1 2 3 4 5 6 7 8

Numar Masa Masa Numar Masa neta


Piesa Denumire piesa Tip otel Sectiune Lungime piese in neta pe neta pe Numar piese in in toate
mm fiecare piesa subans. subans. toate subans.
subans. kg kg subans. kg
Pr3-001 Profil laminat S235JR BL30*3 200 1 0.141 0.141 Pr3-002
A A
Pr3-002 Profil laminat S235JR BL30*3 200 1 0.141 0.141
Pr3-020
Pr3-018 Profil laminat S235JR D5 38 140 0.006 0.807
Pr3-020
Pr3-020 Profil laminat S235JR BL30*2 1094 6 0.515 3.092 Pr3-018
Total subansamblu (kg) 4.181
Conectori de lunecare (kg) 0.000
Electrozi 2% (kg) 0.084 Pr3-020
Masa neta pentru un subansamblu (kg) 4.265 Pr3-020 Sectiunea B - B
Masa neta pentru toate subansamblurile (kg) Pr3-020
Scara 1:2
Pr3-001 Pr3-020
Pr3-020
B B

2
Pr3-018
Vedere de sus

38
40
Scara 1:10
Pr3-020

2
Pr3-001
Pr3-020
Pr3-020
B Pr3-018

38
40
Pr3-020
2xISO4017-M12x30-5.6/6 B Pr3-020
60

2
Pr3-018

202
80

C C

202
38
40
60

Pr3-002 Pr3-020
Pr3-020 Det. 1
Pr3-020 1100

2
Pr3-020 Pr3-018
B

38
40
Pr3-020

2
Pr3-018

38
40
Detaliul 1 NOTA:
Scara 1:5
D Pr3-018
- Toate dimensiunile sunt in "mm". D
- Sudurile de colt necotate vor avea grosimea de 0.7xtmin (tmin reprezinta

2
Pr3-020 Pr3-020 30
cea mai mica grosime a pieselor care se sudeaza).
2

Pr3-020 - Tolerante generale pentru constructii sudate conf. SR EN ISO 13920-BE


40

- Nivel de acceptare pentru imbinari sudate conf. SR EN 25817-C


- Acoperire de protectie: AT/OL/Zn 500g/mò/EN ISO 1461
Pr3-020
40

Pr3-020
202
40

Pr3-020 39 39 39
40

Pr3-020
40

E E

ANTREPRENOR: BENEFICIAR: Titlu plansa: REV. DATA DETALII REVIZIE PROIECTAT


SPECIFICATIE: NUME: SEMNATURA:
ASOCIEREA: SA&PE CONSTRUCT - UMB SPEDITION - TEHNOSTRADE - COMPANIA NATIONALA DE 00 07 / 2021
- CONSITRANS MINISTERUL ADMINISTRARE A SISTEM ITS
TRANSPORTURILOR INFRASTRUCTURII
RUTIERE SEF ECHIPA LOT 2
ing. Gabriel BURCIU KM 36+200 - KM 57+550
PROIECTANT: PROIECTANT DE SPECIALITATE: EXPERT DE SPECIALITATE:
PROIECTARE
INVESTITIA:
S.C. CONSITRANS S.R.L. S.C. ELEKTRA INVEST S.R.L. PROIECTARE SI EXECUTIE “DRUM EXPRES CRAIOVA - PITESTI” SEF PROIECT Desen subansamblul
ing. Valentin NICULA Ar3-015
TRONSONUL 2. LOT 2 KM 36+200 - KM 57+550 SPECIALITATE
F FAZA DE PROIECTARE:
F
PROIECTAT ing. Razvan ORZATA
PROIECT TEHNIC DE EXECUTIE ITS STRUCTURI METALICE

Contract: Data: Scara: Cod plansa:


UNIUNEA EUROPEANA GUVERNUL ROMANIEI POS TRANSPORT 92/83463/05.12.2018 VERIFICAT ing. Valentin NICULA
Proiect nr.: 07/2021 1:2 1:5 1:10 S-CST-0918-0-ITS2-ST-01-CO-024-R00
PROIECT CO-FINANTAT DIN FONDUL DE COEZIUNE, PRIN PROGRAMUL OPERATIONAL INFRASTRUCTURA MARE 009/2018