OBIECTIV: 14 INFIINTARE FERMA VACI CARNE

LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.1. TERASAMENTE [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
1 TSC04B1 82 SUTE MC 2.05000
0.00% 0.00% 0.00%
SAP.MEC.CU EXC.DE 0,71-1,25MC IN PAM.CU UMIDITATE
NATURAL DESC.DEP.TER.CAT.2

2 TSC35A3 82 SUTE MC 1.80000


0.00% 0.00% 0.00%
INCARC. AUTO CU INCARC. PE PNEURI CUPA 2,6-3,9 MC
TEREN CATEG 1 LA DIST. < 10 M

3 TRA01A10P 82 TONE 306.00000


0.00% 0.00% 0.00%
TRANSPORTUL RUTIER AL PAMINTULUI SAU MOLOZULUI CU
AUTOBASCULANTA DIST.=10 KM $
PAMANT REZULTAT DIN SAPATURA
4 TSD02A1 82 SUTE MC 2.00000
0.00% 0.00% 0.00%
IMPRAST.PAMINT AFINAT PROVENIT DIN TER.CAT.1 SAU 2
CU BULD.DE 65-80CP IN STRAT.CU GROS.DE 15-20CM

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.1
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
5 TSD07B1 82 SUTE MC 1.60000
0.00% 0.00% 0.00%
COMPACTAREA UMPLUT.CU RULOU COMPRESOR 10-12T.EXCL.
UDAREA PAM.NECOEZ.GRAD.COMPACT.95-96 %

PROIECTANT

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.2
Formular F3
OBIECTIV: 14 INFIINTARE FERMA VACI CARNE

LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.2. CONSTRUCTII [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
1 CA01D1 82 M CUB 6.60000
0.00% 0.00% 0.00%
TURNARE BETON SIMPLU IN STRATURI DE 3-20CM GROSIME
LA CONSTRUCTII CU H<35M

L:10173 -0226:2100910 -BETON MARFA CLASA C10/8 (BC10/B150)

2 CZ0301A1 82 KG 25.00000
0.00% 0.00% 0.00%
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTI
NUI SI RADIERE IN ATEL.CENT.OB 37 D=6-8MM $

3 CZ0301D1 82 KG 1,115.00000
0.00% 0.00% 0.00%
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTI
NUI SI RADIERE IN ATEL.CENT.PC 52 D=6-8MM $

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.3
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
4 CZ0301E1 82 KG 1,300.00000
0.00% 0.00% 0.00%
CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTI
NUI SI RADIERE IN ATEL.CENT.PC 52 D=10- 16 MM $

5 CC01A1 82 KG 2,435.00000
0.00% 0.00% 0.00%
MONTARE ARMATURI DIN OTEL BETON D<18MM IN FUNDATII
IZOLATE CU DISTANTIERI DIN MASE PLASTICE

6 TRA04A10 82 TONE 2.45000


0.00% 0.00% 0.00%
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTOREMORCHERE
CU REMORCI TREILER SUB 20T PE DIS.10 KM.* $

7 CB01A1 82 MP 170.00000
0.00% 0.00% 0.00%
COFRAJE IN CUZINETI FUND PAHAR,FUND UTILAJE,DIN PA
N REF,DIN SCINDURI RAS SC SI SUBSC INCL SPIJINIRI

8 CA07A1 82 M CUB 30.00000


0.00% 0.00% 0.00%
TURNARE BETON ARMAT CU POMPA IN FUNDATII IZOLATE L
A ADINCIME PINA LA 10M SI DISTANTE PINA LA 15M

L:10173 -0228:2100912 -BETON MARFA CLASA C20/16 (BC20/B250)

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.4
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
9 TRA06A10 82 TONE 135.00000
0.00% 0.00% 0.00%
TRANSPORTUL RUTIER AL BETONULUI-MORTARULUI CU AUTO
BETONIERA DE 5,5MC DIST. =10KM $

10 TSD16B1 82 M CUB 72.00000


0.00% 0.00% 0.00%
STRAT DE REPART.DIN BALAST.SUB PRIZMA DE BALAST.CO
MPACT.CU PLACA VIBR.DE 0,7T CU MOT.ARD.INT.<10CP

11 TRA01A10 82 TONE 155.00000


0.00% 0.00% 0.00%
TRANSPORTUL RUTIER AL MATERIALELOR,SEMIFABRICATELO
R CU AUTOBASCULANTA PE DIST.= 10 KM. $

12 CO41A1 82 MP 396.00000
0.00% 0.00% 0.00%
FOLIE PVC - ASIMILAT

13 CC02G1 82 KG 2,460.00000
0.00% 0.00% 0.00%
MONTARE ARMATURI LA CONSTRUCTII H<35M DIN PLASE CU
G=3-6KG/MP IN PERETI DIAFRAGME CU DIST DIN PLASTI
6X100X100
L:10175 -0001:2002349 -PLASE SUDATE TIP 308 NQ 283X6,5(54,8KG/BUC) OL 37-1N

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.5
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
14 TRA04A10 82 TONE 2.46000
0.00% 0.00% 0.00%
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTOREMORCHERE
CU REMORCI TREILER SUB 20T PE DIS.10 KM.* $

15 CG18B1 82 MP 381.60000
0.00% 0.00% 0.00%
PARDOSELI DIN BETON C16/20,DE 20CM GROSIME,IN CIMP
CONTINUU CU 2MM SCLIVISEALA
76,3 MC
L:10173 -0228:2100912 -BETON MARFA CLASA C20/16 (BC20/B250)

16 TRA06A10 82 TONE 190.00000


0.00% 0.00% 0.00%
TRANSPORTUL RUTIER AL BETONULUI-MORTARULUI CU AUTO
BETONIERA DE 5,5MC DIST. =10KM $

17 CL01A1 82 TONE 2.17000


0.00% 0.00% 0.00%
MONTAREA STILPILOR DIN OTEL PT HALE INDUSTRIALE CO
MPLET ASAMBLATI AVIND<1T INCLUSIV

M: - STALPI CADRU
18 CL04A1 82 TONE 6.60000
0.00% 0.00% 0.00%
MONTAREA GRINZILOR PLINE DIN OTEL COMPLET ASAMBLAT
E SUB 1T

M: - GRINZI CADRU

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.6
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
19 CL16A1 82 TONE 3.10000
0.00% 0.00% 0.00%
MONTAREA PANELOR METALICE DE 0,1-0,2T LA CONSTRUC
TII CU H<35M

M: - PANE METALICE
20 IZD02A1 82 TONE 8.80000
8.80% 0.00% 0.00%
CURATIRE RUGINA CU PERIE SIRMA A PIESELOR METALICE
GRINZI ZABRELE,FERME,CONTRAVINTUIRI

21 IZD05B1 82 TONE 8.80000


0.00% 0.00% 0.00%
GRUNDUIRE MANUALA 2 STRAT CU VOPSEA DE MINIU LA CO
NSTRUCTII METALICE

22 IZD03E1 82 TONE 8.80000


0.00% 0.00% 0.00%
VOPSIREA CU VOPS MINIU CU APARAT AER COMPRIMAT PE
CONF SI CONST METAL DIN PROFILE PESTE 12 MM

23 TRA04A10 82 TONE 15.00000


0.00% 0.00% 0.00%
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTOREMORCHERE
CU REMORCI TREILER SUB 20T PE DIS.10 KM.* $

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.7
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
24 CE05E1 82 MP 400.00000
0.00% 0.00% 0.00%
INVELITOARE DIN TABLA CUTATA FIXATA CU SURUBURI FI
LETATE PINA SUB CAP SI PIULITE

M: - TABLA CUTATA
25 AUT1101 82 ORE 40.00000
0.00% 0.00% 0.00%
ORA PR AUTOMACARA CU BRAT CU ZABRELE 4,5-5,8 TF 1
SCHIMB

PROIECTANT

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.8
Formular F3
OBIECTIV: 14 INFIINTARE FERMA VACI CARNE

LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.2. CONSTRUCTII - NOTA DE COMANDA [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
13 CC02G1 82 KG 306.00000 0.09000 27.54
0.00% 0.00% 0.00% 0.28000 85.68
MONTARE ARMATURI LA CONSTRUCTII H<35M DIN PLASE CU 0.00000 0.00
G=3-6KG/MP IN PERETI DIAFRAGME CU DIST DIN PLASTI 0.00000 0.00
6X100X100 0.37000 113.22
L:10175 -0001:2002349 -PLASE SUDATE TIP 308 NQ 283X6,5(54,8KG/BUC) 3.00000
OL 37-1N 918.00 918.00

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.10
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
14 TRA04A10 82 TONE 0.30600 0.00000 0.00
0.00% 0.00% 0.00% 0.00000 0.00
TRANSPORT RUTIER MATER.SEMIFABR. CU AUTOREMORCHERE 0.00000 0.00
CU REMORCI TREILER SUB 20T PE DIS.10 KM.* $ 2.50000 0.77
2.50000 0.77
17 CL01A1 82 TONE 0.54000 28.80000 15.55
0.00% 0.00% 0.00% 500.00000 270.00
MONTAREA STILPILOR DIN OTEL PT HALE INDUSTRIALE CO 10.00000 5.40
MPLET ASAMBLATI AVIND<1T INCLUSIV 0.00000 0.00
538.80000 290.95
M: - STALPI CADRU 540.00000 9.23000 4,984.20 4,984.20
18 CL04A1 82 TONE 2.07700 28.80000 59.82
0.00% 0.00% 0.00% 500.00000 1,038.50
MONTAREA GRINZILOR PLINE DIN OTEL COMPLET ASAMBLAT 10.00000 20.77
E SUB 1T 0.00000 0.00
538.80000 1,119.09
M: - GRINZI CADRU 2,077.00000 7.00000 14,539.00 14,539.00
20 IZD02A1 82 TONE 2.61700 0.00000 0.00
8.80% 0.00% 0.00% 19.90000 52.08
CURATIRE RUGINA CU PERIE SIRMA A PIESELOR METALICE 0.00000 0.00
GRINZI ZABRELE,FERME,CONTRAVINTUIRI 0.00000 0.00
19.90000 52.08
21 IZD05B1 82 TONE 2.61700 32.00000 83.74
0.00% 0.00% 0.00% 100.00000 261.70
GRUNDUIRE MANUALA 2 STRAT CU VOPSEA DE MINIU LA CO 0.00000 0.00
NSTRUCTII METALICE 0.00000 0.00
132.00000 345.44
22 IZD03E1 82 TONE 2.51700 96.00000 241.63

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.11
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
0.00% 0.00% 0.00% 100.00000 251.70
VOPSIREA CU VOPS MINIU CU APARAT AER COMPRIMAT PE 30.00000 75.51
CONF SI CONST METAL DIN PROFILE PESTE 12 MM 0.00000 0.00
226.00000 568.84

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.12
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
24 CE05E1 82 MP 90.00000 0.80000 72.00
0.00% 0.00% 0.00% 8.00000 720.00
INVELITOARE DIN TABLA CUTATA FIXATA CU SURUBURI FI 0.00000 0.00
LETATE PINA SUB CAP SI PIULITE 0.00000 0.00
8.80000 792.00
M: - TABLA CUTATA 90.00000 41.00000 3,690.00 3,690.00
26 CE21A 02 M 30.80000 62.00000 1,909.60
0.00% 0.00% 0.00% 10.00000 308.00
PROCURARE SI MONTARE SISTEME DE JGHEABURI DIN TABL 0.00000 0.00
A 0.00000 0.00
72.00000 2,217.60
27 CE23A 02 M 12.50000 60.00000 750.00
0.00% 0.00% 0.00% 10.00000 125.00
PROCURARE SI MONTARE SISTEME DE BURLANE DIN TABLA 0.00000 0.00
(PROTEJATA ANTICOROZIV) 0.00000 0.00
70.00000 875.00

TOTAL A: 27,291.09 3,112.66 101.68 0.77 30,506.19

TOTAL A:

PROIECTANT

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.13
a1 b1 c1 d1 e1 f1

Obiectiv:
Obiect:
Categorie:
Recapitulatie
Material Manopera Utilaj Transport Total
M m U t T
Cheltuieli directe 27,291.09 3,112.66 101.68 0.77 30,506.20
din care utilaje
Alte cheltuieli directe
C.A.S. 15.800% 491.80 491.80
C.A.S.S. 5.200% 161.86 161.86
Aj.somaj 0.500% 15.56 15.56
Acc. munca, boli profes. 0.270% 8.40 8.40
Contr.Concedii Medicale 0.850% 26.46 26.46
Fond garantare salarii 0.250% 7.78 7.78
Mo mo Uo to To
TOTAL CHELT. DIRECTE 27,291.09 3,824.53 101.68 0.77 31,218.07
Cheltuieli indirecte Io = 4.000% x To 1,248.72
Profit Po = 4.000% x (To+Io) 1,298.67
TOTAL GENERAL categorie Vo = To+Io+Po 33,765.46
Formular F3
OBIECTIV: 14 INFIINTARE FERMA VACI CARNE

LISTA
cu cantitatile de lucrari pe categorii de lucrari
Obiect: 9 REMIZA
Categorie: 9.3. INSTALATII ELECTRICE [ ron ]
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
1 EA16C1 82 BUCATA 2.00000
0.00% 0.00% 0.00%
DOZA DERIVATIE PT.CABLURI ETANSA

L:12020 -0012:5537890 -DOZA DERIVATIE. EXDIICT6 COD 7042

2 EA01A1 82 M 40.00000
0.00% 0.00% 0.00%
CANAL DE CABLU METALIC 100X60 - ASIMILAT

3 EC04A1 82 M 150.00000
0.00% 0.00% 0.00%
CABLU ENERGIE MONTAT LIBER PE FUND CANALE,CONDUCTE
<16MMP

L:12007 -1276:9000084 -CABLU CUPRU IZOL+MANTA PVC, TENS.06/1KV, CYYF 3X1,5 MMP

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.15
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
4 EC04A1 82 M 10.00000
0.00% 0.00% 0.00%
CABLU ENERGIE MONTAT LIBER PE FUND CANALE,CONDUCTE
<16MMP

L:12007 -1270:4807870 -CABLU CUPRU IZOL.+MANTA PVC,TENS.0,6/1KV, CYYF 3X2,5MMP

5 ED03A1 82 BUCATA 2.00000


0.00% 0.00% 0.00%
COMUTATOR UNIPOLAR INGROPAT,DE SERIE,CONSTR.NORM.D
IN BACHELITA SAU CONSTR.IMPERMEABILA

L:12011 -0004:5520392 -COMUTATOR CUMPANA PT.SIMBOL 020 10A 1250V S.3185

6 ED08B1 82 BUCATA 1.00000


0.00% 0.00% 0.00%
PRIZA DUBLA MONOFAZATA MONTATA APARENT CP, 16A/ 25
0V, CONSTR. ETANSA

L:12017 -0003:5536133 -PRIZA BIPOLARA ANTIGRON 250/10A COD 255

7 EE12G1 82 BUCATA 6.00000


0.00% 0.00% 0.00%
CORP DE ILUMINAT PTR. LAMPI FLUORESCENTE TUBULARE
ETANS MONTAT PE DIBLURI DE MATERIAL PLASTIC

-M: CORP DE ILUMINAT FLUORESCENT, 2 X 36W, TIP FIPAD 05

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.16
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
8 EE04A1 82 BUCATA 2.00000
0.00% 0.00% 0.00%
CORP DE ILUMINAT TIP PROIECTOR 1 X 400 W

9 EF09A1 82 BUCATA 50.00000


0.00% 0.00% 0.00%
RACORD.COND.CU.AP.SAU MOT.LA BORNE.TAB.EL.PE MARM.
,MET.,SAU CAPS.,COND.CU SECT.<10MMP $

10 EG08B1 82 M 4.00000
0.00% 0.00% 0.00%
COND.LEG.PAM.INST.PARATRASNET PROT.LEG.PAMINT MONT
.PAM.BANDA OL ZINC.40X4MM MONT.IN TEREN TARE *

11 EG10A1 82 BUCATA 1.00000


0.00% 0.00% 0.00%
CUTIE CU ECLISA DE LEGATURA PT.CENTURA DE INPAMINT
ARE

12 EF02B1 82 BUCATA 1.00000


0.00% 0.00% 0.00%
TABLOU ELECTRIC PE SCHELET MET.CU MASCA MONT.PERET
E SAU IN NISA,TABLOUL CU SUPR.DE 0,31-0,90MP

- M: TABLOU ELECTRIC

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.17
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
13 EH05B1 82 BUCATA 1.00000
0.00% 0.00% 0.00%
INCERCARE TABLOURI DIN CUTII CAPSULATE IN NUMAR DE
MAX.10 $

14 EG01A1 82 BUCATA 2.00000


0.00% 0.00% 0.00%
TIJA CAPTAREMONTATA PE ACOPERIS H = 0,5M

15 EG07B1 82 M 122.00000
0.00% 0.00% 0.00%
COND.COBOR. BANDA OTEL ZINC.25X4MM,MONT.APARENT PE
ZIDURI

16 EG08B1 82 M 100.00000
0.00% 0.00% 0.00%
COND.LEG.PAM.INST.PARATRASNET PROT.LEG.PAMINT MONT
.PAM.BANDA OL ZINC.40X4MM MONT.IN TEREN TARE *

17 W1R06A1 82 M 72.00000
0.00% 0.00% 0.00%
ELECTROD DIN TEAVA DE OTEL DE DOI TOLI SI JUMATATE
PENTRU LEGAREA LA PAMINT IN TEREN NORMAL

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:06/27/2017 Pag.18
Nr. Capitolul de lucrari U/M Cantitatea Pretul unitar Materiale Manopera Utilaj Transport Total
Crt. Simbol a)materiale
Denumire Resursa b)manopera
Observatii c)utilaj
Corectii d)transport
Liste Anexe Total(a+b+c+d)
18 EG10A1 82 BUCATA 4.00000
0.00% 0.00% 0.00%
CUTIE CU ECLISA DE LEGATURA PT.CENTURA DE INPAMINT
ARE

19 W1P08A 82 BUCATA 1.00000


0.00% 0.00% 0.00%
VERIFICAREA PRIZELOR DE PAMINT PT.LUCRARI DE INSTA
LATII ELECTRICE LA CONSTRUCTII $

20 YC10. 82 BUCATA 2.00000


0.00% 0.00% 0.00%
PROCURARE STINGATOR CU PULBERE SI CO2 TIP P6