Sunteți pe pagina 1din 22

TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND

Denumire resursa (CI25)


MATERIAL
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Adeziv placare ceramica AG 651 CLASSIC


Punte de aderenta universala AP 300
Economy and legislation

MANOPERA
Project Theme: Finishes

Faiantar
Total manopera
pret total
Adrian-Alexandru Șerbănoiu
Cătălina-Mihaela Helepciuc

Denumire resursa (CI26)


MATERIAL
Chit AJ 610 1 200 5 alb
MANOPERA

Finisaje podea
Professor:

Faiantar
Total manopera
pret total
Denumire resursa
MATERIAL
Gresie exterior Habitat 86451
Gresie interior baie / bucatarie, 4035-021
Faianta bucatarie
Faianta baie 2042-0513 Tivoli Beige
Denumire resursa
MATERIAL

Student name:
Folie parchet PEE Aquastop polietilena la

Group: 3305
Substrat din polistiren extrudat pentru lam
Parchet laminat 12 mm oak roanne natur
MANOPERA
Dulgher
Marmo
nata cu film
ger R EHL082 clasa 32
at, Arbiton Secura Max, 6 mm m(2)
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION
m(2)

m(2)

m(2)

UM

m(2)
m(2)
m(2)
m(2)

UM

ora
ore

KG

UM

ora
ore

l
KG

UM
1.495

pachet
Cantitati

cutie
Cantitati

A01
Cantitati

A01
Cantitati
1.52
1.32
1.63
1.55

3.99
0.07
0.07

0.62

5.04
0.21
0.21

0.18
1.78
25
1

Tamplarie / finisaje pereti interiori

Cantitate totala Pret unitar Suprafata


273.5148
95.2692

27.6588
Pret unitar

Pret unitar

Pret unitar
Denumire resursa UM Cantitati Pret unitar Pret/mp
Materiale

12.39

12.39
6.97
4.09

34.9
22.9
22.9
29.9

5.03

5.21
0.84
Cale portante si distantiere buc 4 0.42 1.68
14

45

Diblu expandabil L=105mm buc 7 1.71 11.97


Fereastra PVC ochiuri fixe 90x150 cm mp 1 216.64 216.64

153.66
Spuma poliuretanica l 0.1 25 2.5
70.77
70.77
70.77

68.41

47.71
31.94
5.6

Spuma siliconica l 0.07 46 3.22


Manopera
Tamplar categoria speciala ora 0.50 12.39 6.195

Pret total
Muncitor deservire ora 0.2 12.39 2.478
479.204076

162.633744

144.102348
229.752432
42.917238

Pret Manopera ora 0.70 6.0711


493.2669
289.4493

2387.509

1092.559
3184.65

955.006
990.78

128.24

Pret Total 242.0811

Denumire resursa UM Cantitati Pret unitar Pret/mp


Materiale
Cale portante si distantiere buc 4 0.42 1.68
Diblu expandabil L=105mm buc 7 1.71 11.97
Fereastra PVC ochiuri fixe 60x150 cm mp 1 216.64 216.64
Spuma poliuretanica l 0.1 25 2.5
Spuma siliconica l 0.07 46 3.22
Manopera
Tamplar categoria speciala ora 0.50 12.39 6.195
Muncitor deservire ora 0.2 12.39 2.478
Pret Manopera ora 0.70 6.0711
Pret Total 242.0811

Denumire resursa UM Cantitati Pret unitar Pret/mp


Materiale
Banda precomprimata, impregnata, 10mm m 3 0.85 2.55
Cale portante si distantiere buc 4 0.42 1.68
Diblu expandabil L=105mm buc 7 1.71 11.97
Fereastra PVC ochiuri fixe 230x180 cm mp 1 277.3 277.3
Spuma poliuretanica l 0.1 25 2.5
Spuma siliconica l 0.07 46 3.22
Manopera
Tamplar categoria speciala ora 0.80 12.39 9.912
Muncitor deservire ora 0.2 12.39 2.478
Pret Manopera ora 1.00 12.39
Pret Total 311.61
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Denumire resursa UM Cantitati Pret unitar Pret/mp


Materiale
Apa Industriala mc 0.0003 0.16 0.000048
Glet de ipsos superfin Knauf Satengips 20kg kg 0.9 1.61 1.449
Manopera
Ipsosar ora 0.2 12.39 2.478
Muncitor deservire ora 0.05 12.39 0.6195
Pret Total 4.546548

Denumire resursa UM Cantitati Pret unitar Pret/mp


Materiale
Amorsa Deko Nano kg 0.06 7.47 0.4482
Vopsea lavabila pentr interior DEKO V8057 40kg (25 l) kg 0.06 5.75 0.345
Manopera
Zugrav vopsitor ora 0.25 12.39 3.0975
Pret Total 3.8907

Denumire resursa UM Cantitati Pret unitar Pret/mp


Materiale
Cale portante si distantiere buc 7 0.42 2.94
Diblu expandabil L=135mm buc 7 1.71 11.97
Spuma poliuretanica l 0.3 25 7.5
Usa din profile PVC tip schnicks intru-un canat mp 1 132.47 132.47
Silicon de etansare l 0.25 20 5
Manopera
Tamplar categoria speciala ora 0.60 12.39 7.434
Muncitor deservire ora 0.25 12.39 3.0975
Pret Manopera ora 0.85 8.951775
Pret Total 168.8318
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Nord 32.76
Sud 26.55
Est 57.95
Vest 53.04
Pereti interiori Etaj 49.92
Pereti interiori Parter 35.22
Total 255.44

Pret Total Glet 1161.37


Pret Total Var+Amorsa 993.8404

Pret Total 13 Usi Int+Ext 2194.813


Pret Total Ferestre 90x150 3buc 726.2433
Pret Total Ferestre 60x150 5buc 1210.406
Pret Total Ferestre 230x180 5buc 1558.05
Pret Total Tamplarii 5689.512

Tencuiala interior/ exterior


TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Tencuiala exterioara
Denumire resursa UM Cantitati/B02 Pret unitar pret/mp
Materiale
Amorsa Hasit 12 Aufbrensperre l 0.3 10.17 3.051
Tencuiala Hasit kalkzementputz 651 kg 20.8 0.49 10.192
Total Materiale 13.243
Manopera
Zidar tencuitor ora 0.136 12.39 1.68504
Muncitor deservire ora 0.034 12.39 0.42126
Total Manopera 2.1063
Utilaje
Masina tencuit pft g5c ora 0.039 18 0.702
Total Utilaje 0.702
Pret total/mp 16.0513

Tencuiala interioara CF14


Denumire resursa Um Cantitati Pret unitar pret/mp
Materiale
Apa industriala mc 0.003 0.16 0.00048
Grund pentru suprafete absrbante GRUNDIERMITTEL kg 0.1 12.11 1.211
Material marunt % 1 0.1 0.1
Mortar uscat pe baza de ipsos pentru tencuiala M-75 kg 10.5 0.81 8.505
Sina pentru tencuire rapida m 0.6 0.81 0.486
Total Materiale 10.30248
Utilaje
Masina de tencuit ora 0.6 18 10.8
Utilaj de ridicat ora 0.01 133.88 1.3388
Total Utilaje 12.1388
Manopera
Ipsosar ora 0.33 12.39 4.0887
Muncitor deservire ora 0.14 12.39 1.7346
Total Manopera 5.8233
Pret total 28.26458

Pereti de compartimentare
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Pereti Gips Carton


Denumire resursa UM Cantitati Pret unitar pret/mp
Materiale
Banda autoadeziva (armare rosturi) 90m/rola m 1.6 0.16 0.256
Banda etansare din PE (3 mm x 90 mm) pt profil UW 100, 30 m/rola m 1.3 1.28 1.664
Chit acrilic (permanent elastic) sub forma de cordon pe contur m 2.6 3 7.8
Pasta de finisare rigips RIFIN,sac 20 kg kg 0.5 1.72 0.86
Pasta de rosturi rigips SUPER, sac 5 kg kg 0.98 2.95 2.891
Placa rigips Fonic 12.5X1200X2000 mm, tip D,mucie pro 12.23 kg mp 4 11.95 47.8
Profil (montant) CW 100,L=4 m,Rigiprofil m 2 6.62 13.24
Profil (sina de ghidaj) UW 100, L = 4 m, Rigiprofil m 0.8 5.46 4.368
Surub autofiletant 212, L = 25 mm, diametru = 3.5 mm 1000buc/cutie buc 13 0.03 0.39
Surub autofiletant 212, L = 35 mm, diametru = 3.5 mm 1000buc/cutie buc 26 0.03 0.78
Surub autofiletant 212, L = 55 mm, diametru = 3.5 mm 500buc/cutie buc 1.6 0.04 0.064
Surub cu diblu 6X45mm, 100buc/cutie buc 1.6 0.13 0.208
Vata minerala de sticla AKUSTO RO 5 Twin, MPS cu 24 role, 2X2X7500X600X50 mm 0.65 kg mp 1 4.95 4.95
Total Materiale 85.271
Manopera
Specialist montare gips carton ore 1.1161 12.39 13.82848
Muncitor deservire ore 0.197 12.39 2.44083
Total manopera 16.26931
Pret total 101.5403

Fatade Tencuiala interioara Tencuiala exterior Pereti Compartimentare


Nord 46.93 46.93
Sud 48 48
Est 73.54 73.54
Vest 73.4 73.4
Total mp 364.865 241.87 42.57
Pret fara manopera 8188.037627 3372.87715 3629.98647
Pret manopera 2124.718355 509.450781 692.5844841

Pret total lucrare 10312.75598 3882.327931 4322.570954

Izolatie exterioara + finisaje aparente


TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Denumire resursa UM Cantitati/A01 Pret unitar pret/mp


Materiale
Dibluri cu cui de plastic buc 7 1.5 10.5
Grund universal kg 0.3 4.92 1.476
Material marunt kg 0.25 6.88 1.72
Mortar adeziv pentru lipire placi polistiren extrudat kg 5 0.9 4.5
Mortar adeziv pentru tencuiala armata kg 3 0.9 2.7
Plasa fibra de sticla mp 1.1 3.32 3.652
Polistiren expandat pentru izolarea fatadelor gros=100 mm dim 1000x500 mm mp 1.01 21.4 21.614
Tencuiala decorativa de exterior kg 2.7 5.03 13.581
Manopera
Izolator lurari speciale ora 0.95 12.39 14.9919
Muncitor deservire ora 0.26 12.39
Total Manopera ora 1.21
Pret total/mp 74.7349
Pret Izolatie/mp (fara manopera) 39.81
Pret mortar subtire/mp (fara manopera) 6.352

Denumire resursa Um Cantitati Pret unitar pret/mp


Materiale
Elemente liniare din piatra m 1.02 58.87 60.0474
Adeziv piatra Weber Stone alb kg 5 1.516 7.58
Ipsos pentru constructii kg 1 0.556 0.556
Praf de frecat mp 0.15 5.76 0.864
Praf de piatra kg 0.1 0.455 0.0455
Apa mc 0.015 2.56 0.0384
Mortar ciment-var M 100 T mc 0.017 866 14.722
Manopera
Pietrar mp 35 35 35
Muncitor deservire constructii montaj mp 35 35 35
Pret total 153.8533
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION
Fatade Suprafata Izolatie Mortar subtire Decorativa Piatra decorativa
Nord 48.09 48.09 27.95 20.14
Sud 49.74 49.74 60.1 6
Est 74.7 74.7 59.2 7.31
Vest 74.56 74.56 56.33 18.32
Total mp 247.09 247.09 203.58 51.77
Pret fara manopera 9836.6529 1569.51568 2764.82 7964.985341
Pret manopera 3704.348571 1811.95
Pret/resursa 17875.33713 9776.935341
Pret total lucrare 27652.27247

Obiectivul: Vila
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Formularul F3 - Lista cu cantitati de lucrari pe categorii de lucrari

Obiectul: Izolatie
Devizul: Pret
SECTIUNEA TEHNICA SECTIUNEA
FINANCIARA
Nr Simbol Capitolul de lucrari UM Cantitat Pretul Pretul
ea unitar total
(Lei) (Lei)
1.1. CI13A% Elem.liniare dr.din metr 51.77 62.768 3249.50
1 materiale u 1 3
speciale(marmura, travertin Material 6.0271 312.021
sau piatra),simple,profilate :
sau sculptate glafuri cu Manope 56.541 2927.12
latimea pana la 30 cm incl., ra: 8
montate pe console Utilaj: 0.2 10.354
metalice si fixate in perete Transpo 0 0
cu mortar de ciment-var M rt:
100-T
1.1. IZF37A01 Sistem de termoizolare cu mp 247.09 78.765 19462.0
2 + placi Austrotherm (in camp) 51
pe elemente de zidarie Material 49.652 12268.6
(fatade grele) : 4 19
Manope 29.112 7193.43
ra: 6 2
Utilaj: 0 0
Transpo 0 0
rt:

Total ore manopera (ore) 420.6384


Total greutate materiale (tone) 3.6646
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Materia Manop Utilaj Transp


l era ort Total
Total Cheltuieli Directe 12580.6 10120.5 0 0 22701.2
4 6

Alte cheltuieli directe


Coeficient Valoare Materia Manope Utilaj Transp Total
l ra ort
Contributia 2,2500 0 389.565 0 0 389.565
asiguratorie %
pentru munca

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 12580.6 10510.1 0 0 23090.7
4 25 65
Cheltuieli 10,000 3974.90
indirecte 0% 2
Profit 5,0000 2186.19
% 6

Total Deviz fara TVA 29251.863

Obiectul: Finisaje pardoseli


Devizul: Finisaje pardoseli
SECTIUNEA TEHNICA SECTIUNEA
FINANCIARA
Nr Simbol Capitolul de lucrari UM Cantitat Pretul Pretul
ea unitar total
(Lei) (Lei)
2.1. CI25A01+ Adeziv HASIT pentru placari mp 273.514 7.9256 2167.75
1 ceramice, aplicat in strat 4
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

subtire la interior si Material 2.873


exterior, cu distanta intre : 785.797
caneluri de 4mm Manope 5.0526 1381.95
ra: 7
Utilaj: 0 0
Transpo 0 0
rt:
2.1. 2400254 Faianta neagra muchii drept mp 0 0 0
2 150x 75x5,5 c. E s233 Material 0 0
:
Transpo 0 0
rt:
2.1. CI26A01+ Chit mineral HASIT pentru mp 95.26 7.1402 680.175
3 rostuirea materialelor Material 5.456 519.739
ceramice, aplicat la interior :
si exterior, cu grosimea de Manope 1.6842 160.437
rost de 3 mm ra:
Utilaj: 0 0
Transpo 0 0
rt:
2.1. 2940436 Parchet fag lmb,ul 17 x 30 x mp 70.77 28.682 2029.82
4 300 xx cls.2 s 228/4 5
Material 28.682 2029.82
: 5
Transpo 0 0
rt:
2.1. 20024706 Polistiren extrudat pt mp 70.77 22.552 1596.05
5 izolarea teraselor si a 7 5
pardos ind. austrotherm xps Material 22.552 1596.05
30 gk gros= 60 mm dim= : 7 5
1250x600 mm mp/pac= Transpo 0 0
5,25 mc/pac= 0,315 rt:
2.1. 6716650 Folie polietilena 0,2 mm mp 70.77 0.9 63.693
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

6 Material 0.9
: 63.693
Transpo 0 0
rt:
2.1. CG11A1 Pardoseli din plăci din gresie mp 31.94 60.780 1941.34
7 ceramică patrate sau 8
dreptunghiulare de aceias Material 33.714 1076.85
culoare asezate simplu : 8 2
Manope 26.466 845.324
ra:
Utilaj: 0.6 19.164
Transpo 0 0
rt:
2.1. CG11A1 Pardoseli din plăci din gresie mp 22.9 60.780 1391.88
8 ceramică patrate sau 8 1
dreptunghiulare de aceias Material 33.714 772.07
culoare asezate simplu : 8
Manope 26.466 606.071
ra:
Utilaj: 0.6 13.74
Transpo 0 0
rt:
2.1. 2400256 Faianta mapisa 23.5x35.5 mp 0 0 0
9 cm. isis-ga Material 0 0
:
Transpo 0 0
rt:

Total ore manopera (ore) 124.4301


Total greutate materiale (tone) 6.5203

Materia Manop Utilaj Transp Total


l era ort
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Total Cheltuieli Directe 6844.03 2993.78 32.904 0


1 9 9870.72
4

Alte cheltuieli directe


Coeficient Valoare Materia Manope Utilaj Transp Total
l ra ort
Contributia 2,2500 0 67.36 0 0 67.36
asiguratorie %
pentru munca

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 6844.03 3061.14 32.904 0 9938.08
1 9 4
Cheltuieli 10,000 993.808
indirecte 0%
Profit 5,0000 546.595
%

Total Deviz fara TVA 11478.487

Obiectul: Tencuieli
Devizul: Pret
SECTIUNEA TEHNICA SECTIUNEA
FINANCIARA
Nr Simbol Capitolul de lucrari UM Cantitat Pretul Pretul
ea unitar total
(Lei) (Lei)
3.1. CF14B01+ Tencuiala unistrat pe baza mp 364.865 34.181 12471.7
1 de ipsos dupa procedeul 9 65
Knauf, aplicata mecanizat Material 20.593 7513.90
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

pe suport absorbant - : 7
B.C.A., caramida, grosime 6
medie 10 mm Manope 11.308 4125.96
ra: 2 7
Utilaj: 2.28 831.892
Transpo 0 0
rt:
3.1. RPCF12A Tencuiala HASIT universala mp 241.87 37.632 9102.15
2 02+ pentru renovari si egalizari, 4 8
la interior si exterior, avand Material 34.77 8409.82
grosimea de 10 mm, : 4
aplicata intr-un strat Manope 2.5744 622.675
mecanizat ra:
Utilaj: 0.288 69.659
Transpo 0 0
rt:
3.1. CQ01G+ Pereti despartitori din placi mp 42.57 67.223 2861.70
3 de gips-carton, montant 6 8
simplu, structura metalica, Material 45.419 1933.51
h max = 2,75 m de 12,5 mm : 6 1
grosime, intr-un strat (1+1) Manope 21.654 921.811
Montant CW 100, distanta ra:
intre montanti 60 cm, Utilaj: 0.15 6.385
grosime totala perete 125 Transpo 0 0
mm rt:

Total ore manopera (ore) 235.6796


Total greutate materiale (tone) 10.8257

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 17857.2 5670.45 907.936 0 24435.6
42 2 3
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Alte cheltuieli directe


Coeficient Valoare Materia Manope Utilaj Transp Total
l ra ort
Contributia 2,2500 0 127.585 0 0 127.585
asiguratorie %
pentru munca

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 17857.2 5798.03 907.936 0 24563.2
42 7 15
Cheltuieli 10,000 2456.32
indirecte 0% 2
Profit 5,0000 1350.97
% 7

Total Deviz fara TVA 28370.514

Obiectul: Glet+var
Devizul: pret
SECTIUNEA TEHNICA SECTIUNEA
FINANCIARA
Nr Simbol Capitolul de lucrari UM Cantitat Pretul Pretul
ea unitar total
(Lei) (Lei)
4.1. CF23B01+ Glet Knauf pentru interior mp 255.44 8.0206 2048.77
1 aplicat pe, pe tencuieli var- 8
ciment Material 2.0056 512.306
:
Manope 6.015 1536.47
ra: 2
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

Utilaj: 0
0
Transpo 0 0
rt:
4.1. RPCR08A Vopsirea (zugraveli lavabile) metr 255.44 15.364 3924.81
2 % cu vopsea pe baza de acetat u 9 8
de polivinil-vinacet, la patr Material 4.9099 1254.19
interior si exterior, in doua at : 3
straturi pe tencuieli Manope 10.345 2642.73
existente ra: 8 1
Utilaj: 0.1092 27.894
Transpo 0 0
rt:

Total ore manopera (ore) 173.6992


Total greutate materiale (tone) 0.7347

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 1766.49 4179.20 27.894 0 5973.59
9 3 6

Alte cheltuieli directe


Coeficient Valoare Materia Manope Utilaj Transp Total
l ra ort
Contributia 2,2500 0 94.032 0 0 94.032
asiguratorie %
pentru munca

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 1766.49 4273.23 27.894 0 6067.62
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

9 5
8
Cheltuieli 10,000 606.763
indirecte 0%
Profit 5,0000 333.72
%

Total Deviz fara TVA 7008.111

Obiectul: Tamplarie
Devizul: pret
SECTIUNEA TEHNICA SECTIUNEA
FINANCIARA
Nr Simbol Capitolul de lucrari UM Cantitat Pretul Pretul
ea unitar total
(Lei) (Lei)
5.1. CK33A+ Montare usi din tamplarie mp 25 541.86 13546.7
1 de PVC, cu un singur canat, 94 36
montate cu dibluri din Material 520.81 13020.4
plastic, etanşarea rosturilor : 84 61
cu spuma poliuretanica si Manope 20.451 511.275
cordon de silicon, având ra:
suprafaţa tocului: pânâ la Utilaj: 0.6 15
2,5 mp inclusiv; Transpo 0 0
rt:
5.1. CK02B+ Montare ferestre din mp 20.7 250.24 5180.03
2 tamplarie de PVC, cu un 32 5
singur canat fix, avand Material 234.30 4850.09
suprafata tocului intre 1mp : 42 7
si 2,5 mp inclusiv, izolarea Manope 15.639 323.727
rosturilor cu spume ra:
poliuretanice, etansarea cu Utilaj: 0.3 6.21
spume siliconice. montata Transpo 0 0
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

la perti din caramida plina rt:


5.1. CK02B+ Montare ferestre din mp 20.7 250.24 5180.03
3 tamplarie de PVC, cu un 32 5
singur canat fix, avand Material 234.30 4850.09
suprafata tocului intre 1mp : 42 7
si 2,5 mp inclusiv, izolarea Manope 15.639 323.727
rosturilor cu spume ra:
poliuretanice, etansarea cu Utilaj: 0.3 6.21
spume siliconice. montata Transpo 0 0
la perti din caramida plina rt:
5.1. CK02B+ Montare ferestre din mp 4.5 247.46 1113.59
4 tamplarie de PVC, cu un 62 8
singur canat fix, avand Material 231.52 1041.87
suprafata tocului intre 1mp : 72 2
si 2,5 mp inclusiv, izolarea Manope 15.639 70.375
rosturilor cu spume ra:
poliuretanice, etansarea cu Utilaj: 0.3 1.35
spume siliconice. montata Transpo 0 0
la perti din caramida plina rt:

Total ore manopera (ore) 51.085


Total greutate materiale (tone) 4.0813

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 23762.5 1229.10 28.77 0 25020.4
27 5 02

Alte cheltuieli directe


Coeficient Valoare Materia Manope Utilaj Transp Total
l ra ort
Contributia 2,2500 0 27.655 0 0 27.655
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

asiguratorie %
pentru munca

Materia Manop Utilaj Transp Total


l era ort
Total Cheltuieli Directe 23762.5 1256.76 28.77 0 25048.0
27 57
Cheltuieli 10,000 2504.80
indirecte 0% 6
Profit 5,0000 1377.64
% 3

Total Deviz fara TVA 28930.506

Total General fara TVA 105039.481


TVA (19%) 19957.501
TOTAL GENERAL (Lei) 124996.982

Cursul de referință: 4.7789 Lei/Euro, din data de 2020-01-06

Raport generat cu programul Devizonline, creat de Softmagazin;


www.devizonline.ro;
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION
TECHNICAL UNIVERSITY “GHEORGHE ASACHI” OF IASI CIVIL ENGINEERING AND BUILDING SERVICES FACULTY CIVIL AND
INDUSTRIAL ENGINEERING DEPARTMENT ACADEMIC YEAR: 2019-2020 SUBJECT: ECONOMY AND LEGISLATION

S-ar putea să vă placă și