Sunteți pe pagina 1din 9

G

AsB 19.08.2022 As Built ing. Iavorschi Edward

A 03.2019 Prima editie

Indice Data Modificare Proiectant Aprobat Consultant Aprobat CFR


Index Date Modification/Revision Designer Approved Consultant Approved CFR

GUVERNUL ROMÂNIEI PROIECT FINANŢAT DE UNIUNEA EUROPEANĂ

Data Semnătură
BENEFICIAR / BENEFICIARY Date Signature
C.N.C.F. "C.F.R." - S.A.
Aprobat
Approved Beneficiar/Beneficiary Engineer

Data Semnătură
CONSULTANT / ENGINEER Date Signature
Aprobat
Approved Consultant/Consulting Engineer

Data Semnătură
PROIECTANT / DESIGNER Joint Venture leader Date Signature
Aprobat Funcţie / Function
Approved

CONSTRUCTOR / CONTRACTOR: Şi PARTENERII


Data Semnătură
PROIECTANT DDE / REVIEWER / REVIZUIT Date Signature
Aprobat Responsabil Proiectant
Approved Design Responsible ing. Angelescu Sergiu 19.08.2022
Verificat Responsabil Proiectant
Checked Design Responsible ing. Holbura Marius 19.08.2022
Întocmit Proiectant / Revizuit
Elaborated Designer / Reviewer ing. Iavorschi Edward 19.08.2022
"Reabilitarea liniei c.f. Simeria - Braşov, parte componentă a coridorului IV Pan - European
pentru circulaţia trenurilor cu viteză maximă de 160 km/h"
Secţiunea Coşlariu - Simeria

"Rehabilitation of the Railway Line Simeria - Braşov, component Part of the IV Pan -
European Corridor for the Trains Circulation with maximum speed of 160 km/h"
Section Coşlariu - Simeria

Denumire desen / Drawing Title :


DRAWING_NAME

Statia : BARABANT

Diagrame de cablaj macazuri

Scara / Scale Object / LOT Cod desen / Drawing Code Nr. / No


- BRB / 33 RCS4-2.1-D400-TIS-BRB-5235-AsB 1/9
T-21 E137740-B
SCARA: - FORMAT: A4 PAGINA: 2 / 9
Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV
SCARA: - FORMAT: A4 PAGINA: 3 / 9
Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV
SCARA: - FORMAT: A4 PAGINA: 4 / 9
Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV
SCARA: - FORMAT: A4 PAGINA: 5 / 9
Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV
GAK1
Zp1

Zp2
Zp3

Zp4

SCARA: - FORMAT: A4 PAGINA: 6 / 9


Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV
SCARA: - FORMAT: A4 PAGINA: 7 / 9
Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV
SCARA: - FORMAT: A4 PAGINA: 8 / 9
Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV
Zp5

Zp6
Zp7

Zp8

GAK2

SCARA: - FORMAT: A4 PAGINA: 9 / 9


Diagrame de cablaj macazuri
PROIECTAT:
NUMARUL DESENULUI:
RCS4 2.1 D400 TIS BRB 5235 AsB
PROJ PBS ABS OBS LOC CHRONO REV

S-ar putea să vă placă și