GENERALE SI DE RENOVARE OBIECTUL: LOT 1 - INSTALATII ALIMENTARE CU APA STADIUL FIZIC: INSTALATII EXTERIOARE DE ALIMENTARE CU APA Beneficiar: ________________________________________ Proiectant: ________________________________________ Executant: ________________________________________
F3 - LISTA cuprinzand cantitatile de lucrari
- lei -
SECTIUNEA TEHNICA SECTIUNEA FINANCIARA
Pretul unitar TOTALUL
Nr. Capitolul de lucrari U.M. Cantitatea (exclusiv TVA) (exclusiv TVA) -lei- -lei- 0 1 2 3 4 5=3x4 1 TSC02A1 Sapatura cu excavat pe pneuri 0,21 - 100 1.12 3,162.00 3,541.44 0,39 mc pamant umidit. natur. desc. mc material: 0.00 0.00 dep. ter. cat 1 manopera: 0.00 0.00 utilaj: 3,162.00 3,541.44 transport: 0.00 0.00 2 TSA02E1 Sapatura manuala de pamant in spatii mc 48.00 75.00 3,600.00 limitate, avand sub 1,00 m sau peste material: 0.00 0.00 1,00 m latime, executata fara sprijini, cu manopera: 75.00 3,600.00 taluz vertical, la fundatii, canale, utilaj: 0.00 0.00 subsoluri, drenuri, trepte de infratire etc. transport: 0.00 0.00 in pamant coeziv mijlociu sau foarte coeziv adancime <1,5 m teren mijlociu 3 CQ16C% Foraj rotativ cu circ.directa m 200.00 227.86 45,571.20 pt.consolid,etansarid material: 26.26 5,251.20 90...130mm,netubat teren categoria iii manopera: 120.00 24,000.00 utilaj: 81.60 16,320.00 transport: 0.00 0.00 4 CQ16D% Foraj rotativ cu circ.directa m 215.00 290.52 62,462.40 pt.consolid,etansarid material: 36.12 7,766.40 130...180mm,netubat teren categoria iii manopera: 120.00 25,800.00 utilaj: 134.40 28,896.00 transport: 0.00 0.00 5 ACE08A1 Umplutura in...sant. la cond. de alim. cu mc 24.00 176.88 4,245.00 apa si canalizare cu: nisip material: 76.88 1,845.00 manopera: 100.00 2,400.00 utilaj: 0.00 0.00 transport: 0.00 0.00 6 TSC26A1 Dislocarea mecanica a pamantului din 100 1.60 858.00 1,372.80 depozit nou,necompactat si impingerea mc material: 0.00 0.00 lui pana la 5 m...cu buldozer pe tractor manopera: 0.00 0.00 de 65-80 CP teren catg. 1 sau 2 utilaj: 858.00 1,372.80 transport: 0.00 0.00 7 TSD01B1 Imprastierea cu lopata a pamant. mc 136.00 125.00 17,000.00 afinat,strat uniform 10-30cm. gros cu material: 0.00 0.00 sfarim. bulg. teren...teren mijlociu manopera: 125.00 17,000.00 utilaj: 0.00 0.00 transport: 0.00 0.00 Pag 2 STADIUL FIZIC: INSTALATII EXTERIOARE DE ALIMENTARE CU APA 0 1 2 3 4 5=3x4 8 TSD04D1 Compactarea cu maiul de mana a mc 136.00 50.02 6,802.99 umpluturilor executate in sapaturi material: 0.02 2.99 orizontale sau inclinate la 1/4,inclusiv manopera: 50.00 6,800.00 udarea fiecarui strat de pamant in utilaj: 0.00 0.00 parte,avand :...20 cm grosime pamant transport: 0.00 0.00 coeziv 9 TRA05A10 Transport rutier materiale,semifabricate tona 22.50 80.00 1,800.00 cu...autovehic.speciale(cisterna,beton.et material: 0.00 0.00 c)pe dist.de 10 manopera: 0.00 0.00 utilaj: 0.00 0.00 transport: 80.00 1,800.00 10 TRA01A30 Transportul rutier tona 24.00 80.00 1,920.00 al...materialelor,semifabricatelor cu material: 0.00 0.00 autobasculanta pe dist.= 30 km. manopera: 0.00 0.00 utilaj: 0.00 0.00 transport: 80.00 1,920.00 11 TRA01A10P Transportul rutier al...pamantului sau tona 40.80 80.00 3,264.01 molozului cu autobasculanta dist.=10 material: 0.00 0.00 km manopera: 0.00 0.01 utilaj: 0.00 0.00 transport: 80.00 3,264.00 12 00601C01 Pregatirea pentru imbinare tuburi din m 200.00 43.46 8,692.00 PEHD cu D= 125 mm in bare cu L=12 material: 23.46 4,692.00 m si pozitionarea in pamant dupa manopera: 20.00 4,000.00 imbinare utilaj: 0.00 0.00 transport: 0.00 0.00 13 00601C01 Pregatirea pentru imbinare tuburi din m 215.00 54.87 11,797.90 PEHD cu D=160 mm in bare cu L=12 m material: 34.87 7,497.90 si pozitionarea in pamant dupa imbinare manopera: 20.00 4,300.00 utilaj: 0.00 0.00 transport: 0.00 0.00 14 00602D06 Sudura cap la cap tuburi din PEHD buc 33.00 140.00 4,620.00 PE100 Pn 10...D = 125 mm material: 0.00 0.00 manopera: 50.00 1,650.00 utilaj: 90.00 2,970.00 transport: 0.00 0.00 15 00602D06 Sudura cap la cap tuburi din PEHD PE buc 36.00 137.00 4,932.00 80 Pn 10...D = 125 mm material: 0.00 0.00 manopera: 50.00 1,800.00 utilaj: 87.00 3,132.00 transport: 0.00 0.00 16 ACE09D1 Montarea armaturilor cu actionare buc 3.00 1,000.00 3,000.00 manuala sau mecanica (robinet vane material: 700.00 2,100.00 ventile clap. compens. etc. )dn:...100 manopera: 300.00 900.00 utilaj: 0.00 0.00 transport: 0.00 0.00 17 ACE09E1 Montarea armaturilor cu actionare buc 1.00 1,050.00 1,050.00 manuala sau mecanica (robinet vane material: 750.00 750.00 ventile clap. compens. etc. )dn:...125 manopera: 300.00 300.00 utilaj: 0.00 0.00 transport: 0.00 0.00 Pag 3 STADIUL FIZIC: INSTALATII EXTERIOARE DE ALIMENTARE CU APA 0 1 2 3 4 5=3x4 18 ACE09E1 Montarea armaturilor cu actionare buc 3.00 1,050.00 3,150.00 manuala sau mecanica (robinet vane material: 750.00 2,250.00 ventile clap. compens. etc. )dn:...125 manopera: 300.00 900.00 utilaj: 0.00 0.00 transport: 0.00 0.00 19 ACB05C2 Imbinare cu flanse piese...leg. flanse buc 6.00 324.13 1,944.75 armaturi si contoare cu dn 100 mm si pn material: 24.13 144.75 10 -25 at. manopera: 300.00 1,800.00 utilaj: 0.00 0.00 transport: 0.00 0.00 20 ACB05D1 Imbinare cu flanse piese...leg. flanse buc 2.00 325.14 650.27 armaturi si contoare cu dn 125 mm si pn material: 25.14 50.27 2,5-25 at. manopera: 300.00 600.00 utilaj: 0.00 0.00 transport: 0.00 0.00 21 ACB05E1 Imbinare cu flanse piese...leg. flanse buc 6.00 325.14 1,950.81 armaturi si contoare cu dn 150 mm si pn material: 25.14 150.81 2,5-25 at. manopera: 300.00 1,800.00 utilaj: 0.00 0.00 transport: 0.00 0.00 22 ACE04A1 Garnitura manevra cu tija 20 mm pentru buc 4.00 685.68 2,742.70 vane montate: in...pamant material: 585.68 2,342.70 manopera: 100.00 400.00 utilaj: 0.00 0.00 transport: 0.00 0.00 23 ACE01A1 Hidrant subteran de incendiu avand buc 4.00 2,823.78 11,295.11 d:...80 mm material: 2,073.78 8,295.11 manopera: 750.00 3,000.00 utilaj: 0.00 0.00 transport: 0.00 0.00 24 DC02XA Taierea cu masina cu discuri diamantate m 56.00 135.76 7,602.54 a rosturilor la material: 9.28 519.66 imbracam.bet.cim.,colmatarea cu mastic manopera: 50.00 2,800.00 bit. utilaj: 76.48 4,282.88 transport: 0.00 0.00 25 RCSB28E% Demolarea betoanelor vechi, mc 8.00 303.00 2,424.04 manual,placi prefabricate peste 15cm material: 0.00 0.04 gros. manopera: 300.00 2,400.00 utilaj: 3.00 24.00 transport: 0.00 0.00 26 DA14A1 Fundatie din beton de ciment la strazi mc 8.00 693.24 5,545.93 alei si platforme carosabile material: 363.57 2,908.53 manopera: 312.50 2,500.00 utilaj: 17.18 137.40 transport: 0.00 0.00 27 DB14A1 Strat de baza din mixturi asfaltice tona 11.00 1,465.85 16,124.32 executat la cald cu asternere manuala; material: 702.85 7,731.32 manopera: 750.00 8,250.00 utilaj: 13.00 143.00 transport: 0.00 0.00 Pag 4 STADIUL FIZIC: INSTALATII EXTERIOARE DE ALIMENTARE CU APA 0 1 2 3 4 5=3x4 28 ACE07D1 Spalarea si desinfectarea conductelor de 100 2.00 752.71 1,505.41 alimentare cu apa avand dn...125 m material: 2.71 5.41 manopera: 750.00 1,500.00 utilaj: 0.00 0.00 transport: 0.00 0.00 29 ACE07E1 Spalarea si desinfectarea conductelor de 100 2.15 753.88 1,620.83 alimentare cu apa avand dn...160 m material: 3.88 8.33 manopera: 750.00 1,612.50 utilaj: 0.00 0.00 transport: 0.00 0.00 30 ACE16A1 Montarea parapetelor si podetelor m 120.00 75.00 9,000.00 metalice de inventar la santuri material: 0.00 0.00 pentru...conducte manopera: 75.00 9,000.00 utilaj: 0.00 0.00 transport: 0.00 0.00 procent material manopera utilaj transport total Cheltuieli directe: 54,312.42 129,112.51 60,819.52 6,984.00 251,228.45 Recapitulatia: Recapitulatie 2018 Camera de munca 2,2500 % 0.00 2,905.03 0.00 0.00 2,905.03 Total Inclusiv Cheltuieli Directe: 54,312.42 132,017.54 60,819.52 6,984.00 254,133.49 Cheltuieli indirecte 10,0000 % 5,431.24 13,201.75 6,081.95 698.40 25,413.35 Total Inclusiv Cheltuieli indirecte: 59,743.67 145,219.30 66,901.47 7,682.40 279,546.83 Profit 10,0000 % 5,974.37 14,521.93 6,690.15 768.24 27,954.68 Total Inclusiv Profit: 65,718.03 159,741.23 73,591.62 8,450.64 307,501.52 TOTAL GENERAL (fara TVA): 307,501.52 TVA: 19.00 % 58,425.29