Documente Academic
Documente Profesional
Documente Cultură
LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.1. TERASAMENTE [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
1 TSC04B1 82 SUTE MC 2.05000
0.00% 0.00% 0.00%
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU UMIDITATE
NATURAL DESC.DEP.TER.CAT.2
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.1
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
5 TSD07B1 82 SUTE MC 1.60000
0.00% 0.00% 0.00%
COMPACTAREA UMPLUT.CU RULOU COMPRESOR 10-12T.EXCL.
UDAREA PAM.NECOEZ.GRAD.COMPACT.95-96 %
PROIECTANT
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.2
Formular F3
OBIECTIV: 14 INFIINTARE FERMA VACI CARNE
LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.2. CONSTRUCTII [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
1 CA01D1 82 M CUB 6.60000
0.00% 0.00% 0.00%
TURNARE BETON SIMPLU IN STRATURI DE 3-20CM GROSIME
LA CONSTRUCTII CU H<35M
2 CZ0301A1 82 KG 25.00000
0.00% 0.00% 0.00%
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTI
NUI SI RADIERE IN ATEL.CENT.OB 37 D=6-8MM $
3 CZ0301D1 82 KG 1,115.00000
0.00% 0.00% 0.00%
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTI
NUI SI RADIERE IN ATEL.CENT.PC 52 D=6-8MM $
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.3
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
4 CZ0301E1 82 KG 1,300.00000
0.00% 0.00% 0.00%
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTI
NUI SI RADIERE IN ATEL.CENT.PC 52 D=10- 16 MM $
5 CC01A1 82 KG 2,435.00000
0.00% 0.00% 0.00%
MONTARE ARMATURI DIN OTEL BETON D<18MM IN FUNDATII
IZOLATE CU DISTANTIERI DIN MASE PLASTICE
7 CB01A1 82 MP 170.00000
0.00% 0.00% 0.00%
COFRAJE IN CUZINETI FUND PAHAR,FUND UTILAJE,DIN PA
N REF,DIN SCINDURI RAS SC SI SUBSC INCL SPIJINIRI
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.4
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
9 TRA06A10 82 TONE 135.00000
0.00% 0.00% 0.00%
TRANSPORTUL RUTIER AL BETONULUI-MORTARULUI CU AUTO
BETONIERA DE 5,5MC DIST. =10KM $
12 CO41A1 82 MP 396.00000
0.00% 0.00% 0.00%
FOLIE PVC - ASIMILAT
13 CC02G1 82 KG 2,460.00000
0.00% 0.00% 0.00%
MONTARE ARMATURI LA CONSTRUCTII H<35M DIN PLASE CU
G=3-6KG/MP IN PERETI DIAFRAGME CU DIST DIN PLASTI
6X100X100
L:10175 -0001:2002349 -PLASE SUDATE TIP 308 NQ 283X6,5(54,8KG/BUC) OL 37-1N
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.5
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
14 TRA04A10 82 TONE 2.46000
0.00% 0.00% 0.00%
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTOREMORCHERE
CU REMORCI TREILER SUB 20T PE DIS.10 KM.* $
15 CG18B1 82 MP 381.60000
0.00% 0.00% 0.00%
PARDOSELI DIN BETON C16/20,DE 20CM GROSIME,IN CIMP
CONTINUU CU 2MM SCLIVISEALA
76,3 MC
L:10173 -0228:2100912 -BETON MARFA CLASA C20/16 (BC20/B250)
M: - STALPI CADRU
18 CL04A1 82 TONE 6.60000
0.00% 0.00% 0.00%
MONTAREA GRINZILOR PLINE DIN OTEL COMPLET ASAMBLAT
E SUB 1T
M: - GRINZI CADRU
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.6
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
19 CL16A1 82 TONE 3.10000
0.00% 0.00% 0.00%
MONTAREA PANELOR METALICE DE 0,1-0,2T LA CONSTRUC
TII CU H<35M
M: - PANE METALICE
20 IZD02A1 82 TONE 8.80000
8.80% 0.00% 0.00%
CURATIRE RUGINA CU PERIE SIRMA A PIESELOR METALICE
GRINZI ZABRELE,FERME,CONTRAVINTUIRI
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.7
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
24 CE05E1 82 MP 400.00000
0.00% 0.00% 0.00%
INVELITOARE DIN TABLA CUTATA FIXATA CU SURUBURI FI
LETATE PINA SUB CAP SI PIULITE
M: - TABLA CUTATA
25 AUT1101 82 ORE 40.00000
0.00% 0.00% 0.00%
ORA PR AUTOMACARA CU BRAT CU ZABRELE 4,5-5,8 TF 1
SCHIMB
PROIECTANT
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.8
Formular F3
OBIECTIV: 14 INFIINTARE FERMA VACI CARNE
LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.2. CONSTRUCTII - NOTA DE COMANDA [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
13 CC02G1 82 KG 306.00000 0.09000 27.54
0.00% 0.00% 0.00% 0.28000 85.68
MONTARE ARMATURI LA CONSTRUCTII H<35M DIN PLASE CU 0.00000 0.00
G=3-6KG/MP IN PERETI DIAFRAGME CU DIST DIN PLASTI 0.00000 0.00
6X100X100 0.37000 113.22
L:10175 -0001:2002349 -PLASE SUDATE TIP 308 NQ 283X6,5(54,8KG/BUC) 3.00000
OL 37-1N 918.00 918.00
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.10
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
14 TRA04A10 82 TONE 0.30600 0.00000 0.00
0.00% 0.00% 0.00% 0.00000 0.00
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTOREMORCHERE 0.00000 0.00
CU REMORCI TREILER SUB 20T PE DIS.10 KM.* $ 2.50000 0.77
2.50000 0.77
17 CL01A1 82 TONE 0.54000 28.80000 15.55
0.00% 0.00% 0.00% 500.00000 270.00
MONTAREA STILPILOR DIN OTEL PT HALE INDUSTRIALE CO 10.00000 5.40
MPLET ASAMBLATI AVIND<1T INCLUSIV 0.00000 0.00
538.80000 290.95
M: - STALPI CADRU 540.00000 9.23000 4,984.20 4,984.20
18 CL04A1 82 TONE 2.07700 28.80000 59.82
0.00% 0.00% 0.00% 500.00000 1,038.50
MONTAREA GRINZILOR PLINE DIN OTEL COMPLET ASAMBLAT 10.00000 20.77
E SUB 1T 0.00000 0.00
538.80000 1,119.09
M: - GRINZI CADRU 2,077.00000 7.00000 14,539.00 14,539.00
20 IZD02A1 82 TONE 2.61700 0.00000 0.00
8.80% 0.00% 0.00% 19.90000 52.08
CURATIRE RUGINA CU PERIE SIRMA A PIESELOR METALICE 0.00000 0.00
GRINZI ZABRELE,FERME,CONTRAVINTUIRI 0.00000 0.00
19.90000 52.08
21 IZD05B1 82 TONE 2.61700 32.00000 83.74
0.00% 0.00% 0.00% 100.00000 261.70
GRUNDUIRE MANUALA 2 STRAT CU VOPSEA DE MINIU LA CO 0.00000 0.00
NSTRUCTII METALICE 0.00000 0.00
132.00000 345.44
22 IZD03E1 82 TONE 2.51700 96.00000 241.63
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.11
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
0.00% 0.00% 0.00% 100.00000 251.70
VOPSIREA CU VOPS MINIU CU APARAT AER COMPRIMAT PE 30.00000 75.51
CONF SI CONST METAL DIN PROFILE PESTE 12 MM 0.00000 0.00
226.00000 568.84
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.12
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
24 CE05E1 82 MP 90.00000 0.80000 72.00
0.00% 0.00% 0.00% 8.00000 720.00
INVELITOARE DIN TABLA CUTATA FIXATA CU SURUBURI FI 0.00000 0.00
LETATE PINA SUB CAP SI PIULITE 0.00000 0.00
8.80000 792.00
M: - TABLA CUTATA 90.00000 41.00000 3,690.00 3,690.00
26 CE21A 02 M 30.80000 62.00000 1,909.60
0.00% 0.00% 0.00% 10.00000 308.00
PROCURARE SI MONTARE SISTEME DE JGHEABURI DIN TABL 0.00000 0.00
A 0.00000 0.00
72.00000 2,217.60
27 CE23A 02 M 12.50000 60.00000 750.00
0.00% 0.00% 0.00% 10.00000 125.00
PROCURARE SI MONTARE SISTEME DE BURLANE DIN TABLA 0.00000 0.00
(PROTEJATA ANTICOROZIV) 0.00000 0.00
70.00000 875.00
TOTAL A:
PROIECTANT
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.13
a1 b1 c1 d1 e1 f1
Obiectiv:
Obiect:
Categorie:
Recapitulatie
Material Manopera Utilaj Transport Total
M m U t T
Cheltuieli directe 27,291.09 3,112.66 101.68 0.77 30,506.20
din care utilaje
Alte cheltuieli directe
C.A.S. 15.800% 491.80 491.80
C.A.S.S. 5.200% 161.86 161.86
Aj.somaj 0.500% 15.56 15.56
Acc. munca, boli profes. 0.270% 8.40 8.40
Contr.Concedii Medicale 0.850% 26.46 26.46
Fond garantare salarii 0.250% 7.78 7.78
Mo mo Uo to To
TOTAL CHELT. DIRECTE 27,291.09 3,824.53 101.68 0.77 31,218.07
Cheltuieli indirecte Io = 4.000% x To 1,248.72
Profit Po = 4.000% x (To+Io) 1,298.67
TOTAL GENERAL categorie Vo = To+Io+Po 33,765.46
Formular F3
OBIECTIV: 14 INFIINTARE FERMA VACI CARNE
LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.3. INSTALATII ELECTRICE [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
1 EA16C1 82 BUCATA 2.00000
0.00% 0.00% 0.00%
DOZA DERIVATIE PT.CABLURI ETANSA
2 EA01A1 82 M 40.00000
0.00% 0.00% 0.00%
CANAL DE CABLU METALIC 100X60 - ASIMILAT
3 EC04A1 82 M 150.00000
0.00% 0.00% 0.00%
CABLU ENERGIE MONTAT LIBER PE FUND CANALE,CONDUCTE
<16MMP
L:12007 -1276:9000084 -CABLU CUPRU IZOL+MANTA PVC, TENS.06/1KV, CYYF 3X1,5 MMP
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.15
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
4 EC04A1 82 M 10.00000
0.00% 0.00% 0.00%
CABLU ENERGIE MONTAT LIBER PE FUND CANALE,CONDUCTE
<16MMP
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.16
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
8 EE04A1 82 BUCATA 2.00000
0.00% 0.00% 0.00%
CORP DE ILUMINAT TIP PROIECTOR 1 X 400 W
10 EG08B1 82 M 4.00000
0.00% 0.00% 0.00%
COND.LEG.PAM.INST.PARATRASNET PROT.LEG.PAMINT MONT
.PAM.BANDA OL ZINC.40X4MM MONT.IN TEREN TARE *
- M: TABLOU ELECTRIC
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.17
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
13 EH05B1 82 BUCATA 1.00000
0.00% 0.00% 0.00%
INCERCARE TABLOURI DIN CUTII CAPSULATE IN NUMAR DE
MAX.10 $
15 EG07B1 82 M 122.00000
0.00% 0.00% 0.00%
COND.COBOR. BANDA OTEL ZINC.25X4MM,MONT.APARENT PE
ZIDURI
16 EG08B1 82 M 100.00000
0.00% 0.00% 0.00%
COND.LEG.PAM.INST.PARATRASNET PROT.LEG.PAMINT MONT
.PAM.BANDA OL ZINC.40X4MM MONT.IN TEREN TARE *
17 W1R06A1 82 M 72.00000
0.00% 0.00% 0.00%
ELECTROD DIN TEAVA DE OTEL DE DOI TOLI SI JUMATATE
PENTRU LEGAREA LA PAMINT IN TEREN NORMAL
Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.18
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
18 EG10A1 82 BUCATA 4.00000
0.00% 0.00% 0.00%
CUTIE CU ECLISA DE LEGATURA PT.CENTURA DE INPAMINT
ARE
PROIECTANT