1982-1984 1984-1988 1988-1996 1996-1997 1997-2000
13516 SERIES BE SERIES BEA SERIES VNE-18-63 SERIES VBC-18-83 SERIES
2 bo poe
ree 410 [35 rao 137" rus rule
a BE=18 ap pend Tye
ob it] Peso me ? bE
= ae on ——
7008 099 | — sm roe 413 fa rao 130 a aus 205 | we
‘TL [rssieceo BE-22 | pessoa ‘L Weo-2d
Eel Ea | coum Cee. |
7006 100|——or—| 7240 139s 7241 247 | oe
fasi6—a I TL pyvecss
|» fu i (LL | tL -E—4
708 t04|—— ne a 200 140 | — ar aus ana | ae yaa 200 eee
LY] isst6=22] a] | 8e-35 aa | BEA-35 as ah | | vec—40.
0 — ef tL» —\u- LL =o}
pone va Patan rats — a a ene]
[| Jrsste-as s a | | Bea-as. as VNE-50 vac-50
i $e} ef — m—[o| ———
E 0 - 16
rao 20] os rau 200 ms 7241 290 ve
BEA-58 I VNE-e3 + vec-63
DISCLAIMER : THIS 1S_A CONCEPTUAL DRAWING ONLY
AND DOES NOT REPRESENT ALL SAFETY CONTROLS
WHICH WAY BE REQUIRED. THE CONTRACTOR IS
RESPONSIBLE FOR THE SAFE INSTALLATION OF FUEL
BURNING EQUIPMENT. THE DESIGNER MUST DETERMINE
IF & SUGGESTED SYSTEM WILL WORK IN HIS/HER
APPLICATION” AND ADD THE NECESSARY ISOLATION
VALVES, SAFETY DEVICES. AND MODIFICATIONS WHICH
MAY BE REQUIRED BY LOCAL AUTHORITIES
DATE 10/12/01
TITLE COMBUSTION CHAMBERS
FILE_I:\Vitola Biferral\Combustion Chambers.dwo
Manufacturing Company Inc.
750 WeMURRAY ROAD, WATERLOO, ONTARO NOV 265