NR. LUCRARI INFRASTRUCTURA DESCRIERE U.M. CANTITATE


1 Beton in Blocuri de fundare C12/15 mc. 2.30
2 Beton in cuzineti C16/20 mc. 0.30
3 Armatura Cuzineti BST500 kg. 11

4 Total fier fundatii BST500 Kg. 11


5 Total beton fundatii mc. 2.60

LUCRARI SUPRASTRUCTURA
6 Beton in stalpi parter C16/20 mc. 0.60
7 Beton in grinzi peste parter C16/20 mc. 0.60

8 Fier in stalpi parter BST500 kg. 55


9 Fier in grinzi peste parter BST500 kg. 77

10 Total fier Parter BST500 kg. 132


11 Total beton Parter C16/20 mc. 1.20

12 Beton in scara rampa Parter-Etaj C16/20 mc. 1.50


13 Fier in scara rampa Parter-Etaj BST500 kg. 126

14 Beton in stalpi etaj C16/20 mc. 3.00


15 Beton in buinadrugi etaj C16/20 mc. 1.75
16 Beton in centuri peste etaj C16/20 mc. 2.50
17 Beton in grinzi peste etaj C16/20 mc. 0.20
18 Zidarie 0.29– etaj GVP cu Rck>10/mmp mc. 15.00
19 Zidarie 0.24– etaj GVP cu Rck>10/mmp mc. 1.00
20 Zidarie 0.15– etaj mp. 50

21 Fier in stalpi etaj BST500 kg. 245


22 Fier in centuri peste etaj BST500 kg. 281
23 Fier in grinzi peste etaj BST500 kg. 29
24 Fier in buiandrugi etaj BST500 kg. 97

25 Total fier Etaj BST500 kg. 652


26 Total beton Etaj C16/20 mc. 7.45

27 Total fier kg. 921


28 Total beton mc. 12.75

29 MASA LEMNOASA Grinzi din lemn mc. 3.200

30 Suruburi M12 cu saiba si piulita buc 69


31 Suruburi M12 cu diblu de beton buc 69
32 MASA LEMNOASA SARPANTA mc. 8.486
33 INVELITOARE ( SUPRAFATA ACOPERISULUI) mp. 161.521

Corp 2

NR. LUCRARI INFRASTRUCTURA DESCRIERE U.M. CANTITATE


1 Beton in Blocuri de fundare C12/15 mc. 15.00
2 Beton in elevatie C16/20 mc. 2.50
3 Beton placa pe sol C12/15 mc. 4.00
4 Plasa sudata placa pe sol STNB Φ5 100x100mm mp 45
5 Armatura Centuri de fundare BST500 kg. 337
6 Armatura Cuzineti BST500 kg. 79

7 Total fier fundatii BST500 Kg. 416


8 Total beton fundatii mc. 25.00

LUCRARI SUPRASTRUCTURA
9 Beton in stalpi parter C16/20 mc. 1.75
10 Beton in grinzi peste parter C16/20 mc. 3.50
11 Zidarie 0.15– parter mp. 53.00

12 Fier in stalpi parter BST500 kg. 140


13 Fier in grinzi peste parter BST500 kg. 367

14 Total fier Parter BST500 kg. 507


15 Total beton Parter C16/20 mc. 5.25

16 Total fier kg. 923


17 Total beton mc. 26.75

18 MASA LEMNOASA Grinzi din lemn mc. 1.128

19 Suruburi M12 cu saiba si piulita buc 38


20 Suruburi M12 cu diblu de beton buc 38
21 MASA LEMNOASA SARPANTA mc. 3.388
22 INVELITOARE ( SUPRAFATA ACOPERISULUI) mp. 51.198
Corp 3

NR. LUCRARI INFRASTRUCTURA DESCRIERE U.M. CANTITATE


1 Beton in Blocuri de fundare C12/15 mc. 11.00
2 Beton in elevatie C16/20 mc. 2.50
3 Beton placa pe sol C12/15 mc. 3.00
4 Plasa sudata placa pe sol STNB Φ5 100x100mm mp 30
5 Armatura Centuri de fundare BST500 kg. 181
6 Armatura Cuzineti BST500 kg. 72

7 Total fier fundatii BST500 Kg. 253


8 Total beton fundatii mc. 16.50

LUCRARI SUPRASTRUCTURA
9 Beton in stalpi parter C16/20 mc. 1.50
10 Beton in grinzi peste parter C16/20 mc. 2.60
11 Zidarie 0.15– parter mp. 48

12 Fier in stalpi parter BST500 kg. 167


13 Fier in grinzi peste parter BST500 kg. 275

14 Total fier Parter BST500 kg. 442


15 Total beton Parter C16/20 mc. 4.10

16 Total fier kg. 695


17 Total beton mc. 20.60

18 MASA LEMNOASA Grinzi din lemn mc. 1.056

19 Suruburi M12 cu saiba si piulita buc 20


20 Suruburi M12 cu diblu de beton buc 20
21 MASA LEMNOASA SARPANTA mc. 2.778
22 INVELITOARE ( SUPRAFATA ACOPERISULUI) mp. 53.668