Raportare Gantt pentru lucrarea 24A - CONSTRUIRE BLOCURI SOCIALE NEG

Denumire Cantitate UM Durata Inceput Sfarsit Iulie 2022 August 2022 Septembrie 2022 Octombrie 2022 Noiembrie 2022 Decembrie 2022 Ianuarie 2023 Februarie 2023 Martie 2023 Aprilie 2023 Mai 2023 Iunie 2023 Iulie 2023 August 2023 Septembrie 2023 Octombrie 2023 Noiembrie 2023 Decembrie 2023 Ianuarie 2024 Februarie 2024
Prog. Estimata
-2627-3 4-10 11-1718-2425-31 1-7 8-1415-2122-2829-4 5-11 12-1819-25 26-2 3-9 10-1617-2324-3031-6 7-1314-2021-2728-4 5-11 12-1819-25 26-1 2-8 9-1516-2223-2930-5 6-1213-1920-2627-5 6-1213-1920-26 27-2 3-9 10-1617-2324-30 1-7 8-1415-2122-2829-4 5-11 12-1819-25 26-2 3-9 10-1617-2324-3031-6 7-1314-2021-2728-3 4-1011-1718-24 25-1 2-8 9-1516-2223-2930-5 6-1213-1920-2627-3 4-1011-1718-2425-31 1-7 8-1415-2122-2829-4 5-11 12-1819-2526-
ORGANIZARE DE SANTIER 0,00 4,00d 27.06.2022 30.06.2022
LUCRARI CONSTRUCTII-MONTARE 0,00 2,00d 28.06.2022 30.06.2022
Organizare santier 1,00 SET 2,00d 28.06.2022 30.06.2022
PLATFORMA BETONATA CONTAINERE 0,00 1,00d 27.06.2022 27.06.2022
Organizare santier-platforme 1,00 SET 1,00d 27.06.2022 27.06.2022
CLADIRE A P+1 NR.1 0,00 94,11d 01.07.2022 10.11.2022
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 01.07.2022 15.08.2022
Rezistenta 1,00 SET 31,21d 01.07.2022 15.08.2022
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 15.08.2022 12.09.2022
Lucrari interioare 1,00 SET 20,00d 15.08.2022 12.09.2022
LUCRARI EXTERIOARE A P+1 NR1 0,00 22,00d 12.09.2022 12.10.2022
Lucrari exterioare 1,00 SET 22,00d 12.09.2022 12.10.2022
INSTALATII SANITARE INTERIOARE 0,00 9,75d 12.09.2022 23.09.2022
Montaj Teava 1,00 SET 4,95d 12.09.2022 19.09.2022
Montaj obiecte sanitare 1,00 SET 1,69d 19.09.2022 20.09.2022
Probe functionare 1,00 SET 2,61d 20.09.2022 23.09.2022
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 23.09.2022 23.09.2022
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 12.09.2022 09.11.2022
Montaj cablaj 1,00 SET 15,00d 12.09.2022 03.10.2022
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 03.10.2022 11.10.2022
Priza de pamant si impamantare 1,00 SET 14,40d 11.10.2022 31.10.2022
Probe de functionare 1,00 SET 3,00d 31.10.2022 03.11.2022
Montaj echipamente inst electrice 1,00 SET 4,00d 03.11.2022 09.11.2022
INSTALATII INCALZIRE 0,00 18,88d 12.09.2022 07.10.2022
Montaj Teava 1,00 SET 10,13d 12.09.2022 26.09.2022
Montaj Aparataj 1,00 SET 3,75d 26.09.2022 30.09.2022
Montaj echipamente inst termice 1,00 SET 5,00d 30.09.2022 07.10.2022
PANOURI SOLARE 0,00 10,00d 12.09.2022 26.09.2022
Montaj Teava 1,00 SET 4,75d 12.09.2022 16.09.2022
Montaj echipamente solare 1,00 SET 5,25d 16.09.2022 26.09.2022
INSTALATII CLIMATIZARE 0,00 6,24d 12.09.2022 20.09.2022
Montaj teava 1,00 SET 2,25d 12.09.2022 14.09.2022
Montaj aparataj 1,00 SET 3,99d 14.09.2022 20.09.2022
INSTALATII GAZE 0,00 3,88d 12.09.2022 16.09.2022
Instalatie gaz 1,00 SET 3,88d 12.09.2022 16.09.2022
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 07.10.2022 10.10.2022
Procurare echipamente Instalatii termice 1,00 SET 1,00d 07.10.2022 10.10.2022
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 07.10.2022 10.10.2022
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 07.10.2022 10.10.2022
MONTAJ INSTALATII ELECTRICE CL 0,00 4,00h 09.11.2022 10.11.2022
Procurare echipamente Instalatie electrica 1,00 SET 4,00h 09.11.2022 10.11.2022
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 23.09.2022 26.09.2022
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 23.09.2022 26.09.2022
CLADIRE A P+1 NR.2 0,00 94,61d 15.08.2022 23.12.2022
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 15.08.2022 27.09.2022
Rezistenta 1,00 SET 31,21d 15.08.2022 27.09.2022
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 27.09.2022 25.10.2022
Lucrari interioare 1,00 SET 20,00d 27.09.2022 25.10.2022
LUCRARI EXTERIOARE A P+1 NR1 0,00 22,00d 25.10.2022 24.11.2022
Lucrari exterioare 1,00 SET 22,00d 25.10.2022 24.11.2022
INSTALATII SANITARE INTERIOARE 0,00 9,75d 25.10.2022 08.11.2022
Montaj Teava 1,00 SET 4,95d 25.10.2022 01.11.2022
Montaj obiecte sanitare 1,00 SET 1,69d 01.11.2022 03.11.2022
Probe functionare 1,00 SET 2,61d 03.11.2022 07.11.2022
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 07.11.2022 08.11.2022
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 25.10.2022 22.12.2022
Montaj cablaj 1,00 SET 15,00d 25.10.2022 15.11.2022
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 15.11.2022 23.11.2022
Priza de pamant si impamantare 1,00 SET 14,40d 23.11.2022 13.12.2022
Probe de functionare 1,00 SET 3,00d 13.12.2022 16.12.2022
Montaj echipamente inst electrice 1,00 SET 4,00d 16.12.2022 22.12.2022
INSTALATII INCALZIRE 0,00 18,88d 25.10.2022 21.11.2022
Montaj Teava 1,00 SET 10,13d 25.10.2022 08.11.2022
Montaj Aparataj 1,00 SET 3,75d 08.11.2022 14.11.2022
Montaj echipamente inst termice 1,00 SET 5,00d 14.11.2022 21.11.2022
PANOURI SOLARE 0,00 10,00d 25.10.2022 08.11.2022
Montaj Teava 1,00 SET 4,75d 25.10.2022 01.11.2022
Montaj echipamente solare 1,00 SET 5,25d 01.11.2022 08.11.2022
INSTALATII CLIMATIZARE 0,00 6,24d 25.10.2022 02.11.2022
Montaj teava 1,00 SET 2,25d 25.10.2022 27.10.2022
Montaj aparataj 1,00 SET 3,99d 27.10.2022 02.11.2022
INSTALATII GAZE 0,00 3,88d 25.10.2022 31.10.2022
Instalatie gaz 1,00 SET 3,88d 25.10.2022 31.10.2022
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 21.11.2022 22.11.2022
Procurare echipamente Instalatii termice 1,00 SET 1,00d 21.11.2022 22.11.2022
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 21.11.2022 22.11.2022
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 21.11.2022 22.11.2022
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 22.12.2022 23.12.2022
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 22.12.2022 23.12.2022
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 08.11.2022 09.11.2022
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 08.11.2022 09.11.2022
CLADIRE A P+1 NR.3 0,00 94,61d 27.09.2022 07.02.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 27.09.2022 09.11.2022
Rezistenta 1,00 SET 31,21d 27.09.2022 09.11.2022
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 09.11.2022 07.12.2022
Lucrari interioare 1,00 SET 20,00d 09.11.2022 07.12.2022
LUCRARI EXTERIOARE A P+1 NR3 0,00 22,00d 07.12.2022 06.01.2023
Lucrari exterioare 1,00 SET 22,00d 07.12.2022 06.01.2023
INSTALATII SANITARE INTERIOARE 0,00 9,75d 07.12.2022 21.12.2022
Montaj Teava 1,00 SET 4,95d 07.12.2022 14.12.2022
Montaj obiecte sanitare 1,00 SET 1,69d 14.12.2022 16.12.2022
Probe functionare 1,00 SET 2,61d 16.12.2022 20.12.2022
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 20.12.2022 21.12.2022
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 07.12.2022 06.02.2023
Montaj cablaj 1,00 SET 15,00d 07.12.2022 28.12.2022
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 28.12.2022 05.01.2023
Priza de pamant si impamantare 1,00 SET 14,40d 05.01.2023 26.01.2023
Probe de functionare 1,00 SET 3,00d 26.01.2023 31.01.2023
Montaj echipamente inst electrice 1,00 SET 4,00d 31.01.2023 06.02.2023
INSTALATII INCALZIRE 0,00 29,63d 07.12.2022 18.01.2023
Montaj Teava 1,00 SET 10,13d 07.12.2022 21.12.2022
Montaj Aparataj 1,00 SET 3,75d 21.12.2022 27.12.2022
Montaj echipamente inst termice 1,00 SET 15,75d 27.12.2022 18.01.2023
PANOURI SOLARE 0,00 10,00d 07.12.2022 21.12.2022
Montaj Teava 1,00 SET 4,75d 07.12.2022 14.12.2022
Montaj echipamente solare 1,00 SET 5,25d 14.12.2022 21.12.2022
INSTALATII CLIMATIZARE 0,00 6,24d 07.12.2022 15.12.2022
Montaj teava 1,00 SET 2,25d 07.12.2022 09.12.2022
Montaj aparataj 1,00 SET 3,99d 09.12.2022 15.12.2022
INSTALATII GAZE 0,00 3,88d 07.12.2022 13.12.2022
Instalatie gaz 1,00 SET 3,88d 07.12.2022 13.12.2022
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 18.01.2023 19.01.2023
Procurare echipamente Instalatii termice 1,00 SET 1,00d 18.01.2023 19.01.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 18.01.2023 19.01.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 18.01.2023 19.01.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 06.02.2023 07.02.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 06.02.2023 07.02.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 21.12.2022 22.12.2022
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 21.12.2022 22.12.2022
CLADIRE A P+1 NR.4 0,00 94,61d 09.11.2022 22.03.2023
Orizontal: 1 din 1 - Vertical: 1 din 4
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 21.12.2022 22.12.2022
CLADIRE A P+1 NR.4 0,00 94,61d 09.11.2022 22.03.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 09.11.2022 22.12.2022
Rezistenta 1,00 SET 31,21d 09.11.2022 22.12.2022
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 22.12.2022 19.01.2023
Lucrari interioare 1,00 SET 20,00d 22.12.2022 19.01.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 22,00d 19.01.2023 20.02.2023
Lucrari exterioare 1,00 SET 22,00d 19.01.2023 20.02.2023
INSTALATII SANITARE INTERIOARE 0,00 9,75d 19.01.2023 02.02.2023
Montaj Teava 1,00 SET 4,95d 19.01.2023 26.01.2023
Montaj obiecte sanitare 1,00 SET 1,69d 26.01.2023 30.01.2023
Probe functionare 1,00 SET 2,61d 30.01.2023 02.02.2023
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 02.02.2023 02.02.2023
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 19.01.2023 21.03.2023
Montaj cablaj 1,00 SET 15,00d 19.01.2023 09.02.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 09.02.2023 17.02.2023
Priza de pamant si impamantare 1,00 SET 14,40d 17.02.2023 10.03.2023
Probe de functionare 1,00 SET 3,00d 10.03.2023 15.03.2023
Montaj echipamente inst electrice 1,00 SET 4,00d 15.03.2023 21.03.2023
INSTALATII INCALZIRE 0,00 29,63d 19.01.2023 02.03.2023
Montaj teava 1,00 SET 10,13d 19.01.2023 02.02.2023
Montaj aparataj 1,00 SET 3,75d 02.02.2023 08.02.2023
Montaj echipamente inst termica 1,00 SET 15,75d 08.02.2023 02.03.2023
PANOURI SOLARE 0,00 10,00d 19.01.2023 02.02.2023
Montaj Teava 1,00 SET 4,75d 19.01.2023 26.01.2023
Montaj echipamente solare 1,00 SET 5,25d 26.01.2023 02.02.2023
INSTALATII CLIMATIZARE 0,00 6,24d 19.01.2023 30.01.2023
Montaj teava 1,00 SET 2,25d 19.01.2023 24.01.2023
Montaj aparataj 1,00 SET 3,99d 24.01.2023 30.01.2023
INSTALATII GAZE 0,00 3,88d 19.01.2023 25.01.2023
Instalatie gaz 1,00 SET 3,88d 19.01.2023 25.01.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 02.03.2023 03.03.2023
Procurare echipamente Instalatie termice 1,00 SET 1,00d 02.03.2023 03.03.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 02.02.2023 03.02.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 02.02.2023 03.02.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 21.03.2023 22.03.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 21.03.2023 22.03.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 02.02.2023 03.02.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 02.02.2023 03.02.2023
CLADIRE A P+1 NR.5 0,00 94,61d 22.12.2022 04.05.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 22.12.2022 06.02.2023
Rezistenta 1,00 SET 31,21d 22.12.2022 06.02.2023
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 06.02.2023 06.03.2023
Lucrari interioare 1,00 SET 20,00d 06.02.2023 06.03.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 22,00d 06.03.2023 05.04.2023
Lucrari exterioare 1,00 SET 22,00d 06.03.2023 05.04.2023
INSTALATII SANITARE INTERIOARE 0,00 9,75d 06.03.2023 17.03.2023
Montaj Teava 1,00 SET 4,95d 06.03.2023 13.03.2023
Montaj obiecte sanitare 1,00 SET 1,69d 13.03.2023 14.03.2023
Probe functionare 1,00 SET 2,61d 14.03.2023 17.03.2023
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 17.03.2023 17.03.2023
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 06.03.2023 03.05.2023
Montaj cablaj 1,00 SET 15,00d 06.03.2023 27.03.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 27.03.2023 04.04.2023
Priza de pamant si impamantare 1,00 SET 14,40d 04.04.2023 24.04.2023
Probe de functionare 1,00 SET 3,00d 24.04.2023 27.04.2023
Montaj echipamente inst electrice 1,00 SET 4,00d 27.04.2023 03.05.2023
INSTALATII INCALZIRE 0,00 29,63d 06.03.2023 14.04.2023
Montaj Teava 1,00 SET 10,13d 06.03.2023 20.03.2023
Montaj Aparataj 1,00 SET 3,75d 20.03.2023 23.03.2023
Montaj echipamente inst termice 1,00 SET 15,75d 23.03.2023 14.04.2023
PANOURI SOLARE 0,00 10,00d 06.03.2023 20.03.2023
Montaj Teava 1,00 SET 4,75d 06.03.2023 10.03.2023
Montaj echipamente solare 1,00 SET 5,25d 10.03.2023 20.03.2023
INSTALATII CLIMATIZARE 0,00 6,24d 06.03.2023 14.03.2023
Montaj teava 1,00 SET 2,25d 06.03.2023 08.03.2023
Montaj aparataj 1,00 SET 3,99d 08.03.2023 14.03.2023
INSTALATII GAZE 0,00 3,88d 06.03.2023 09.03.2023
Instalatie gaz 1,00 SET 3,88d 06.03.2023 09.03.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 14.04.2023 17.04.2023
Procurare echipamente Instalatii termice 1,00 SET 1,00d 14.04.2023 17.04.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 17.03.2023 20.03.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 17.03.2023 20.03.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 03.05.2023 04.05.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 03.05.2023 04.05.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 17.03.2023 20.03.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 17.03.2023 20.03.2023
CLADIRE A P+1 NR.6 0,00 94,61d 06.02.2023 16.06.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 06.02.2023 21.03.2023
Rezistenta 1,00 SET 31,21d 06.02.2023 21.03.2023
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 21.03.2023 18.04.2023
Lucrari interioare 1,00 SET 20,00d 21.03.2023 18.04.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 22,00d 18.04.2023 18.05.2023
Lucrari exterioare 1,00 SET 22,00d 18.04.2023 18.05.2023
INSTALATII SANITARE INTERIOARE 0,00 9,75d 18.04.2023 02.05.2023
Montaj Teava 1,00 SET 4,95d 18.04.2023 25.04.2023
Montaj obiecte sanitare 1,00 SET 1,69d 25.04.2023 26.04.2023
Probe functionare 1,00 SET 2,61d 26.04.2023 01.05.2023
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 01.05.2023 02.05.2023
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 18.04.2023 15.06.2023
Montaj cablaj 1,00 SET 15,00d 18.04.2023 09.05.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 09.05.2023 17.05.2023
Priza de pamant si impamantare 1,00 SET 14,40d 17.05.2023 06.06.2023
Probe de functionare 1,00 SET 3,00d 06.06.2023 09.06.2023
Montaj echipamente inst electrice 1,00 SET 4,00d 09.06.2023 15.06.2023
INSTALATII INCALZIRE 0,00 29,63d 18.04.2023 29.05.2023
Montaj Teava 1,00 SET 10,13d 18.04.2023 02.05.2023
Montaj Aparataj 1,00 SET 3,75d 02.05.2023 08.05.2023
Montaj echipamente inst termice 1,00 SET 15,75d 08.05.2023 29.05.2023
PANOURI SOLARE 0,00 10,00d 18.04.2023 02.05.2023
Montaj Teava 1,00 SET 4,75d 18.04.2023 25.04.2023
Montaj echipamente solare 1,00 SET 5,25d 25.04.2023 02.05.2023
INSTALATII CLIMATIZARE 0,00 6,24d 18.04.2023 26.04.2023
Montaj teava 1,00 SET 2,25d 18.04.2023 20.04.2023
Montaj aparataj 1,00 SET 3,99d 20.04.2023 26.04.2023
INSTALATII GAZE 0,00 3,88d 18.04.2023 24.04.2023
Instalatie gaz 1,00 SET 3,88d 18.04.2023 24.04.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 29.05.2023 30.05.2023
Procurare echipamente Instalatii termice 1,00 SET 1,00d 29.05.2023 30.05.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 02.05.2023 03.05.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 02.05.2023 03.05.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 15.06.2023 16.06.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 15.06.2023 16.06.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 02.05.2023 03.05.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 02.05.2023 03.05.2023
CLADIRE A P+1 NR.7 0,00 94,61d 21.03.2023 31.07.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 21.03.2023 03.05.2023
Rezistenta 1,00 SET 31,21d 21.03.2023 03.05.2023
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 03.05.2023 31.05.2023
Lucrari interioare 1,00 SET 20,00d 03.05.2023 31.05.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 22,00d 31.05.2023 30.06.2023
Lucrari exterioare 1,00 SET 22,00d 31.05.2023 30.06.2023
INSTALATII SANITARE INTERIOARE 0,00 9,75d 31.05.2023 14.06.2023
Montaj Teava 1,00 SET 4,95d 31.05.2023 07.06.2023
Montaj obiecte sanitare 1,00 SET 1,69d 07.06.2023 09.06.2023 Orizontal: 1 din 1 - Vertical: 2 din 4
Montaj Teava 1,00 SET 4,95d 31.05.2023 07.06.2023
Montaj obiecte sanitare 1,00 SET 1,69d 07.06.2023 09.06.2023
Probe functionare 1,00 SET 2,61d 09.06.2023 13.06.2023
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 13.06.2023 14.06.2023
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 31.05.2023 28.07.2023
Montaj cablaj 1,00 SET 15,00d 31.05.2023 21.06.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 21.06.2023 29.06.2023
Priza de pamant si impamantare 1,00 SET 14,40d 29.06.2023 19.07.2023
Probe de functionare 1,00 SET 3,00d 19.07.2023 24.07.2023
Montaj echipamente inst electrice 1,00 SET 4,00d 24.07.2023 28.07.2023
INSTALATII INCALZIRE 0,00 29,63d 31.05.2023 12.07.2023
Montaj Teava 1,00 SET 10,13d 31.05.2023 14.06.2023
Montaj Aparataj 1,00 SET 3,75d 14.06.2023 20.06.2023
Montaj echipamente inst termice 1,00 SET 15,75d 20.06.2023 12.07.2023
PANOURI SOLARE 0,00 10,00d 31.05.2023 14.06.2023
Montaj Teava 1,00 SET 4,75d 31.05.2023 07.06.2023
Montaj echipamente solare 1,00 SET 5,25d 07.06.2023 14.06.2023
INSTALATII CLIMATIZARE 0,00 6,24d 31.05.2023 08.06.2023
Montaj teava 1,00 SET 2,25d 31.05.2023 02.06.2023
Montaj aparataj 1,00 SET 3,99d 02.06.2023 08.06.2023
INSTALATII GAZE 0,00 3,88d 31.05.2023 06.06.2023
Instalatie gaz 1,00 SET 3,88d 31.05.2023 06.06.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 12.07.2023 13.07.2023
Procurare echipamente Instalatii termice 1,00 SET 1,00d 12.07.2023 13.07.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 14.06.2023 15.06.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 14.06.2023 15.06.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 28.07.2023 31.07.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 28.07.2023 31.07.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 14.06.2023 15.06.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 14.06.2023 15.06.2023
CLADIRE A P+1 NR.8 0,00 94,61d 06.02.2023 16.06.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 31,21d 06.02.2023 21.03.2023
Rezistenta 1,00 SET 31,21d 06.02.2023 21.03.2023
LUCRARI INTERIOARE CLADIRE A P 0,00 20,00d 21.03.2023 18.04.2023
Lucrari interioare 1,00 SET 20,00d 21.03.2023 18.04.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 22,00d 18.04.2023 18.05.2023
Lucrari exterioare 1,00 SET 22,00d 18.04.2023 18.05.2023
INSTALATII SANITARE INTERIOARE 0,00 9,75d 18.04.2023 02.05.2023
Montaj Teava 1,00 SET 4,95d 18.04.2023 25.04.2023
Montaj obiecte sanitare 1,00 SET 1,69d 25.04.2023 26.04.2023
Probe functionare 1,00 SET 2,61d 26.04.2023 01.05.2023
Montaj echipamente Inst Sanitare 1,00 SET 4,00h 01.05.2023 02.05.2023
INSTALATII ELECTRICE INTERIOAR 0,00 42,40d 18.04.2023 15.06.2023
Montaj cablaj 1,00 SET 15,00d 18.04.2023 09.05.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 6,00d 09.05.2023 17.05.2023
Priza de pamant si impamantare 1,00 SET 14,40d 17.05.2023 06.06.2023
Probe de functionare 1,00 SET 3,00d 06.06.2023 09.06.2023
Montaj echipamente inst electrice 1,00 SET 4,00d 09.06.2023 15.06.2023
INSTALATII INCALZIRE 0,00 29,63d 18.04.2023 29.05.2023
Montaj Teava 1,00 SET 10,13d 18.04.2023 02.05.2023
Montaj Aparataj 1,00 SET 3,75d 02.05.2023 08.05.2023
Montaj echipamente inst termice 1,00 SET 15,75d 08.05.2023 29.05.2023
PANOURI SOLARE 0,00 10,00d 18.04.2023 02.05.2023
Montaj Teava 1,00 SET 4,75d 18.04.2023 25.04.2023
Montaj echipamente solare 1,00 SET 5,25d 25.04.2023 02.05.2023
INSTALATII CLIMATIZARE 0,00 6,24d 18.04.2023 26.04.2023
Montaj teava 1,00 SET 2,25d 18.04.2023 20.04.2023
Montaj aparataj 1,00 SET 3,99d 20.04.2023 26.04.2023
INSTALATII GAZE 0,00 3,88d 18.04.2023 24.04.2023
Instalatie gaz 1,00 SET 3,88d 18.04.2023 24.04.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 29.05.2023 30.05.2023
Procurare echipamente Instalatii termice 1,00 SET 1,00d 29.05.2023 30.05.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 01.05.2023 02.05.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 01.05.2023 02.05.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 15.06.2023 16.06.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 15.06.2023 16.06.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 02.05.2023 03.05.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 02.05.2023 03.05.2023
CLADIRE B P+2 NR.1 0,00 146,00d 21.03.2023 11.10.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 45,00d 21.03.2023 23.05.2023
Rezistenta 1,00 SET 45,00d 21.03.2023 23.05.2023
LUCRARI INTERIOARE CLADIRE A P 0,00 35,00d 23.05.2023 11.07.2023
Lucrari interioare 1,00 SET 35,00d 23.05.2023 11.07.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 38,00d 11.07.2023 01.09.2023
Lucrari interioare 1,00 SET 38,00d 11.07.2023 01.09.2023
INSTALATII SANITARE INTERIOARE 0,00 15,94d 11.07.2023 02.08.2023
Montaj Teava 1,00 SET 8,73d 11.07.2023 24.07.2023
Montaj obiecte sanitare 1,00 SET 1,70d 24.07.2023 25.07.2023
Probe functionare 1,00 SET 5,25d 25.07.2023 01.08.2023
Montaj echipamente Inst Sanitare 1,00 SET 2,00h 01.08.2023 02.08.2023
INSTALATII ELECTRICE INTERIOAR 0,00 65,00d 11.07.2023 10.10.2023
Montaj cablaj 1,00 SET 25,00d 11.07.2023 15.08.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 11,00d 15.08.2023 30.08.2023
Priza de pamant si impamantare 1,00 SET 18,00d 30.08.2023 25.09.2023
Probe de functionare 1,00 SET 4,00d 25.09.2023 29.09.2023
Montaj echipamente inst electrice 1,00 SET 7,00d 29.09.2023 10.10.2023
INSTALATII INCALZIRE 0,00 40,81d 11.07.2023 06.09.2023
Montaj Teava 1,00 SET 14,81d 11.07.2023 01.08.2023
Montaj Aparataj 1,00 SET 6,00d 01.08.2023 09.08.2023
Montaj echipamente inst termice 1,00 SET 20,00d 09.08.2023 06.09.2023
PANOURI SOLARE 0,00 26,50d 11.07.2023 16.08.2023
Montaj Teava 1,00 SET 14,25d 11.07.2023 31.07.2023
Montaj echipamente solare 1,00 SET 12,25d 31.07.2023 16.08.2023
INSTALATII CLIMATIZARE 0,00 2,13d 11.07.2023 13.07.2023
Montaj teava 1,00 SET 2,13d 11.07.2023 13.07.2023
INSTALATII GAZE 0,00 15,00d 11.07.2023 01.08.2023
Instalatie gaz 1,00 SET 15,00d 11.07.2023 01.08.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 06.09.2023 07.09.2023
Procurare echipamente Instalatii termice 1,00 SET 1,00d 06.09.2023 07.09.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 02.08.2023 03.08.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 02.08.2023 03.08.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 10.10.2023 11.10.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 10.10.2023 11.10.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 02.08.2023 03.08.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 02.08.2023 03.08.2023
CLADIRE B P+2 NR.2 0,00 146,00d 23.05.2023 13.12.2023
REZISTENTA CLADIRE A P+1 NR.1 0,00 45,00d 23.05.2023 25.07.2023
Rezistenta 1,00 SET 45,00d 23.05.2023 25.07.2023
LUCRARI INTERIOARE CLADIRE A P 0,00 35,00d 25.07.2023 12.09.2023
Lucrari interioare 1,00 SET 35,00d 25.07.2023 12.09.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 38,00d 12.09.2023 03.11.2023
Lucrari exterioare 1,00 SET 38,00d 12.09.2023 03.11.2023
INSTALATII SANITARE INTERIOARE 0,00 15,94d 03.11.2023 27.11.2023
Montaj Teava 1,00 SET 8,73d 03.11.2023 16.11.2023
Montaj obiecte sanitare 1,00 SET 1,70d 16.11.2023 17.11.2023
Probe functionare 1,00 SET 5,25d 17.11.2023 24.11.2023
Montaj echipamente Inst Sanitare 1,00 SET 2,00h 24.11.2023 27.11.2023
INSTALATII ELECTRICE INTERIOAR 0,00 65,00d 12.09.2023 12.12.2023
Montaj cablaj 1,00 SET 25,00d 12.09.2023 17.10.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 11,00d 17.10.2023 01.11.2023
Priza de pamant si impamantare 1,00 SET 18,00d 01.11.2023 27.11.2023
Probe de functionare 1,00 SET 4,00d 27.11.2023 01.12.2023
Montaj echipamente inst electrice 1,00 SET 7,00d 01.12.2023 12.12.2023
INSTALATII INCALZIRE 0,00 40,81d 12.09.2023 08.11.2023
Orizontal: 1 din 1 - Vertical: 3 din 4
Montaj echipamente inst electrice 1,00 SET 7,00d 01.12.2023 12.12.2023
INSTALATII INCALZIRE 0,00 40,81d 12.09.2023 08.11.2023
Montaj teava 1,00 SET 14,81d 12.09.2023 03.10.2023
Montaj aparataj 1,00 SET 6,00d 03.10.2023 11.10.2023
Montaj Echipamente inst termice 1,00 SET 20,00d 11.10.2023 08.11.2023
PANOURI SOLARE 0,00 26,50d 12.09.2023 18.10.2023
Montaj Teava 1,00 SET 14,25d 12.09.2023 02.10.2023
Montaj echipamente solare 1,00 SET 12,25d 02.10.2023 18.10.2023
INSTALATII CLIMATIZARE 0,00 2,13d 12.09.2023 14.09.2023
Montaj teava 1,00 SET 2,13d 12.09.2023 14.09.2023
INSTALATII GAZE 0,00 15,00d 12.09.2023 03.10.2023
Instalatie gaz 1,00 SET 15,00d 12.09.2023 03.10.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 08.11.2023 09.11.2023
Procurare echipamente Instalatii termice 1,00 SET 1,00d 08.11.2023 09.11.2023
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 27.11.2023 28.11.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 27.11.2023 28.11.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 12.12.2023 13.12.2023
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 12.12.2023 13.12.2023
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 27.11.2023 28.11.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 27.11.2023 28.11.2023
CLADIRE B P+2 NR.3 0,00 146,00d 25.07.2023 14.02.2024
REZISTENTA CLADIRE A P+1 NR.1 0,00 45,00d 25.07.2023 26.09.2023
Rezistenta 1,00 SET 45,00d 25.07.2023 26.09.2023
LUCRARI INTERIOARE CLADIRE A P 0,00 35,00d 26.09.2023 14.11.2023
Lucrari interioare 1,00 SET 35,00d 26.09.2023 14.11.2023
LUCRARI EXTERIOARE A P+1 NR1 0,00 38,00d 14.11.2023 05.01.2024
Lucrari exterioare 1,00 SET 38,00d 14.11.2023 05.01.2024
INSTALATII SANITARE INTERIOARE 0,00 15,94d 14.11.2023 06.12.2023
Montaj Teava 1,00 SET 8,73d 14.11.2023 27.11.2023
Montaj obiecte sanitare 1,00 SET 1,70d 27.11.2023 28.11.2023
Probe functionare 1,00 SET 5,25d 28.11.2023 05.12.2023
Montaj echipamente Inst Sanitare 1,00 SET 2,00h 05.12.2023 06.12.2023
INSTALATII ELECTRICE INTERIOAR 0,00 65,00d 14.11.2023 13.02.2024
Montaj cablaj 1,00 SET 25,00d 14.11.2023 19.12.2023
\Montaj aparataj si corpuri de iluminat 1,00 SET 11,00d 19.12.2023 03.01.2024
Priza de pamant si impamantare 1,00 SET 18,00d 03.01.2024 29.01.2024
Probe de functionare 1,00 SET 4,00d 29.01.2024 02.02.2024
Montaj echipamente inst electrice 1,00 SET 7,00d 02.02.2024 13.02.2024
INSTALATII INCALZIRE 0,00 40,81d 14.11.2023 10.01.2024
Montaj Teava 1,00 SET 14,81d 14.11.2023 05.12.2023
Montaj Aparataj 1,00 SET 6,00d 05.12.2023 13.12.2023
Montaj echipamente inst termice 1,00 SET 20,00d 13.12.2023 10.01.2024
PANOURI SOLARE 0,00 26,50d 14.11.2023 20.12.2023
Montaj Teava 1,00 SET 14,25d 14.11.2023 04.12.2023
Montaj echipamente solare 1,00 SET 12,25d 04.12.2023 20.12.2023
INSTALATII CLIMATIZARE 0,00 2,13d 14.11.2023 16.11.2023
Montaj teava 1,00 SET 2,13d 14.11.2023 16.11.2023
INSTALATII GAZE 0,00 23,25d 14.11.2023 15.12.2023
Instalatie gaz 1,00 SET 23,25d 14.11.2023 15.12.2023
MONTAJ TERMICE CLADIRE A P+1 0,00 1,00d 10.01.2024 11.01.2024
Procurare echipamente Instalatii termice 1,00 SET 1,00d 10.01.2024 11.01.2024
MONTAJ INSTALATII CLIMATIZARE 0,00 1,00d 06.12.2023 07.12.2023
Procurare echipamente Instalatie climatizare 1,00 SET 1,00d 06.12.2023 07.12.2023
MONTAJ INSTALATII ELECTRICE CL 0,00 1,00d 13.02.2024 14.02.2024
Procurare echipamente Instalatie electrica 1,00 SET 1,00d 13.02.2024 14.02.2024
MONTAJ INSTALATII SANITARE INT 0,00 1,00d 06.12.2023 07.12.2023
Procurare echipamente Instalatii sanitare 1,00 SET 1,00d 06.12.2023 07.12.2023
RETELE EXTERIOARE IN INTERIORU 0,00 50,00d 25.07.2023 03.10.2023
CONDUCTE PENTRU APA SI ACCESOR 0,00 25,00d 25.07.2023 29.08.2023
Alimentare cu apa incinta 1,00 SET 25,00d 25.07.2023 29.08.2023
CANALIZARE EXTERIOARA 0,00 25,00d 29.08.2023 03.10.2023
Canalizare incinta 1,00 SET 25,00d 29.08.2023 03.10.2023
Montaj sanitare retele exterio 0,00 0,00h 29.08.2023 29.08.2023
Procurare echipamente sanitare exterioare 1,00 SET 0,00h 29.08.2023 29.08.2023
DRUMURI 0,00 102,68d 03.10.2023 22.02.2024
TESASAMENTE CAROSABIL 0,00 42,30d 03.10.2023 30.11.2023
Terasament drum 1,00 SET 42,30d 03.10.2023 30.11.2023
SUPRASTRUCTURA CAROSABIL 0,00 56,00d 30.11.2023 16.02.2024
Suprastructura drum 1,00 SET 56,00d 30.11.2023 16.02.2024
TERASAMENTE TROTUARE 0,00 42,19d 03.10.2023 30.11.2023
Terasament trotuare 1,00 SET 42,19d 03.10.2023 30.11.2023
SUPRASTRUCTURA TROTUAR 0,00 40,00d 30.11.2023 25.01.2024
suprastructura trotuare 1,00 SET 40,00d 30.11.2023 25.01.2024
MARCAJE SI SEMNALIZARE 0,00 4,38d 16.02.2024 22.02.2024
Marcaje si semnalizare rutiera 1,00 SET 4,38d 16.02.2024 22.02.2024
LUCRARI EXTERIOARE 0,00 39,50d 03.10.2023 27.11.2023
LOC DE JOACA PENTRU COPII S=2X 0,00 9,50d 03.10.2023 16.10.2023
Infra si supra Loc de joaca 1,00 SET 9,50d 03.10.2023 16.10.2023
SPATII VERZI S=4378 MP 0,00 30,00d 16.10.2023 27.11.2023
Spatii verzi 1,00 SET 30,00d 16.10.2023 27.11.2023
Organizare de santier 0,00 2,88d 22.02.2024 27.02.2024
LUCRARI CONSTRUCTII-DEMONTARE 0,00 2,88d 22.02.2024 27.02.2024
Demobilizare Organizare de santier 1,00 SET 2,88d 22.02.2024 27.02.2024

NOTA: In momentul semnarii contractului


vom prezenta un grafic actualizat
conform ordin de incepere a lucrarilor.
In conceperea graficului a fost luat in
calcul si lucru pe timp friguros conform
procedura pe timp friguros.