MANAGEMENT
6, 7
1. Project, project management, project lifecycle
2. Pre-feasibility study: resources analysis
3. Objectives, activities, results
4. Project management: Work Package, Working
Plan, Timing, Critical Path; project
monitoring
5. Risk Assessment, Risk Analysis
6. Monitoring and Evaluation; Valorisation
7. Founding, Financial Sheet
Constrains
11
2
ACTIVITIES (HOW?)
Activities:
AIM
2. Ending with at
Result 1
least one certain
result Result 2….
Financial
I. Personnel Costs
III. Subcontracting
Financial
A1.1 A1.2. .. A2.1. …. Total
I. Personnel Costs
III. Subcontracting
TOTAL
Realistic!!!!
Eligible!!!!
10. Structura bugetului:
DENUMIRE CAPITOL BUGET ANUL I ANUL TOTAL
NR. II VALOARE
CRT (RON) (RON) (RON)
CHELTUIELI DE PERSONAL *
1. [salarii, CAS, Şomaj, Contribuţia pentru asigurările sociale de
sănătate, colaborări, diurna-deplasari interne/externe]
CHELTUIELI INDIRECTE (regie, max 5% din valoarea
2.
grantului)
3. = 3.1.
3. CHELTUIELI DE INFORMARE DOCUMENTARE
+ 3.2.
3.1 Cheltuieli materiale
Mobilitati
[vizite de studiu, participări la manifestări ştiinţifice interne şi
3.2
internaţionale în concordanţă cu tematica grantului, taxe de acces,
cheltuieli de transport şi cazare) – max. 15% din valoarea grantului
MATERIALE, OBIECTE DE INVENTAR
4. [materiale consumabile inclusiv reactivi, componente, costuri
pentru acces la infrastructura de cercetare a tertilor]
COSTURI DE VALORIFICARE A REZULTATELOR
CERCETARII
5.
[materiale consumabile inclusiv reactivi, componente, costuri
pentru acces la infrastructura de cercetare a tertilor]
6. TAXE DE ACCES la laboratoare specializate
MOBILITY COSTS:
– TRAVEL AND ACCOMMODATION
• ORIENTATIVE: PLANE: 350 EUR; ACCOMMODATION: 50-60
EUR/NIGHT
– INSURANCE
– CONFERENCE FEES
TO BE CONSIDERED IN THE DISSEMINATION ACTIVITIES
TO BE EXPLAINED IN THE PROJECT (WHERE, why?)
MATERIALS
• EVERYTHING BELLOW 1800 RON
– CONSUMABLE (PAPER, TONNER, FILES,
ETC.)
– SUBSTANCES
– VERY SMALL EQUIPMENT (<1800 RON)
TO BE CONSIDERED IN THE PRACTICAL
ACTIVITIES
VALORISATION COSTS
• PRINTING BOOKS (INCLUDING THE
THESIS!)
• DEVELOPING THE PROTOTYPE
• ACCESS IN OTHER LABORATORIES
TO BE CONSIDERED IN THE FINAL
PHASE (IF NECESSARY)
EQUIPMENT (CAPITAL COSTS)
• EQUIPMENTS, DEVICES, ITEMS ABOVE
1800 RON (EXCEPT CONSUMABLES,
INCLUDING SUBSTANCES)
• TO BE CONSIDERED IN A SEPRATAE
ACTIVITY: INFRASTRUCTURE
UPDATING/DEVELOPMENT (NOT IN
TD)
DENUMIRE CAPITOL BUGET (2008) A1.1... A2.1.... A3.1.
Sinteza
NR.
literatu exp valorificare
CRT
ra
CHELTUIELI DE PERSONAL *
1. [salarii, CAS, Şomaj, Contribuţia pentru asigurările sociale de X X X
sănătate, colaborări, diurna-deplasari interne/externe]
CHELTUIELI INDIRECTE (regie, max 5% din valoarea
2. X X X
grantului)
3. CHELTUIELI DE INFORMARE DOCUMENTARE
3.1 Cheltuieli materiale X
Mobilitati
[vizite de studiu, participări la manifestări ştiinţifice interne şi
3.2 X
internaţionale în concordanţă cu tematica grantului, taxe de acces,
cheltuieli de transport şi cazare) – max. 15% din valoarea grantului
MATERIALE, OBIECTE DE INVENTAR
4. [materiale consumabile inclusiv reactivi, componente, costuri X
pentru acces la infrastructura de cercetare a tertilor]
COSTURI DE VALORIFICARE A REZULTATELOR
CERCETARII
5. - - ?
[materiale consumabile inclusiv reactivi, componente, costuri
pentru acces la infrastructura de cercetare a tertilor]
6. TAXE DE ACCES la laboratoare specializate - - -
7. TOTAL