Documente Academic
Documente Profesional
Documente Cultură
CONTENTS
1. PREZENTARE...........................................................................................................................................................4
1.1 MTS GROUP.............................................................................................................................................. 4
1.1.1 Obiectivele companiei.................................................................................................................................4
1.1.2 Dezvoltarea companiei................................................................................................................................4
1.1.3 Globalizarea.................................................................................................................................................4
1.1.4 Garantii si calitatea.....................................................................................................................................4
2. GAMA DE CAZANE.................................................................................................................................................1
2.1 IDENTIFICAREA GAMEI CAZANELOR................................................................................................... 1
2.2 DIMENSIUNILE CAZANELOR SI POZITIA RACORDURILOR................................................................1
2.3 CONECTAREA LA BOILER.............................................................................................................................. 2
3. SISTEMUL HIDRAULIC.........................................................................................................................................1
3.1 MOD DE LUCRU - INCALZIRE........................................................................................................................ 2
3.2 MOD DE LUCRU - PRODUCERE ACM.............................................................................................................. 3
3.2.1 Servomotorul valvei cu trei cai....................................................................................................................5
3.3 POMPA DE CIRCULATIE................................................................................................................................... 6
3.4 SCHIMBATORUL DE CALDURA PRINCIPAL......................................................................................................... 7
3.5 GRUPUL HIDRAULIC....................................................................................................................................... 7
3.6 GRUPUL HIDRAULIC DE DISTRIBUTIE.............................................................................................................. 8
3.7 PRESOSTAT.................................................................................................................................................... 8
3.8 VASUL DE EXPANSIUNE CENTRAL................................................................................................................... 9
4. INSTALATIA DE GAZ..............................................................................................................................................1
4.1 VALVA DE GAZ.............................................................................................................................................. 1
4.1.1 Arzatorul principal.......................................................................................................................................2
4.1.2 Schimbarea tipului de gaz............................................................................................................................2
4.1.3 Reglarea presiunii de gaz............................................................................................................................2
4.2 DEFECTE - CAUZE - INTRETINERE.................................................................................................................. 4
5. SISTEMUL DE EVACUARE GAZE ARSE............................................................................................................1
5.1 CAMERA DESCHISA........................................................................................................................................ 1
5.2 CAMERA ETANSA........................................................................................................................................... 1
5.2.1 Ventilatorul...................................................................................................................................................2
5.2.2 Presostatul de aer........................................................................................................................................2
5.3 SISTEMUL DE EVACUARE................................................................................................................................ 2
5.3.1 Sistemul coaxial...........................................................................................................................................2
5.3.2 Sistemul cu doua tuburi...............................................................................................................................3
5.4 CONTROALE.................................................................................................................................................. 4
5.4.1 Verificarea evacuarii gazelor arse...............................................................................................................4
5.4.2 Analiza gazelor de ardere............................................................................................................................4
6. ECHIPAMENTUL ELECTRIC SI ELECTRONIC...............................................................................................1
6.1 DESCRIEREA P.C.B........................................................................................................................................ 1
6.1.1 P,C.B. Table..................................................................................................................................................1
6.1.2 Tabel de functii.............................................................................................................................................4
6.2 SISTEMUL DE ALIMENTARE ELECTRICA........................................................................................................... 4
6.3 LOGICA SI SIGURANTA................................................................................................................................... 4
6.3.1 Controlul evacuarii fumuluil (models FFI)................................................................................................4
6.3.2 Controlul evacuarii fumuluil (models MI)..................................................................................................4
6.3.3 Controlul pompei de circulatie....................................................................................................................5
6.4 REGLAREA.................................................................................................................................................... 5
6.4.1 Reglarea temperaturii..................................................................................................................................5
6.4.2 Moduri de operare.......................................................................................................................................5
6.4.3 Termostat de siguranta-Ceas-Termostat de camera....................................................................................7
16/06/2003 11:01:00 AM 6 2
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 3
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 4
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 5
MICROSYSTEM WALL HUNG BOILER
1. PREZENTARE
1.1.3 Globalizarea
Globalizarea Grupului s-a consolidat in 1992 cu 12 fabrici in 4 tari.
Aceste fabrici sunt structurate pe executia unui singur produs cu inalt nivel de specializare si flexibilitate.
16/06/2003 11:01:00 AM 6 6
MICROSYSTEM WALL HUNG BOILER
2. GAMA DE CAZANE
legenda:
10 – 15 – 21 - 28 Puterea maxima de lucru in kW
R Incalzire centrala
Indica tipul camerei de ardere-etansa si evacuarea
FF gazelor arse prin ventilator
I Aprindere si control flacara electronic
16/06/2003 11:01:00 AM 6 1
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 2
MICROSYSTEM WALL HUNG BOILER
RI RFFI
Legenda
A. Tur incalzire
B. Admisie gaz
C. Retur incalzire
16/06/2003 11:01:00 AM 6 3
MICROSYSTEM WALL HUNG BOILER
cazane
boiler MicroSystem MicroSystem MicroSystem MicroSystem
10 15 21 28
MICROBOILER (xx) (xx) (x) (x)
BACD 125 (x) (xx) (xx)
(x) posibil
(xx) ideal
16/06/2003 11:01:00 AM 6 4
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 5
MICROSYSTEM WALL HUNG BOILER
3. Circuitul hidraulic
16/06/2003 11:01:00 AM 6 1
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 2
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 3
MICROSYSTEM WALL HUNG BOILER
Note:
16/06/2003 11:01:00 AM 6 4
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 5
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 6
MICROSYSTEM WALL HUNG BOILER
Cazanul este predispus, din fabrica, pentru a putea fi conectat la un kit special in vederea producerii de apa
calda menajera.
Kitul contine urmatoarele:
1. Cutie electrica/ interfata pt conectarea la placa electronica a cazanului,
2. Valva cu 3 cai motorizata pt distribuirea agentului termic,
3. Termostat limitator (80°C), care se instaleaza pe boilerul indirect producator de ACM, pt a controla
temperatura agentului termic trimis catre boiler,
4. Conectori si robineti
Boilerele se pot conecta la cazan prin intermediul a doua feluri de kituri
16/06/2003 11:01:00 AM 6 7
MICROSYSTEM WALL HUNG BOILER
Note:
Daca se foloseste acest programator, se va inlatura puntea 10-15 si se vor lega cablurile aferente.
Alimentarea cesului cu tensiune 220V se va face din bornele 11-12.
16/06/2003 11:01:00 AM 6 9
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 10
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 11
MICROSYSTEM WALL HUNG BOILER
Caracteristici:
cursa: 7.5 mm
timpi de comutare: deschidere valva 6 sec.
Inchidere valva 4 sec.
alimentare: 220Vca 50Hz
1. contact stanga
2. comun
3. contact dreapta
16/06/2003 11:01:00 AM 6 12
MICROSYSTEM WALL HUNG BOILER
1) Ventil
2) Valva automata cu separator de aer
3) Surub de acces la arborele pompei pt deblocarea acestuia
230V 50Hz monofazic motor
WILO NFHOL 15/5-IC: 0,33A - 88W pompa de circulatie
Curbele de functionare ale pompei (s-a tinut cont de pierderile de sarcina din cazan)
16/06/2003 11:01:00 AM 6 13
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 14
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 15
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 16
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 17
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 18
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 19
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 20
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 21
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 22
MICROSYSTEM WALL HUNG BOILER
2
1
1) Valva de umflare
2) Suport de prindere
3) Racord catre instalatie
Caracteristici:
Capacitate: 6 litres
Presiunea de incarcare cu azot: 1 bar
Temperatura maxima de lucru: 90°C
Presiunea maxima de lucru: 3.0bar
Vasul preia expansiunea apei din circuitul primar datorata dilatatiei.
Este alcatuit din doua incaperi separate de o membrana de cauciuc. Azotul se gaseste intr-o incapere
iar apa din circuitul primar in cealalta.
Spatiul ocupat de azot se poate comprima compensand surplusul de volum de apa rezultat din
dilatatie.
Vasul de expansiune din dotarea cazanului este proiectat pt o instalatie de aproximativ 130 litri.
16/06/2003 11:01:00 AM 6 23
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 1
MICROSYSTEM WALL HUNG BOILER
4. INSTALATIA DE GAZ
16/06/2003 11:01:00 AM 6 2
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 3
MICROSYSTEM WALL HUNG BOILER
Componenta:
504 NAC
Schema legaturilor
16/06/2003 11:01:00 AM 6 4
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 5
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 6
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 7
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 9
MICROSYSTEM WALL HUNG BOILER
Model cazan
10-15 RI – 21 RI – RFFI 28 RFFI
RFFI
Pozitia butonului ora 6 ora 12 ora 3
16/06/2003 11:01:00 AM 6 10
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 11
MICROSYSTEM WALL HUNG BOILER
Arzator
Calaminarea ajutajelor cauzata de calitatea proasta a gazului: se inlocuiesc duzele cu altele nikelate.
Pentru intretinerea arzatorului, se vor curata ajutajele, elementele de legatura si tuburile venturi cu aer
comprimat; daca arzatorul este foarte murdar se vor spala componentele temeinic in apa.
Valva de gaz
Bobina nu are continuitate electrica; cazanul da scantee dar focul nu se aprinde deoarece gazul nu
patrunde:
Se va inlocui valva
Rezistenta ohmica a bobinelor: EV1 5800Ohm - EV2 19200 Ohm (230Volt)
Operatorul valvei stricat, gazul nu poate trece: se va inlocui valva
Filtrul valvei obturat; datorita
Modulatorul
Vibratii in bobina modulatorului: adauga un condensator electrolytic de 100-150 µF 50V atentie la
polarizarea lui (zgomotul poate fi cauzat si de un fir care da la masa)
Bobina modulatorului este arsa, cazanul nu mai moduleaza flacara si va merge numai pe minim: se va
inlocui bobina modulatutului.
Arcul sau/si tija modulatorului stricate, sistemul nu se regleaza: se inlocuieste modulatorul sau arcul si tija
lui.
16/06/2003 11:01:00 AM 6 12
MICROSYSTEM WALL HUNG BOILER
5. SISTEMUL DE EVACUARE
Tip B 11 bs
Tipul B 11 bs sunt cazane cu camera de ardere deschisa care folosesc pentru combustie aerul din incaperea in
care sunt instalate
Gazele de ardere sunt evacuate prin tiraj natural pe tubulatura exterioara aferenta care trebuie sa aiba o
portiune verticala dreapta de cel putin de doua ori diametrul racordului de evacuare al cazanului.
Un system « T T B » asigura controlul permanent al evacuarii gazelor arse.
Asigurarea aerului proaspat in incaperea in care este instalat cazanul este obligatorie, in concordanta cu prescriptiile
ISCIR. Priza de aer trebuie sa aiba o sectiune utila de min. 6 cmp pt fiecare kW de putere instalata, si nu trebuie sa fie
mai mica de 100 cmp.
16/06/2003 11:01:00 AM 6 1
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 2
MICROSYSTEM WALL HUNG BOILER
5.2.1 Ventilatorul
Ventilatorul folosit este in functie de modelul cazanului .
16/06/2003 11:01:00 AM 6 3
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 4
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 5
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 6
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 7
MICROSYSTEM WALL HUNG BOILER
Daca distantele sunt superioare celor din tabelul anterior atunci se foloseste sistemul bitubular (separata
admisia de evacuare).
Acest system foloseste tuburi de 80 mm, care au pierderi de sarcina mici.
Lungimea maxima a tubulaturii este data in tabelul de mai jos.
Pierderea de sarcina a unui cot de 90° este echivalenta cu 0.5 metri de conducra dreapta ; astfel incat pentru fiecare
cot inserat se reduce lungimea maxima permisa cu 0,5 m.
16/06/2003 11:01:00 AM 6 8
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 9
MICROSYSTEM WALL HUNG BOILER
5.4 Controale
Notes:
16/06/2003 11:01:00 AM 6 10
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 11
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 1
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 2
MICROSYSTEM WALL HUNG BOILER
Legenda:
A ON/OFF comutator A08 termostat de camera
B ON/OFF led verde A09 presostat de fum / sonda de fum
C comutator incalzire A10 boiler
D led verde – incalzirea in functiune A11 thermostat de supratemperatura
E reset button A12 alimentare aprindere – valva de gaz
F led boiler oprit A13 senzor de flacara
Conectari posibile:
16/06/2003 11:01:00 AM 6 3
MICROSYSTEM WALL HUNG BOILER
Notes:
RI
16/06/2003 11:01:00 AM 6 4
MICROSYSTEM WALL HUNG BOILER
RFFI Notes:
16/06/2003 11:01:00 AM 6 5
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 6
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 7
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 8
MICROSYSTEM WALL HUNG BOILER
Function MI FFI
Comanda electronica aprindere CBM2 CBM2
Presostat de fum (contact)/ comanda ventilator - CBM2
Generator de scantei (traf aprindere) (1) (1)
Sensor de flacara-control CBM2 CBM2
Oprire-control CBM2 CBM2
Valva cu 3 cai-releu control RT1 (2) RT1 (2)
Termostat boiler- control RT1 (2) RT1 (2)
Functia anti-inghet (3) (3)
ON/OFF LED x x
Lampa oprire x x
Iarna/vara selector LED x x
16/06/2003 11:01:00 AM 6 9
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 10
MICROSYSTEM WALL HUNG BOILER
6.4 Reglaje
Note:
Placa CT1 comanda (pe tensiune inalta) cu termostat mecanic si controleaza temperatura din circuitul de
incalzire fiind legata la placa RT1 (accessoriu pentru controlul exterior al incalzirii apei).
16/06/2003 11:01:00 AM 6 12
MICROSYSTEM WALL HUNG BOILER
Numai cronotermostatul si/sau termostatul de camera pot fi conectate la terminalele placii cazanului.
16/06/2003 11:01:00 AM 6 13
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 14
MICROSYSTEM WALL HUNG BOILER
Cand este cerere de ACM (pompa porneste si valva cu 3 cai comuta pe ACM), regulatorul de temperatura
de pe bordul cazanului este ignorat si temperatura este controlata de termostatul de pe turul circuitului
primar care alimenteaza boilerul exterior in modul productie ACM (setat la 80°C). Cazanul merge in
regim TOT sau NIMIC (Max-Oprit) , pe modul –ACM valva de gaz nu functioneaza niciodata pe minim.
Cererea de ACM are prioritate todeauna fata de cererea de caldura, odata ce cererea de ACM a fost
realizata, cazanul fiind pe pozitia IARNA, valva cu 3 cai comuta pe incalzire centrala.
3) “BOILER UK” system with kit for the UK market supplied by other manufacturers (Dunfoss,
Honeywell)
Even in this case, the boiler runs together with a boiler for the production of domestic hot water. The
connection between the boiler is made by means of kits sold by other manufacturers, in particular for the
UK market. The kits include (for the electric section), the 3-way motor driven switch valve (“Y” plan
system) or two area valves (“S” plan system), a timer to control both C.H. and D.H.W., a thermostat to
control the boiler water temperature and a room thermostat.
The substantial difference between this configuration and the “MTS BOILER” system, is that in this case
the water heater is not controlled by the and is therefore treated as though it were one of the elements of
the C.H. circuit. It can not be considered as a proper “request for D.H.W. mode running" and consequently
the winter/summer selector acts as in the case of the "only .C.H." system. It should therefore be noted that
this selector must be selected at all times (led on, winter mode). In addition, the C.H. timer and the room
thermostat are controlled by the “UK” kit, so that the relevant jumpers on the boiler terminal board must
not be removed.
The “UK” kit interfaces with the boiler simply like an open/closed contact on the relevant terminal board
of the boiler, with the control logic of the different kit components controlled independently from the
exterior.
16/06/2003 11:01:00 AM 6 15
MICROSYSTEM WALL HUNG BOILER
At a request from the UK kit (that autonomously controls the 3-way valve or the
area valves),the boiler activates and heat the water according to the setting on the Note:
water temperature set-up knob (on the front panel of the boiler); it is important to set
this regulation on maximum setting to ensure, if necessary, fast heating of the boiler.
Remember that this configuration is not fitted with the additional thermostat as in
the case of the MTS configuration. The boiler always operates with the
OFF/MIN/MAX burner (the gas valve modulates between MAX and MIN even
when heating the boiler, since it “sees” a request like the room C.H. request).
16/06/2003 11:01:00 AM 6 16
MICROSYSTEM WALL HUNG BOILER
16/06/2003 11:01:00 AM 6 17
MICROSYSTEM WALL HUNG BOILER
6.5 Afisaje-diagnoza:
Semnalizari ale placii CT1:
Placa in tensiune “activa”= ON, Led aprins verde
220V “declansat” lampa (rosu)
“Iarna/Vara” Led aprins = iarna, stins = vara (verde)
16/06/2003 11:01:00 AM 6 19
MICROSYSTEM WALL HUNG BOILER
Notes:
16/06/2003 11:01:00 AM 6 20