Avizat / APROVE
DIRECTOR CERTIFICARE /
CERTIFICATION DIRECTOR
TOTAL Q ARM
Program de audit / Audit program : nr si data programului transmis de noi Etapa din program / program stage: din programul transmis
xxx xxx
7. PERIOADA DE DESFĂŞURARE A AUDITULUI: perioada va va fi
7. PERIOD PERFORMING THE AUDIT: va fi comunicata de noi
comunicata de noi
9. OBIECTIVELE AUDITULUI
determinerea gradului de conformitate a sistemului de 9. OBJECTIVES OF THE AUDIT
management integrat cu criteriile de audit; - establish the conformity status of the integrated management
determinarea gradului de eficacitate al actiunilor corective / system with the audit criteria;
preventive; - determining the effectiveness of the corrective / preventive
- determining the effectiveness of integrated management system
determinarea gradului de eficacitate a SMI.
10. COMPETENTE MEMBRII ECHIPA DE AUDIT (Cod EA, NACE): 10. COMPETENCES of AUDIT TEAM MEMBERS ( EA, NACE Code):
va va fi comunicata de noi va va fi comunicata de noi
14. ANEXE: Programul de desfăşurare a auditului la faţa locului. 14.APPENDIX: Audit program.
15. DIFUZARE Planul de audit a fost adus la cunoștința DISTRIBUTION of Audit plan:
Membrii echipei de audit / Members of audit team Reprezentant organizație auditată /Members of audited
Se va trece ECHIPA DE AUDIT comunicata de noi Se va trece ECHIPA DE AUDIT comunicata de noi
Planificare, stabilire procese, documentatie Planning, establishing processes, documentation 5.4.2, 4.1, 4.2 4.1, 4.4.4 4.1, 4.4.4 RMI
Responsabil proces 09.15-10.00 AS + A1 + A2
Stabilire resurse, functii, roluri, responsabilitati, autoritati Set resources, roles, responsibilities, authorities 5.5.1, 5.5.2 4.4.1 4.4.1
Procese de management
Analiza efectuata de management, identificarea zonelor de Management analysis, identifying areas of improvement 5.6, 8.4, 8.5.1 4.6 4.6
si alocare resurse
imbunatatire
Processes
părţi componente ale structurilor metalice; Manufacture of metal structures and parts of
fabricare de uşi şi ferestre metal structures; Metal window and door manufacturing
si procese suport aferente
RMI
and support processes
Planificare, procese referitoare la relatia cu clientul, control Planning processes in the relationship with the customer,
Main processes
operational, infrastructura, mediul de lucru, proiectare si operational control, infrastructure, work environment, design 5.4, 7.1, 7.2 4.3, 4.4.6 4.3, 4.4.6
dezvoltare, aprovizionare, realizarea, controlul, validarea and development, sourcing, development, testing, validation of 6.3, 6.4, 7.3 11.30-14.00
produsului / serviciului, product / service 7.4, 7.5.1, 7.5.2
Identificarea si trasabilitatea produsului/serviciului Identification and traceability of the product / service
Proprietatea clientului; pastrarea produsului Customer property; product storage 7.5.3
7.5.4, 7.5.5
4.5.5 4.5.5
Process monitoring,
Pregatire pentru situatii de urgenta si capacitate de raspuns Emergency preparedness and response capacity 4.4.7
analysis,