLROSB 137,1 1,0638 145 ,8

MAGAZIE CU ZIDURI DIN CRMID SAU B.C.A.


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
MAGAZIE STRUCT.C R MID GARAJZID 479 ,2 1,0337 495,3
CU ZIDRIE STRUCTURA B.C.A . GARAJBCA 316,3 1,0667 337,4 pag.carte: 53

INVELITORI LA MAGAZII POZATE PE ASTEREALA DIN SCNDURI SAU POZATE FARA


ASTEREALA
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INVELITOARE ASTER.+CART.ASF. INVCA400 28,4 1,1654 33,1
PE ASTER.+AZBOCIM INVAZBO 37,8 1,1339 42 , 9
ASTEREALA ASTER.TBL.PLANA ZN ITZNPLAN 45 ,3 1,0946 49 ,6
ASTER.ZNOND/CUT ITZNOND 90,7 1,0485 95,1
INVELIT.FARA AZBOCIMENT OND . INVFAAZB 22,5 1,0375 23 ,3
ASTEREALA TABL.ZN.OND.CUTAT INVFATZNO 76,2 0,9929 75 ,7

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


INVELITOARE ASTER.+CART .ASF. INVCA400 28,4 1,1654 33,1
PE ASTER.+AZBOCIM INVAZBO 37,8 1,1339 42 , 9
ASTEREALA ASTER TBL.PLANA ZN ITZNPLAN 45,3 1,0946 49 ,6
ASTER.ZN.OND/CUT ITZNOND 90,7 1,0485 95,1
INVELIT.FARA AZBOCIMENT OND . INVFAAZB 22,5 1,0375 23 ,3
ASTEREALA TABL.ZN.OND/CUTAT INVFATZNO 76,2 0,9929 75,7
AUGUST 2016 - IULIE 2017
3.4. CLDIRI PENTRU BUCTRII DE VARA

SISTEME CONSTRUCTIVE AFERENTE BUCT RIEI DE VARA


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
ZID.24+PLACA BETON BUCZID24 479,2 1,0337 495 ,3
STRUCTURA STR.PAIANTA RPAIANTA 402,1 0 ,9640 387,6 pag.carte: 58
STR.LEMN ECARISAT LEMNECAR 160,0 1,0276 164 ,4
STR.LEMN ROTUND LEMNROT 128,7 1,0993 141,5

TIP SISTEM TIP SUBSISTEM Simbol pre cost curent


CLDIRE carte 2016 - 2017 2016 - 2017
ASTEREALA+CA.ASF. INVCA400 28,4 1,1654 33,1
ACOPERI ASTER.+AZBOCIMENT INVAZBO 37,8 1,1339 42,9
ASTER.TBL.PL.ZINC . ITZNPLAN 45,3 1,0946 49 ,6
ASTER.+TBL.ZINC.ON. ITZNOND 90,7 1,0485 95,1

TIP SISTEM TIP SUBSISTEM Simbol pre cost curent


CLDIRE carte 2016 - 2017 2016 - 2017
FINISAJ CL.ZID.+PL.BETON FINBUCZID 489,4 1,0103 494,4
INTERIOR STR.PAIANTA FINPAIANTA 191,2 0 ,9767 186 ,7
EXTERIOR STR.LEMN FINBUCLEMN 100,2 1,0051 100,7

TIP SISTEM TIP SUBSISTEM Simbol pre cost curent


CLDIRE carte 2016 - 2017 2016 - 2017
INSTAL. ELECTR.1BEC+2PRIZE ELBUCVA 45,1 0,9317 42,0
FUNCIONALE SANIT.CHIUVETA SABUCVA 169,0 0,9369 158,3

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


HALE METALICE DIN EUROPROFILE U OARE ZICATE
TIP SISTEM TIP SUBSISTEM Simbol pre indice cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND810 382,1 1,1172 426 , 9
STRUCTURA SUPRASTRUCTURA ZND8H4-6 249 ,7 0,9983 249 ,3
C, Z, U, I SUPRASTRUCTURA ZND8H4-7 271,9 0,9885 268 ,8
D=8M SUPRASTRUCTURA ZND8H4-8 294,2 0,9979 293 ,6
Hs = 4 M SUPRASTRUCTURA ZND8H4-9 336,1 1,0000 336 ,1
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND810 382,1 1,1172 426 , 9
STRUCTURA SUPRASTRUCTURA ZND8H5-6 267,6 0,9983 267 ,1
c, Z, U, Z SUPRASTRUCTURA ZND8H5-7 291,5 0,9885 288 ,1
D=8M SUPRASTRUCTURA ZND8H 5-8 294,8 0,9979 294,2
Hs = 5 M SUPRASTRUCTURA ZND8H5-9 338,0 1,0000 338 ,0

TIP SISTEM TIP SUBSISTEM Simbol pre cost curent


CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND810 382,1 1,1172 426 , 9
STRUCTURA SUPRASTRUCTURA ZND10H4-6 241,6 0,9699 234,3
C, Z, U, I SUPRASTRUCTURA ZND10H4-7 263,2 0,9649 254,0
D = 10 M SUPRASTRUCTURA ZND10H4-8 285 ,3 0,9988 285 ,0
Hs = 4 M SUPRASTRUCTURA ZND10H4-9 323,6 1,0004 323 ,7
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND810 382,1 1,1172 426 , 9
STRUCTURA SUPRASTRUCTURA ZND10H 5-6 258,7 0,9699 250 , 9
c, z, U, Z SUPRASTRUCTURA ZND10H5-7 280,3 0,9649 270 ,5
D = 10 M SUPRASTRUCTURA ZND10H 5- 8 302,9 0,9988 302 ,5
Hs = 5 M SUPRASTRUCTURA ZND10H 5- 9 341,9 1,0004 342 ,0

TIP SISTEM TIP SUBSISTEM Simbol pre cost curent


CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND1214 391,8 1,1129 436 ,0
STRUCTURA SUPRASTRUCTURA ZND12H4-6 242,3 0,9643 233 ,6
c, z, U, Z SUPRASTRUCTURA ZND12H4-7 261,7 0,9421 246 ,5
D = 12 M SUPRASTRUCTURA ZND12H4- 8 279,3 0,9289 259 ,4
Hs = 4 M SUPRASTRUCTURA ZND12 H4-9 317,0 0,8515 269 , 9
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND1214 391,8 1,1129 436 ,0
STRUCTURA SUPRASTRUCTURA ZND12 H 5-6 257,1 0,9026 232 ,1
c, Z, U, Z SUPRASTRUCTURA ZND12 H5-7 274,8 0,8881 244 ,0
D = 12 M SUPRASTRUCTURA ZND12 H5- 8 293,1 0,8708 255 ,2
Hs = 5 M SUPRASTRUCTURA ZND12H 5-9 329,4 0,8125 267 ,6

TIP SISTEM TIP SUBSISTEM Simbol pre cost curent


CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND1214 391,8 1,1129 436 ,0
STRUCTURA SUPRASTRUCTURA ZND14H4-6 245 ,8 0,9682 238 ,0
c, Z, U, Z SUPRASTRUCTURA ZND14H4-7 267,8 0,9300 249 ,1
D = 14 M SUPRASTRUCTURA ZND14H4-8 290,7 0 ,8948 260 ,1
Hs = 4 M SUPRASTRUCTURA ZND14H4-9 333,1 0 ,8141 271,2
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND1214 391,8 1,1129 436 ,0
STRUCTURA SUPRASTRUCTURA ZND14H 5-6 262,7 0,9834 258 ,3
c, z, U, Z SUPRASTRUCTURA ZND14H5-7 273,2 0,9892 270 ,2
D = 14 M SUPRASTRUCTURA ZND14H5-8 304,6 0,9331 284,2
Hs = 5 M SUPRASTRUCTURA ZND14H5-9 358,9 0,9380 336 ,6

TIP SISTEM TIP SUBSISTEM Simbol pre cost curent


CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND1214 391,8 1,1129 436 ,0
STRUCTURA SUPRASTRUCTURA ZND15H6-6 275 ,3 0,9758 268 ,6
c, Z, U, Z SUPRASTRUCTURA ZND15H6-7 299,8 0,9596 287 ,7
D = 15 M SUPRASTRUCTURA ZND15H6- 8 355 ,4 0,9139 324,8
Hs = 6 M SUPRASTRUCTURA ZND15H6- 9 438,8 0,9765 428 ,5
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FIZND1214 391,8 1,1129 436 ,0
STRUCTURA SUPRASTRUCTURA ZND15H8-6 355 ,9 0,9758 347 ,3
c, z, U, Z SUPRASTRUCTURA ZND15H8-7 371,8 0,9596 356 ,8
D = 15 M SUPRASTRUCTURA ZND15H8-8 440,7 0,9140 402 ,8
Hs = 8 M SUPRASTRUCTURA ZND15H8- 9 544,0 0,9761 531 ,0
AUGUST 2016 - IULIE 2017
4.1.2. STRUCTURI METALICE CU 2 DESCHIDERI

4.1.2.1. HALE METALICE CU 2 DESCHIDERI, DIN EUROPROFILE TIP HEA, HEM, HEB SI IPE

STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,


NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 14 m, NLIME ST LP Hs = 4 M SI Hs = 6 M , Hs = 8 M, Hs = 10 M
Hs = 4 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017 pag.carte: 75
INFRASTRUCTURA FSC2 D14 293,6 1,1666 342,5
STRUCTURA SUPRASTRUCTURA 2D14 H4-6 252,1 1,0614 267,6
HEA, HEB, IPE SUPRASTRUCTURA 2D14H4-7 264,5 1,0697 282,9
D = 14 M SUPRASTRUCTURA 2D14H4-8 281,8 1,0598 298,7
Hs = 4 M SUPRASTRUCTURA 2D14 H4-9 298 ,9 1,0798 322,8
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D14 293,6 1,1666 342 ,5
STRUCTURA SUPRASTRUCTURA 2 D14H6-6 253,3 1,0551 267,3
HEA, HEB, IPE SUPRASTRUCTURA 2 D14H6-7 267,6 1,0551 282,3
D = 14 M SUPRASTRUCTURA 2 D14H6-8 282,3 1,0602 299 ,3
Hs = 6 M SUPRASTRUCTURA 2 D14H6-9 306,7 1,0790 330, 9
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D14 293,6 1,1666 342 ,5
STRUCTURA SUPRASTRUCTURA 2 D14H8-6 257,9 1,0663 275,0
HEA, HEB, IPE SUPRASTRUCTURA 2 D14H8-7 273,8 1,0745 294,2
D = 14 M SUPRASTRUCTURA 2 D14H8-8 290,9 1,0774 313,4
Hs = 8 M SUPRASTRUCTURA 2 D14H8-9 308,6 1,0777 332 ,6
Hs = 10 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D14 297,5 1,0998 327 ,2
STRUCTURA SUPRASTRUCTURA 2 D14 H10-6 278,8 1,0496 292 ,6
HEA, HEB, IPE SUPRASTRUCTURA 2 D14H10-7 285,9 1,0588 302 ,7
D = 14 M SUPRASTRUCTURA 2 D14 H10-8 303,5 1,0783 327 , 3 I
Hs = 10 M SUPRASTRUCTURA 2 D14H10-9 331,4 1,0911 361,6 |
STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,
NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 15 m, NLIME ST LP Hs = 4 M SI Hs = 6 M , Hs = 8 M , Hs = 10 M
Hs = 4 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D15 297,8 1,0738 319,8
STRUCTURA SUPRASTRUCTURA 2 D15H4-6 261,5 1,0764 281,5 pag.carte: 76
HEA, HEB, IPE SUPRASTRUCTURA 2D15H4-7 274,9 1,1116 305,6
D = 15 M SUPRASTRUCTURA 2D15H4-8 295,0 1,1055 326,1
Hs = 4 M SUPRASTRUCTURA 2D15H4-9 307,0 1,0981 337,1
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D15 297,8 1,0738 319,8
STRUCTURA SUPRASTRUCTURA 2 D15H6-6 263,5 1,0678 281,4
HEA, HEB, IPE SUPRASTRUCTURA 2 D15H6-7 277,6 1,0721 297 ,6
D = 15 M SUPRASTRUCTURA 2 D15H6-8 299,6 1,0764 322,5
Hs = 6 M SUPRASTRUCTURA 2 D15H6-9 327,0 1,0899 356 ,4
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D15 297,8 1,0738 319 ,8
STRUCTURA SUPRASTRUCTURA 2 D15H8-6 265,7 1,0678 283 ,7
HEA, HEB, IPE SUPRASTRUCTURA 2 D15H8-7 279,9 1,0795 302 ,2
D = 15 M SUPRASTRUCTURA 2 D15H8-8 302,4 1,0774 325,8
Hs = 8 M SUPRASTRUCTURA 2 D15H8-9 331,7 1,0877 360,8
Hs = 10 m indice cost curent
TIP SISTEM TIP SUBSISTEM Simbol pre 2016 - 2017 2016 - 2017
CLDIRE carte 2015 - 2016 2015 - 2016
INFRASTRUCTURA FSC2 D15 297,8 1,0738 319 ,8
STRUCTURA SUPRASTRUCTURA 2 D15H10-6 285,7 1,0496 299 , 9
HEA, HEB, IPE SUPRASTRUCTURA 2 D15H10-7 293,3 1,0588 310,5
D = 15 M SUPRASTRUCTURA 2 D15H10-8 310,3 1,0783 334,6
I Hs = 10 M SUPRASTRUCTURA 2 D15H10-9 341,9 1,0911 373,0 |
STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,
NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 18 m, NLIME ST LP Hs = 6 M , Hs = 8 M , Hs = 10 M
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D18-6 286,3 1,0579 302 , 9
STRUCTURA SUPRASTRUCTURA 2 D18 H6-6 315,3 1,0643 335,6 pag.carte: 77
HEA, HEB, IPE SUPRASTRUCTURA 2 D18 H6-7 324,8 1,0995 357,1
D = 18 M SUPRASTRUCTURA 2D18 H6-8 334,5 1,1322 378,7
Hs = 6 M SUPRASTRUCTURA 2D18 H6-9 365,2 1,0960 400, 3
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D18-8 316,3 1,0579 334,6
STRUCTURA SUPRASTRUCTURA 2 D18 H8-6 353,6 1,0908 385,7
HEA, HEB, IPE SUPRASTRUCTURA 2 D18 H8-7 364,5 1,1181 407,5
D = 18 M SUPRASTRUCTURA 2 D18 H8-8 375,5 1,1551 433 ,7
Hs = 8 M SUPRASTRUCTURA 2 D18 H8-9 403,3 1,1408 460, 1
Hs = 10 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D18-10 339,9 1,0579 359 ,6
STRUCTURA SUPRASTRUCTURA 2D18H10-6 377,2 1,0980 414,2
HEA, HEB, IPE SUPRASTRUCTURA 2 D18 H10-7 389,3 1,1227 437,1
D = 18 M SUPRASTRUCTURA 2 D18 H10-8 401,6 1,1623 466 ,8
Hs = 10 M SUPRASTRUCTURA 2 D18 H10-9 434,5 1,1498 499 ,6

STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,


NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 20 m, NLIME ST LP Hs = 6 M , Hs = 8 M , Hs = 10 M
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D20-6 293,4 1,0667 313,0
STRUCTURA SUPRASTRUCTURA 2 D 20 H6-6 301,8 1,0871 328 , 1 pag.carte: 78
HEA, HEB, IPE SUPRASTRUCTURA 2 D 20 H6-7 327,3 1,0779 352 ,8
D = 20 M SUPRASTRUCTURA 2 D 20 H6-8 354,2 1,0635 376 ,7
Hs = 6 M SUPRASTRUCTURA 2 D 20 H6-9 394,1 1,0170 400,8
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre indice cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D20-8 303,3 1,0667 323,5
STRUCTURA SUPRASTRUCTURA 2 D 20 H8-6 339,6 1,1032 374,6
HEA, HEB, IPE SUPRASTRUCTURA 2 D 20 H8-7 359,6 1,0860 390,5
D = 20 M SUPRASTRUCTURA 2 D 20 H8-8 363,7 1,0748 390,9
Hs = 8 M SUPRASTRUCTURA 2D 20 H8-9 400,7 1,0203 408,8
Hs = 10 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FSC2 D20-10 293,4 1,1082 325,1
STRUCTURA SUPRASTRUCTURA 2D20H10-6 380,3 1,1033 419,6
HEA, HEB, IPE SUPRASTRUCTURA 2 D20H10-7 402,7 1,1080 446 ,2
D = 20 M SUPRASTRUCTURA 2 D20H10-8 407,3 1,0717 436 ,5
Hs = 10 M SUPRASTRUCTURA 2D 20H10-9 444,3 1,1094 492, 9

STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,


NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 22 m, NLIME STLP Hs = 6 M , Hs = 8 M , Hs = 10 M
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 368,6 1,0631 391, 9
STRUCTURA SUPRASTRUCTURA 2 D22 H6-6 317,9 1,0916 347,0 pag.carte: 79
HEA, HEB, IPE SUPRASTRUCTURA 2 D22 H6-7 342,5 1,0989 376 ,4
D = 22 M SUPRASTRUCTURA 2 D22 H6-8 372,2 1,0718 398 , 9
Hs = 6 M SUPRASTRUCTURA 2 D 22H6-9 416,9 1,0108 421,4
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 385,0 1,0631 409 ,3
STRUCTURA SUPRASTRUCTURA 2 D22 H8-6 336,3 1,0889 366 ,2
HEA, HEB, IPE SUPRASTRUCTURA 2 D 22 H8-7 352,8 1,0889 384 ,2
D = 22 M SUPRASTRUCTURA 2 D 22 H8-8 357,7 1,0649 380 , 9
Hs = 8 M SUPRASTRUCTURA 2 D 22 H8-9 394,7 1,0078 397,8
Hs = 10 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 385,0 1,0631 409 ,3
STRUCTURA SUPRASTRUCTURA 2 D 22H10-6 376,6 1,0745 404 ,7
HEA, HEB, IPE SUPRASTRUCTURA 2 D 22H10-7 395,1 1,0684 422 , 1
D = 22 M SUPRASTRUCTURA 2 D 22H10-8 400,6 1,0480 419,8
Hs = 10 M SUPRASTRUCTURA 2D 22H10-9 437,3 0,9935 434,5

STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,


NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 24 m, NLIME STLP Hs = 6 M , Hs = 8 M , Hs = 10 M
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 362,1 1,0631 384 , 9
STRUCTURA SUPRASTRUCTURA 2 D 24H6-6 329,1 1,0818 356 ,0
HEA, HEB, IPE SUPRASTRUCTURA 2 D 24H6-7 353,7 1,0876 384,7
D = 24 M SUPRASTRUCTURA 2 D 24H6-8 378,4 1,0884 411, 9
Hs = 6 M SUPRASTRUCTURA 2 D 24 H6-9 425,0 1,0327 438 , 9
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 405,5 1,0631 431,1
STRUCTURA SUPRASTRUCTURA 2 D24 H8-6 339,3 1,1237 381,3
HEA, HEB, IPE SUPRASTRUCTURA 2 D24H8-7 366,7 1,1263 413 ,0
D = 24 M SUPRASTRUCTURA 2 D24H8-8 378,0 1,1259 425 ,6
Hs = 8 M SUPRASTRUCTURA 2 D 24 H8-9 397,7 1,0678 424 ,7
Hs = 10 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 405,7 1,0631 431,3
STRUCTURA SUPRASTRUCTURA 2 D24 H10-6 380,0 1,1444 434, 9
HEA, HEB, IPE SUPRASTRUCTURA 2 D24 H10-7 410,7 1,1441 469 , 9
D = 24 M SUPRASTRUCTURA 2 D 24 H10-8 423,4 1,1921 504 ,7 I
Hs = 10 M SUPRASTRUCTURA 2 D 24H10-9 467,5 1,1680 546 ,0 |
STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,
NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 27 m, NLIME ST LP Hs = 6 M , Hs = 8 M , Hs = 10 M
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 362,1 1,0631 384, 9
STRUCTURA SUPRASTRUCTURA 2 D 27H6-6 348,6 1,0726 373,9 pag.carte: 81
HEA, HEB, IPE SUPRASTRUCTURA 2D 27H6-7 385,2 1,0693 411,9
D = 27 M SUPRASTRUCTURA 2D27H6-8 376,3 1,0709 403,0
Hs = 6 M SUPRASTRUCTURA 2D27H6-9 406,8 1,0302 419,1
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 405,7 1,0631 431,3
STRUCTURA SUPRASTRUCTURA 2 D 27H8-6 349,7 1,0969 383 ,6
HEA, HEB, IPE SUPRASTRUCTURA 2 D 27H8-7 361,0 1,0913 394,0
D = 27 M SUPRASTRUCTURA 2 D 27H8-8 370,0 1,0923 404,2
Hs = 8 M SUPRASTRUCTURA 2 D 27H8-9 392,5 1,0802 424,0
Hs = 10 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 426,1 1,0654 454,0
STRUCTURA SUPRASTRUCTURA 2 D27 H10-6 391,6 1,0857 425 ,2
HEA, HEB, IPE SUPRASTRUCTURA 2 D27 H10-7 404,5 1,0781 436 , 1
D = 27 M SUPRASTRUCTURA 2 D27 H10-8 414,4 1,1269 467,0
Hs = 10 M SUPRASTRUCTURA 2 D 27 H10-9 439,6 1,1229 493 ,6

STRUCTURA METALICA 2 DESCHIDERI INCLUSIV CONTRAVANTUIRI, PANE,


NCHIDERI PERIMETRALE SI FRONTON HALE METALICE CU PROFILE HEA, HEB, IPE
DESCHIDEREA D = 30 m, NLIME ST LP Hs = 6 M , Hs = 8 M , Hs = 10 M
Hs = 6 m
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 362,1 1,0631 384 , 9
STRUCTURA SUPRASTRUCTURA 2 D 30 H6-6 366,3 1,0769 394 ,5
HEA, HEB, IPE SUPRASTRUCTURA 2 D 30 H6-7 392,5 1,0693 419 ,7
D = 30 M SUPRASTRUCTURA 2 D 30 H6-8 409,8 1,0669 437 ,2
Hs = 6 M SUPRASTRUCTURA 2 D 30 H6-9 443,2 1,0392 460 ,6
Hs = 8 m
TIP SISTEM TIP SUBSISTEM Simbol pre indice cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 362,1 1,0631 384, 9
STRUCTURA SUPRASTRUCTURA 2 D 30 H8-6 372,3 1,0839 403,5
HEA, HEB, IPE SUPRASTRUCTURA 2 D 30 H8-7 392,5 1,0954 429 , 9
D = 30 M SUPRASTRUCTURA 2D 30 H8-8 397,4 1,1098 441,0
Hs = 8 M SUPRASTRUCTURA 2D 30H8-9 432,7 1,0712 463,5
Hs = 10 m
TIP SISTEM TIP SUBSISTEM Simbol pre indice cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA FISMET3020 362,1 1,0631 466 , 9
STRUCTURA SUPRASTRUCTURA 2D30 H10-6 417,0 1,0869 453 ,2
HEA, HEB, IPE SUPRASTRUCTURA 2D 30H10-7 439,6 1,0798 474,7
D = 30 M SUPRASTRUCTURA 2D 30H10-8 445,0 1,1211 498 , 9
Hs = 10 M SUPRASTRUCTURA 2 D 30H10-9 484,6 1,1279 546 ,6

4.1.2.2. HALE METALICE CU 2 DESCHIDERI, DIN EUROPROFILE ZINCATE

STRUCTURI EUROPROFILE ZINCATE CU 2 DESCHIDERI D = 8 m H s = 4 m H s = 5 m


TIP SISTEM TIP SUBSISTEM Simbol pre indice cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2 FIZND810 341,8 1,1194 382 ,6
STRUCTURA SUPRASTRUCTURA 2ZND 8 H 4-6 225,7 0,9983 225 ,3
C , Z, U, I SUPRASTRUCTURA 2ZND 8 H4-7 247,4 0,9885 244,6
D = 2 X 8 M SUPRASTRUCTURA 2ZND 8H4-8 267,8 0,9979 267,2
Hs = 4 M SUPRASTRUCTURA 2ZND 8H4-9 305,9 1,0000 305 , 9
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2FIZND810 341,9 1,1194 382 ,6
STRUCTURA SUPRASTRUCTURA 2ZND 8 H 5-6 243,7 0,9983 243 ,3
c, z, U, Z SUPRASTRUCTURA 2ZND8H5-7 265,4 0,9885 262 ,3
D = 2 X 8 M SUPRASTRUCTURA 2ZND 8 H 5-8 274,3 0,9979 273 ,7
| Hs = 5 M SUPRASTRUCTURA 2ZND 8 H 5-9 313,7 1,0000 313 ,7

STRUCTURI EUROPROFILE ZINCATE CU 2 DESCHIDERI D = 1 0 m H s = 4 m H s = 5 m


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2 FIZND810 ,
341 8 1 , 1194 382 ,6
STRUCTURA SUPRASTRUCTURA 2ZND10H 4-6 220,0 0,9699 213,4 pag.carte: 84
c, Z, U, Z SUPRASTRUCTURA 2ZND10H4-7 239 ,4 0,9649 231,0
D = 2 X 10 M SUPRASTRUCTURA 2ZND10H 4-8 259,8 0,9988 259 ,5
Hs = 4 M SUPRASTRUCTURA 2ZND10H4-9 294,5 1,0004 294,6
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2 FIZND 810 341, 8 1 , 1194 382,6
STRUCTURA SUPRASTRUCTURA 2ZND10H 5-6 235,3 0,9699 228,2
c, z, U, Z SUPRASTRUCTURA 2ZND10H5-7 255,0 0,9649 246,0
D = 2 X 10 M SUPRASTRUCTURA 2ZND10H5-8 275,6 0,9988 275,3
Hs = 5 M SUPRASTRUCTURA 2ZND10H 5-9 311,2 1,0004 311,3

STRUCTURI EUROPROFILE ZINCATE CU 2 DESCHIDERI D = 1 2 m H s = 4 m H s = 5 m


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2FIZND1214 349,3 1,1172 390,2
STRUCTURA SUPRASTRUCTURA 2ZND12 H 4-6 220,6 0,9643 212,7 pag.carte: 84
c, z, U, Z SUPRASTRUCTURA 2ZND12H4-7 238,1 0,9421 224 , 3
D = 2 X 12 M SUPRASTRUCTURA 2ZND12 H 4-8 236,5 0,9289 219 ,7
Hs = 4 M SUPRASTRUCTURA 2ZND12 H 4-9 253,4 0,8515 215 ,8
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2 FIZND1214 349,3 1,1172 390,2
STRUCTURA SUPRASTRUCTURA 2ZND12H 5-6 237,9 0,9026 214,7
C , Z, U, Z SUPRASTRUCTURA 2ZND12H5-7 254,3 0,8881 225,8
D = 2 X 1 2 M SUPRASTRUCTURA 2ZND12H5-8 271,3 0,8708 236 ,2
Hs = 5 M SUPRASTRUCTURA 2ZND12H5-9 304,7 0,8125 247 ,6

STRUCTURI EUROPROFILE ZINCATE CU 2 DESCHIDERI D = 1 4 m H s = 4 m H s = 5 m


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2FIZND1214 349,3 1,1172 390,2
STRUCTURA SUPRASTRUCTURA 2ZND14H 4-6 223,6 0,9682 216 ,5 pag.carte: 85
C, z, u, z SUPRASTRUCTURA 2ZND14H4-7 243,7 0,9300 226 ,6
D = 2 X 14 M SUPRASTRUCTURA 2 ZND14H 4-8 264,4 0,8948 236 ,6
Hs = 4 M SUPRASTRUCTURA 2 ZND14H 4-9 303,2 0,8141 246 ,8
TIP SISTEM TIP SUBSISTEM Simbol pre indice cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2 FIZND1214 349,3 1,1172 390 ,2
STRUCTURA SUPRASTRUCTURA 2ZND14H 5-6 238,9 0,9834 234 , 9
c, Z, U, Z SUPRASTRUCTURA 2ZND14H5-7 248 ,5 0,9892 245 ,8
D = 2 X 14 M SUPRASTRUCTURA 2ZND14H 5-8 277,2 0,9331 258 ,7
Hs = 5 M SUPRASTRUCTURA 2ZND14H 5-9 326,6 0,9380 306 ,4

STRUCTURI EUROPROFILE ZINCATE CU 2 DESCHIDERI D = 1 5 m H s = 4 m H s = 5 m


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2FIZND1214 349,3 1,1172 390,2
STRUCTURA SUPRASTRUCTURA 2 ZND 14 H 4-6 250, 4 0,9758 244 ,3
c, z, U, Z SUPRASTRUCTURA 2ZND14H4-7 272,7 0,9596 261,7
D = 2 X 15 M SUPRASTRUCTURA 2ZND14H4-8 323,4 0,9139 295,6
Hs = 6 M SUPRASTRUCTURA 2ZND14H 4-9 399,3 0,9765 389 , 9
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
CLDIRE carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 2FIZND1214 371,1 1,1172 414 ,6
STRUCTURA SUPRASTRUCTURA 2ZND14H 5-6 323,9 0,9758 316 , 1
c , z, u, z SUPRASTRUCTURA 2ZND14H5-7 338,4 0,9596 324,7
D = 2 X 15 M SUPRASTRUCTURA 2ZND14H 5-8 401,0 0,9140 366 ,5
Hs = 8 M SUPRASTRUCTURA 2ZND14H 5-9 495,1 0,9761 483 ,3

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
4.1.3. ELEMENTE STRUCTURALE EXISTENTE IN INTERIORUL HALEI:
PLANSEU B.A., SCARA METALICA, PUT LIFT MARFA 2 STATII

PLANSEU SUPANTA
TIP SISTEM TIP CONSTRUCIE Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
STRUCTURA PLANSEU SUPANTA PLBHMET 629,9 1,1455 721,6 pag.carte: 86

SCARA METALICA ACCES SUPANTA


TIP SISTEM TIP CONSTRUCIE Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
STRUCTURA SCARA METALICA SCARMET 12.261,7 0,9888 12.124,4

PUT LIFT MARFA CU 2 STATII


TIP SISTEM TIP CONSTRUCIE Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
STRUCTURA PUT LIFT MARFA 2.ST PUTLIFT2ST 32.104,8 1,2795 41.078 , 1

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
4.1.3. STRUCTURI PE CADRE METALICE MULTIETAJATE DIN PROFILE HEA, HEB SI IPE

STRUCTURA PE CADRE METALICE MULTIETAJATE, PLANSEE DIN BETON, LIFT + SCRI ACCES
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
SUPRASTRUCTURA CADREHEA6 719,0 1,0071 724,1 pag. carte: 87
STRUCTURA SUPRASTRUCTURA CADREHEA7 759,7 1,0071 765 ,1
METALICA SUPRASTRUCTURA CADREHEA 8 811,9 1,0071 817,7
SUPRASTRUCTURA CADREHEA9 878,3 1,0071 884,5
STRUCTURA PLANSEE BETON PLANSEESMET 233,8 1,0669 249,4
ELEMENTE STRUCTURALE LIFT +SCARI ACCES
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
ELEMENTE PUT LIFT/ 1 STATIE PUTLIFT 5.322, 2 1,2795 6.809,8
STRUCTURA SCARA/ 1 NIVEL SCARAM ON 2.971,5 0,9706 2.884,1

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
4.2. NCHIDERI DIN PANOURI IZOLATOARE, ALE HALELOR INDUSTRIALE - INVELITORI

4.2.1. INVELITORI DIN PANOURI ISOPAN CU TERMOIZOLATIE DIN POLISTIREN

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN POLISTIREN - GROSIME PANOU DE 40 MM


TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOPAN 40-POLISTIR POLIS-40-8 182,8 1,1042 201 , 8
HALA D = 10 M ISOPAN 40-POLISTIR POLIS-40-10 173,8 1,0542 183 , 2
HALAD = 12 M ISOPAN 40-POLISTIR POLIS-40-12 172,0 1,0449 179 ,7
HALA D = 14 M ISOPAN 40-POLISTIR POLIS-40-14 171,8 1,0377 178 , 3
HALAD = 15 M ISOPAN 40-POLISTIR POLIS-40-15 174,5 1,0171 177 , 5
HALA D = 18 M ISOPAN 40-POLISTIR POLIS-40-18 174,5 1,0171 177 , 5
HALA D = 20 M ISOPAN 40-POLISTIR POLIS-40-20 176,9 0,9889 174, 9
HALA D = 22 M ISOPAN 40-POLISTIR POLIS-40-22 179,6 0,9687 174,0
HALA D = 24 M ISOPAN 40-POLISTIR POLIS-40-24 182,5 0,9489 173 , 2
HALA D = 27 M ISOPAN 40-POLISTIR POLIS-40-27 185 ,2 0,9308 172, 4
HALA D = 30 M ISOPAN 40-POLISTIR POLIS-40-30 188,4 0,9125 171 , 9

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN POLISTIREN - GROSIME PANOU DE 50 MM


TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOPAN 50-POLISTIR POLIS-50-8 183,1 1,1252 206, 0
HALA D = 10 M ISOPAN 50-POLISTIR POLIS-50-10 177,0 1,0559 186, 9
HALA D = 12 M ISOPAN 50-POLISTIR POLIS-50-12 175 ,2 1,0467 183 , 4
HALA D = 14 M ISOPAN 50-POLISTIR POLIS-50-14 175,0 1,0397 181 , 9
HALA D = 15 M ISOPAN 50-POLISTIR POLIS-50-15 177,7 1,0194 181 , 1
HALA D = 18 M ISOPAN 50-POLISTIR POLIS-50-18 177,7 1,0096 179, 4
HALA D = 20 M ISOPAN 50-POLISTIR POLIS-50-20 180,1 0,9917 178 , 6
HALA D = 22 M ISOPAN 50-POLISTIR POLIS-50-22 182,8 0,9718 177 , 6
HALA D = 24 M ISOPAN 50-POLISTIR POLIS-50-24 185 ,7 0,9523 176, 8
HALA D = 27 M ISOPAN 50-POLISTIR POLIS-50-27 188,4 0,9387 176, 9
HALA D = 30 M ISOPAN 50-POLISTIR POLIS-50-30 191,6 0,9163 175, 6

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN POLISTIREN - GROSIME PANOU DE 60 MM


TIP TIP SUBSISTEM Simbol pre indice cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D =8M ISOPAN 60 -POLISTIR -
POLIS 60 8 - 189 , 2 1 ,1302 208, 4
HALA D = 10 M ISOPAN 60 -POLISTIR -
POLIS 60 10- 184 , 4 1 ,0498 191 , 7
HALA D = 12 M ISOPAN 60 -POLISTIR -
POLIS 60 12- 182 , 6 1 ,0409 189, 9
HALA D = 14 M ISOPAN 60 -POLISTIR -
POLIS 60 14- 182 , 4 1 ,0342 191 , 4
HALA D = 15 M ISOPAN 60 -POLISTIR -
POLIS 60 15- 185 , 1 1 ,0148 187,8
HALA D = 18 M ISOPAN 60 -POLISTIR -
POLIS 60 18- 185 , 1 1 ,0054 188, 5
HALA D = 20 M ISOPAN 60 -POLISTIR -
POLIS 60 20- 187 , 5 0,9882 188, 0
HALA D = 22 M ISOPAN 60 -POLISTIR -
POLIS 60 22- 190 , 2 0,9692 187, 2
HALA D = 24 M ISOPAN 60 -POLISTIR -
POLIS 60 24- 193, 2 0,9500 186,1
HALA D = 27 M ISOPAN 60 -POLISTIR -
POLIS 60 27- 195 , 9 0,9328 185, 6
HALA D = 30 M ISOPAN 60 -POLISTIR -
POLIS 60 30- 199 , 0 0,9151 182,1

-
INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN POLISTIREN GROSIME PANOU DE 80 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte -
2016 2017 2016 2017 -
HALA D = 8 M -
ISOPAN 80 POLISTIR -
POLIS 80 8 -
199 , 7 1,1386 227, 4
HALAD = 10 M -
ISOPAN 80 POLISTIR -
POLIS 80 10 -194 9
, 1 ,0546 205, 5
HALA D = 12 M -
ISOPAN 80 POLISTIR -
POLIS 80 12 -193, 1 1 ,0454 201 , 9
HALAD = 14 M -
ISOPAN 80 POLISTIR -
POLIS 80 14 -192 , 9 1,0391 200 , 4
HALA D = 15 M -
ISOPAN 80 POLISTIR -
POLIS 80 15 -195 , 6 1 ,0215 199,8
HALAD = 18 M -
ISOPAN 80 POLISTIR -
POLIS 80 18 -195 , 6 1,0117 197, 9
HALA D = 20 M -
ISOPAN 80 POLISTIR -
POLIS 80 20 -199 , 2 1 ,0076 200 , 7
HALA D = 22 M -
ISOPAN 80 POLISTIR -
POLIS 80 22 -200 , 7 0,9846 197, 6
HALA D = 24 M -
ISOPAN 80 POLISTIR -
POLIS 80 24 -202 , 9 0,9733 197, 5
HALA D = 27 M -
ISOPAN 80 POLISTIR -
POLIS 80 27 -206 , 4 0,9433 194, 7
HALA D = 30 M -
ISOPAN 80 POLISTIR -
POLIS 80 30 -209 ,5 0,9263 194,1

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN -


POLISTIREN GROSIME PANOU DE 100 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte - -
2016 2017 2016 2017
= -
HALA D 8 M ISOP.100 SPUMPOLIURET SP.URETAN 100 8 - - 236 ,8 1 ,0154 240 , 4
= -
HALA D 10 M ISOP.100 SPUMPOLIURET SP. URETAN 100 10 - - 230 ,5 0,9408 216, 9
= -
HALA D 12 M ISOP.100 SPUMPOLIURET SP. URETAN 100 12 - - 227 ,8 0,9366 213, 4
= -
HALA D 14 M ISOP.100 SPUMPOLIURET SP. URETAN 100 14 - - 226 , 6 0,9352 211 , 9
= -
HALA D 15 M ISOP.100 SPUMPOLIURET SP. URETAN 100 15 - - 229 , 0 0,9219 211 ,1
= -
HALA D 18 M ISOP.100 SPUMPOLIURET SP. URETAN 100 18 - - 229 , 0 0,9142 209, 4
= -
HALA D 20 M ISOP.100 SPUMPOLIURET SP. URETAN 100 20 - - 230 , 3 0,9049 208, 4
= -
HALA D 22 M ISOP.100 SPUMPOLIURET SP. URETAN 100 22 - - 232 ,5 0,8923 207, 5
HALA D = 24 M ISOP.100-SPUMPOLIURET SP.URETAN-100-24 236,7 0,8731 206,7
HALA D = 27 M ISOP.100-SPUMPOLIURET SP.URETAN-100-27 238,9 0,8623 206, 0
HALA D = 30 M ISOP.100-SPUMPOLIURET SP.URETAN-100-30 240,4 0,8550 205, 5

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN POLISTIREN - GROSIME PANOU DE 120 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOP.100-SPUMPOLIURET SP.URETAN-120-8 250,2 1,0812 270, 5
HALAD = 10 M ISOP.100-SPUMPOLIURET SP.URETAN-120-10 243,7 0,9420 229 , 6
HALA D = 12 M ISOP.100-SPUMPOLIURET SP.URETAN-120-12 240,8 0,9388 226, 1
HALAD = 14 M ISOP.100-SPUMPOLIURET SP.URETAN-120-14 242,6 0,9252 224, 5
HALA D = 15 M ISOP.100-SPUMPOLIURET SP.URETAN-120-15 242,1 0,9245 223 , 8
HALAD = 18 M ISOP.100-SPUMPOLIURET SP.URETAN-120-18 242,1 0,9173 222, 1
HALA D = 20 M ISOP.100-SPUMPOLIURET SP.URETAN-120-20 243,4 0,9085 221 , 1
HALA D = 22 M ISOP.100-SPUMPOLIURET SP.URETAN-120-22 245 ,6 0,8964 220, 2
HALA D = 24 M ISOP.100-SPUMPOLIURET SP.URETAN-120-24 247,5 0,8863 219,4
HALA D = 27 M ISOP.100-SPUMPOLIURET SP.URETAN-120-27 250,4 0,8735 218 ,7
HALA D = 30 M ISOP.100-SPUMPOLIURET SP.URETAN-120-30 253,3 0,8610 218 , 1

4.2.2. INVELITORI DIN PANOURI ISOPAN CU TERMOIZOLATIE DIN SPUMA POLIURETANICA

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN SPUMA POLIURETANICA - GROSIME PANOU DE 40 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOP.40-SPUMPOLIURET SP.URETAN-40-8 189,8 1,1256 213 , 6
HALA D = 10 M ISOP.40-SPUMPOLIURET SP.URETAN-40-10 184,3 1,0519 193 , 9
HALA D = 12 M ISOP.40-SPUMPOLIURET SP.URETAN-40-12 181,9 1,0465 190, 4
HALA D = 14 M ISOP.40-SPUMPOLIURET SP.URETAN-40-14 181,4 1,0406 188 , 8
HALA D = 15 M ISOP.40-SPUMPOLIURET SP.URETAN-40-15 183,9 1,0230 188, 1
HALA D = 18 M ISOP.40-SPUMPOLIURET SP.URETAN-40-18 183,9 1,0135 186, 4
HALA D = 20 M ISOP.40-SPUMPOLIURET SP.URETAN-40-20 185,7 0,9916 184, 1
HALA D = 22 M ISOP.40-SPUMPOLIURET SP.URETAN-40-22 188,2 0,9759 183 ,7
HALA D = 24 M ISOP.40-SPUMPOLIURET SP.URETAN-40-24 190 9
, 0 9621
, 183 ,7
HALA D = 27 M ISOP.40-SPUMPOLIURET SP.URETAN-40-27 193,5 0,9459 183 , 0
HALA D = 30 M ISOP.40-SPUMPOLIURET SP.URETAN-40-30 196,7 0,9281 182, 6

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN SPUMA POLIURETANICA - GROSIME PANOU DE 50 MM
~~
| TIP | TIP SUBSISTEM [ Simbol | pre | indice | cost curent |
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOP.50-SPUMPOLIURET SP.URETAN-50-8 199,9 1,1181 223 , 5
HALA D = 10 M ISOP.50-SPUMPOLIURET SP.URETAN-50-10 193,8 1,0448 202, 5 pag.carte: 92
HALA D = 12 M ISOP.50-SPUMPOLIURET SP.URETAN-50-12 191,1 1,0403 198 , 8
HALA D = 14 M ISOP.50-SPUMPOLIURET SP.URETAN-50-14 190,5 1,0361 197 , 4
HALA D = 15 M ISOP.50-SPUMPOLIURET SP.URETAN-50-15 192,9 1,0191 196, 6
HALAD = 18 M ISOP.50-SPUMPOLIURET SP.URETAN-50-18 192,9 1,0100 194, 8
HALA D = 20 M ISOP.50-SPUMPOLIURET SP.URETAN-50-20 194,3 0,9986 194, 0
HALA D = 22 M ISOP.50-SPUMPOLIURET SP.URETAN-50-22 196,7 0,9816 193 , 1
HALA D = 24 M ISOP.50-SPUMPOLIURET SP.URETAN-50-24 199,4 0,9643 192, 3
HALA D = 27 M ISOP.50-SPUMPOLIURET SP.URETAN-50-27 201,8 0,9491 191 , 5
HALA D = 30 M ISOP.50-SPUMPOLIURET SP.URETAN-50-30 204,2 0,9354 191 , 0

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN SPUMA POLIURETANICA - GROSIME PANOU DE 60 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOP.60-SPUMPOLIURET SP.URETAN-60-8 206,1 1,1178 230,4
HALA D = 10 M ISOP.60-SPUMPOLIURET SP.URETAN-60-10 200,2 1,0408 208 , 4
HALAD = 12 M ISOP.60-SPUMPOLIURET SP.URETAN-60-12 197,6 1,0368 204, 9
HALA D = 14 M ISOP.60-SPUMPOLIURET SP.URETAN-60-14 197,0 1,0399 204, 9
HALAD = 15 M ISOP.60-SPUMPOLIURET SP.URETAN-60-15 199,4 1,0202 203 , 4
HALA D = 18 M ISOP.60-SPUMPOLIURET SP.URETAN-60-18 199,4 1,0162 202, 6
HALA D = 20 M ISOP.60-SPUMPOLIURET SP.URETAN-60-20 201,0 0,9994 200, 9
HALA D = 22 M ISOP.60-SPUMPOLIURET SP.URETAN-60-22 203,4 0,9790 199, 1
HALA D = 24 M ISOP.60-SPUMPOLIURET SP.URETAN-60-24 206,1 0,9623 198, 3
HALA D 27 M
= ISOP. -
60 SPUMPOLIURET SP.URETAN-60-27 208,5 0,9474 197 , 5
HALA D = 30 M ISOP.60-SPUMPOLIURET SP.URETAN-60-30 211,5 0,0317 6, 7

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN SPUMA POLIURETANICA - GROSIME PANOU DE 80 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOP.80-SPUMPOLIURET SP.URETAN-80-8 224,6 1,1194 251 ,4
HALA D = 10 M ISOP.80-SPUMPOLIURET SP.URETAN-80-10 218,2 1,0390 226,7
HALA D = 12 M ISOP.80-SPUMPOLIURET SP.URETAN-80-12 215,3 1,0367 223 , 2
HALA D = 14 M ISOP.80-SPUMPOLIURET SP.URETAN-80-14 214,5 1,0339 221 , 8
HALA D = 15 M ISOP.80-SPUMPOLIURET SP.URETAN-80-15 216,8 1,0192 221 , 0
HALA D = 18 M ISOP.80-SPUMPOLIURET SP.URETAN-80-18 216,8 1,0111 219, 2
HALA D = 20 M ISOP.80-SPUMPOLIURET SP.URETAN-80-20 218,0 1,0019 218 , 4
HALA D = 22 M ISOP.80-SPUMPOLIURET SP.URETAN-80-22 220,4 0,9867 217 , 5
HALA D = 24 M ISOP.80-SPUMPOLIURET SP.URETAN-80-24 222,3 0,9746 216,7
HALA D = 27 M ISOP.80-SPUMPOLIURET SP.URETAN-80-27 225 ,4 0,9577 215, 9
HALA D = 30 M ISOP.80-SPUMPOLIURET SP.URETAN-80-30 228,4 0,9395 214, 6

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN SPUMA POLIURETANICA - GROSIME PANOU DE 100 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOP.100-SPUMPOLIURET SP.URETAN-100-8 236,8 1,1290 267 , 3
HALA D = 10 M ISOP.100-SPUMPOLIURET SP.URETAN-100-10 230,5 1,0444 240,7
HALAD = 12 M ISOP.100-SPUMPOLIURET SP.URETAN-100-12 227,8 1,0414 237 , 2
HALA D = 14 M ISOP.100-SPUMPOLIURET SP.URETAN-100-14 226,6 1,0398 235,6
HALAD = 15 M ISOP.100-SPUMPOLIURET SP.URETAN-100-15 229,0 1,0262 235, 0
HALA D = 18 M ISOP.100-SPUMPOLIURET SP.URETAN-100-18 229,0 1,0185 233 , 2
HALA D = 20 M ISOP.100-SPUMPOLIURET SP.URETAN-100-20 230,0 1,0086 232, 0
HALA D = 22 M ISOP.100-SPUMPOLIURET SP.URETAN-100-22 232,5 0,9949 231 , 3
HALA D = 24 M ISOP.100-SPUMPOLIURET SP.URETAN-100-24 236,7 0,9739 230, 5
HALA D = 27 M ISOP.100-SPUMPOLIURET SP.URETAN-100-27 238,9 0,9623 229, 9
HALA D = 30 M ISOP.100-SPUMPOLIURET SP.URETAN-100-30 240,4 0,9497 228 , 3

INVELITOARE DIN PANOURI IZOLATOARE CU TERMOIZOLATIE DIN SPUMA POLIURETANICA - GROSIME PANOU DE 120 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA D = 8 M ISOP.120-SPUMPOLIURET SP.URETAN-120-8 250,2 1,1278 282, 2
HALA D = 10 M ISOP.120-SPUMPOLIURET SP.URETAN-120-10 243,7 1,0408 253 , 6
HALA D = 12 M ISOP.120-SPUMPOLIURET SP.URETAN-120-12 240,8 1,0388 250, 1
HALA D = 14 M ISOP.120-SPUMPOLIURET SP.URETAN-120- 14 242,6 1,0251 248,7
HALA D = 15 M ISOP.120-SPUMPOLIURET SP.URETAN-120- 15 242,1 1,0167 246, 1
HALA D = 18 M ISOP.120-SPUMPOLIURET SP.URETAN-120- 18 242,1 1,0134 245, 3
HALA D = 20 M ISOP.120-SPUMPOLIURET SP.URETAN-120-20 243,4 1,0041 244, 4
HALA D = 22 M ISOP.120-SPUMPOLIURET SP.URETAN-120-22 245,6 0,9918 243 , 6
HALA D = 24 M ISOP.120-SPUMPOLIURET SP.URETAN-120-24 247,5 0,9728 240, 8
HALA D = 27 M ISOP.120-SPUMPOLIURET SP.URETAN-120-27 250 , 4 0 9697
, 242, 8
HALA D = 30 M ISOP.120-SPUMPOLIURET SP.URETAN-120-30 253,3 0,9567 242, 3

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
4.3. NCHIDERI PERIMETRALE CU PANOURI IZOLATOARE ALE HALELOR INDUSTRIALE
( PEREI EXTERIORI)

4.3.1. PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIE DIN POLISTIREN

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN POLISTIREN - GROSIME PANOU DE 40 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOPAN 40-POLISTIR POLIS-40-4 146,3 1,0238 149, 8
HALA H = 5 M ISOPAN 40-POLISTIR POLIS-40-5 142,5 1,0312 146 , 9 pag.carte: 96
HALA H = 6 M ISOPAN 40-POLISTIR POLIS-40-6 141,4 1,0387 146 , 9
HALA H = 8 M ISOPAN 40-POLISTIR POLIS-40-8 139,0 1,0378 144,3
HALAH = 10 M ISOPAN 40-POLISTIR POLIS-40-10 139,3 1,0370 144, 5

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN POLISTIREN - GROSIME PANOU DE 50 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOPAN 50-POLISTIR POLIS-50-4 154,3 0,9867 152 , 2
HALA H = 5 M ISOPAN 50-POLISTIR POLIS-50-5 149,5 1,0103 151 , 0 pag.carte: 96
HALA H = 6 M ISOPAN 50-POLISTIR POLIS-50-6 147,9 1,0339 152 , 9
HALA H = 8 M ISOPAN 50-POLISTIR POLIS-50-8 144,7 1,0246 148 ,3
HALAH = 10 M ISOPAN 50-POLISTIR POLIS-50-10 144,7 1,0153 146 , 9

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN POLISTIREN - GROSIME PANOU DE 60 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOPAN 60-POLISTIR POLIS-60-4 159,7 0,9769 156 , 0
HALA H = 5 M ISOPAN 60-POLISTIR POLIS-60-5 154 9
, 0 9877
, 153 , 0 pag.carte: 96
HALA H = 6 M ISOPAN 60-POLISTIR POLIS-60-6 153,3 0,9986 153 ,1
HALA H = 8 M ISOPAN 60-POLISTIR POLIS-60-8 150,1 1,0012 150 ,3
HALAH = 10 M ISOPAN 60-POLISTIR POLIS-60-10 150,1 1,0038 150 ,7

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN POLISTIREN - GROSIME PANOU DE 80 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOPAN 80-POLISTIR POLIS-80-4 168,3 0,9965 167 ,7
HALA H = 5 M ISOPAN 80-POLISTIR POLIS-80-5 163,4 1,0197 166 , 6 pag.carte: 97
HALA H = 6 M ISOPAN 80-POLISTIR POLIS-80-6 161,6 1,0430 168 , 5
HALA H = 8 M ISOPAN 80-POLISTIR POLIS-80-8 158,3 1,0364 164, 1
HALAH = 10 M ISOPAN 80-POLISTIR POLIS-80-10 158,1 1,0299 162 , 8

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN POLISTIREN - GROSIME PANOU DE 100 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOPAN 100-POLISTIR POLIS-100-4 186,2 1,0319 192 ,1
HALA H = 5 M ISOPAN 100-POLISTIR POLIS-100-5 180,9 1,0441 188 , 9 pag.carte: 97
HALA H = 6 M ISOPAN 100-POLISTIR POLIS-100-6 179,0 1,0564 189,1
HALA H = 8 M ISOPAN 100-POLISTIR POLIS-100-8 175,3 1,0614 186 ,1
HALAH = 10 M ISOPAN 100-POLISTIR POLIS-100-10 175,0 1,0665 186 , 6

-
PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN POLIS riREN GROSIME PANOU D E 120 MM
'

TIP TIP SUBSISTEM Simbol pre cost curent


CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOPAN 120-POLISTIR POLIS-120-4 202,4 1,0860 219, 8
HALA H = 5 M ISOPAN 120-POLISTIR POLIS-120-5 196,7 1,0998 216 ,3 pag.carte: 97
HALA H = 6 M ISOPAN 120-POLISTIR POLIS-120-6 194,6 1,1137 216 ,7
HALA H = 8 M ISOPAN 120-POLISTIR POLIS-120-8 190,6 1,1203 213 , 5
HALAH = 10 M ISOPAN 120-POLISTIR POLIS-120-10 190,1 1,1270 214,2

4.3.2. PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIE DIN SPUMA POLIURETANICA

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN SPUMA POLIURETANICA - GROSIME PANOU DE 40 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOP.40-SPUMPOLIURET SP.URETAN-40-4 171,0 0,9693 165 , 8
HALA H = 5 M ISOP.40-SPUMPOLIURET SP.URETAN-40-5 165,3 0,9868 163 ,1 pag.carte: 98
HALA H = 6 M ISOP. 40-SPUMPOLIURET SP.URETAN-40-6 162,9 1,0044 163 , 6
HALA H = 8 M ISOP. 40-SPUMPOLIURET SP.URETAN-40-8 158,9 1,0207 162 , 2
HALAH = 10 M ISOP. 40-SPUMPOLIURET SP.URETAN-40-10 158,3 1,0370 164, 2

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN SPUMA POLIURETANICA - GROSIME PANOU DE 50 MM
TIP TIP SUBSISTEM Simbol pre indice cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOP.50-SPUMPOLIURET SP.URETAN-50-4 179,8 0,9567 172 , 0
HALA H = 5 M ISOP.50-SPUMPOLIURET SP.URETAN-50-5 173,0 0,9760 168 , 8 pag.carte: 98
HALA H = 6 M ISOP.50-SPUMPOLIURET SP.URETAN-50-6 169,9 0,9953 169, 1
HALA H = 8 M ISOP.50-SPUMPOLIURET SP.URETAN-50-8 165,1 1,0386 171, 5
HALAH = 10 M ISOP.50-SPUMPOLIURET SP.URETAN-50-10 164,0 1,0820 177, 4

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN SPUMA POLIURETANICA - GROSIME PANOU DE 60 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOP.60-SPUMPOLIURET SP.URETAN-60-4 186,2 0,9599 178 ,7
HALA H = 5 M ISOP.60-SPUMPOLIURET SP.URETAN-60-5 179,3 0,9783 175 , 4 pag.carte: 98
HALA H = 6 M ISOP.60-SPUMPOLIURET SP.URETAN-60-6 176,4 0,9967 175 , 8
HALA H = 8 M ISOP.60-SPUMPOLIURET SP.URETAN-60-8 171,5 1,0071 172 ,7
HALAH = 10 M ISOP.60-SPUMPOLIURET SP.URETAN-60-10 170,4 1,0176 173 , 4

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN SPUMA POLIURETANICA - GROSIME PANOU DE 80 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOP.80-SPUMPOLIURET SP.URETAN-80-4 211,8 0,9689 205 , 2
HALA H = 5 M ISOP.80-SPUMPOLIURET SP.URETAN-80-5 204,3 0,9894 202 ,1 pag.carte: 99
HALA H = 6 M ISOP.80-SPUMPOLIURET SP.URETAN-80-6 200,3 1,0100 202 ,3
HALA H = 8 M ISOP.80-SPUMPOLIURET SP.URETAN-80-8 194,3 1,0253 199, 2
HALAH = 10 M ISOP.80-SPUMPOLIURET SP.URETAN-80-10 192,5 1,0407 200 ,3

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN SPUMA POLIURETANICA - GROSIME PANOU DE 100 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOP.100-SPUMPOLIURET SP.URETAN-100-4 216,3 1,0055 217 , 5
HALA H = 5 M ISOP.100-SPUMPOLIURET SP.URETAN-100-5 209 0
, 1 ,0242 214 ,1 pag.carte: 99
HALA H = 6 M ISOP.100-SPUMPOLIURET SP.URETAN-100-6 205,6 1,0430 214, 4
HALA H = 8 M ISOP.100-SPUMPOLIURET SP.URETAN-100-8 200,2 1,0518 210 , 6
HALAH = 10 M ISOP.100-SPUMPOLIURET SP.URETAN-100-10 198,9 1,0607 211, 0

PEREI EXTERIORI DIN PANOURI ISOPAN CU TERMOIZOLATIA DIN SPUMA POLIURETANICA - GROSIME PANOU DE 120 MM
TIP TIP SUBSISTEM Simbol pre cost curent
CL DIRE carte 2016 - 2017 2016 - 2017
HALA H = 4 M ISOP.120-SPUMPOLIURET SP.URETAN-120-4 222,7 1,0747 239,3
HALA H = 5 M ISOP.120-SPUMPOLIURET SP.URETAN-120-5 215,8 1,0930 235 , 9 pag.carte: 99
HALA H = 6 M ISOP.120-SPUMPOLIURET SP.URETAN-120-6 212,6 1,1113 236 ,3
HALA H = 8 M ISOP.120-SPUMPOLIURET SP.URETAN-120-8 207,7 1,1214 232 , 9
| HALA H = 10 M ISOP.120-SPUMPOLIURET SP.URETAN-120-10 206,6 1,1315 233 , 8 |

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
4.4. FERESTRE SI USI ALE HALELOR INDUSTRIALE

ELEMENTE FINISAJ EXTERIOR LA INVELITORI SI PEREI DIN PANOURI IZOLATOARE


TIP TIP ELEMENTE Simbol pre cost curent
SUBSISTEM SUBSISTEM carte 2016 - 2017 2016 - 2017
NCHIDERI TRAPE DE FUM 1,0 X 1,0 TRAPFUM 1 3.765,5 0,9803 3.691 , 3
ACOPERI TRAPE DE FUM 2,0 X 1,0 TRAPFUM 2 4.651,5 0,9803 4.559, 9
USI AUTO 2500X2500 UAUTO-2525 4.452,2 0,9893 4.404, 6
NCHIDERI USI AUTO 2500X 3000 UAUTO-2530 5.231,8 0,9803 5.128 ,7
PEREI USI AUTO 3000X 3000 UAUTO-3030 5.869,8 0,9803 5.754, 2
EXTERIORI USI AUTO 3500X 3000 UAUTO-3530 6.334,9 0,9803 6.210, 1
KIT ACTION EL.USA AUTO KITELECTRIC 1.329,0 0,9803 1.302, 8

TAMPLARIE SI COPERTINE LA INVELITORI SI PEREI DIN PANOURI IZOLATOARE


TIP TIP ELEMENTE Simbol pre cost curent
SUBSISTEM SUBSISTEM carte 2016 - 2017 2016 - 2017
NCHIDERI LUMINATOARE FIXE LUMINAFIX 171,0 1,0180 174, 1
ACOPERI LUMINATOARE MOBILE LUMINAMOBIL 340,2 1,0180 346, 3
FERESTRE FIXE FERPVCFIX 36,0 1,0180 36 , 6
NCHIDERI FERESTRE FIXE + MOBILE FERPVCFIX/MOBIL 170,6 1,0180 173 , 7
PEREI FERESTRE MOBILE FERPVCMOBIL 429,3 1,0180 437 , 0
EXTERIORI USI DUBLE ACCES USIDUBLEACCES 497,5 1,0180 506, 5
COPERT.POLICARBONAT COPERT-POLIC. 229,5 1,0180 233 , 6

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
4.5. COMPARTIMENT RI INTERIOARE LA CLDIRI CU STRUCTURI METALICE
DIN PROFILE HEA, HEM SI HEB

COMPATIMENTARI INTERIOARE LA CLDIRE CU STRUCTURA PE CADRE METALICE DE TIP HEA, HEM , HEB
TIP TIP ELEMENTE Simbol pre cost curent
SUBSISTEM SUBSISTEM carte 2016 - 2017 2016 - 2017
BCA 20 CM SI 10 CM COMPBCA 39,9 1,1796 47 , 1
BCA+ZID CAR. 20 CM SI 12,5 CM COMPBCAZ 54,0 1,1813 63 , 8
POROTHERM 20 CM SI 10 CM COMPORO 58,5 1,2440 72, 8
RIGIPS EXCL.FIN. ALB/ALB+ALB/VERDE COMPRIGI 29,2 1,2346 36, 1
TAVAN UOR ARMSTRONG TRIGSUST 183,6 0,9889 181 , 6
PERETE PANOU ISOPAN 40-POLISTIR CAO MPART-40 146,3 1,0238 149 , 8
DE TIP ISOPAN 50-POLISTIR CAO MPART-50 154,3 0,9867 152,2
ISOPAN ISOPAN 60-POLISTIR CAO MPART-60 159,7 0,9769 156,0
TAVAN ISOPAN 40-POLISTIR TAVAN-40 136,6 0,9125 124,6
DE TIP PANOU ISOPAN 50-POLISTIR TAVAN-50 144,7 0,9163 132 , 6
ISOPAN ISOPAN 60-POLISTIR TAVAN-60 150,0 0,9159 137 , 4

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
4.6. FINISAJUL INTERIOR AL HALELOR INDUSTRIALE CU STRUCTURI METALICE DIN PROFILE HEA, HEM SI HEB

FINISAJ INTERIOR HALE INDUSTRIALE - ZONA PRODUCIE, BIROURI, VESTIARE, DEPOZITE


TIP TIP FINISAJ AFERENT Simbol pre cost curent
SUBSISTEM DESTINAIE FUNC IONALA carte 2016 - 2017 2016 - 2017
FINISAJ FIN.HALA EXCL.PARDOS FINHALPROD 135,6 1,1321 153 , 5 pag.carte: 103
INTERIOR HALA
FIN. BIROURI.MAI TRII FINBIROUMAISTRU 606 ,4 1,0347 627 ,4
INDUSTRIALA FIN. VESTIARE IN HALA FINVESTIAR 458,2 1,0788 494,3
FIN. DEP.EXCL.PARDOS. FINDEPHAL 132,7 1,0696 141,9

PARDOSELI IN HALE INDUSTRIALE - ZONA PRODUCIE


TIP TIP FINISAJ AFERENT Simbol pre cost curent
SUBSISTEM DESTINAIE FUNC IONALA carte 2016 - 2017 2016 - 2017
FINISAJ PARD REZ.U.HALA PARDHALA 152,8 0,9844 150,4 pag.carte: 103
HALA PARD.MED.AGRESIV PARDAGRES 462,5 1,0115 467,8
INDUSTRIALA PARD.TRAFIC INTENS PARDTRAF 413,7 0,9911 410,0
PARD.REZ.UMEZEAL PARDHIDR 395,3 0,7821 309,2

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
4.7. INSTALAII FUNCIONALE ALE HALELOR INDUSTRIALE

INSTALAII ELECTRICE DE ILUMINAT SI PRIZE MONOFAZATE LA HALE CU H = 4-6 M SI H = 6-10 M CU SI FARA FERESTRE
TIP TIP ELEMENT SUBSISTEM Simbol pre cost curent
SUBSISTEM ZONA FER. SI ZONA OPACA carte 2016 - 2017 2016 - 2017
INSTALA II ILUM+PRIZE+FER. H=4-6 M EL 1DZN 30,8 1,0269 31,6 pag.carte: 105
ELECTRICE ILUM+PRIZE+OPAC H=4-6 M ELTIMAHALA 48 ,9 1, 0599 51 , 8
FUNC IONALE ILUM +PRIZE+FER. H=6-10 M ELHALAC 57,8 1,0322 59,7
ILUM +PRIZE H=6-10 OPAC ELPR200 92,4 0,9541 88,2

INSTALAII SANITARE FUNC IONALE AFERENTE HALA, BIROURI SI VESTIARE


TIP TIP ELEMENT SUBSISTEM Simbol pre cost curent
SUBSISTEM ZONA FER. SI ZONA OPACA carte 2016 - 2017 2016 - 2017
INSTALA II AFER. HALA SATIMALA 93,2 1,0092 94,1 pag.carte: 105
SANITARE AFER. BIROURI HALA LAWC 356, 1 1,0311 367 , 2
FUNC IONALE AFER. VESTIARE BARB. VESTBARB 269,0 1,1447 307 , 9
AFER. VESTIARE FEMEI VESTFEMEI 227,5 1,1039 251 , 1

INSTALAII NCLZIRE FUNCIONALE AFERENTE HALA, BIROURI SI VESTIARE


TIP TIP ELEMENT SUBSISTEM Simbol pre cost curent
SUBSISTEM ZONA FER. SI ZONA OPACA carte 2016 - 2017 2016 - 2017
AFERENTE HALA H = 4 M INCHAL4 23,3 1,0131 23 , 6 pag.carte: 105
INSTALA II AFERENTE HALA H = 5 M INCHAL5 32,7 1,0131 33,1
NCLZIRE AFERENTE HALA H = 6 M INCHAL6 45 ,6 1,0131 46,2
FUNC IONALE AFERENTE HALA H = 8 M INCHAL8 75,1 1,0131 76,1
AFERENTE HALA H = 10 M INCHAL10 96,9 1,0131 98,2
AFER.BIROU+VESTIAR INCCONV 117,5 1,0043 118 , 0

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
5.1. STRUCTURI DIN LEMN REALIZATE IN SISTEM MiTek - MULTICUI

STRUCTURA CASA LEMN INCLUSIV NCHIDERILE DIN OSB SI VATA MINERALA+SARPANTA TIP MiTek

CASA LEMN PARTER+MANSARDA CU ARPANTA LEMN SISTEM MiTek


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
INFRASTRUCTURA 414,1 1,1045 457 ,4
STRUCTURA STRUCT.LEMN PARTER STRUCALEMN 397,8 1,0013 398 ,3 pag.carte: 114
ARPANTA MiTek SARPMITEK 83,5 1,0181 85,0
TOTAL STRUCTURA 895,4
FINISAJ FINISAJ OBINUIT FOBFSCL 580,5 0,9921 575 , 9
FINISAJ SUPERIOR FSUPFSCL 1.023,5 0,9308 952 ,6
INVELITOARE INVELITOARE LINDAB INVLINDAB 133,6 1,1335 151,4

INSTALA II .
INST ELECTRICE FUNCT . ELINGRCL 84,9 1,0529 89 ,4
FUNCTION. INST. NC LZIRE FUNCT. INCCONVCL 107,4 0,9884 106,2

TIP SISTEM TIP SUBSISTEM pre


Simbol cost curent
carte 2016 - 2017 2016 - 2017
FINSAJ STR.SCARA + FINISAJ SCASTEJACL 12.756,0 0,9262 11.814, 6
SANITARE INST.SANITARE PARTER CHINOX+LAWC 3.135 ,4 0,8981 2.815, 9
FUNCTION. INST.SANITARE MANS. CALAWC 3.634,9 1,1612 4.220, 8

CLDIRE AGRICOLA DIN LEMN CU CADRE TIP MiTek

STRUCTURA CLDIRE AGRICOLA DIN LEMN CU CADRE MiTek


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
ELEMENT DESCHIDERE 15 M FCADRU15 151,9 1,0181 154,6
CADRU DESCHIDERE 20 M FCADRU20 170,5 1,0181 173 ,6
FERMA DESCHIDERE 25 M FCADRU25 189,2 1,0181 192 ,6
MITEK DESCHIDERE 30 M FCADRU 30 219,7 1,0181 223 ,7
ASTEREALA
ELEMENT ASTEREALA ASTEREALA 57,5 1,0946 62 , 9
STRUCTURA PEREI HALA INCLUSIV OSB
ELEMENT PEREI EXTER.HALA PERETI3,0 59,1 1,0499 62 ,0

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
5.2. STRUCTURA MANSARDA CU LUCARNE REALIZATA IN SISTEM MiTek

STRUCTURA MANSARDA SISTEM MiTek


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
STRUCTURA MANSARDA TIP MITEK MANSLUCARN 346,7 1,0276 356 ,3 pag.carte: 116
SUPORT PARDOSELI
SUPORT 2 PLACI OSB 18 MM DUBLUOSB18 92,7 0,8951 83 , 0
PARDOS. DULAPI ECARISATI 50 MM DULAPI 79,1 1,0662 84, 3

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
5.3. FERME CIRCULARE DIN LEMN EXECUTATE IN SISTEM MiTek - MULTICUI
SI INVELITORI METALICE

FERMA CIRCULARA SISTEM MiTek + ASTEREALA + INVELITORI


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
ELEMENT DESCHIDERE 15,0 M FCIRCULAR15 172,4 1,0181 175,5
FERMA DESCHIDERE 20,0 M FCIRCULAR20 190,9 1,0181 194,4
CIRCULARA DESCHIDERE 25,0 M FCIRCULAR25 208,0 1,0181 211,8
MITEK DESCHIDERE 31,25 M FCIRCULAR32 218, 1 1,0181 222,0
ASTEREALA
ELEMENT ASTEREALA ASTEREALA 57,5 1,0946 62, 9
INVELITORI
SUBSISTEM TABLA OND.VOPS.+VATA M.100 MM INVTOVM10 95,7 1,0433 99 ,8
INVELITORI TABLA OND.VOPS.+VATA M.50 MM INVTOVM 5 79,2 1,0433 82,6
PE SUPRAF. TABLA PLANA ZINCATA FARA VATA INVZINCATA 50,5 1,0433 52,7
CURBATE TABLA ARAL 0,7 MM +VATA M.100 MM ARALVM 10 168, 1 1,0433 175,4

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
6.1. ZIDURI DE SPRIJIN PENTRU CONSOLIDAREA TERENURILOR

ZIDURI DE SPRIJIN DIN BETON ARMAT


TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
ZID S. B. A. NLIME 1M ZIDSP1M 646,4 0,9769 631,5 pag.carte: 122
ZID SPRIJIN ZID S. B. A . NLIME 1,5M ZIDSP1.5M 1.154,6 0,9769 1.127 ,9
BETON ARMAT ZID S. B.A . NLIME 2 M ZIDSP 2M 1.662,3 0,9769 1.623 ,9
ZID S. B.A . NLIME 2 , 5 M ZIDSP2.5M 2.170,5 0,9769 2.120 ,4

ZIDURI DE SPRIJIN DIN BETON ARMAT


TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
ZID SPRIJIN ZID B.SIMPLU INALT.1M ZIDSPBS1M 955,0 1,0602 1.012,5
DIN BETON ZID B.SIMPLU NALT.1,5M ZIDSPBS 1 ,5 M 1.333,3 1,0611 1.414,8
SIMPLU ZID B.SIMPLU NALT.2,0 M ZIDSPBS 2 M 1.711,2 1,0620 1.817 ,3

ZIDURI DE SPRIJIN DIN PIATRA DE RAU FIXATA CU MORTAR


TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
ZID SPRIJIN ZID S.PIATRA INALT.1M ZIDSPRP1M 529,5 0,9518 504,0 pag.carte: 122
DIN PIATRA ZID S.PIATRA NALT.1,5M ZIDSPRPI1, 5M 876,6 0,9518 834 ,3
ZIDITA ZID S.PIATRA INALT.2M ZIDSPRPI2M 1.097,8 0,9518 1.044,9

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
6.2. INSTALAIE DE ALIMENTARE CU ENERGIE ELECTRICA A LIFTULUI
INSTALAIE DE FOR A 380 V

INSTALAIE ELECTRICA ALIMENTARE LIFTURI+CAMERA TROLIU


TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
LIFT+CAMERA ELECTR . LIFT PERS. EL380V-8E 2.056,9 0, 9950 2.046 ,6 pag.carte: 123
| TROLIU ELECTR . LIFT PERS. EL380V+10E 1.949,9 1,0605 2.067 ,9
COST AFERENT 1 STAIE / 1LIFT (ETAJ CLDIRE) PENTRU 1 PUT LIFT
|1 statie+cota af.cam.troliu 228,5 0,9952 227,4

Indicii de actualizare prezentai conin i indicele de descretere a TVA de la 24% la 20%.


AUGUST 2016 - IULIE 2017
6.3. PISCINE EXTERIOARE

STRUCTURA+FINISAJ+INST.SANITARE BAZINE NOT DIN BETON ARMAT


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
carte 2016 - 2017 2016 - 2017
STRUCTURA PISCINA INDIVID.8X4 PISCIN100 956,9 1,0372 992 ,5 pag.carte: 124
FINISAJ BAZIN SEMIOLIMPIC LINER8X4 1.034,3 1,0077 1.042 ,3
BAZIN BAZIN OLIMPIC FIPISIN 1.330,5 0,9930 1.321,2
INST. SANITARE INST.SANITARE BAZIN SABA8X 4 124,7 1,0065 125 ,5

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.
AUGUST 2016 - IULIE 2017
6.4. PODE E RUTIERE

PODEE TUBULARE SI OVOIDALE - L IME DRUM 5 M SI 7 M


TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
PODE TUB PODE TUB 500 PODET 500 21.306,7 0,9618 20.492 , 8
I L IME DRUM
PODE TUB 800 PODET 800 34.532,3 1, 0193 35.198 , 8
| 5M PODE TUB 1000 PODET1000 41.646,0 0,9967 41.508 , 6
drum cu lime carosabil de 7,5 m
PODE TUB PODE TUB 500 PODET7,5-500 31.960,0 0,9618 30.739,1
L IME DRUM PODE TUB 800 PODET 7,5-800 51.798,4 1,0193 52.798 , 1
7M PODE TUB 1000 PODET7, 5-1000 62.469,1 0,9967 62.263,0
PODE PODE OVOIDAL 5,0 PODOVOID5 37.812,4 1,0144 38.356 , 9
OVOIDAL PODE OVOIDAL 7,5 PODOVOID7,5 58.223,5 1,0144 59.061, 9

PODEE DALATE CU INFRASTRUCTURA TOTAL MONOLIT L IME DRUM 5 M SI 7 M


TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
PODE DALAT INFRA PODE DALAT INFRDR5 31.616,5 1,0305 32.580,8
PREFABRICATE DESCHIDERE 2 M DALE2 32.384,0 1,0323 33.429, 7
DESCHIDERE DESCHIDERE 3 M DALE3 37.919,6 0,9917 37.604, 9
PODE DESCHIDERE 4 M DALE4 41.737,5 0,9843 41.082 , 2
DESCHIDERE 5 M DALE 5 45.932,4 1,0000 45.932, 4
SISTEM RUTIER DRUM BALASTAT DRBALAST 3.395,4 1,0104 3.430,7
AFERENT DRUM BETONAT DRBB 5.738,9 1,2803 7.347 , 5
PODE DRUM BETONAT+ASF DRBBA 7.982,2 1,0281 8.206, 5
drum cu l ime carosabil de 7,5 m
PODE DALAT INFRA PODE DALAT INFRDR7,5 47.424,8 1,0305 48.871,3
PREFABRICATE DESCHIDERE 2 M DALE2 35.827,8 1,0323 36.984, 7
DESCHIDERE DESCHIDERE 3 M DALE3 42.755,6 0,9917 42.400 , 7
PODE DESCHIDERE 4 M DALE4 49.505,0 0,9843 48.727 , 8
DESCHIDERE 5 M DALE 5 53.346,2 1,0000 53.346 , 2
SISTEM RUTIER DRUM BALASTAT DRBALAST 5.093,1 1,0104 5.146,1
AFERENT DRUM BETONAT DRBB 8.608,3 1,2803 11.021, 2
PODE DRUM BETONAT+ASF. DRBBA 11.973,3 1,0281 12.309, 7
PODEE DALATE CU INFRASTRUCTURA MONOLIT+PREFABRICATE
L IME DRUM 5 MSI 7 M
TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
PODE DALAT INFRA PODE DALAT INFRDRPREF 40.746,9 0,9853 40.147 , 9 pag.carte: 128
PREFABRICATE DESCHIDERE 2 M DALE2 32.384,0 1,0323 33.429, 7
DESCHIDERE DESCHIDERE 3 M DALE3 37.919,6 0,9917 37.604, 9
PODE DESCHIDERE 4 M DALE4 41.737,5 0,9843 41.082 , 2
DESCHIDERE 5 M DALE 5 45.932,4 1,0000 45.932 , 4
SISTEM RUTIER DRUM BALASTAT DRBALAST 3.395,4 1,0104 3.430,7
AFERENT DRUM BETONAT DRBB 5.738,9 1,2803 7.347,5
PODE DRUM BETONAT+ASF DRBBA 7.982,2 1,0281 8.206,5
drum cu l ime carosabil de 7,5 m
PODE DALAT INFRA PODE DALAT INFRDR7.5 61.120,3 0,9853 60.221, 8
PREFABRICATE DESCHIDERE 2 M DALE2 35.827,8 1,0323 36.984,7
DESCHIDERE DESCHIDERE 3 M DALE3 42.755 ,6 0,9917 42.400,7
PODE DESCHIDERE 4 M DALE4 49.505 ,0 0,9843 48.727, 8
DESCHIDERE 5 M DALE 5 53.346,2 1,0000 53.346 , 2
SISTEM RUTIER DRUM BALASTAT DRBALAST 5.093,1 1,0104 5.146, 1
AFERENT DRUM BETONAT DRBB 8.608,3 1,2803 11.021,2
PODE DRUM BETONAT+ASF. DRBBA 11.973,3 1,0281 12.309, 7
PODEE CU INFRASTRUCTURA CADRE PREFABRICATE SI SISTEM RUTIER
L IME DRUM 5 M SI 7 M
TIP TIP SUBSISTEM Simbol pre cost curent
C-TII SPECIALE carte 2016 - 2017 2016 - 2017
INFRA DESCHIDERE 2 M DALE2 65.122,5 1,0323 67.225 ,3 pag.carte: 129
CADRE DESCHIDERE 3 M DALE3 71.144,4 0,9917 70.553 , 9
PODE DESCHIDERE 4 M DALE4 75.422,4 0,9843 74.238 ,3
SISTEM RUTIER DRUM BALASTAT DRBALAST 3.395,4 1,0104 3.430,7
AFERENT DRUM BETONAT DRBB 5.738,9 1,2803 7.347 , 5
PODE DRUM BETONAT+ASF DRBBA 7.982,2 1,0281 8.206, 5

drum cu l ime carosabil de 7,5 m
INFRA DESCHIDERE 2 M DALE2 78.056,4 1,0323 80.576 , 8
CADRE DESCHIDERE 3 M DALE3 88.248,5 0,9917 87.516 , 0
PODE DESCHIDERE 4 M DALE4 90.265,8 0,9843 88.848, 6
SISTEM RUTIER DRUM BALASTAT DRBALAST 5.093,1 1,0104 5.146,1
AFERENT DRUM BETONAT DRBB 8.608,3 1,2803 11.021, 2
PODE DRUM BETONAT+ASF. DRBBA 11.973,3 1,0281 12.309, 7
AUGUST 2016 - IULIE 2017
6.5. REELE EXTERIOARE DE GAZE

SPTUR TRASEU GAZE


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
ELEMENT carte 2016 - 2017 2016 - 2017
GAZE SP TUR TRASEU SAPGAZ 56,6 1,1719 66,3 pag.carte: 130

TRASEE AERIENE DE BRANAMENTE GAZE DIN TEVA NEAGRA VOPSITA IN INTERIORUL CLDIRII
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
ELEMENT carte 2016 - 2017 2016 - 2017
TRASEU EAVA 1/2" TNGAZV1 /2 59,0 1,0311 60, 8 pag.carte: 130
BRANAM. TRASEU EAVA 3 /4 " TNGAZV 3 /4 64, 2 1 ,0311 66, 2
GAZE TRASEU EAVA 1" TNGAZV1 71,6 1,0311 73, 8
ACCESORII BRANAMENT GAZE
ELEMENT KIT SENZOR GAZE KITGAZE 302,0 1,0269 310,0
FIRIDA GAZE FIRIDA60X 60 85,9 1,0000 85, 9

TRASEE SUBTERANE PENTRU GAZE CU EAVA PEHD - SDR11 IN EXTERIORUL CLDIRII


TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
ELEMENT carte 2016 - 2017 2016 - 2017
PEHD-SDR11 PEHD04O 14,62 0,9217 13, 5
PEHD-SDR11 PEHD05 O 18,82 0,9217 17, 3
TRASEE PEHD-SDR11 PEHD063 26,91 0,9217 24, 8
CONDUCTE PEHD -SDR 11 PEHD075 38 , 30 0,9217 35, 3
PEHD PEHD-SDR11 PEHD09O 54,85 0,9217 50, 6
PEHD-SDR11 PEHD011 O 83,34 0,9217 76, 8
PEHD-SDR11 PEHD0125 102,86 0,9217 94, 8
PEHD-SDR11 PEHD014 O 135,09 0,9217 124, 5
PEHD-SDR11 PEHD016O 173,92 0,9217 160 , 3
PEHD-SDR11 PEHD018 O 211,52 0,9217 195 , 0
PEHD-SDR11 PEHD02 OO 252,11 0,9217 232 , 4
ACCESORII TRASEE SUBTERANE CU PRE PE BUCATA
ACCESORII RASUFLATORI CU CAPAC RASUFGAZE 69,6 1,0665 74, 2
GAZE CONEX.BRANSAMENT CONEXGAZE 109,6 1,0497 115 , 0
TRASEE SUBTERANE PENTRU GAZE CU EAVA OTEL TRASA FARA SUDURA IN EXTERIORUL CLDIRII
TIP SISTEM TIP SUBSISTEM Simbol pre cost curent
ELEMENT carte 2016 - 2017 2016 - 2017
TRASEE T.TR.FARA SUDURA TGFS50 87,65 1,1067 97,0 pag.carte: 131
CONDUCTE T.TR.FARA SUDURA TGFS60 102,94 1,0872 111,9
EAVA TRASA T.TR.FARA SUDURA TGFS76 114,97 1,0876 125, 0
FARA T.TR.FARA SUDURA TGFS89 142,62 1,0473 149, 4
SUDURA T.TR.FARA SUDURA TGFS114 198,88 1,0491 208 , 6

Indicii de actualizare prezentai conin i indicele de descre tere a TVA de la 24% la 20%.