LOCAIE PROIECT: BUCURETI /ROMANIA DEFINIREA PROIECTULUI: CENTRU COMERCIAL , SUPRAFAA 25000 METRII PTRAI. CLIENT: AFI CONTRACTOR: DANYA CEBUS ROM. DURATA: 24 LUNI/ 2009 SCOPUL LUCR RILOR : DESA A REALIZAT CU SUCCES APROVIZIONAREA CU MATERIALE A INFRASTRUCTURII DIN OEL , FABRICAREA I MONTAJUL STRUCTURII METALICE A CINEMATOGRAFELOR.
en

PROJECT LOCATION: BUCHAREST /ROMANIA PROJECT DEFINITION: 250000 SQUARE METER SHOPPING CENTER CLIENT: AFI CONTRACTOR: DANYA CEBUS ROM. DURATION: 24 MONTHS/ 2009 SCOP OF WORK: DESA HAS ACCOMPLISHED THE STEEL SUBSTRUCTURE MATERIAL SUPPLY, FABRICATION AND MONTAGE OF THE CINEMAS.

www. desacons.eu

CET TURCENI DESULPHURIZATION PLANT - STEEL STRUCTURE ERECTION

ro
LOCAIE PROIECT: TURCENI-CRAIOVA/ROMNIA DEFINIREA PROIECTULUI: MONTAJ STRUCTURA METALIC CLIENT: COMPLEXUL ENERGETIC TURCENI CONTRACTOR: AUSTRIAN ENERGY & ENVIRONMENT CONTRACTOR PENTRU STRUCTURA METALIC : TMUCB SA DURATA: 24 LUNI/ 2011 SCOPUL LUCRARILOR : DESA EXECUT URMATOARELOR OBIECTIVE: MONTAJ STRUCTUR METALIC ESTACADA PENTRU CONDUCTE. MONTAJ STRUCTUR METALIC PENTRU CLADIREA ,,DESHIDRATARE GIPS. MONTAJ STRUCTUR METALIC PENTRU SUSINEREA CONDUCTELOR DE GAZE ARSE. MONTAJ STRUCTUR METALIC PENTRU CLADIREA ,, POMPE GIPS. MONTAJ STRUCTUR METALIC A SCRII CLDIRII ,,CALCAR. MONTAJ STRUCTUR METALIC A CLDIRII DE NCRCARE GYPS. MONTAJ STRUCTUR METALIC A STAIILOR DE NCRCARE GYPS. MONTAJ STRUCTUR METALIC A SCRII ABSORBERULUI. CANTITATEA LUCRRILOR EXECUTATE : 2000 DE TONE STRUCTUR METALIC MONTATE N 6 LUNI. FABRICAREA I MONTAREA N ANTIER A TANCURILOR DE SLAM GIPS.

en
PROJECT LOCATION: TURCENI-CRAIOVA/ROMANIA PROJECT DEFINITION: STEEL STRUCTURE ERECTION CLIENT: CET CONTRACTOR: AUSTRIAN ENERGY & ENVIRONMENT CONTRACTOR FOR CIVIL WORKS: TMUCB SA DURATION: 24 MONTHS/ 2011 SCOPE OF WORK: DESA IS EXECUTING THE WORK ITEMS DESCRIBED BELOW.
ERECTION OF THE STEEL STRUCTURE OF PIPE RACKS ERECTION OF THE STEEL STRUCTURE OF GYPSUM DEWATERING BUILDING ERECTION OF THE STEEL STRUCTURE OF FLUE GAS DUCT BUILDINGS ERECTION OF THE STEEL STRUCTURE OF GYPSUM PUMP BUILDING ERECTION OF THE STEEL STRUCTURE OF LIME STONE STAIR TOWERS ERECTION OF THE STEEL STRUCTURE OF GYPSUM LOADING BUILDING ERECTION OF THE STEEL STRUCTURE OF GYPSUM LOADING STATIONS ERECTION OF THE STEEL STRUCTURE OF ABSORBER STAIR TOWERS

QUANTITY OF EXECUTED WORKS:


2000 TONS OF STEEL STRUCTURE ERECTION IN 6 MONTHS SLURRY TANKS SITE FABRICATION AND MONTAGE

www. desacons.eu

ro

LOCAIE PROIECT: TURCENI-CRAIOVA/ROMNIA DEFINIREA PROIECTULUI: CONSTRUIREA DE UNITAI SUPLIMENTARE N CADRUL CENTRALEI TERMICE TURCENI CLIENT: COMPLEXUL ENERGETIC TURCENI CONTRACTOR: AUSTRIAN ENERGY & ENVIRONMENT CONTRACTOR PENTRU LUCRARI CIVILE: SYNERGY CONSTRUCT SRL DURATA: 24 LUNI/ 2011 SCOPUL LUCRRILOR : DESA EXECUT URMATOARELE OBIECTIVE: EXECUIA TUTUROR FUNDAIILOR PENTRU ESTACADA SUSINERE CONDUCTE , N TOTAL 284 DE FUNDAII, INCLUZND ACTIVITATEA TOPOGRAFIC, MONTAJUL I FIXAREA ANCORAJELOR. EXECUIA CLDIRII DE PROCESARE AP EXECUIA CLDIRII ELECTRICE ,, CALCAR EXECUIA STRUCTURII DE DESCRCARE CALCAR EXECUIA FUNDAIEI TANCURILOR DE SLAM EXECUIA CLDIRII ,, PRECONCASARE CALCAR EXECUIA FUNDAIILOR STRUCTURII DE GAZE ARSE EXECUIA CLDIRII ELECTRICE ,, GIPS EXECUIA FUNDAIILOR ANSAMBLULUI NCRCARE/DESCRCARE GIPS
en

PROJECT LOCATION: TURCENI-CRAIOVA/ROMANIA PROJECT DEFINITION: CONSTRUCTION OF ADDITIONAL UNITS IN CET TURCENI THERMAL POWER PLANT CLIENT: CET CONTRACTOR: AUSTRIAN ENERGY & ENVIRONMENT CONTRACTOR FOR CIVIL WORKS: SYNERGY CONSTRUCT SRL DURATION: 24 MONTHS/ 2011 SCOPE OF WORK: DESA IS EXECUTING THE WORK ITEMS DESCRIBED BELOW. EXECUTION OF ALL PIPE RACK FOUNDATIONS, TOTAL AMOUNT OF 284 PIECES, INCLUDING THE TOPOGRAPHIC SERVICES, ANCHORAGE APPLICATION and GROUTING .
EXECUTION OF PROCESS WATER BUILDING EXECUTION OF LIMESTONE ELECTRICAL BUILDING EXECUTION OF LIMESTONE UNLOADING STRUCTURE EXECUTION OF SLURRY TANK FOUNDATION EXECUTION OF PRECRUSHING FOUNDATION and WALLS EXECUTION OF FLUE GAS DUCT STRUCTURE FOUNDATIONS EXECUTION OF ELECTRICAL BUILDINGS

www. desacons.eu

CET TURCENI DESULPHURIZATION PLANT

CET TURCENI CONCENTRATORS BLOCK 5 and 6

ro

LOCAIE PROIECT: TURCENI-CRAIOVA/ROMNIA DEFINIRE PROIECT: STRUCTUR DE BETON ARMAT CU PIESE NGLOBATE CLIENT: CET CONTRACTOR: ROMELECTRO S.A CONTRACTOR PENTRU LUCRRI CIVILE: ENERGOCONSTRUCTIA S.A DURAT: 2 LUNI/ 2010 SCOPUL LUCRRI: DESA EXECUT STAIA DE PREPARARE I EVACUARE SLAM DENS 5 SI 6
en

PROJECT LOCATION: TURCENI-CRAIOVA/ROMANIA PROJECT DEFINITION: REINFORCED CONCRETE STRUCTURE WITH EMBEDDED PLATES CLIENT: CET CONTRACTOR: ROMELECTRO S.A CONTRACTOR FOR CIVIL WORKS: ENERGOCONSTRUCTIA S.A DURATION: 2 MONTHS/ 2010 SCOPE OF WORK: DESA IS EXECUTING THE CONCENTRATORS BLOCK 5 and 6 AS TURN-KEY.

www. desacons.eu

ro

LOCAIE PROIECT: BUCURETI/ROMNIA DEFINIREA PROIECTULUI: CLDIRE DE BIROURI CLASA A DE 49000 m2, CU INVESTIIE DE 65mil. EURO CLIENT: CHAYTON CAPITAL CONTRACTOR: SUMMA EUROPE DURAT: 24 LUNI/ 2011 SCOPUL LUCRRILOR: DESA A EXECUTAT URMATOARELE LUCRRI DE FINISAJE DESCRISE MAI JOS EXECUIE PEREI COMPARTIMENTARE DIN RIGIPS EXECUIE TAVAN FALS
en

PROJECT LOCATION: BUCHAREST/ROMANIA PROJECT DEFINITION: CLASS A OFFICE BUILDINGS 49000 m2 WITH 65 MILLION EURO INVESTMENT CLIENT: CHAYTON CAPITAL CONTRACTOR: SUMMA EUROPE DURATION: 24 MONTHS/ 2011 SCOPE OF WORK: DESA HAS EXECUTED THE FINISHING WORK ITEMS DESCRIBED BELOW. GYPSUM WALLS INSTALLATION FALSE CEILING INSTALLATION

www. desacons.eu

AFI PALACE COTROCENI PARK

ro

LOCAIE PROIECT: BUCURETI/ROMNIA DEFINIREA PROIECTULUI : CLDIRE DE BIROURI DIN STRUCTUR METALIC CU O SUPRAFA DE 26000 m2. CLIENT: MILLENNIUM ESTATE SRL CONTRACTOR: SUMMA DURATA: 13 LUNI/ 2006 SCOPUL LUCRRILOR: ASOCIATUL DESA N CALITATE DE INGINER STRUCTURIST A SUPERVIZAT TOT PROCESUL DE FABRICARE I MONTARE A STRUCTURII METALICE.
en

PROJECT LOCATION: BUCHAREST/ROMANIA PROJECT DEFINITION: 26000 SQUARE METER STEEL STRUCTURE CORE HIGH RISE BUILDING CLIENT: MILLENNIUM ESTATE SRL CONTRACTOR: SUMMA DURATION: 13 MONTHS/ 2006 SCOPE OF WORK: DESA PARTNER CONTRIBUTED AS A STRUCTURAL ENGINEER, MANAGING ALL STEEL STRUCTURE FABRICATION AND MONTAGE.

www. desacons.eu

PROIECTUL PALACE OF PEACE

ro

LOCAIE PROIECT: CHISINAU/MOLDOVA DEFINIRE PROIECT: CENTRU COMERCIAL CU O SUPRAFA DE 75500 m2. CLIENT: ANCHOR GROUP CONTRACTOR: SUMMA DURATA: 16 LUNI/ 2008 SCOPUL LUCRRILOR: ASOCIATUL DESA N CALITATE DE INGINER STRUCTURIST A CONTRIBUIT LA EXECUTIA TUTUROR CADRELOR DE BETON ARMAT.
en

PROJECT LOCATION: CHISINAU/MOLDOVA PROJECT DEFINITION: 75500 SQUARE METER SHOPPING CENTER. CLIENT: ANCHOR GROUP CONTRACTOR: SUMMA DURATION: 16 MONTHS/ 2008 SCOPE OF WORK: DESA PARTNER CONTRIBUTED AS A STRUCTURAL ENGINEER, MANAGING ALL THE RC FRAME EXECUTION.

www. desacons.eu

ro

LOCAIE PROIECT: BUCURETI/ROMNIA DESCRIEREA PROIECTULUI : CENTRU COMERCIAL DE 28000 m2. COMPUS DIN CINCI CLDIRI DIFERITE CONECTATE NTRE ELE DE LUMINATOARE. STRUCTURA COMPOZIT EXECUTAT DIN STLPI DE BETON PREFABRICAI, ACOPERIUL I LUMINATOARELE DIN STRUCTUR METALIC, PANOURI TERMOIZOLANTE I IZOLAREA ACOPERIULUI CU PANOURI REALIZATE N ANTIER. CLIENT: BUCHAREST INDUSTRIAL PARK CONTRACTOR: SYNERGY CONSTRUCT INTERNATIONAL DURATA: 8 LUNI/ 2009 SCOPUL LUCRRILOR : ASOCIATUL DESA A FOST RESPONSABIL CU PRODUCIA, MONTAREA I REALIZAREA VOPSITORIEI PENTRU PROTECIE LA FOC A CELOR 1200 DE TONE DE STRUCTUR METALIC.
en

PROJECT LOCATION: BUCHAREST/ROMANIA PROJECT DEFINITION: 28000 SQUARE METER COMMERCIAL PROJECT. COMPOSED OF FIVE DIFFERENT BUILDINGS CONNECTED TO EACHOTHER BY SKYLIGHTS. COMPOSITE STRUCTURE EXECUTED AS PRE-CAST CONCRETE COLUMS, ROOF AND SKYLIGHT STEEL STRUCTURE, THERMAL INSULATED SANDWHICH PANELS AND EXECUTED IN-SITU ROOF INSULATION. CLIENT: BUCHAREST INDUSTRIAL PARK CONTRACTOR: SYNERGY CONSTRUCT INTERNATIONAL DURATION: 8 MONTHS/ 2009 SCOPE OF WORK: DESA PARTNER CONTRIBUTED IN THIS PROJECT RESPONSIBLE FOR THE 1200 TONS OF STEEL STRUCTURE PRODUCTION, MONTAGE and FIRE-PROOF PAINT APPLICATION MANAGEMENT.

www. desacons.eu

ro

LOCAIA PROIECTULUI: ORAUL ILFOV/ROMNIA DEFINIREA PROIECTULUI : CONSTRUIREA UNUI CENTRU LOGISTIC DE 20400 m2. COMPUS DIN STLPI DE BETON ARMAT PREFABRICAI, ACOPERIUL DIN STRUCTUR METALIC, NCHIDERILE PERIMETRALE FCUTE CU PANOURI TERMOIZOLANTE I IZOLAREA ACOPERIULUI CU PANOURI COMPOZITE EXECUTATE N ANTIER. CLIENT: SC M LOGISTIC DISTRIBUTION SRL CONTRACTOR: MEP CONSTRUCT INTERNAIONAL SRL DURATA: 6 LUNI/ 2009 SCOPUL LUCRRILOR : ASOCIATUL FIRMEI DESA A FOST MANAGERUL DE PROIECT DIN PARTEA CONTRACTORULUI.

en

PROJECT LOCATION: ILFOV CITY/ROMANIA PROJECT DEFINITION: 20400 SQUARE METER WEATHER PROOF LOGISTIC CENTER CONSTRUCTION. COMPOSED OF PREFABRICATED CONCRETE COLUMNS, STEEL STRUCTURE ROOF, PERIMETER SANDWICH PANELS and COMPOSITE IN-SITU EXECUTED ROOF INSULATION. CLIENT: SC M LOGISTIC DISTRIBUTION SRL CONTRACTOR: MEP CONSTRUCT INTERNATIONAL SRL DURATION: 6 MONTHS/ 2009 SCOPE OF WORK: DESA PARTNER CONTRIBUTED IN THIS PROJECT AS THE PROJECT MANAGER OF THE CONTRACTOR.

www. desacons.eu

ro

LOCAIA PROIECTULUI: YANBU/SAUDI ARABIA DEFINIREA PROIECTULUI : CONSTRUIREA I MONTAREA ECHIPAMENTELOR UNEI FABRICI DE POLIPROPILEN CU O CAPACITATE DE 40000 DE TONE PE AN. CLIENT: NATIONAL PETROCHEMICAL INDUSTRIAL CO. CONTRACTOR: TECNIMONT ARABIA LTD. DURATA : 24 LUNI/ 2007 SCOPUL LUCRRILOR : ASOCIATUL DESA N CALITATE DE INGINER STRUCTURIST A SUPERVIZAT LUCRRILE SUBTERANE, EXECUIA TUTUROR CADRELOR DE BETON ARMAT I LUCRRILE DE INTERIOR.
en

PROJECT LOCATION: YANBU/SAUDI ARABIA PROJECT DEFINITION: WHOLE CONSTRUCTION AND EQUIPMENT MONTAGE OF A POLYPROPYLENE STATION WITH A CAPACITY OF 40000 TONS PER YEAR. CLIENT: NATIONAL PETROCHEMICAL INDUSTRIAL CO. CONTRACTOR: TECNIMONT ARABIA LTD. DURATION: 24 MONTHS/ 2007 SCOPE OF WORK: DESA PARTNER CONTRIBUTED AS A STRUCTURAL ENGINEER, MANAGING ALL THE UNDERGROUND WORKS, RC STRUCTURES and INTERIOR WORKS.

www. desacons.eu

PROIECTUL PALACE OF PEACE

ro

LOCAIE PROIECT: RABIGH/SAUDI ARABIA DEFINIREA PROIECTULUI: CONSTRUIREA I MONTAREA ECHIPAMENTELOR UNEI FABRICI DE POLIETILENA CU O CAPACITATE DE 60000 DE TONE PE AN. CLIENT: SAUDI ARAMCO & SUMITOMO CHEMICAL CONSORSIUM. CONTRACTOR: TECNIMONT ARABIA LTD. DURATA: 26 LUNI/ 2008 SCOPUL LUCRRILOR: ASOCIATUL DESA N CALITATE DE INGINER SUPERVIZOR A CONTRIBUIT LA PREFABRICAREA I MONTAREA A 220000 METRII DE CONDUCTE WBI I 6200 TONE STRUCTUR METALIC.
en

PROJECT LOCATION: RABIGH/SAUDI ARABIA PROJECT DEFINITION: WHOLE CONSTRUCTION AND EQUIPMENT MONTAGE OF A POLYETHYLENE STATION WITH A CAPACITY OF 60000 TONS PER YEAR. CLIENT: SAUDI ARAMCO & SUMITOMO CHEMICAL CONSORSIUM. CONTRACTOR: TECNIMONT ARABIA LTD. DURATION: 26 MONTHS/ 2008 SCOPE OF WORK: DESA PARTNER CONTRIBUTED AS A GROUP CHIEF RESPONSIBLE FOR THE PREFABRICATION and MONTAGE OF 220000 WDI PIPING and 6200 TONS OF STEEL STRUCTURE.

www. desacons.eu

PROIECTUL PALACE OF PEACE

ro

LOCAIE PROIECT: ASTANA/KAZAKHSTAN DEFINIRE PROIECT: PIRAMIDA PCII ESTE NOMINALIZAT SIMBOLUL ORAULUI ASTANA, INCLUZND O UNIVERSITATE, UN MUSEU I N INTERIOR O SALA DE OPERA DE 1500 DE LOCURI. CLIENT: KAZAKHSTAN GOVERMENT CONTRACTOR: SEMBOL CONSTRUCTION/SAMKO DURATA: 12 LUNI/ 2006 SCOPUL LUCRRILOR: PARTENERUL DESA A CONTRIBUIT LA ACEST PROIECT N CALITATE DE INGINER, GESTIONND I SUPERVIZND O PARTE A STRUCTURII METALICE I A SISTEMELOR DE FAAD.
en

PROJECT LOCATION: ASTANA/KAZAKHSTAN PROJECT DEFINITION: THE PYRAMIN OF PEACE IS NOMINATED TO BE THE SYMBOL OF ASTANA CITY INCLUDING A UNIVERSITY, MUSEUM AND 1500- SEAT OPERA AUDITORIUM INSIDE. CLIENT: KAZAKHSTAN GOVERMENT CONTRACTOR: SEMBOL CONSTRUCTION/SAMKO DURATION: 12 MONTHS/ 2006 SCOPE OF WORK: DESA PARTNER CONTRIBUTED AS A SITE ENGINEER, MANAGING SOME PART OF STEEL STRUCTURE AND FACADE CLADDING.

www. desacons.eu

GUIDING PRINCIPLES

DESA ENGINEERING CONSTRUCTION which aims to render services in the highest level and provide the most developed products for its customers, is aware of the fact that quality, environment, health and safety issues are fundamental business principles and integral parts of each project. The fact that expectations of our shareholders are in line with this view, which has entirely been adopted by the DESA ENGINEERING CONSTRUCTION Management, also corroborates us. Together with the active participation and supports of all the DESA Family and business partners, the fundamental principles hereunder have been adopted for all the decisions which affect our activities on quality, environment, health and safety issues: To perform and execute all activities pursuant to the laws in force and business ethics under the requirements of social and environmental responsibilities, To inform all DESA employees the importance of fulfillment of legal conditions and customer requirements, To be receptive for continuous development and to fulfill the requirements of customer expectations ideally, To ensure a flexible management which meets the requirements by the customer focused project execution program and competitive price strategy, To execute the most convenient scientific solutions within our knowledge and experience in fields out of the scope of the law and the legislation, To execute all activities without compromising the occupational health and safety requirements, To determine the risks regarding occupational safety and environment, to avoid them or to take the required measures in order to minimize their effects, To perform the required efforts in order to ensure for our business partners to perform works in high quality as well as safely and securely in terms of environmental issues, Regarding environmental, health and safety issues, to set targets which will provide the sustainable development and to monitor the performance orientated to reach these targets, To provide the training and resources which will render the required knowledge and experience for the employees of DESA for execution of these principles as well as qualified performance of their works, To develop a culture for DESA employees where the aforesaid principles are shared.

PRINCIPII FUNDAMENTALE

DESA ENGINEERING CONSTRUCTION are ca scop prestarea i furnizarea de servicii de cel mai nalt nivel i s furnizeze produse dintre cele mai dezvoltate pentru clienii si; este contient de faptul c problemele de calitate, mediu, de sntate i siguran ocupaional sunt principiile fundamentale de afaceri i parte integrant a fiecrui proiect. Faptul c ateptrile acionarilor notri sunt n conformitate cu acest punct de vedere, ne confirm de asemenea c a fost adoptat n ntregime de ctre Conducerea DESA ENGINEERING CONSTRUCTION. mpreun, cu participarea activ i sprijinul tuturor celor din Familia DESA i a partenerilor de afaceri, "principiile fundamentale" de mai jos au fost adoptate pentru toate deciziile care afecteaz activitile noastre pe calitate, mediu, sntate i probleme de siguran ocupaional: efectuarea i executarea tuturor activitilor n conformitate cu legile n vigoare i a eticii in afaceri cu cerinele responsabilitii sociale i de mediu informarea tuturor angajailor DESA despre importana ndeplinirii condiiilor legale i cerinelor clientului receptivitatea la dezvoltarea continu i la ndeplinirea in mod ideal a cerinelor i ateptrilor clienilor asigurarea unui management flexibil care ndeplinete cerinele clientului concentrat pe execuia programului de proiect i pe strategia de preuri competitive executarea soluiilor cele mai convenabile tiinific din cadrul cunotinelor i experienei noastre, n conformitate cu sfera de aplicare a legislaiei executarea tuturor activitilor fr a compromite cerinele sntatii i securitii n munc determinarea riscurilor n ceea ce privete sigurana la locul de munc i a mediului, pentru a le evita sau pentru a lua msurile necesare pentru a minimiza efectele acestora asumarea eforturilor necesare pentru a asigura partenerilor notri de afaceri efectuarea lucrrilor de nalt calitate, n condiii de siguran n ceea ce privete problemele de mediu n ceea ce privete mediul, sntatea i problemele de siguran ocupaional, stabilirea obiectivelor care asigur dezvoltarea durabil i monitorizarea orientat spre performana pentru a atinge aceste obiective pentru angajaii DESA oferim instruire i resurse pentru acumularea de cunotine necesare, care alturi de experien, vor duce la executarea acestor principii, precum i performana calificat a muncii lor dezvoltarea unei culturi organizaionale pentru angajaii DESA n care principiile menionate mai sus sunt mprtite

CORPORATE HISTORY DESA was established by 28 years old Turkish structural engineers, Erkan Demirezen-Veysel Sidar oban-Ahmet Dalolu, at late 2008 in Bucharest Romania just before the global economical crisis. Individiually all the partners have challenging experiences in different areas of construction and they have integrant technical skills that these lead DESA to become an operating and growing company with possesing more than 40 employees, although the 2009 global crisis effects are devastating in all over the world. For the time being DESA is a fast growing company with an annual turnover of 2.000.000 Euro in 2010. DESA VISION To maintain the optimum efficiency with quality and speed meanwhile keeping the client satisfaction in the foreground. FIELDS OF ACTIVITY Mobilization and Earthworks Reinforced Concrete Structures Execution Application of Faade Systems Application of Water-Heat Insulation Systems Wide Variety of Roof System applications Steel Structure Supply, Fabrication and Erection Interior Finishing and Fit-Out Works Landscaping Design& Built Turnkey Projects

ISTORIA DESA ENGINEERING CONSTRUCTION DESA a fost nfiinat de ctre 3 ingineri structuriti turci cu vrsta de 28: Erkan Demirezen, Veysel Sidar Coban i Ahmet Daliolu, la sfritul anului 2008, n Bucureiti Romnia, chiar nainte de nceperea crizei economice globale. Toi partenerii au experien imortant, acumulat individual, n diferite zone din domeniul construciilor i au aptitudini tehnice integrante care a facut DESA s devin o companie operaional n cretere avnd peste 40 de angajai dei efectele crizei globale din 2009 sunt devastatoare n toat lumea. n acest moment DESA este o companie n dezvoltare cu o cifr de afaceri pentru anul 2010 de 2 000 000 euro. VIZIUNEA DESA Meninerea eficienei optime cu calitate i vitez de execuie i n acelai timp, meninerea n prim plan a satisfaciei clienilor. DOMENII DE ACTIVITATE Organizare de antier i terasamente Execuie structuri din beton armat Aplicri sisteme de faad Aplicri sisteme de termizolaii i hidroizolaii Aplicri diferite sisteme de acoperi Aprovizionare, fabricare i montaj structur metalic Finisaje interioare i exterioare Peisagistic Proiectare i execuie proiecte la cheie

CONTACT US
AHMET DAGLIOGLU: General Manager Dipl.-Ing. EWF/IIW/Structural ERKAN DEMIREZEN: Managing Partner Dipl.-Ing. Structural VEYSEL SIDAR COBAN: Managing Partner Dipl.-Ing. Structural +40 730 653 899 adaglioglu@desacons.eu +40 729 987 648 erkan@desacons.eu

Group of Companies
DHI ENGINEERING CONSTRUCTION Country branch of Desa Engineering Construction in Arbil, Iraq

+40 730 653 899 sidarc@desacons.eu