Sunteți pe pagina 1din 66

DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE

CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
BEJUCAL DE OCAMPO, CHIAPAS MATAMOROS”, CHEIE: 07EPR0374D CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE OBSER
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT
AXĂ SECȚIUNE TIP um VAȚI
LA 01 CLASA DIDACTIC RC

A0101 PRELIMINARI VEZI SCHITA.


1101000011 CURĂȚARE, AMENAJARE ȘI NIVELARE ÎN ZONA CLĂDIRI, INCL. SCULE, 1-2 AB m2 10.40 7.20 74.88
MUNĂ DE MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL PLUS 74.88 m2
LUCRĂRII.

h. AVG.
1102000021 1 AB M3 8.80 0.80 1.20 1.00 8.45 Z-2
SĂPAREA MÂNĂ ÎN TERENUL INVESTIGAT PE ȘANTIER, SECȚIUNEA
A,B 1-2 8.30 0.80 1.20 2.00 15.94 Z-1
OBLIGATORIE 0,00 PÂNĂ LA 2,00 MTS ADÂNCIME. INCLUDE: FINISARE
PANTĂ, TRANSPORTARE ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII, 2 AB 8.80 0.80 1.062 1.00 7.48 Z-2
MUNCĂ, SCULE, LOPATARE, FINISARE ȘI DRENARE. PLUS 31.87 M3

1102000051 EXCAVARE MÂNĂ ÎN TERENUL INVESTIGAT PE SANTIER PENTRU M3 5.16 7.07 0.15 1.00 5.47 BANCĂ
INSTRUIRE DE PLAZAS CIVICĂ, TRIBUNALELE 8.30 0.73 0.15 1.00 0.91 INTERIOARĂ
SPORT ȘI M3
PLUS 6.38
DEMUTAREA CLĂDIRILOR, INCLUDE: TRANSPORTAREA ÎN EXTERIOR ȘI
ÎN INTERIOR LUCRĂRII, SCULTELOR ȘI MUNCĂ.

1103000011 1, 2 AB M3 8.70 0.630 0.80 2.00 8.77


A,B 1-2 9.10 0.790 0.80 2.00 11.50
UMPLAREA SĂPAȚILOR CU MATERIAL DIN SĂPAȚIE, PENTRU STRUCTURI M3
PLUS 20.27
ȘI/SAU PENTRU A AJUNGE LA NIVELURI DE PROIECTE, ÎN STRATURI
GROSIME DE 20 CMS, COMPACTATE CU PIZON LA
90% CONFORM DOVADA PROCTOR, ANTERIOR
THE
INCORPORAREA APEI NECESARE, INCLUSIV: MATERIAL PRELUNSIT,
MĂSURĂ COMPACTATĂ, SCULĂ, MANĂ DE MUNCĂ ȘI TRANSPORT ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

1103000051 1-2 AB M3 7.78 5.84 0.30 1.00 13.63 BANCĂ


INTERIOARĂ
B. 1-2 8.30 1.000 0.30 1.00 2.49
UMPLAREA SĂPĂRILOR CU MATERIAL ÎMBUNĂTĂȚIT, PENTRU
STRUCTURI ȘI/SAU PENTRU A AJUNGE LA NIVELELE DE PROIECTE, ÎN
STRATURI GROSIME DE 20 CMS, COMPACTATE CU PIZON 90%,
CONFORM PROCTOR, ÎNAINTE DE INCORPORARE A APEI NECESARE ȘI M3
PLUS 16.12
INCLUDERE A APEI, MATERIALUL, MĂSURAT COMPACT. SCULE, MUNĂ DE
MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

ELABORAT: Vo.Bo.:

ENG. FELIPE ALBERTO COLMENARES MERIDA CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE ENG. SIXTO VAZQUEZ MONZON DIRECTOR
LUCRĂRI PUBLICE MUNICIPALE
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um

A0102 FUNDAȚIE VEZI SCHITA


1201000031 ȘABLAN BETON F'C=100 KG/CM2 REALIZAT PE SANTIER CU GROSIMEA
1 ,2 AB m2 8.30 0.70 2.00 11.62
DE 6 CM, INCLUDE: PREGĂTIREA ZONEI A,B 1-2 7.20 0.90 2.00 12.96
INSTALĂ, SCULĂ, MĂNĂ DE MUNCĂ ȘI TRANSPORTUL ÎN EXTERIOR ȘI ÎN
În cad. acces 4.44 0.15 1.00 0.67
INTERIORUL LUCRĂRII.
În cad. trotuar 8.76 0.15 1.00 1.31
m2
PLUS 26.56

1203000031 PANTOF DE
1 și 2 AB Z-1 M3 8.30 0.60 0.15 2.00 1.49
(SPIKE 01.) BETON F'C=250 KG/CM2 REALIZAT PE SANTIER, PENTRU ALERTARE
A,B 1-2 Z-2 7.40 0.70 0.15 2.00 1.55
FUNDARE. DIMENSIUNEA MAXIMĂ A AGREGATULUI VA FI DE (3/4") ȘI
CALITATEA ȘI BANCA DE ORIGINE TREBUIE APROBATE DE H. CONSILIUL 1 și 2 AB 8.30 0.21 0.352 2.00 1.23
CT1 ȘI CT2
ORĂSENULUI INCLUDE: TRANSPORTUL ÎN EXTERIOR ŞI ÎN INTERIORUL PLUS 4.27
LUCRĂRII, SCULE, MUNCĂ, PRELEVARE, TURNARE, VIBRAT, CURSARE, M3
ÎNCERCĂRI DE LABORATOR, DEŞEURI ŞI MEZER.

1212000011 (SPIKE. 02) OTEL PENTRU ARMATURA FUNDATIEI CU TIJA Nr. 2


F'Y=2400 KG/CM2. INCLUDE: Aprovizionare PE SANTIER, TRANSPORT cruce de oțel LUNGIME. SECȚIUNI PCS LUNGIME.
ÎN INTERIORUL ȘI ÎN EXTERIOAREA LUCRĂRII, STRUMENTULUI, MUNCĂ, 1 AB TC-2 kg 1.148 1.00 48.00 55.10
ACTIVAT, PLASARE, ACOSTARE, cârlige, suprapuneri, picioarele
2 AB CT-1 1.148 1.00 48.00 55.10
ÎNcrucișează, deșeuri și pliuri în ORICE ELEMENT STRUCTURAL. aripioarelor
110.20
picioarele
lung. Toate greutate
(kg/ml) aripioarelor
110.20 0.250 27.55
PLUS 27.55

(SPIKE. 03) OTEL PENTRU ARMATURA IN FUNDATIE CU TIJA NUM 3


FY=4200 KG/CM2. INCLUDE: Aprovizionare PE SANTIER, TRANSPORT IN
1212000021 kg
EXTERIOR SI IN INTERIOR SANTIERUL, STRUMENTA, MANA DE mana, oțel longitudinal LUNGIME. SECȚIUNI PCS LUNGIME.
ACTIVAT, PLASARE, ACOSTARE, cârlige, suprapuneri, A,B 1-2 kg 8.321 2.00 3.00 49.93
ÎNcrucișează, deșeuri și pliuri în ORICE ELEMENT STRUCTURAL.
1,2 AB 7.60 2.00 4.00 60.80
cruce de oțel
PANTOF DE
A,B 1-2 Z-2 0.718 2.00 37.00 53.13
ALERTARE
1,2 AB Z-1 0.618 2.00 34.00 42.02
205.88
lung. Toate greutate
(kg/ml) =(7,4/0,2)+1 =38 P
205.88 0.557 114.68
=((8,3-1,4)/0,25)+1
PLUS 114.68

kg

CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D
BEJUCAL DE OCAMPO, CHIAPAS CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012


DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
ELABORAT: Vo.Bo.:

ENG. FELIPE ALBERTO COLMENARES MERIDA CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE ENG. SIXTO VAZQUEZ MONZON DIRECTOR
LUCRĂRI PUBLICE MUNICIPALE
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um

1212000031 (SPIKE. 04) OTEL PENTRU ARMATURA FUNDATIEI CU TIJA NUM 4,5,6, AL oțel longitudinal LUNGIME. SECȚIUNI PCS LUNGIME. VEZI SCHITA

12 F'Y=4200 KG/CM2. INCLUDE: Aprovizionare la șantier, A,B 1-2 kg 8.29 2.00 4.00 66.32 CT1 ȘI CT2
POARTĂ OUT ȘI INTERIOR DE THE SANTIER, 66.32
ACTIVAT, greutate
PLASARE, ACOSTARE, cârlige, suprapuneri, CRUCI, tija de 1/2". lung. Toate
(kg/ml)
DEŞEURI, PUTEA ÎN ORICE ELEMENT 66.32 0.997 66.12
STRUCTURALE, INSTRUMENTE ȘI MANACĂ.
PLUS 66.12 kg

1213000011 ASTA PENTRU FUNDAȚIE CU LEMN DE PIN DE 3a. FINALIZAREA A,B 1-2 m2 7.40 0.15 4.00 4.44
UZUAL, MĂSURĂ DUPĂ SUPRAFAȚĂ DE A LUA LEGATURA, 1,2 AB 8.41 0.15 4.00 5.05 EXTERIOR SIDE
INCLUDE:
unealta, transporta EXTERIOR SI INTERIOR MUNCA, 1 AB 8.30 0.35 2.00 5.81
MATERIALE, MUNCĂ ÎN CALIFICAT, îndoirea ȘI 2 AB 8.30 0.35 2.00 5.81
DEŞURUBAT
PLUS 21.11 m2

121500030 1,2 AB K-1 m 0.99 12.00 11.88 TIP K=1


(SPIKE. 05) ANCORA CASTELULUI ÎN FUNDAȚIE DE 14x21 CMS.
CU BETON F'C=250 KG/CM2. ARMAT CU 4 VAR. #4 ȘI EST. DIN # PLUS 11.88 m
2 A/C 15 CM. DE LUNG. INCLUDE: ALIMENTARE, ACTIVAT, MONTAT,
Suprapuneri, cârlige și deșeuri, susținere comună, CU
3a LEMN DE PIN, EȘOSARE, EȘOSARE, TRANSPORT ÎN EXTERIOR ȘI ÎN
INTERIOR LUCRĂRII, MATERIALELOR, SCULTELOR ȘI MANUALĂ

1216000061 1 AB ML 8.75 1 8.75


(SPIKE. 06) OCHI PERIMETRAL BETON F'C= 250 KG/CM2
SECȚIUNEA MEDIE 14X23 CMS., MONTAT CU TIJA # 3Y .1-2 AB ML 1.15 4 4.60
ALERGARE
BASTON # 2 A/C 25CM. DE LUNG. INCL. FORMARE APARENTĂ, AB .1-2 ML 7.79 2 15.58 (STRINISIUNEA
DECOPERIRE, MATERIALE, TURNARE, SCULE, MANA DE MUNCĂ ȘI 1 AB ML 0.21 4 0.84
TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII. PLUS 29.77 ML

1216000062 (SPIKE. 07)Folta DE BETON F'C=250 KG/CM2 2 AB m 8.24 1.00 8.24


SECȚIUNE
AB .1-2 m 0.98 2.00 1.96
MEDIE DE 15X20 CMS. CU 5 VARS. DE LA NR. 3 SI TEST DE 1,40
m. DE LUNGIME DE NR. 2 @ 25 CMS. INCL. UNALĂ, MÂNĂ PLUS 10.20 m
A LUCRĂRII ȘI A TRANSPORTULUI ÎN EXTERIOR ȘI ÎN INTERIORUL
LUCRĂRII.

1217000052 perete DE LEGĂTURĂ ÎN FUNDAȚIE CU PARTIȚIE DE LA 1-2 m2 7.80 1.000 1.00 7.80
BETON F'C=40 KG/CM2. DE 15X20X40 CMS. STABILIT CU MORTARE, B. 1-2 7.80 1.111 1.00 8.67 SA AJUNGE LA EI
CIMENT, NIsip, 1:5 DIN 15 CMS. GROSIME INCLUSE: MATERIALE, CARURUL 0.15 1.039 -3.00 -0.47 MAI MAI CASTEL
EXTERIOR SI IN INTERIOR LUCRARA, INSTALATURI, SCULE SI MANA DE
0.15 1.620 -3.00 -0.73 MAI MAI CASTEL
MANIERA.
PLUS 15.27 m2

CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D CALCUL:
BEJUCAL DE OCAMPO, CHIAPAS

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

ENG. FELIPE ALBERTO COLMENARES MERIDA CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE ENG. SIXTO VAZQUEZ MONZON DIRECTOR
LUCRĂRI PUBLICE MUNICIPALE

ELABORAT
: Vo.Bo.:
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um

VEZI SCHITA
medie mare
1217000053 1,2 AB m2 6.03 0.958 2.00 11.55
perete DE LEGĂTURĂ ÎN FUNDAȚIE CU PARTIȚIE DE
F'C BETON=40 KG/CM2. DE 15X20X40 CMS. ASEZAT CU MORTARE CEM- 1,2 AB 2.27 1.200 2.000 5.45
MAI MAI CASTEL
ARE. 1:5 DIN 20 CMS. DE LA ESP. INCLUSE: MATERIALE: CARURUL 0.14 1.039 -6.00 -0.87
MAI MAI CASTEL
EXTERIOR SI IN INTERIORUL LUCRARII, UNELE DE INSTALATURI SI MANA 0.14 1.620 -6.00 -1.36
DE MANA. M2
PLUS 14.77

TIP K
1220000216 A,B 1-2 k m 0.78 8.00 6.24
(SPIKE. 08) ANCORA CASTELUL IN FUNDATIE DE 14X15CMS.CU BETON PLUS 6.24 m
F'C=250KG/CM2., ARMATAT CU 4 VAR. #4 SI STIVELE DE #2 A/C 15CM.,
INCLUDE: ALIMENTARE, ACTIVAT, MONTAJ, SUPRAPUNURI, CÂRLIGE ȘI
DEȘEURI, EȘTIREA CU LEMN A 3-A DE PIN, EȚIZARE, EȘOSARE,
MATERIALE, TRADUCERE ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII,
SCULĂ ȘI MUNCĂ.

A0103 STRUCTURA
1302000011 TIMPAN
1,2 AB m2 7.81 0.60 0.59 4.00 11.06
APARATE PENTRU PERETI SI STOLPI NEAPARENTA CU LEMN DE PIN DE
ZONA MAI MÂNĂ
3a. (TIMPANO) INCLUDE: FORMAREA, DEFORMAREA, ACTIVATĂ, ECHELE 0.25 0.40 -2.00 -0.20
LA ORICE ÎNĂLȚIME, LEMN DE PIN TERȚI PENTRU MATRICE (POLINI, BARE PLUS 10.86 DE

ȘI TEȘTII), SCULE, MANA DE MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN m2


INTERIORUL LUCRĂRII.

1302000051 AB .1-2 m2 7.20 10.55 75.96 VEZI SCHITA din


EȘOTIZARE PENTRU PLACELE ȘI GRANDELE ACOPERȘULUI APARENT CU
TRIPLAY DE PIN DE 16 MM.; INCLUDE: DEFORMARE SI COBORARE, AB .1-2 m2 10.55 0.1 2 2.11 dale
SCULE, MANA DE MUNCĂ, CARURUL ÎN EXTERIOR ȘI ÎN INTERIORUL AB .1-2 m2 7.20 0.1 2 1.44 BANDI T-1
LUCRĂRII, MATERIALE, ESCHELE LA ORICE ÎNĂLȚIME, LEMN DE PIN
.1-2 AB m2 7.09 0.3 4 8.508 T-2
TERȚI PENTRU SPRIJIN, FRÂNARE ȘI TRASARE (POLINI, BARE ȘI TEȘTI)
.1-2 AB m2 5.86 0.4 2 4.688 COPERTE T-1
.1-2 AB m2 0.2 0.3 4 0.24 T-2 TAPAS
.1-2 AB m2 0.25 0.4 1 0.10 UNION SLAB-
AB .1-2 m2 7.91 0.14 2 -2.21 UNION CADE
.1-2 AB m2 0.14 0.2 4 -0.11 MOCHETAS
.1-2 AB m2 3.2 0.21 2 -1.34 M2
PLUS 89.39

CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D CALCUL:
BEJUCAL DE OCAMPO, CHIAPAS

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

ENG. FELIPE ALBERTO COLMENARES MERIDA CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE ENG. SIXTO VAZQUEZ MONZON DIRECTOR
LUCRĂRI PUBLICE MUNICIPALE

ELABORAT: Vo.Bo.: .
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um

LUNGIME
1303000092 oțel în cruce SECȚIUNI PCS LUNGIME. BLOCARE T=1
(SPIKE. 09) OTEL DE ARMAT IN STRUCTURA CU TIJA F'Y=2400 KG/CM2. .
INCL.: SCULĂ, MÂNĂ DE MUNCĂ, CARRU 1,2 AB kg 1.00 2.00 45.00 90.00
EXTERIOR ŞI ÎN INTERIORUL LUCRĂRII, SUM., ACTIVAT, ARMAT, 90.00
Suprapuneri, cârlige, șei și deșeuri. lung. Toate greutate
(kg/ml)
90.00 0.251 PLUS 22.59 kg

1303000093 oțel longitudinal kg LUNGIME SECȚIUNI PCS LUNGIME. VEZI SCHITA AN


.
(SPIKE. 010) ARMATURA OTEL IN STRUCTURA DIAM.#3 F'Y=4200 1-2 AB A1+B1 7.00 1.00 30.00 210.00 =( 10.58 / 0.30 ) =
KG/CM2 INCLUS: SCULE, MANA DE MUNCĂ, CARURI ÎN EXTERIOR ŞI
INTERIOR DE THE SANTIER, LIVRA, ACTIVAT, L
ARMAT, AB 1-2 B. 10.10 1.00 12.00 121.20
Suprapuneri, cârlige, șei și deșeuri. AB 1-2 FIE LA 10.10 1.00 12.00 121.20
Bastoane
1,2 AB S F+G 2.10 2.00 10.00 42.00 LATURĂ

A,B 1-2 C+E 1.40 2.00 13.00 36.40 TÂTITĂ


LA

AB 1-2 h 2.00 1.00 10.00 20.00 CENTRAL

oțel longitudinal
A,B 1-2 tu 6.50 2.00 2.00 26.00
Eu
m
3.85 2.00 2.00 15.40
P 1.02 2.00 2.00 4.08
UN
8.10 2.00 2.00 32.40
cruce de oțel FIE lung. Mediu
A,B 1-2 1.50 4.00 20.00 120.00 =( 4.0 / 0.20 ) + 1 =

oțel longitudinal
1-2 AB 7.10 1.00 2.00 14.20 adiţional

1-2 AB % 1.50 1.00 4.00 6.00 Bastoane

cruce de oțel
1-2 AB
<‘ 1.40 2.00 38.00 106.40 =(5.2/0.2)+8+1=35

875.28
lung. Toate greutate
(kg/ml)
875.28 0.566 495.41
PLUS 495.41 kg

ELABORA Vo.Bo.:
T:

CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D CALCUL:
BEJUCAL DE OCAMPO, CHIAPAS

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012


DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
ENG. FELIPE ALBERTO COLMENARES MERIDA CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE ENG. SIXTO VAZQUEZ MONZON DIRECTOR
LUCRĂRI PUBLICE MUNICIPALE
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
BEJUCAL DE OCAMPO, CHIAPAS MATAMOROS”, CHEIE: 07EPR0374D CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE OBSER
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT
AXĂ SECȚIUNE TIP um VAȚI

oțel longitudinal LUNGIME. SECȚIUNI PCS LUNGIME.


1303000094 VEZI SCHITA AN
1-2 AB kg 7.09 2.00 5.00 70.90
BLOCARE T=1
Bastoane 5.098 2.00 2.00 20.39
= 0.55+2+2+0.55 =
(SPIKE. 011) ARMATURA OTEL IN STRUCTURA DIAM. # 4,5,6 LA 12 oțel longitudinal
F'Y=4200 KG/CM2. INCL.: SCULE, MUNĂ DE MUNCĂ, TRANSPORT ÎN 1-2 AB 7.09 1.00 2.00 14.18
EXTERIOR ȘI ÎN INTERIORUL SANTIERULUI, ALIMENTARE, ACTIVATĂ, greutate BLOCARE T=2
tija de 1/2". lung. Toate 105.47
MONTAJ, SUPRAPUNĂRI, CÂRLIGE, SĂI ȘI DEȘEURI. (kg/ml)
105.47 0.997 105.15
oțel longitudinal
axa centrală 7.09 1.00 3.00 21.27
BLOCARE T=2
21.27
tija de 5/8". lung. Toate greutate
(kg/ml)
21.27 1.566 33.31
PLUS 138.46
kg

1, 2 AB M3 7.10 0.20 0.30 2.00 0.85


1306000031 GAMPER T-1
1, 2 AB 7.10 0.24 0.40 1.00 0.68 GAMPER T-2
zona timpanului = 2,25 m2 2.25 0.15 2.00 0.68 TIMPAN
(PUA 12) BETON SIMPLU F'C=250 KG/CM2. FABRICAT PE SANTIER CU
1-2 AB 7.16 10.60 0.10 1.00 7.59 DALĂ
CIMENT RN PENTRU PLACE SI GRANDURI DE ACOPERIS. DIMENSIUNEA
MAXIMA A AGREGATULUI VA FI DE 19 MM. (3/4"), ȘI CALITATEA ȘI BANCA PLUS 9.80 M3
SA DE ORIGINE TREBUIE APROBATE DE H. PRIMĂRIE, INCLUDE: SCULE,
MÂNĂ DE MUNCĂ, TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII,
MAȘINĂ DE PRELEVARE, TURNARE, VIBRATĂ, CURSARE, DEȘEURI ȘI
AMESTEC.

A0104
1 AB m2 3.90 1.52 1.00 5.93
1403000092
SMITHY 2 AB 2.90 1.52 1.00 4.41
PLUS 10.34 m2
(SPIKE. 013) FURNIZAREA SI AMPLASAREA PROTECTIEI GEAMULUI PE
BAZA PE PROFIL TUBULAR (PTR) DREPTANGULAR VERDE 1" X 1", CADRE
FORMARE SI PATAT STRUCTURAL 1/2" LA FIECARE 14 CMS. DE
SEPARARE ÎN FORMA ORIZONTALĂ, INCLUDE: 4 BUPĂ DE EXPANSARE
DE 2" CU STUPURI DE 3'', SILICON TRANSPARENT, BAZĂ PRIMARĂ,
VOPSEA ALBĂ SMALĂ ALCHIDĂ, SUDARE E-6013, SCULĂ, MANĂ DE MĂSĂ,
ELABORA CARURĂ ÎN INTERIORUL ȘI EXTERIOR LUCRĂRILOR ȘI LUCRĂRII. Vo.Bo.:
T: EXECUTAREA SA CORECTĂ.

CONDUCTOR MUNICIPAL LUCRĂRI PUBLICE DIRECTOR LUCRĂRI PUBLICE MUNICIPALE .


DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
LOCAȚIE
CHEIE CONCEPT MATAMOROS”, CHEIE: 07EPR0374D
LUNG LARG ÎNALT CALCUL:
PCS REZULTAT OBSERVAȚI
BEJUCAL DE OCAMPO, CHIAPAS AXĂ SECȚIUNE TIP um

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

A0105 ZIDARIE
1503000821
(PUA. 014) LANT SAU CASTEL BETON F'C=250 KG/CM2 DE 14X15 CMS. ARMAT 1 AB CC4 ML 4.26 1.00 4.26 TIP CC-4

CU 4 VARS. Nu. 3, F'Y=4200 KG/CM2 EST. Nu. 2 2 AB 3.27 1.00 3.27


@ 20 CMS. INCL.: SCULĂ, MÂNĂ DE MUNCĂ, TRANSPORT EXTERIOR PLUS 7.53 ML
ȘI ÎN INTERIORUL LUCRĂRII, EȘORIZAREA COMUNĂ, ÎNTRECARE DE
LANE, VIBRAT, TURNAT, CURIT.

1505000062 A,B 1-2 ML 7.79 2.00 15.58


(SPIKE. 015) LANTUL BETON F'C=250 KG/CM2 DE 14X10 CM.FARA 1 AB 3.40 2.00 6.80
ARMATURI (ZOCLO) INCLUDE: SCULLA, MANA DE MANERA, CARRUTUL B. 1-3 PLUS 22.38 ML
EXTERIOR SI IN INTERIORUL LUCRARII, ESTAJAREA APARENTA.

1505000063
(PUA. 016) LANT BETON F'C=250 KG/CM2. DE 21X10 CMS. FĂRĂ ARMATURĂ 1, 2 AB ML 2.20 4.00 8.80
(ZOCLO) INCLUSIVĂ: ȘOPRIJAREA ȘI DESCORTAREA APARENTĂ, PLUS 8.80 ML
SCULE, MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIOR
MUNCA.

1505000066 A,B 1-2 CC-2 ML 7.49 4.00 29.96 TIP CC-2


(PUA. 017) LANȚ SAU CASTEL BETON F'C=250 KG/CM2.14X20
CMS. cu 4 VAR. #4 ȘI EST. #2 @ 20 CMS. INCL.: SHORING COMUN, PLUS 29.96 ML
TENSIREA, ÎNTRECAREA TIJELOR, SCULĂ, MUNUCĂ
ȘI TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII. (CD-2).

1505000096
(PUA. 018) LANT SAU CASTEL BETON F'C=250 KG/CM2 DE 14X15 CMS. ARMAT A,B 1-2 k ML 2.50 6.00 15.00 TIP K

CU 4 VARS. Nu. 4, F'Y=4200 KG/CM2 EST. Nu. 2 PLUS 15.00 ML


@ 15 CMS. INCL.: SCULĂ, MÂNĂ DE MUNCĂ, TRANSPORT EXTERIOR
ȘI ÎN LUCRĂRI, EȘOSARE COMUNĂ, EȘOSARE ȘI ÎNTRECARE DE TINE.

1505000097 (PUA. 019) LANȚ SAU CASTEL BETON, F'C= 250 KG/CM2. DE A,B 1-2 DC -1 ML 7.79 2.00 15.58 TIP CD-1
14X30 CMS, MONTAT CU 4 TIGE Nr. 4 ȘI STRIELE Nr. 2 @ 25 CMS.CU LEMN PLUS 15.58 ML
DE PIN SHORING A 3-a. INCLUDE: ACTIVAT, SCURTATAT, NESHORTAT,
INSTRUMENTA, MUNUCĂ ŞI
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII
ELABORAT: Vo.Bo.:
.
ENG. FELIPE ALBERTO COLMENARES MERIDA CONTROLATOR LUCRĂRI PUBLICE ENG. SIXTO ZQUEZ MONZON
MUNICIPALE MANAGER D. VA SI LUCRARI S MUNICIPAL
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
LOCAȚIE
CHEIE CONCEPT MATAMOROS”, CHEIE: 07EPR0374D
LUNG LARG ÎNALT CALCUL:
PCS REZULTAT OBSERVAȚI
BEJUCAL DE OCAMPO, CHIAPAS AXĂ SECȚIUNE TIP um

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

TIP K-1
1, 2 AB K-1 ML 2.49 8.00 19.92
2.60 4.00 10.40
TIP CC-5
1505000210
(SPIKE. 020) LANȚ SAU CASTEL DE BETON F'C=250 1,2 AB 1.487 4.00 5.95
ML
KG/CM2,14X21CMS. BRAŢ. cu 4 VAR. Nu. 4 ST. #2 @ 15 CMS. INCL.: PLUS 36.27
SHORING UZUAL, DEŞURUBAT, TRECERE DE TIGI,
SCULE, MUNĂ DE MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL
LUCRĂRII. SUB FEREASTRĂ
1 AB m2 3.90 0.73 1.00 2.85
SUB FEREASTRĂ
2 AB 2.90 0.73 1.00 2.12
SE INCAPE IN PERETI
1503000285 7.317 2.30 2.00 33.66
PERETE DE 14 cm. ENG. DIN BETON TABICON 10x14x28Cm. F'c=40 m2
PLUS 38.63
Kg/Cm2. PRISE CU MORTARE CEM-SAND 1:3. FINISAJ COMUN. PANA LA O
INALTIME DE LA 0 LA 3M. INCLUDE: TRANSPORT LA 20 MTS. DEŞEURI, A,B 1-2
CURATARE, MATERIALE, ESCHELE, ECHIPAMENTE DE MUNCĂ, SCULE ŞI
TOTUL NECESAR PENTRU EXECUTAREA CORECTĂ A EI.

LA, 1-2 m2 0.84 2.30 4.00 7.73 0,653 medie în mo


1503000286 0.734 2.30 4.00 6.75
m2
PERETE DE 20Cm. ENG. DIN BETON TABICON 10x20x40Cm. F'c=40 PLUS 14.48
Kg/Cm2. PRISE CU MORTARE CEM-SAND 1:3. FINISAJ COMUN. PANA LA O
INALTIME DE LA 0 LA 3M. INCLUDE: TRANSPORT LA 20 MTS. DEŞEURI,
CURATARE, MATERIALE, ESCHELE, ECHIPAMENTE DE MUNCĂ, SCULE ŞI
TOTUL NECESAR PENTRU EXECUTAREA CORECTĂ A EI.

A0106 ANULARE POST DE FEREASTRĂ


1601000042
(PUA. 021) FURNIZARE SI AMPLASARE PORTI DE 1 AB m2 3.90 1.520 1.00 5.93 GEAMUL FAȚĂ
ALUMINIU ANODIZAT NATURAL TIP COMERCIAL 2" CU FIX SI CULISANT, 2 AB 2.90 1.520 1.00 4.41 m2
CONFORM PROIECT, INCLUDE: ACCESORII, PLUS 10.34
SCULĂ, MUNĂ DE MUNCĂ, TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL
LUCRĂRII.

1603000046 1 AB PZA 1.00 1.00


(SPIKE. 022) FURNIZARE SI AMPLASARE USI CU TOC UNIVERSAL SI PZA
CONTRACADRE (ANONIZAT NATURAL) DE 0,92 X 2,44 CU 0,032 MTS. PLUS 1.00
FORMAT CU DOUA FOI DE FOIA DE VAR NEGRU. 26, SEPARAT DE UN
MIEZ DE SPUMA POLIURETANICA, CONFORM PROIECT, Nr. PLAN: 4 - 3688
- 7, INCLUDE BAALAMALE, SCULĂ, MANA DE MUNCĂ, TRANSPORT ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII
ELABORAT: Vo.Bo.:
.
ENG. FELIPE ALBERTO COLMENARES MERIDA
CONDUCTOR MUNICIPAL LUCRĂRI PUBLICE ENG. SIXTO zquez monzon
MANAGER D. MUNICIPAL S
VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
LOCAȚIE
CHEIE CONCEPT MATAMOROS”, CHEIE: 07EPR0374D
LUNG LARG ÎNALT CALCUL:
PCS REZULTAT OBSERVAȚI
BEJUCAL DE OCAMPO, CHIAPAS AXĂ SECȚIUNE TIP um

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

A0107 INST. ELECTRIC


1702000020 1 AB PZA 1.00 1.00
PZA
FURNIZAREA ȘI AMPLASAREA PANOULUI DE CONTROL QOD-4 PĂTRAT PLUS 1.00
SAU SIMILAR. INCLUS: CONEXIUNE DE TEST, MATERIALE PENTRU
FIXARE, SCULE, MANA DE MANERA, TRANSPORT IN EXTERIOR SI IN
INTERIOR SANTIERULUI

VEZI SCHITA
1707000010
ALIMENTAREA SI AMPLASAREA APARATULUI FLUORESCENT 2 X 32 1-2 AB PZA 5.00 5.00
PZA
WATI, ALIMENTARE CU DUPĂ DE 1,22 X 0,30 MTS, LAMPĂ ECONOMISTĂ PLUS 5.00
DE ENERGIE MOD. T-8 BASE G13.,
Aprindere INSTANTANĂ, 127 V/60 HZ, 410 K, ALB RECE, 5900 LM, DIFUSOR
ACRIL ȘI BALAST ELECTRONIC MOD. QTP 2 X 32 T8/127 ISN-D
QUICKTRONIC LINE, MCA. OSRAM SAU SIMILARE CA CALITATE,
EFICIENTA SI COST. INCLUDE: MATERIAL PENTRU FIXAREA ESTE, BANDĂ
IZOLANTĂ, ESCHFODARE, ÎNCERCĂRI, SCULE, MANĂ DE MUNCĂ,
TRADUCERE ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII, TOTUL NECESAR
PENTRU FUNCȚIONAREA ESTE CORECTĂ.

1702000420 LA 1-2 PZA 3.00 3.00


PZA
ALIMENTAREA SI AMPLASAREA COMUTATORULUI TERM MAGNETIC DE PLUS 3.00
1 POL 15 LA 50 AMperi. TIP QO MARCA SQUARE'D. INCLUDE: SCULĂ,
MANA DE MUNCĂ, CARURUL ÎN EXTERIOR ŞI ÎN INTERIORUL LUCRĂRII,
CONECTAREA ŞI PROBA.

1-2 AB SARE 2.00 2.00


1703000455
PRISE PENTRU VENTILATOR DE TAVAN IN CUTIE DE LAMINA SARE
ȚEVA GALVANIZATĂ ȘI CONDUCTĂ PVC GRE 13 MM PLUS 2.00
DIAMETRU, INCLUDE: PIPELINE, CONEXIUNI, CUTII, TOPS,
INSTRUMENTE, SCHELE, MANA DE MUNCĂ, TRANSPORT ÎN INTERIORUL
ŞI EXTERIOR ŞANTIERULUI.

1705000020 1-2 AB SARE 5.00 5.00


SARE
PRISE CENTRAL ÎN CUTIE TĂBLĂ ZINCATA CU TUV GRES PVC, INCLUDE: PLUS 5.00
CONECTOARE, CUPLĂRI, UMBĂ ZINCAT, SÂRMĂ
(MCA. CONDUMEX, ȘOFERI
MONTERREY, LATINCASA, CONDELMEX, CONELEC), ȘASIU ȘI Vo.Bo.:
PRODUS:
CAPAC DE ALUMINIU DE LA 1 LA 3 GEAMURI, TRANSPORT EXTERIOR SI .
INTERIOR LUCRARI, TESTE, CONECTARE, MANA DE mana si inginerie.
FELIPEHEALRBREARMTIEONCTOAL, MAPEANGAARDEOSRMEESR.IDA SUPERVIzor zquez monzon
ENG. SIXTO
LUCRĂRI PUBLICE MUNICIPALE MANAGER D. MUNICIPAL S
VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
CONCEPT CONCEPT ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
SANTIER:
LOCAȚIE
CHEIE MATAMOROS”, CHEIE: 07EPR0374D
LUNG LARG ÎNALT CALCUL:
PCS REZULTAT OBSERVAȚI
BEJUCAL DE OCAMPO, CHIAPAS AXĂ SECȚIUNE TIP um

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

1705000180 1,2 AB SARE 1.00 1.00


IEȘIRE CONTACT DUPLEX MONOFAZAT 15A-125 V NEMA 5-15R, PLUS 1.00 SARE
2 STÂLPI 3 SÂRMĂ, IMPĂMÂNAT, INSTALAT ASCUNS ÎN PEREȚI, MASA
SAU UNDE NECESARĂ, PLACĂ DE ALUMINIU ANODIZAT CULOARE
ARGINT. INCLUDE: CONDUIT PVC REZISTENT, CABLURI THW 10 CABLU,
CABLU CURU GOUL CABLU 12 (MARCA CONDUMEX, CONDUCTOARE
MONTERREY, LATINCASA, CONDULMEX) SAU SIMILARE CA CALITATE ȘI
COST, ACCESORII
NECESAR, CONEXIUNI, DOvezi, MÂNĂ DE
SCULĂ, CARURULSANTIER,
ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

1816000054 1-2 AB PZA 1.00 1.00 1.00


(SPIKE 023) REG. DE TAB. SECTIUNE ROSIE COMUN 60X60X80 CMS. PLUS 1.00 PZA
CU SP. DE 13 CMS. UN PLAN. INT. C/MOARTE. AC. 1:5, Ahab. LUSTRUIT
CU COPERT METALIC DIN Foaie NETEDA CAL. 18, INCL.: BALAMAILE,
CADRU UNG 1"X1"X1/8", 1 1/4 X 1 1/4" X 1/8" GARNIERE UNG, TIJA Nr. 4
ANCORAT LA LANT CAPTUT CU
POLIDUCT PORTOCALIU PENTRU ȚINEREA CONDUCTOARELOR, CLEMĂ
TIP OMEGA, LANT BETON F'C=150 KG/CM2 DE 15X15 CMS
DE SECC, INARMAT CU 3 VARS Nr. 3, EST. Nu. 2 @ 20
CMS.FIXARE CAPAC METAL DE LANT CU 4 ANCORE, RESOSTING SI
SHORING CU MAD. DE PIN DE 3a. DUZĂ, FOND PITRIș DE 3/4", VOPSEA
(CU U. v.)
ANTICOROZIV, SCULE, MANA DE MUNCĂ ȘI TRANSPORT
ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

A0108 FINISAJE
1901000011 A,B 1-2 m2 7.79 5.85 1.00 45.57 ZONA DE LOUNGE

(SPIKE. 024) ETAJ CONC. F'C=150KG/CM2 DE 10 CM. ENG. FINALIZAREA 8.80 1.15 1.00 10.12 TROTUAR
LUSTRUSATE SAU Zgariate CU PERIE DE PĂR, PLACE DE 3,06 X 2,00 MTS., PLUS 55.69 m2
ROTĂRI LA RE FINISATE CU TURNER; INCLUDE: TRADUCEREA ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII, TURNAREA, EȘOSAREA ȘI
EȘOTAREA CU LEMN DE PIN DE LA TERȚI PĂRȚI, MÂNĂ DE MUNCĂ,
MIXER, CURAȚI CU PERIE, SAPUN ȘI APA.

ELABORA Vo.Bo.:
T:ENG. PHILIP .
SUPRAVEGHEA SI ALBERTO COLMENARES MERIDA ZQUEZ MONZON
ENG. SIXTO
ZĂ SAU DE LUCRĂRI PUBLICE MUNICIPALE MANAGER D. S MUNICIPAL
VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE INCLUS
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI:
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
BEJUCAL DE OCAMPO, CHIAPAS MATAMOROS”, CHEIE: 07EPR0374D CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um

1-2 AB m2 7.20 10.55 1.00 75.96 m2


1902000015
PLUS 75.96
(SPIKE. 025) SUMA. ȘI LOCUL. DE IMPERM. PREFABAT. MULTISTRAT DE
ASFALT MODIFICAT "SBS" CU MIN. DIN 12% POLIM ASFALTIC MODIFICAT
MODIFICAT.; C/REF. CENTRU FIBRA DE STICLA DE 90 GRS/M2.C/RAZINA
BOROSILICAT DE TERMOFIXARE TIP "E" SI SARMA REF. LUNGIME. UN
TAXI. APARENȚĂ CU PIETRIȘ PE BAZĂ DE REOLIT PIGMENTAT ȘI
GLAMURĂ LA FOC CU RĂȘINA SILICIOANĂ ÎN COL. TERRACOTA CU 3,5
MM. DE LA ESP. TOTAL: REALIZAREA SUPRAPUNELOR DE 0,10 MTS. ÎN
AMBELE CELE; APLICATĂ PRIN TERMOFUZIA PE BAZĂ DE FOCUL UNEI
PLINTE CU GAZ BUTAN, MEMBRANA PREFABRICATĂ TREBUIE SĂ SE
CONFORME CU PARAMETRII F:1:T INDICATĂȚI DE „UATC F412T3 ȘI
TREBUIE SĂ PREZINEȚI O GARANȚIE SCRISĂ DE 5 ANI INCLUS: ()
STRUMENTE, MANA DE MANERA, TRANSPORT IN EXTERIOR SI IN
INTERIOR SANTIERUL, CURATIREA, PREGATIREA SUPRAFETEI,
APLICARE PRIMER ASFALT CU PERFORMANTE DE 0,20 LTS./M2,
ETANSAREA SI CALAFAREA FISURILOR SI CRISATURILOR PE BAZA
ASFALTULUI DE CIMENT PLASTIC CU PERFORMANTA LTS. .

Vo.Bo.:
ELABORAT:
.
ENG. FELIPE ALBERTO COLMENARES MERIDA
zquez monzon
CONDUCTOR MUNICIPAL LUCRĂRI PUBLICE MUNICIPAL S
ENG. SIXTO
MANAGER D.
VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
BEJUCAL DE OCAMPO, CHIAPAS MATAMOROS”, CHEIE: 07EPR0374D CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

1903000060 LOCAȚIE m2 IN PERETI DE 14 CM alt avg


CHEIE (SPIKE. 026) Aprovizionare CONCEPT
ȘI APLICARE DE VOPSEA (CU LUNG LARG ÎNALT PCS REZULTAT OBSERV
AXĂ
A,B SECȚIUNE
1-2 TIP um 7.79 3.18 4.00 99.09 AȚI
PROTECȚIE U V.) , VINIL LAVABIL VINIMEX, SUPER NOVI, KEM TONE,
mai puțină zonă de lucru
OPTIMUS 54, PROFESSIONAL, BERELEX, OSEL ORO, ACUARIO 10, VINI 0.25 0.40 -4.00 -0.40
ESTAR, PLUS, COLEMAN PLUS, PLASTICA 63, DOAL VINIL GRAN TURISMO STREAŞINĂ
CODE 1030021, ACVIN-TEX . SATIN, DECOR NETED SATIN, 1,2 AB 0.81 2.50 8.00 16.20
= (1.08+0.53)/2 = 0
SATIN MAESTRU ÎN PERETI, DUZĂ
0.21 2.55 4.00 2.14
COLONI, GRANDURI SI PLAFANI LA ORICE INALTIME, LUCRARE FINISATA
PERETE 20 CM
INCLUSIV: PREGATIREA SUPRAFETEI, PENSAREA SI TENCUIREA
NECESARE, INCLUSIV: ZOCLO, STRUMENTA, MANA DE MANIERA SI 1,2 AB 1.00 2.80 8.00 22.40
TRANSPORTUL EXTERIOR SI IN INTERIORUL LUCRARII.
SUB FEREASTRĂ
1 AB 3.90 0.95 2.00 7.41
0.07 0.95 2.00 0.13
VÂNZARE DUZA
3.90 0.15 1.00 0.59
=1.52+1.52 = 3.04
3.10 0.20 1.00 0.62
2 AB 2.90 1.04 2.00 6.03
0.07 1.40 1.00 0.10
=1.95+1.52 =3.47
3.47 0.20 1.00 0.69
1.45 0.20 1.00 0.29
= (0.06+0.12)/2 =
0.09 2.50 2.00 0.45
0.85 0.85 0.50 1.00 0.36
DALĂ
1-2 AB m2 7.20 10.20 1.00 73.44
FRONTIERĂ
A,B 1-2 10.20 0.10 2.00 2.04 FRONTIERĂ
1,2 AB 7.20 0.10 2.00 1.44 ZONA MAI MÂNĂ DE
A,B 1-2 3.80 0.15 -4.00 -2.28 ZONA MAI MÂNĂ DE
AB 1-2 5.80 0.20 -1.00 -1.16 ZONA MAI MÂNĂ DE
1,2 AB 7.10 0.20 -2.00 -2.84 GAMPER T-1
A,B 1-3 7.10 0.20 4.00 5.68 FUND

= 3.90 +1.95 = 5.85 5.80 0.20 1.00 1.16 GAMPER T-2

AB 1-3 5.80 0.34 2.00 3.94 FUND

5.80 0.30 1.00 1.74 m2


PLUS 239.26 Vo.Bo.:
ELABORAT: .
ENG 1 . 0 S .9 I 5
ENG. FELIPE ALBERTO COLMENARES MERIDA zquez monzon
1.00 XTO VA E
CONDUCTOR MUNICIPAL LUCRĂRI PUBLICE ML 10.95 MUNICIPAL S
MANAGER D. LUCRĂRI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D CALCUL:
BEJUCAL DE OCAMPO, CHIAPAS

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um
NAS FORJAT ÎN BANCĂ; INCLUDE: APARENT SHORING CU TRIPLAY DE PLUS 10.95 ML
PIN DE 16MM. LEMNUL ȘI TERȚI PARTI, TEȘITURI, STRUNCHIREA,
FORMAREA, DESCIMBRAREA, TRANSPORTUL ÎN EXTERIOR ȘI ÎN
INTERIOR LUCRĂRII, SCULTELOR ȘI MUNCĂ.

1903000064 FURNIZAREA SI AMPLASAREA STICLA FLOTANTA TRANSPARA DE 6 MM. 1 AB m2 3.90 1.52 1.00 5.93 VEZI SCHITA
IN FIX; INCLUDE: MESTECATI, RUSTE, TIEIE, CURATE, 2 AB 2.90 1.52 1.00 4.41
SCULE, MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIOR PLUS 10.34 m2
MUNCA.

2101000071 A,B 1-2 m2 7.79 3.06 4.00 95.35 alt mediu = (2,71+3.
(SPIKE. 027) PLAT DE PERETE CU MORTAR DE CIMENT-VAR- 0.30 0.40 -4.00 -0.48 mai puțină zonă de lucru
NIsip 1:2:6 PLOMAT ȘI RIGLĂ, FINIS BURET; INCLUDE: EVISISARE, STREAŞINĂ
FINISARE, FORJAREA RUSTICĂ, PREGĂTIREA SUPRAFEȚEI, SCHELE, 1, 2 AB 0.81 2.40 8.00 15.55 = (1.07+0.53)/2 = 0
MANOPERĂ DE (6,01 LA 12,00 M DE
0.21 2.40 4.00 2.02 DUZĂ
ÎNĂLȚIE) ȘI TOTUL NECESAR PENTRU EXECUTAREA SA CORECTĂ
PERETE 20 CM
1, 2 AB 1.05 2.40 8.00 20.16

SUB FEREASTRĂ
1 AB 3.90 0.80 2.00 6.24
0.07 0.88 2.00 0.12
3.90 0.15 1.00 0.59 VÂNZARE DUZA

3.00 0.20 1.00 0.60 =1.52+1.52 = 3.04

2 AB 1.95 0.88 2.00 3.43


0.07 0.88 1.00 0.06
3.40 0.15 1.00 0.51 =1.95+1.52 =3.47

1.50 0.20 1.00 0.30


0.09 2.40 2.00 0.43 = (0.06+0.12)/2 =

1.95 2.56 1.00 4.99 PUE SIDE

PLUS 149.87 m2

A010A Lăcătuș
2120000031 2 AB PZA 1.00 1.00
FURNIZARE SI AMPLASARE FOAIE PHILLIPS MOD.825 LOCK
ELABORA OTEL SOLID FUNCTIONARE CU CHEIE PE AMBELE LATE SAU PLUS 1.00 V M sau 2 .Bo.: .
T:
ENG. PHILIP CALITATE ȘI COST ASEMĂNĂ PENTRU UȘĂ ȘI/SAU ALUMINIU ZQUEZ MONZON
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE

SUPRAVEGHEA E M A U L B T E IP R A T N O E C L; O I L N M C E L N U A Y RE : IS DO M S E R U ID
Ñ A
S ENG. SIXTO
MANAGER D. S MUNICIPAL
ZĂ CARE ACTIONAZĂ CA O BATĂ LA LUCRĂRI PUBLICE MUNICIPALE VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D
BEJUCAL DE OCAMPO, CHIAPAS CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um
CU ÎNCHIDERE DE ȘOC, PÂNĂTOARE, SCULĂ, MUNCĂ ȘI TRANSPORT ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

PZA
A010A SEMNALIZARE
PZA 1.00 1.00
2901000111
PLUS 1.00
(SPIKE. 028) FURNIZAREA ȘI AMPLASAREA UNUI SEMNAL DE ȘANTIER DE
0,60 X 0,60 MTS ÎN ȚIA CERAMICĂ GRAVĂ ȘI VOPSĂ CONFORM UNUI
DESIGN AUTORIZAT DE H. PRIMĂRIE, INCLUDE: AMPLASAREA PIESEI PE
BAZĂ PE UNGHI DE ALUMINIU INFERIOR DE 1/2" ANCORAT DE PERETE
CU ANCORE SI SURUBURI, Adeziv "NU MAI CUI" SI SILICON ALB PE
PERIMETRUL TIGLEI, MATERIALE, MANUALĂ, STRUMENTE, TRANSPORT
IN INTERIOR SI EXTERIOR LUCRARI, DESIURI SI TOTUL NECESAR
PENTRU EXECUTAREA CORECTA A EI.

2960000046
PZA
PZA 1.00 1.00
(SPIKE. 029) SEMNE BASORElief DE 1,71 X 0,52 MTS CU LEGENDA PLUS 1.00
„CHIAPAS NE UNEȘTE” PE PEREtele CAP; CONFORM PROIECTULUI,
INCLUDE: MATRIGA UNICEL, ESCHELE LA ORICE INALTIME, A PICTA
(CU PROTECŢIE UV) COROIAT,
BURET FINE PLAT, CURĂȚARE, SCULĂ, MANOPERĂ ȘI TRANSPORT ÎN
INTERIORUL ȘI EXTERIOR SANTIERULUI.

A010B PROTECTIE CIVILA


2501000013 FURNIZAREA ȘI AMPLASAREA EXTINTORULUI DE PUDRĂ CHIMICĂ
USCATĂ PZA
DE LA 4,5 KG. Cu suport MCA. EXTINFLAM INCLUDE: MATERIALE, MANA DE PZA 1.00 1.00
mana, INSTRUMENTE SI TOTUL NECESAR PENTRU EXECUTAREA PLUS 1.00
CORECTA A SAUI.

Vo.Bo.:
.
ELABORAT:
zquez monzon
MUNICIPAL S
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE

ENG. SIXTO
MANAGER D.
VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D
BEJUCAL DE OCAMPO, CHIAPAS CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um
2501000143 PZA 2.00 2.00
PLUS 2.00 PZA
FURNIZARE SI AMPLASARE SEMNALIZAREA INFORMATIV 30x30CM.
PLASTIC ȘI VINIL, INCLUDE: MATERIAL DE FIXARE, SCULE ȘI MANOPERĂ,
TRANSPORT ÎN INTERIORUL ȘI EXTERIOR LUCRĂRII ȘI TOTUL NECESAR
PENTRU EXECUTAREA CORECTĂ A EI.

2501000144 PZA 1.00 1.00


PZA
PLUS 1.00

FURNIZARE SI AMPLASARE SEMNALIZARE PREVENTIVA DE 30x30CM.


PLASTIC ȘI VINIL, INCLUDE: MATERIAL DE FIXARE, SCULE ȘI MANOPERĂ,
TRANSPORT ÎN INTERIORUL ȘI EXTERIOR LUCRĂRII ȘI TOTUL NECESAR
PENTRU EXECUTAREA CORECTĂ A EI.

A010D MANEVRE SI MONTAJ


3101000274
(PUA. 030) (M10600090) MONTAREA SI AMPLASAREA SILIEI PZA 1.00 1.00
PORCELAN ALB 900 x 3000 mm., FURNIZAT DE CONTRACTANT, INCLUDE:
1.00
ACCESORII PENTRU A LUI FIXARE,
DESCĂRCARE, SCULĂ, MUNCĂ, TRANSPORT ÎN LUCRĂRI.

3112000383
(SPIKE. 031) (M10600041) AMPLASARE MESA PENTRU MASTER 1200 x 600
x 750 mm FURNIZAT DE CONTRACTANT. INCLUDE: DESCARCARE, PZA 1.00 1.00
PZA
TRANSPORT IN INTERIORUL LUCRARII. PLUS 1.00

313000004
(SPIKE. 032) (M10400126) PLASARE SCAUN SUPILABILE
PLASTIC, FURNIZAT DE EL CONTRACTANT, INCLUDE: PZA 1.00 1.00 PZA
DESCARCARE, TRANSPORT IN INTERIORUL LUCRUI. PLUS 1.00

ELABORAT:
313000005 Vo.Bo.:
ENG. FELIPE(PAULAB.ER0T3O3) C(OML1M0E60N0A0R1E7)S MCEORLIODCAATION .
SCAUN PALET
SUPERVISOPROLDIEPROOBPRIALESNPOUBSLUICMAISNIMSTURNAICDIPOALPEOSR PZA 40.00 40.00
CONTRACTORUL INCLUDE DIRECTORUL ING 4 . 0 S .0 I 0 zquez monzon
SUMĂ D MUNICIPAL S
XTO VA E
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D CALCUL:
BEJUCAL DE OCAMPO, CHIAPAS

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um
, ,
DESCARCARE, TRANSPORT IN INTERIORUL LUCRUI

m2 25 1.30 32.50 32.50 m2


LUCRARE EXTERNĂ
PLUS 32.50
1901000011 (PUA. 024) ETAJ CONC. F'C=150KG/CM2 DE 10 CM. ENG. FINISAJ LUSTRUS
SAU Zgariat CU PERIE DE PĂR, PLACE DE 3,06 X 2,00 MTS., ROTĂRI LA RE
FINISATE CU TURNER; INCLUDE: TRADUCEREA ÎN EXTERIOR ȘI ÎN
INTERIORUL LUCRĂRII, TURNAREA, UTILIZAREA ȘI UTILIZARE CU LEMN
DE PIN DE CLASA A TREIA, MÂNĂ DE MUNCĂ, SCULĂ, MIXER, CURĂȚARE
CU PERIE, SAPUN ȘI APA.

PZA 1.00 1.00


1719000010 (PUA. 023) REG. DE TAB. SECTIUNE ROSIE COMUN 60X60X80 CMS. CU SP. PLUS 1.00
DE 13 CMS. UN PLAN. INT. C/MOARTE. AC. 1:5, Ahab. Lustruit cu capac
metalic din foaie netedă CAL. 18, INCL.: BAALAMALE, CADRU
UNGHI DE 1"X1"X1/8", CONTRA-CADRE CU UNGHI DE 1 1/4 X 1 1/4" X 1/8",
TIJA Nr. 4 ANCORAT DE UN LANȚ ACCOPERIT CU POLIDUCT PORTOCALIU
PENTRU ȚINEREA CONDUCTORILOR, TIP CLEMĂ
OMEGA, LANT BETON F'C=150 KG/CM2 DE 15X15 CMS SECC, ARMAT CU 3
VARS Nr. 3, EST. Nu. 2 @ 20 CMS.CASA METALICA FIXARE LA LANTUL CU
4 ANCORE, SHORING SI SHORING CU MAD. DE PIN DE 3a. DUZĂ, FOND
PITRIș DE 3/4", VOPSEA (CU U. V.) ANTICOROZIV, SCULĂ, MANA DE
MUNCĂ ȘI TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

Vo.Bo.:
ELABORAT: .

zquez monzon
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE

ENG. SIXTO
MANAGER D.
VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
BEJUCAL DE OCAMPO, CHIAPAS MATAMOROS”, CHEIE: 07EPR0374D CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

1704000040 ALIMENTAREA SI MONTAREA TEVII PVC GRE 32 LOCAȚIE PZA 10 10 10


CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERV
mm DIAMETRU; INCLUDE: TRANSPORT, MATERIALE PENTRU AXĂ SECȚIUNE TIP um PLUS 10 PZA AȚI
TINE
FIXARE ȘI SUPPORT, ECHELE, SCULĂ MICĂ, MÂNĂ
DE LUCRARE SI TOTUL NECESAR PENTRU EXECUTAREA EI CORECTA.

1702000420 PZA 1.00 1.00


ALIMENTAREA ȘI AMPLASAREA ÎNTRERUPĂTORUL TERMOMAGNETIC PLUS 1.00 PZA
TIP QO 1 POL DE LA 15 LA 50 AMperi, MARCA SQUARE'D; INCLUDE:
TRANSPORT, CONEXIUNE, TESTARE, SCUL MINOR, MANA DE MUNCĂ ȘI
TOTUL NECESAR PENTRU EXECUTAREA SA CORECTĂ.

1712000080 ML 3.00 3.00


ALIMENTAREA SI AMPLASAREA CABLULUI VINANEL XXI THW-LS/THHW- PLUS 3.00 ML
LS, 600 VOLȚI, MARCA 10 GAUGE CONDUMEX, LATINCASA,
CONDUCTORES MONTERREY, IUSA; INCLUDE: TRANSPORT, POZAT,
BANDA IZOLANTĂ, LUBRIFIARE, GHIDURI, IZOLARE PUNCTĂ, CONEXIUNI,
SCHELE, SCULE MICI, MANĂ DE MUNCĂ ȘI
TOTUL NECESAR PENTRU EXECUTAREA SA CORECTA.

1712000090 ML 7.00 7.00


ALIMENTAREA SI AMPLASAREA CABLULUI VINANEL XXI THW-LS/THHW- PLUS 7.00 ML
LS, 600 VOTI, CALIBRU 8 BRAND CONDUMEX, LATINCASA,
DRIVERS MONTERREY, IUSA; INCLUDE: TRANSPORT, POZAT,
BANDA IZOLANTĂ, LUBRIFIARE, GHIDURI, IZOLARE PUNCTĂ, CONEXIUNI,
SCHELE, SCULE MICI, MANĂ DE MUNCĂ ȘI
TOTUL NECESAR PENTRU EXECUTAREA SA CORECTA.

ELABORA Vo.Bo.:
T: .
1712000070 ML 40.00 40.00
E SU ALMBINE IR STORO CO
Y LM CO IN LO A CREA SCIMO EN RD ID E A
CABLE VINANEL XXI ZQUEZ MONZON
ENG. PHILIP DIRECTORUL ING 4 . 0 S .0 I 0
THW-LS/THHW- SAU DE LUCRĂRI PUBLICE MUNICIPALE SUMĂ D S MUNICIPAL
SUPRAVEGHEA XTO VA E
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
MATAMOROS”, CHEIE: 07EPR0374D CALCUL:
BEJUCAL DE OCAMPO, CHIAPAS

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT OBSERVAȚI
AXĂ SECȚIUNE TIP um
LS, 600 VOLTI, MARCA CALIBRATA 12 CONDUMEX, LATINCASA,
CONDUCTORES MONTERREY, IUSA; INCLUDE: TRANSPORT, POZARE,
BANDĂ IZOLANTĂ, LUBRIFIARE, GHIDURI, IZOLARE PUNCTĂ, CONEXIUNI,
ECHELE, UNELE MINICE, MANA DE MUNCĂ ȘI TOT CE NECESAR PENTRU
EXECUTAREA CORECTĂ A EI.

1702000010 PZA 1.00 1.00


ALIMENTAREA SI AMPLASAREA CENTRULUI DE INCARCARE QOD-2, PLUS 1.00 PZA
MARCA SQUARE'D; INCLUDE: TRANSPORT, CONECTARE, TEST,
PENTRU FIXAREA EI, MINOR INSTRUMENTA, MANA DE mana SI TOTUL
NECESAR PENTRU EXECUTAREA CORECTA A EI.

1704000020 ML 20.00 20.00


ALIMENTAREA SI MONTAREA TEVII PVC GRĂ DE 19 PLUS 20.00 ML
mm DIAMETRU; INCLUDE: TRANSPORT, MATERIALE PENTRU
FIXARE SI SUPPORT, ESCHELE, MICULE UNALE, MANA DE MANA SI
TOTUL NECESAR PENTRU EXECUTAREA CORECTA A SEI.

ELABORA Vo.Bo.:
T: .
ENG. FILIP SI ALBERTO COLMENARES MERIDA ENG. SIXTO zquez monzon
SUPRAVE SAU DE LUCRĂRI PUBLICE MUNICIPALE MANAGER D. MUNICIPAL S
VA SI LUCRARI
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE

CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN PLANURI: INCLUS
SANTIER: ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO
BEJUCAL DE OCAMPO, CHIAPAS MATAMOROS”, CHEIE: 07EPR0374D CALCUL:

NUMERE DE GENERATOR LOCAȚIE: CARIER EL MOLINO DATA: FEBRUARIE 2012

LOCAȚIE OBSERV
CHEIE CONCEPT LUNG LARG ÎNALT PCS REZULTAT AȚI
AXĂ SECȚIUNE TIP um

ELABORAT: Vo.Bo.: .
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ANEXE

SALĂ
DE
CLAS
Ă

SALĂ
DE
CLAS
Ă

ELABORAT Vo.Bo.: .
:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ANEXE

MBRON
MBRON

Wham
= 29 buc

ELABORAT Vo.Bo.: .
:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ANEXE

SA
U

NIVEL DE
PROIECT
SK
SK

ELABORAT Vo.Bo.: .
:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ANEXE

S K-1
S K-1

GAMPER T-2

ANEXE

LATERALE
FRANTE
FRONTE

TIMPAN
NA-TRABE

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON


CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE DIRECTOR LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

EXOS
34 buc

20

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON


CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE DIRECTOR LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

EXOS

5.10

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ZEROU
RI

chetas

RIOR
LA

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ANEXE

ELABORAT Vo.Bo.: .
:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

și T-2

.81

N/A

0,09 ÎN K-2

timpanele
GAMPER T-
2
GAMPER T-
1

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON


CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE DIRECTOR LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ANEXE

41)/2 = 3.06
și T-2

.80

N/A

0,09 ÎN K-2
RTA

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
ACȚIUNI

ELABORAT: Vo.Bo.: .

ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIRECTOR
CONTROLATOR LUCRĂRI PUBLICE MUNICIPALE LUCRĂRI PUBLICE MUNICIPALE
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

Cod Concept Unitate Cantitate PU Cantitate


LA PRIMAR
A01
ELABORAT: 01 CLASA DIDACTIC RC tu. Bo.
A0101 PRELIMINARI
CURĂȚARE, ÎNTINDERE ȘI NIVELARE ÎN ZONA PLANTEI
1101000011 DE CLĂDIRI, INCL. INSTRUMENTE, MUNĂ DE MUNCĂ ŞI m2 74.8800 $ 10.45 $ 782.50
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

SĂPAREA MÂNĂ ÎN TERENUL INVESTIGAT PE SANTIER,


SECȚIUNE OBLIGATORIE 0,00 PÂNĂ LA 2,00 MTS ADÂNCIME.
1102000021 INCLUDE: PANTĂ FINA, TRANSPORT M3 31.8700 $ 118.69 $ 3,782.65
ÎN INTERIORUL ŞI ÎN EXTERIOR ŞANTIERUL, MÂNĂ DE MUNCĂ,
SCULE, LOPATĂ, CONTEXTUL ÎNFERIT ȘI
santine.

SĂPAREA MÂNĂ ÎN TERENUL CERCETAT PE SANTIER PENTRU


INSTRUIRE DE PLAZAS CIVI,
1102000051 TRIBUNALELE M3 6.3800 $ 131.88 $ 841.39
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII,
SCULTELOR ȘI MUNCĂ.

UMPLAREA SĂPĂRILOR CU MATERIAL DIN SĂPAȚIE, PENTRU


STRUCTURI ȘI/SAU PENTRU A AJUNGE LA NIVELELE DE
PROIECTE, ÎN STRATURI GROSIME DE 20 CMS, COMPACTATE
1103000011 CU PIZON 90% DUPA M3 20.2700 $ 80.65 $ 1,634.78
TEST PROCTOR, ÎNAINTE DE INCORPORARE A APEI
NECESARE, INCLUSIV: RĂSPÂNDIREA MATERIALULUI,
MĂSURARE COMPACTĂ, INSTRUMENT, MÂNĂ
DE SANTIER ȘI
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

UMPLAREA SĂPĂRILOR CU MATERIAL ÎMBUNĂTĂȚIT, PENTRU


STRUCTURI ȘI/SAU PENTRU A AJUNGE LA NIVELURI DE
PROIECTE, ÎN STRATURI DE 20 CMS DE GROSIME, $ 9,453.25
1103000051 M3 16.1200 $ 586.43
PROCTOR, ANTERIOR THE
INCORPORARE A APEI
NECESAR, INCLUDE: FURNIZAREA ȘI MATERIAL PRELUNGIT,
MĂSURĂ COMPACTATE. SCULE, MUNĂ DE MUNCĂ ȘI
TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.
$ 16,494.57

TOTAL PRELIMINARI

SUBTOTAL $ 16,494.57
ACUMULAT $ 16,494.57

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate


A0102 FUNDAȚIE
ȘABLAN BETON F'C=100 KG/CM2 MADE IN
LUCRARE CU GROSIME DE 6 CM, INCLUDE: PREGATIREA
1201000031 A ZONEI DE DEPLACARE, SCULĂ, MUNĂ DE MUNCĂ ȘI m2 26.5600 $ 108.17 $ 2,873.00
TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

(SPIKE 01.) BETON F'C=250 KG/CM2 MADE IN


LUCRARE, PENTRU FUNDARE. DIMENSIUNEA MAXIMĂ A
AGREGATULUI VA FI DE (3/4") ȘI CALITATEA ȘI BANCA DE
ORIGINE TREBUIE APROBATE DE H. CONSILIUL ORĂSENULUI
1203000031 INCLUDE: TRANSPORTUL ÎN EXTERIOR ŞI ÎN INTERIORUL M3 4.2700 $ 2,703.34 $ 11,543.26
LUCRĂRII, SCULE, MUNCĂ, PRELEVARE, TURNARE, VIBRAT,
CURSARE, ÎNCERCĂRI DE LABORATOR, DEŞEURI ŞI MEZER.

(SPIKE. 02) OTEL PENTRU ARMATURA FUNDATIEI CU TIJA Nr. 2


F'Y=2400 KG/CM2. INCLUDE: Aprovizionarea pe șantier,
transportarea în exteriorul și în interiorul șantierului,

1212000011 INSTRUMENT, MÂNĂ DE SANTIER, ACTIVAT, kg 27.5500 $ 27.20 $ 749.36


AMPLASAREA, AMARAREA, CÂRLIGE, SUPRAPUNURI, CRUCI,
DEȘEURI ȘI CUTURI ÎN ORICE ELEMENT STRUCTURAL.

(SPIKE. 03) OTEL PENTRU ARMATURA IN FUNDATIE CU TIJA


NUM 3 FY=4200 KG/CM2. INCLUDE: Aprovizionare la șantier,
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL
LUCRĂRII,
1212000021 SCULĂ, MUNĂ DE MUNCĂ, ACTIVARE, AMPLASARE, AMARARE, kg 114.6800 $ 25.17 $ 2,886.50
CÂRLIGE, SUPRAPUNĂRI, CRUCI, DEȘEURI ȘI CUTURI ÎN
ORICE ELEMENT STRUCTURAL.

(SPIKE. 04) OTEL PENTRU ARMATURA IN FUNDATIE CU


TIJĂ NUM 4,5,6, LA 12 F'Y=4200 KG/CM2.
INCLUDE: ALIVRARE PE SANTIER, TRANSPORT EXTERIOR SI
1212000031 ÎN INTERIORUL LUCRĂRII, ACTIVAT, AMPLASARE, AMARARE, kg 66.1200 $ 22.56 $ 1,491.67
CÂRLIGE, suprapuneri, CRUCI, DEŞEURI,
COBURI ÎN ORICE ELEMENT STRUCTURAL, SCULĂ ȘI
MANOPERĂ.

ASTA PENTRU FUNDAȚIE CU LEMN DE PIN DE 3a. FINALIZAREA


UZUAL, MĂSURĂ DE SUPRAFAŢĂ DE
1213000011 CONTACT, INCLUDE: SCULĂ, CARURUL ÎN EXTERIOR ȘI ÎN m2 21.1100 $ 134.03 $ 2,829.37
INTERIORUL LUCRĂRII, MATERIALE, MUNCĂ ÎN ACTIVAT,
ȘOIȚAREA

SUBTOTAL $ 22,373.16

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
ACUMULAT $ 38,867.73

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

Cod Concept Unitate Cantitate PU Cantitate

(SPIKE. 05) ANCORA CASTELULUI ÎN FUNDAȚIE DE 14x21 CMS.


CU BETON F'C=250 KG/CM2. ARMAT CU 4 VAR. #4 ȘI EST. DIN #
2 A/C 15 CM. DE LUNG. INCLUDE:
LIVRA, ACTIVAT, ARMAT, suprapuneri,
1215000030 m 11.8800 $ 349.60 $ 4,153.25
CÂrlige și deșeuri, susținere comună, cu al 3-lea lemn de pin,
sprijinire, sprijinire, transport exteriorȘI INTERIOR DE
THE SANTIER, MATERIALE,
SCULĂ ȘI MUNCĂ

(SPIKE. 06) OCHI PERIMETRAL DIN BETON F'C= 250 KG/CM2


SECTIUNEA MEDIA 14X23 CMS., MONTAT CU TIJA #3 SI TASTIA
1216000061 #2 A/C 25 CM. DE LUNG. INCL. ML 29.7700 $ 215.50 $ 6,415.44
SHORING APARENT, DEŞURUBAT, MATERIALE,
TORNARE, SCULE, MANA DE MUNCĂ ȘI TRANSPORT ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

(SPIKE. 07) PLATA BETON F'C=250 KG/CM2 SECTIUNEA MEDIA


DE 15X20 CMS. CU 5 VARS. DE LA NR. 3 SI TEST DE 1,40 M. DE
1216000062 LUNGIME DE NR. 2 @ 25 CMS. m 10.2000 $ 329.21 $ 3,357.94
INCL. SCULE, MUNĂ DE MUNCĂ ȘI TRANSPORT ÎN EXTERIOR
ȘI ÎN INTERIORUL LUCRĂRII.

PERETE DE INSTRUCȚIUNE ÎN FUNDAȚIE CU DESPĂRȚITOR DE


BETON F'C=40 KG/CM2. DE 15X20X40 CMS. STABILIT CU
1217000052 MORTARE, CIMENT, NIsip, 1:5 DIN 15 CMS. DE m2 15.2700 $ 291.33 $ 4,448.61
GROSIME INCLUSE: MATERIALE, TRANSPORTUL EXTERIOR ŞI
ÎN INTERIORUL ŞANTIERULUI, INSTALATURILOR, SCULTELE ŞI
MANACĂ.

PERETE DE INTRARE ÎN FUNDAȚIE CU DESPĂRȚITOR DE


1217000053 BETON DE F'C=40KG/CM2. DE 15X20X40 CMS. m2 14.7700 $ 380.76 $ 5,623.83
ENG. INCLUSE: MATERIALE: CARURUL EXTERIOR SI IN
INTERIORUL LUCRARII, UNELE DE INSTALATURI SI MANA DE
MANA.

(SPIKE. 08) ANCORA CASTELUL IN FUNDATIE DE 14X15CMS.CU


BETON F'C=250KG/CM2., ARMATAT CU 4 VAR. #4 ȘI ETRIERI DE
#2 A/C 15CM., INCLUDE: ALIMENTARE, ACTIVAT,
1220000216 m 6.2400 $ 229.83 $ 1,434.14
ARMAT,
CÂRLIGE ȘI DEȘEURI, EȘOSARE CU suprapuneri,
LEMN 3 DE PIN, EȚIZARE,
EȘOTARE, MATERIALE, TRANSPORT ÎN EXTERIOR ȘI ÎN
INTERIOR LUCRĂRII, SCULLE ȘI MANACĂ.

FUNDAȚIA TOTALĂ

$ 47,806.37
SUBTOTAL $ 25,433.21
ACUMULAT $ 64,300.94

ELABORAT: tu. Bo.

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate

A0103 STRUCTURA

APARATE PENTRU PERETI SI STOLPI NEAPARENTA CU LEMN


DE PIN DE 3a. (TIMPANO) INCLUDE: FORMAREA,
DEFORMAREA, ACTIVATĂ, ECHELE LA ORICE ÎNĂLȚIME, LEMN
1302000011 m2 10.8600 $ 220.19 $ 2,391.26
DE PIN TERȚI PENTRU MATRICE (POLINI, BARE ȘI TEȘTII),
SCULE, MANA DE MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN
INTERIORUL LUCRĂRII.

EȘOTIZARE PENTRU PLACELE ȘI GRANDELE ACOPERȘULUI


APARENT CU TRIPLAY DE PIN DE 16 MM.; INCLUDE: SHORING
SI SHORING, INSTRUMENT, MÂNĂ DE
SANTIER,
1302000051 m2 89.3900 $ 268.44 $ 23,995.85
TRADUCERE ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII,
MATERIALE, ESCHELE LA ORICE ÎNĂLȚIME, LEMN DE PIN
CLASA A III-A PENTRU SPRIJIN, FRÂNARE ȘI TRASARE (POLINI,
BARE ȘI ȚISARE)

(SPIKE. 09) OȚEL BOOSTER ÎN STRUCTURA


CU TIJA F'Y=2400 KG/CM2. INCL.: unealta,
1303000092 MUNCĂ, TRANSPORT EXTERIOR ŞI ÎN INTERIORUL LUCRĂRII, kg 22.5900 $ 27.20 $ 614.45
SUM., ACTIVAT, ASSAMBLAT, SUPRAPUNERE, CÂRLIGE,
SALE SI DESEURI.

1303000093 (SPIKE. 010) ARMATURA OTEL IN STRUCTURA DIAM.#3 kg 495.4100 $ 24.10 $ 11,939.38
F'Y=4200 KG/CM2 INCLUS: SCULA, MANA DE MANA, CARURUL
EXTERIOR SI IN INTERIOR LUCRARA, ALIMENTARE, ACTIVAT,
MONTAJ, SUPRAPURTURI, CÂRLIGE, SAU SI DEEUR.

(SPIKE. 011) ARMATURA OTEL IN STRUCTURA DIAM. # 4,5,6 LA


12 F'Y=4200 KG/CM2. INCL.: SCULE, MUNĂ DE MUNCĂ,
1303000094 TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL SANTIERULUI, kg 138.4600 $ 22.56 $ 3,123.66
Aprovizionare, ACTIVAT, ARMAT, suprapuneri,
CÂRLIGE, SĂI ȘI DEȘEURI.

(PUA 12) BETON SIMPLU F'C=250 KG/CM2. FABRICAT PE


SANTIER CU CIMENT RN PENTRU PLACE SI GRANDURI DE
ACOPERIS. DIMENSIUNEA MAXIMA A AGREGATULUI VA FI DE
19 MM. (3/4"), ȘI CALITATEA ȘI BANCA SA DE ORIGINE TREBUIE
APROBATE DE H. PRIMARIA, INCLUDE:
1306000031 INSTRUMENTA, MUNCA, M3 9.8000 $ 2,867.24 $ 28,098.95
TRANSPORT
ÎN INTERIORUL ȘI ÎN EXTERIOR LUCRĂRII, PRELEVARE,
TURNARE, VIBRAT, VINDECAT, DEŞEURI
ȘI MAȘINĂRIE
MIXER.
STRUCTURA GENERALĂ $ 70,163.55

SUBTOTAL $ 70,163.55
ACUMULAT $ 134,464.49

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

Cod Concept Unitate Cantitate PU Cantitate

A0104 SMITHY
(SPIKE. 013) FURNIZARE ȘI AMPLASARE DE PROTECȚIE
PENTRU FEREASTRĂ LA BAZA DE PROFIL TUBULAR
DREPTUNGULAR (PTR) CULOARE VERDE 1" X 1" CADRE DE
FORMARE ȘI PĂTRAT STRUCTURAL 1/2" LA FIECARE 14 CMS.
SEPARARE ORIZONTALĂ, INCLUDE: 4 BUPĂ DE EXPANSIUNE 2"
1403000092 CU BUȚI DE 3", SILIC m2 10.3400 $ 1,021.54 $ 10,562.72
VOPSEA TRANSPARENTĂ, BAZĂ PRIMARĂ, SMAL ALCHIDĂ
CULOARE ALB, SUDARE E-6013,
INSTRUMENTE, MUNCĂ, TRANSPORT ÎN INTERIORUL ȘI
EXTERIOR LUCRĂRII ȘI TOTUL NECESAR PENTRU
EXECUTAREA CORECTĂ A EI.

TOTAL FIERAR $ 10,562.72

A0105 ZIDĂRIE
(SPIKE. 014) LANȚ SAU CASTEL BETON F'C=250 KG/CM2 DE
14X15 CMS. ARMAT CU 4 VARS. Nu. 3,
F'Y=4200 KG/CM2 ÎS T. Nu. 2 @ 20 CMS.
1503000821 INCLUDE: m 7.5300 $ 198.85 $ 1,497.34
SCULĂ, MUNĂ DE MUNCĂ, TRANSPORT ÎN EXTERIOR ȘI ÎN
INTERIORUL LUCRĂRII, ASTA COMUNĂ, TRECERE
LAnsete, vibrate, turnate, vindecate.

(SPIKE. 015) LANȚ BETON F'C=250 KG/CM2 DE 14X10


1505000062 CM.NEMONTAT (ZOCLO) INCLUS: SCULĂ, MÂNĂ m 22.3800 $ 76.80 $ 1,718.78
A LUCRĂRII, TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL
LUCRĂRII, ASPIRARE ȘI DESCORDARE APARENTĂ.
(SPIKE. 016) LANT BETON F'C=250 KG/CM2. DE
1505000063 21X10 CMS. NEMONTAT (ZOCLO) INCL.: APARENT SHORING m 8.8000 $ 106.83 $ 940.10
ȘI EȘOTARE, SCULE, MUNĂ DE MUNCĂ ȘI TRANSPORT ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.
(SPIKE. 017) LANȚ SAU CASTEL BETON F'C=250 KG/CM2.14X20
CMS. cu 4 VAR. #4 ȘI ST. #2 @20 CMS. INCL.: EȘORARE
1505000066 COMUNĂ, COBĂRARE, ÎNTRECARE DE LANE, ML 29.9600 $ 246.31 $ 7,379.45
SCULE, MUNĂ DE MUNCĂ ȘI TRANSPORT ÎN EXTERIOR ȘI ÎN
INTERIORUL LUCRĂRII. (CD-2).

(SPIKE. 018) LANȚ SAU CASTEL BETON F'C=250 KG/CM2 DE


14X15 CMS. ARMAT CU 4 VARS. Nu. 4,
1505000096 m 15.0000 $ 259.66 $ 3,894.90
F'Y=4200 KG/CM2 ÎS T. Nu. 2 @ 15 CMS.
INCLUDE:
SCULĂ, MUNĂ DE MUNCĂ, TRANSPORT ÎN EXTERIOR ȘI ÎN
INTERIORUL LUCRĂRII, EȘOSAREA COMUNĂ, EȘIZAREA ȘI
ÎNTRECAREA TIJELOR.

SUBTOTAL $ 25,993.29
ACUMULAT $ 160,457.78

ELABORAT: tu. Bo.


ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES
DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate

(SPIKE. 019) LANȚ SAU CASTEL BETON, F'C= 250 KG/CM2. DE


14X30 CMS, MONTAT CU 4 TIXE Nr. 4 Y
1505000097 STRIEI nr. 2 @ 25 CMS. CU EPOI DE LEMN DE m 15.5800 $ 317.92 $ 4,953.19
al 3-lea PIN INCLUDE: ACTIVAT, SCURTATAT, NU SCURTAT,
INSTRUMENTE, MUNĂ DE MUNCĂ ŞI
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII
(SPIKE. 020) LANȚ SAU CASTEL BETON F'C=250 KG/CM2.14X21
CMS. BRAŢ. cu 4 VAR. Nu. 4 ST. #2 @ 15 CMS. INCLUDE:
1505000210 SHORING UZUAL, DEŞURUBAT, TRECERE DE m 36.2700 $ 257.24 $ 9,330.09
TIGE, SCULE, MANA DE MUNCĂ ȘI TRANSPORTUL ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.
PERETE DE 14 cm. ENG. DIN BETON TABICON 10x14x28Cm.
F'c=40 Kg/Cm2. ASSETAT CU MORTARE
CEM-ARENA 1:3. FINISAJ COMUN. PANA LA O INALTIME DE LA 0
1503000285 LA 3M. INCLUDE: TRANSPORT LA 20 MTS. DEŞEURI, m2 38.6300 $ 332.91 $ 12,860.31
CURAȚIE, MATERIALE, ESCHELE, ECHIPAMENTE DE MUNCĂ,
SCULE ȘI TOTUL NECESAR PENTRU EXECUTAREA CORECTĂ A
ESTE.

PERETE DE 20Cm. ENG. DIN BETON TABICON 10x20x40Cm.


F'c=40 Kg/Cm2. ASSETAT CU MORTARE
CEM-ARENA 1:3. FINISAJ COMUN. PANA LA O INALTIME DE LA 0
1503000286 LA 3M. INCLUDE: TRANSPORT LA 20 MTS. DEŞEURI, m2 14.4800 $ 417.40 $ 6,043.95
CURAȚIE, MATERIALE, ESCHELE, ECHIPAMENTE DE MUNCĂ,
SCULE ȘI TOTUL NECESAR PENTRU EXECUTAREA CORECTĂ A
ESTE.

ZIDĂRII TOTALE $ 48,618.11


A0106 ANULARE
(SPIKE. 021) FURNIZARE SI AMPLASARE PORTI ALUMINIU
ANODIZAT NATURAL DE TIP COMERCIAL 2" CU FIXE SI
1601000042 CULISANTE, CONFORM PROIECTULUI, INCLUDE: m2 10.3400 $ 1,260.94 $ 13,038.12
ACCESORII, SCULE, MANA DE MUNCĂ, CARURUL ÎN EXTERIOR
ȘI ÎN INTERIORUL LUCRĂRII.

(SPIKE. 022) FURNIZARE SI AMPLASARE USI CU TOC


UNIVERSAL ȘI CONTRACADRU (ANONIZAT
NATURAL) DE 0,92 X 2,44 CU 0,032 MTS. FORMAT CU DOUA FOI
1603000046 DE FOIA DE VAR NEGRU. 26, SEPARAT DE PZA 1.0000 $ 5,535.54 $ 5,535.54
UN MIEZ DE SPUMA POLIURETANICA, CONFORM PROIECT, Nr.
PLAN: 4 - 3688 - 7, INCLUDE BAALAMALE, SCULĂ, MANA DE
MUNCĂ, TRANSPORT ÎN EXTERIOR ȘI ÎN INTERIORUL
LUCRĂRII
ANULARE TOTALĂ $ 18,573.66
SUBTOTAL $ 51,761.20
ACUMULAT $ 212,218.98

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate


A0107 INST. ELECTRIC

FURNIZAREA ȘI AMPLASAREA PANOULUI DE CONTROL QOD-4


PĂTRAT SAU SIMILAR. INCLUS: CONEXIUNE DE TEST,
1702000020 PZA 1.0000 $ 449.92 $ 449.92
MATERIALE PENTRU FIXARE, SCULE, MANA DE MANERA,
TRANSPORT IN EXTERIOR SI IN INTERIOR SANTIERULUI

LIVRA ȘI PLASARE DE ASTRU


FLUORESCENT 2 X 32 WATI, SUPRAVIT CU DABIT DE 1,22 X
0,30 MTS, LAMPA ECONOMISTA ENERGIE MOD.
T-8 BAZA G13., PORNIT
INSTANT, 127 V/60 HZ, 410 K, ALB RECE, 5900 LM, DIFUSOR
ACRIL SI BALAST ELECTRONIC MOD.
2960000046 QTP 2 X 32 T8/127 ISN-D QUICKTRONIC LINE, MCA. OSRAM SAU PZA 5.0000 $ 1,271.10 $ 6,355.50
SIMILARE CA CALITATE, EFICIENTA SI COST. INCLUDE:
MATERIAL PENTRU FIXAREA ESTE, BANDĂ IZOLANTĂ,
ESCHFODARE, ÎNCERCĂRI, SCULE, MANĂ DE MUNCĂ,
TRADUCERE ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII, TOTUL
NECESAR PENTRU FUNCȚIONAREA ESTE CORECTĂ.

LIVRA ȘI PLASARE DE
INTRERUPATOR
1702000420 TERMOMAGNETIC
MARCA SQUARE'D.1 POL DE LA 15SCULĂ,
INCLUDE: LA 50 AMperi.
MANATIPDE
QOMUNCĂ, PZA 3.0000 $ 179.61 $ 538.83
CARURUL ÎN EXTERIOR ŞI ÎN INTERIORUL LUCRĂRII,
CONECTAREA ŞI PROBA.

PRISE PENTRU VENTILATOR DE TAVAN IN CUTIE TABLA


ZINCATA SI TUV CONDUCT PVC GRU DE 13 MM
1703000455 DIAMETRU, INCLUDE: TEVI, CONEXIUNI, CUTII, SARE 2.0000 $ 334.91 $ 669.82
CAPACELE, SCULE, ECHELE, MUNĂ DE MUNCĂ, TRANSPORT
ÎN INTERIORUL ȘI EXTERIOR SANTIERULUI.

PRISE CENTRAL ÎN CUTIE TABĂ ZINCATA


CU TUB CONDUCTĂ pvc GREU, INCLUDE:
CONECTOARE, CUPLĂRI, BARCĂ GALVANIZATĂ, CABLURI
(MCA. CONDUMEX, ȘOFERI MONTERREY,
1705000020 LATINCASA, CONDELMEX, CONELEC), ŞASIU ȘI SARE 5.0000 $ 443.52 $ 2,217.60
COPERTINA DE ALUMINIU DE LA 1 LA 3 GEAMURI, PENTRU
EXTERIOR SI INTERIOR LUCRARI, TESTE, CONECTARE, MANA
DE MANIERA SI STRUMENTE, INTRERUPATOARE.

SUBTOTAL $ 10,231.67
ACUMULAT $ 222,450.65

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate


1705000180
PRISE DE CONTACT MONOFAZĂ DUPLEX 15A-125 V NEMA 5-
15R, 2 POLI 3 SFÂRURI, IMPĂMÂNT, INSTALARE ASCUNS ÎN
PEREȚI, MASA SAU UNDE ESTE NECESAR, PLACĂ ALUMINIU
ANODIZAT CULOAREARGINT. INCLUDE:
CONDUIT PVC REZISTENT, Nr. 10 SÂRME DE CALIBRU THW,
SÂRM DE CUPRU DE GARABILITATE SARE 1.0000 $ 620.80 $ 620.80
Nr. 12 (MARCA CONDUMEX, CONDUCTORES MONTERREY,
LATINCASA, CONDULMEX) SAU SIMILAR CA CALITATE ȘI
COSTURI, ACCESORII NECESAR, CONEXIUNI,
ÎNCERCĂRI, MUNCĂ, SCULĂ, TRANSPORT ÎN EXTERIOR ȘI ÎN
INTERIORUL LUCRĂRII.

(SPIKE 023) REG. DE TAB. ROȘU UZUAL DE


SEC. 60X60X80 CMS. CU SP. DE 13 CMS. UN PLAN. INT.
C/MOARTE. AC. 1:5, Ahab. Lustruit cu capac metalic din tablă
netedă CAL. 18, INCL.: BALAMAILE, CADRU UNG 1"X1"X1/8", 1 1/4
X 1 1/4" X 1/8" GARNIERE UNG, TIJA Nr. 4 ANCORAT LA LANTUL
ACCOPERIT PORTOCALIU PENTRU FIXAREA
CONDUCTOARELOR, CLEMĂ DE TIP OMEGA, LANȚ DE BETON
1816000054 PZA 1.0000 $ 2,858.83 $ 2,858.83
F'C=150 KG/CM2 DE 15X15 CMS DE SECTIUNE, ARMAT CU 3
VARS Nr. 3, EST. Nu. 2 @ 20 CMS.CASA METALICA FIXARE LA
LANTUL CU 4 ANCORE, SHORING SI SHORING CU MAD. DE PIN
DE 3a. DUZĂ, FOND PITRIș DE 3/4", VOPSEA (CU U. V.)
ANTICOROZIV, SCULĂ, MANA DE MUNCĂ ȘI TRANSPORTUL ÎN
EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

TOTAL INST. ELECTRIC


$ 13,711.30
FINISAJE
A0108
(SPIKE. 024) ETAJ CONC. F'C=150KG/CM2 DE 10 CM. ENG.
FINISAJ LUSTRUS SAU Zgariat CU PERIE DE PĂR, PLACE DE
3,06 X 2,00 MTS., IMBĂRI LA RE FINISATE CU TURNER;
INCLUDE: transportul în exterior și în interiorul
1901000011 m2 55.6900 $ 289.74 $ 16,135.62
LUCRARE, TURNARE, FORMARE SI DESCOPERIRE CU LEMN
DE PIN TERȚI, MUNĂ DE MUNCĂ, SCULĂ, MIXER, CURĂȚARE
CU PERIE, APA ȘI SAPUN.

SUBTOTAL $ 19,615.25

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
ACUMULAT $ 242,065.90

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate


(SPIKE. 025) SUMA. ȘI LOCUL. DE IMPERMEABIL
PREFABAT.
MULTISTRAT DE ASFALT MODIFICAT "SBS" CU MIN. DIN POLIM
ASFALTIC MODIFICAT 12% MODIFICAT.; C/REF.
CENTRAL DE FIBRĂ DE STICLĂ DE 90
GRS/M2.C/RĂȘINA BOROSILICATĂ TERMOFIX TIP „E” ȘI Sârmă
REF. LUNGIME. UN TAXI. APARENȚĂ CU PIETRIȘ PE BAZĂ DE
REOLIT PIGMENTAT ȘI GLAMURĂ LA FOC CU RĂȘINA
SILICIOANĂ ÎN COL. TERRACOTA CU 3,5 MM. DE LA ESP.
TOTAL: REALIZAREA SUPRAPUNELOR DE 0,10 MTS. ÎN AMBELE
CELE; APLICAT PRIN TERMOFUZIA PE BAZĂ DE FOCUL UNEI
1902000015 PLINTE CU GAZ BUTAN, m2 75.9600 $ 157.18 $ 11,939.39

MEMBRANA PREFABRICATĂ TREBUIE SĂ SE CONFORME CU


PARAMETRII F:1:T INDICĂȚI DE „UATC F412T3 ȘI TREBUIE SĂ
DEPUNEȚE O GARANȚIE SCRISĂ DE 5 ANI, (CU DEPOZIT)
INCLUSIVĂ: SCULE, MĂNĂ DE MUNCĂ, TRANSPORT ÎN
EXTERIOR ȘI ÎN INTERIORUL INSTALĂȚIILOR, PREGĂTIRE,
PREGĂȚIRE, PREGĂȚIRE. APLICAREA ASFALTULUI PRIMER CU
UN RENDAMENT DE 0,20 LTS./M2, ETANȘAREA ȘI CALAFAREA
PEȘTILOR ȘI CRISURILOR PE BAZĂ DE CIMENT PLASTIC
ASFALTIC CU UN RENDAMENT DE 0,06 LTS/M2.

(SPIKE. 026) FURNIZARE SI APLICARE VOPSEA (CU PROTECTIE


U. V.) , VINIL LAVABIL VINIMEX, SUPER NOVI, KEM TONE,
OPTIMUS 54, PROFESSIONAL, BERELEX, OSEL ORO, ACUARIO
10, VINI ESTAR, PLUS, COLEMAN PLUS, PLASTICA 63, DOAL
VINIL GRAN TURISMO CODE 1030021, ACVIN-TEX . SATIN,
1903000060 DECORAT NETED m2 239.2600 $ 48.36 $ 11,570.61
FINISAJ SATINAT, MASTER SATINAT PE PERETI, STOLPI,
GRANDINE SI TAVANE LA Orice INALTIME, LUCRARE FINISATA
INCLUSIV: PREGATIREA SUPRAFETEI, DEBURURI SI
TENCUIURI NECESARE, INCLUSIV: PLINTA, STRUMENTA, MANA
DE MANIERA SI CARURUL IN EXTERIOR SI IN INTERIORUL
LUCRARII.

NAS FORJAT ÎN BANCĂ; INCLUDE: APARENT SHORING CU


1903000062 TRIPLAY DE PIN DE 16MM. SI LEMNUL DE LA TERȚI PĂRȚI, m 10.9500 $ 104.09 $ 1,139.79
CAMFE,
STRINGAREA, TRANSPORTUL ÎNTUMBLER, împodobit,
EXTERIOR ȘI ÎN INTERIORUL
LUCRĂRII, UNLELOR ȘI MUNCĂ.

FURNIZAREA SI AMPLASAREA STICLA FLOTANTA TRANSPARA


1903000064 m2 10.3400 $ 364.71 $ 3,771.10
DE 6 MM. IN FIX; INCLUDE: MESTECAT, RUGHES,
TĂIEI, CURĂȚARE, SCULE, MANA DE MUNCĂ ȘI TRANSPORTUL
ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL

SUBTOTAL $ 28,420.89
ACUMULAT $ 270,486.79
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate


(SPIKE. 027) PLAT DE PERETE CU MORTAR DE CIMENT-
VAR-NIsip 1:2:6 LA CONDUCE ȘI RIGLA,
FINALIZAREA
1903000081 PUFAT; INCLUDE: COROIAT, ÎNCERCĂRI
DE GOL,
FORJAREA RUSTICĂ, PREGĂTIREA SUPRAFEȚEI, ECHELE, m2 149.8700 $ 242.02
MANUPERĂ DE LA (6,01 LA 12,00 M ÎNĂLȚime) ȘI TOTUL $ 36,271.54
NECESAR PENTRU EXECUTAREA SA CORECTĂ

TOTAL FINISAJE
A0109 $ 80,828.05
Lăcătuș
2120000031
FURNIZARE ȘI AMPLASARE FOIA PHILLIPS MOD.825 BLOCARE
DIN OȚEL SOLID CARE ACTIONEAZĂ CU CHEIE PE AMBELE
LATE SAU CALITATE ȘI COST ASEMĂNĂRI PENTRU
UȘĂ ȘI/SAU MULTIPANOUL ALUMINIU; INCLUDE: DOUA CLECE PZA 1.0000 $ 257.95 $ 257.95
CARE ACTIONAZĂ CA O BLOCARE CU INSTANȚĂ,
SELECURI, INSTRUMENT, MÂNĂ
DE MUNCEȘTE ȘI
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.
$ 257.95
TOTAL LĂCATĂRU

SEMNALIZAREA
A010A

(SPIKE. 028) FURNIZAREA ȘI AMPLASAREA UNUI SEMNAL DE


ȘANTIER DE 0,60 X 0,60 MTS ÎN ȚIA CERAMICĂ GRAVĂ ȘI
VOPSĂ CONFORM UNUI DESIGN AUTORIZAT DE H. PRIMĂRIE,
INCLUDE: AMPLASAREA PIESEI PE BAZĂ PE UNGHI DE
PZA 1.0000 $ 2,966.38 $ 2,966.38
ALUMINIU INFERIOR DE 1/2" ANCORAT DE PERETE CU
2901000111 ANCORE SI SURUBURI, Adeziv "NU MAI CUI" SI SILICON ALB PE
PERIMETRUL TIGLEI, MATERIALE, MANUALĂ, STRUMENTE,
TRANSPORT IN INTERIOR SI EXTERIOR LUCRARI, DESIURI SI
TOTUL NECESAR PENTRU EXECUTAREA CORECTA A EI.

(SPIKE. 029) SEMNE BASORElief DE 1,71 X 0,52 MTS CU


LEGENDA „CHIAPAS NE UNEȘTE” PE PEREtele CAP; CONFORM
PROIECTULUI, INCLUDE: MATRISA UNICEL, ESCHELE
2960000046 LA ORICE ÎNĂLȚIME, VOPSIRE (CU PROTECȚIE UV) CHITUIRE, PZA 1.0000 $ 2,758.25 $ 2,758.25
PLATIRE, BUNERARE FINĂ, CURĂȚARE, SCULE, MANOPERĂ ȘI
TRANSPORT ÎN INTERIORUL ȘI EXTERIOR SANTIERULUI.

SEMNALIZARE TOTALĂ
$ 5,724.63

SUBTOTAL $ 42,254.12
ACUMULAT $ 312,740.91

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate


A010B PROTECȚIE CIVILĂ

FURNIZAREA SI AMPLASAREA STINGATORULUI PULBER


4,5 KG CHIMIC USCAT. Cu suport MCA. EXTINFLAM
2501000013 INCLUDE: MATERIALE, MANA DE MUNCĂ, INSTRUMENTE ȘI
TOT CE NECESAR PENTRU EXECUTAREA CORECTĂ A EI.
PZA 1.0000 $ 663.14 $ 663.14

LIVRA ȘI PLASARE DE SEMNALIZAREA


INFORMATIV 30x30CM. PLASTIC ȘI VINIL, INCLUDE:
2501000143 MATERIALE DE FIXARE, SCULE SI MANA DE mana, TRANSPORT PZA 2.0000 $ 118.70 $ 237.40
IN INTERIOR, EXTERIOR LUCRU SI TOTUL NECESAR PENTRU
EXECUTAREA CORECTA A EI.

LIVRA ȘI PLASARE DE SEMNALIZAREA


PREVENTIV DE 30x30CM. PLASTIC ȘI VINIL, INCLUDE:
2501000144 MATERIALE DE FIXARE, SCULE SI MANA DE mana, TRANSPORT PZA 1.0000 $ 118.70 $ 118.70
IN INTERIOR, EXTERIOR LUCRU SI TOTUL NECESAR PENTRU
EXECUTAREA CORECTA A EI.

PROTECȚIE CIVILĂ TOTALĂ $ 1,019.24

SUBTOTAL $ 1,019.24

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
ACUMULAT $ 313,760.15

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

ELABORAT: tu. Bo.

Cod Concept Unitate Cantitate PU Cantitate


A010C MANEVRE SI MONTAJ
(SPIKE. 030) (M10600090) MONTAREA SI AMPLASAREA
TABLA ALBA PORCELANIZATĂ 900 x 3000 mm., FURRATĂ
DE EL CONTRACTANT, INCLUDE:
3101000274 ACCESORII PENTRU A LUI FIXARE, DESCARCA, PZA 1.0000 $ 3,365.62 $ 3,365.62
INSTRUMENTA, MUNCĂ, TRANSPORT ÎN INTERIORUL
LUCRĂRII.

(SPIKE. 031) (M10600041) AMPLASARE MASA PENTRU


MASTER 1200 x 600 x 750 mm FURNIZAT DE CONTRACTANT.
3120000383 INCLUDE: DESCARCARE, TRANSPORT IN INTERIORUL PZA 1.0000 $ 1,110.04 $ 1,110.04
LUCRARII.

3130000004 PLASTICUL, FURNIZAT DE CONTRACTANT, INCLUDE: PZA 1.0000 $ 477.75 $ 477.75


DESCARCARE, TRANSPORT IN INTRE LUCRARE.

(SPIKE. 033) (M10600017) AMPLASARE ȘA PALET


3130000005 DIN POLIPROPILEN FURNIZAT DE CONTRACTANT, INCLUDE, PZA 40.0000 $ 614.25 $ 24,570.00
DESCĂRCARE, TRANSPORT ÎN LUCRĂRI
TOTAL MANEVRE SI MONTAJ $ 29,523.41
LUCRARE EXTERNĂ
A2315 PERETE ATASA

(SPIKE. 024) ETAJ CONC. F'C=150KG/CM2 DE 10 CM. ENG.


FINISAJ LUSTRUS SAU Zgariat CU PERIE DE PĂR, PLACE DE
3,06 X 2,00 MTS., ROTĂRI LA RE FINISATE CU
2314000010 TUMBLER; INCLUDE: TRADUCEREA ÎN EXTERIOR ȘI ÎN m2 32.5000 $ 289.74 $ 9,416.55
INTERIORUL LUCRĂRII, TURNAREA, UTILIZAREA ȘI UTILIZARE
CU LEMN DE PIN DE CLASA A TREIA, MÂNĂ DE MUNCĂ, SCULĂ,
MIXER, CURĂȚARE CU PERIE, SAPUN ȘI APA.

SUBTOTAL $ 38,939.96

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
ACUMULAT $ 352,700.11

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE

MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS


LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. LA SCOALA
ȘCOALA PRIMARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”,
CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

Cod Concept Unitate Cantitate PU Cantitate


ELABORAT: tu. Bo.

(SPIKE. 023) REG. DE TAB. SECTIUNE ROSIE COMUN 60X60X80


1719000010 PZA 1.0000 $ 2,858.83 $ 2,858.83
CMS. CU SP. DE 13 CMS. UN PLAN. INT. C/MOARTE. AC. 1:5,
Ahab. Lustruit cu capac metalic din foaie netedă CAL. 18, INCL.:
BAALAMALE, CADRU DE UNGHI DE 1"X1"X1/8",
CONTRACADRU CU unghi de 1 1/4 X 1 1/4" X 1/8",
TIJA nr. 4 ANCORAT LA LANT CAPTUTIT CU POLIDUCT
PORTOCALII PENTRU ȚINEREA CONDUCTOARELOR, CLEMĂ
TIP OMEGA, LANT BETON F'C=150 KG/CM2 DE 15X15 CMS DE
SEC, ARMAT CU 3 VARS Nr. 3, EST. Nu. 2 @ 20 CMS.CASA
METALICA FIXARE LA LANTUL CU 4 ANCORE, SHORING SI
SHORING CU MAD. DE PIN DE 3a. DUZĂ, FOND PITRIș DE 3/4",
VOPSEA (CU U. V.) ANTICOROZIV, SCULĂ, MANA DE MUNCĂ ȘI
TRANSPORTUL ÎN EXTERIOR ȘI ÎN INTERIORUL LUCRĂRII.

ALIMENTAREA SI MONTAREA TEVII PVC GRE 32MM


DIAMETRU; INCLUDE: TRANSPORT,
1704000040 MATERIALE PENTRUA LUI FIXARE ȘI A SUSTINE, ML 10 $ 47.71 $ 477.10
Schele, scule MINICE, MANA DE mana si tot ce este necesar pentru
EXECUTAREA CORECTA A ESTE

LIVRA ȘI PLASARE DE
INTRERUPATOR
TERMOMAGNETIC TIP QO DE 1 POL DE LA 15 LA 50 AMPERI,
1702000420 MARCA PĂTRAT; INCLUDE: TRANSPORT, PZA 1.0000 $ 160.37 $ 160.37
CONEXIUNE,
TEST, MINOR INSTRUMENT, MANA DE mana SI TOTUL
NECESAR PENTRU EXECUTAREA SA CORECTA.

FURNIZARE SI AMPLASARE CABLU VINANEL XXI


THW-LS/THHW-LS, 600 VOLTI, CALIBRU 10 MARCA CONDUMEX,
LATINCASA, CONDUCTORES MONTERREY, IUSA; INCLUDE:
TRANSPORT, POZARE, BANDĂ IZOLANTĂ, LUBRIFIARE,
GHIDURI, IZOLARE PUNCTĂ, CONEXIUNI, ECHEFODĂ, UNELE
1712000080 MINORE, MANA DE MUNCĂ ȘI TOT CE NECESAR PENTRU ML 3.0000 $ 15.31 $ 45.93
EXECUTAREA CORECTĂ A EI.

SUBTOTAL: $ 3,542.23
ACUMULAT: $ 356,242.34

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

Cod Concept Unitate Cantitate PU Cantitate

FURNIZARE SI AMPLASARE CABLU VINANEL XXI


THW-LS/THHW-LS, 600 VOLTI, CALIBR 8 BRAND CONDUMEX,
LATINCASA, CONDUCTORES MONTERREY, IUSA; INCLUDE:
1712000090 TRANSPORT, POZARE, BANDĂ IZOLANTĂ, LUBRIFICARE, ML 7.0000 $ 23.99 $ 167.93
GHIDURI, IZOLAREA PUNCTULUI, CONEXIUNI, ESCHELE,
MICULE UNALE, MANA DE mana SI TOTUL NECESAR PENTRU
EXECUTAREA CORECTA A EI.

FURNIZARE SI AMPLASARE CABLU VINANEL XXI


THW-LS/THHW-LS, 600 VOLTI, CALIBRATA 12 MARCA
CONDUMEX, LATINCASA, CONDUCTORES MONTERREY, IUSA;
1712000070 INCLUDE: TRANSPORT, POZARE, BANDĂ IZOLANTĂ, ML 40.0000 $ 10.99 $ 439.60
LUBRIFICARE,
GHIDURI, IZOLAREA PUNCTULUI, CONEXIUNI, ESCHELE,
MICULE UNALE, MANA DE mana SI TOTUL NECESAR PENTRU
EXECUTAREA CORECTA A EI.

FURNIZARE ȘI AMPLASARE CENTRU DE ÎNCARCARE QOD-2,


BRAND PĂTRAT; INCLUDE: CARRY,CONECTARE,
1702000010 TEST, MATERIALE PENTRU FIXAREA SA, STRUMENT PZA 1.0000 $ 223.74 $ 223.74
MINOR, MUNCĂ ȘI TOTUL NECESAR PENTRU EXECUTAREA SA
CORECTĂ.

ALIMENTAREA SI MONTAREA TEVII PVC GRE 19MM


DIAMETRU; INCLUDE: TRANSPORT,
1704000020 MATERIALE PENTRUA LUI FIXARE ȘI A SUSTINE, ML 20.0000 $ 32.82 $ 656.40
ESCHELE, MICULE UNALE, MANA DE mana SI TOTUL NECESAR
PENTRU EXECUTAREA CORECTA A EI.

TOTAL MUNCĂ EXTERNĂ


$ 14,446.45

SUBTOTAL: $ 1,487.67
ACUMULAT: $ 357,730.01
2% CERTIFICAREÎNAINTE DE INIFECH: $ 7,154.60
TVA 16%: $ 57,236.80
VALOARE TOTALĂA CONTRACTA:$ 414,966.81
SUMA TOTALĂ A PROIECTULUI: $ 422,121.41

ELABORAT: tu. Bo.

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

Cod Concept Unitate Cantitate PU Cantitate

REZUMAT PE PĂRȚI

PRELIMINARI $16,494.57

FUNDAȚIE $47,806.37

STRUCTURA $70,163.55

SMITHY $10,562.72

ZIDĂRIE $48,618.11

ANULARE $18,573.66

INSTALATIE ELECTRICA $13,711.30

FINISAJE $80,828.05

Lăcătuș $257.95

SEMNALIZAREA $5,724.63

PROTECȚIE CIVILĂ $1,019.24

MANEVRE SI MONTAJ $29,523.41

LUCRARE EXTERNĂ $14,446.45

SUBTOTAL $ 357,730.01
16% TVA $ 57,236.80
SUMA TOTALĂ DE CONTRACT $ 414,966.81
2% CERTIFICARE ÎNAINTE DE INIFECH. $ 7,154.60
SUMA TOTALĂ A PROIECTULUI $ 422,121.41

ELABORAT: tu. Bo.

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
FOND PENTRU INFRASTRUCTURA SOCIALĂ MUNICIPALĂ 2013
BUGET DE LUCRARE SI/SAU PROIECTE
MUNICIPIUL: BEJUCAL DE OCAMPO, CHIAPAS
LOCALIZARE: CARIER EL MOLINO
PROGRAM: SJ.- INFRASTRUCTURA EDUCAȚIONALĂ DE BAZĂ
SUBPROGRAM: 01) CONSTRUCTII 02) PRIMAR
CONSTRUIREA UNEI SALE DE CLASA EST. 6X8 MTS RC. ÎN ȘCOALA
ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE:
LUCRARE SAU PROIECT: 07EPR0374D
DATA: MARTIE 2013

Cod Concept Unitate Cantitate PU Cantitate

ELABORAT: tu. Bo.

ENG. SIXTO VAZQUEZ MONZON c. ELIDIO DE LEON MORALES


DIRECTOR LUCRĂRI PUBLICE MUNICIPALE PRESEDINTE CONSTITUTIONAL MUNICIPAL
DIRECȚIA LUCRĂRI PUBLICE MUNICIPALE
LUCRARE : CONSTRUIREA O SALĂ DE CLASĂ EST. 6X8 MTS RC. ÎN ȘCOALA ELEMENTARĂ RURALĂ A STATULUI „MARIANO MATAMOROS”, CHEIE: 07EPR0374D
SUBTOTAL LOCATIE : MARTIE 2013
$356,710.78
PROGRAM DE SUME LUNAR PENTRU EXECUTAREA LUCRĂRILOR
MUNICIPIUL :
TOTAL $356,710.78
CONCEPT CANTITATE UNITATE APRILIE MAI MAI IUNIE IUNIE IULIE IULIE AUGUST TOTAL
PERIOADA TOTAL
PRELIMINARI 7.00 JOR $16,494.57 $356,710.78 $16,494.57
ACUMULAT $356,710.78
TVA 16% $57,073.72
2% CERTIFICARE ÎNAINTE DE INIFECH. $7,134.22
FUNDAȚIE 21.00 JOR $47,806.37
$47,806.37 $420,918.72
1______________________

PROCENT DIN PERIOADA 100.00%


STRUCTURA 15.00 JOR $35,081.78 $35,081.78 $70,163.56
PROCENTAT ACUMULAT 100.00%

SMITHY 2.00 JOR $10,562.72 $10,562.72

ZIDĂRIE 18.00 JOR $48,618.11 $48,618.11

ANULARE 2.00 JOR $18,573.66 $18,573.66

INSTALATIE ELECTRICA 3.00 JOR $13,711.30 $13,711.30

FINISAJE 15.00 JOR $80,828.05 $80,828.05

Lăcătuș 1.00 JOR $257.95 $257.95

MANEVRE SI MONTAJ 1.00 JOR $5,724.63 $5,724.63

SEMNALIZAREA 1.00 JOR $29,523.4 1 $29,523.41

LUCRARE EXTERNĂ 7.00 JOR $14,446.45 $14,446.45

CARIER EL MOLINO
BEJUCAL DE OCAMPO, CHIAPAS
Data de începere: 25 APRILIE 2013
Data de încheiere: 25 iulie 2013
Perioada de execuție: 93 ZILE CALENDARĂ

S-ar putea să vă placă și