Hmed= 271.15+0.05*N(m)
Hmax=273.85+0.05*N(m)
Proiectul va cuprinde :
Albia Albia
Albia
Caracteristici majora majora
minora
ST DR
Coeficient de
0.03 0.04 0.04
rugozitate
Diam. Port.
33 15 15
Patului raului
viteza medie
1.25 1.05 1.1
a curentului
Coeficient de
contractie a
0.85 0.85 0.85
curentului in
dreptul raului
coeficient de
1.04 0.7 1.08
turbiditate
viteza de
1.75 1.2 1.15
antrenare
Calculul ariilor
barate
ωbD ωbS
1.5 0
b 1.5
Latim
Trons Inaltim hmi^y+0 hmi^y+1 bmi+hmi^y+ A=Qm/ Vi=A*hmi^y+
ea
on ea hmi .5 .5 1.5 Σbmi+hmi^1+1.5 0.5
bmi
14.42
7'-8 0 0.715 0.778 0.556 8.017 0.356 0.277
11.38
8-9 0 0.925 0.943 0.872 9.929 0.356 0.336
9-9' 3.520 1.950 1.650 3.218 11.327 0.356 0.587
13.12
9'-10 0 1.040 1.028 1.069 14.025 0.356 0.366
12.35
10-11 0 1.250 1.169 1.461 18.047 0.356 0.416
14.53
11-11' 0 2.130 1.698 3.616 52.543 0.356 0.604
11'-12 1.500 2.920 2.117 6.182 9.273 0.356 0.754
16.89
12-13 0 3.510 2.408 8.453 142.775 0.356 0.857
12.58
13-14 0 4.645 2.930 13.611 171.221 0.356 1.043
10.93
14-15 0 5.545 3.317 18.392 201.026 0.356 1.181
15-16 4.330 6.120 3.554 21.751 94.181 0.356 1.265
16-17 4.320 5.945 3.807 22.634 97.780 0.356 1.355
17-18 6.050 5.100 3.394 17.308 104.714 0.356 1.208
18-18'' 1.500 4.560 3.120 14.229 21.344 0.356 1.111
18''-
18' 7.430 3.655 2.643 9.662 71.786 0.356 0.941
18'-19 2.720 2.625 2.062 5.413 14.725 0.356 0.734
11.42
19-20 0 1.795 1.551 2.784 31.789 0.356 0.552
20-21 13.02 1.195 1.143 1.366 17.783 0.356 0.407
0
21-21' 4.660 1.070 1.052 1.126 5.246 0.356 0.374
1097.530
40.000
35.000
30.000
25.000
Viteze barate
20.000 Viteze nebarate
15.000
10.000
5.000
0.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
CALCULUL AFUERILOR
Afuierile in zona podului se calculeaza la raurile cu pat sau maluri erodabile in scopul
stabilirii a adancimii de fundare a infrastructurii, a lungimii podului.
- Generale care au loc pe toata sectiunea latimii ingustate( au loc atunci cand viteza din
sectiunea strangulate este mai mare decat viteza critica de antrenare)
- Locale care se produc in dreptul pilelor sau culeelor si a capetelor digurilor de dirijare ca
urmare a concentrarii vitezelor si a turbioanelor dezvoltate in aceste locuri
- Totale sunt date de cele generale si cele locale
Vmp
haf¿ ∗h
Vml
unde:
Vmp= viteza medie a apei in albia minora in sectiunea podului inainte de producerea
afuierilor
Vml= viteza medie a apei in regim natural in albia minora calculata numai pe latimea
acoperita de pod(intre fetele culeelor)
h= adancimea apei intr-un punct oarecare a-l sectiunii de scurgere inainte de afuiere
h af
E=
h
Tronso
hm v v' h' E h af
n
0.71
CD-8 0.033 0.138386 2.9983705 4.194 2.283371
5
0.92
8-9 0.066 0.167869 2.3458638 2.536 1.420864
5
1.95
9-P1 0.351 0.587381 3.2624137 1.673 1.312414
0
1.04
P110 0.383 0.365862 0.9945305 0.956 0.04547
0
1.25
10-11 0.435 0.416132 1.1953491 0.956 0.054651
0
2.13
11-11' 0.632 0.604309 2.0368749 0.956 0.093125
0
2.92
11'-P2 0.788 0.753636 2.7923356 0.956 0.127664
0
3.51
P2-13 0.896 0.857252 3.3565404 0.956 0.15346
0
4.64
13-14 1.091 1.042998 4.4419174 0.956 0.203083
5
5.54
14-15 1.235 1.18066 5.3025688 0.956 0.242431
5
6.12
15-16 1.323 1.265085 5.8524294 0.956 0.267571
0
5.94
16-17 1.417 1.355213 5.6850805 0.956 0.259919
5
5.10
17-18 1.263 1.208012 4.8770245 0.956 0.222975
0
4.56
18-P3 0.984 1.110752 5.1476345 1.129 0.587634
0
3.65
P3-18' 0.768 0.940934 4.4801308 1.226 0.825131
5
2.62
18'-19 0.577 0.734075 3.3382027 1.272 0.713203
5
1.79
19-20 0.425 0.552004 2.3290115 1.297 0.534011
5
1.19
20-21 0.349663 0.406836 1.3903935 1.163509195 0.195393
5
21-CS 1.07 0.229577 0.374482 1.7453675 1.631184617 0.675368
Kf= coefficient care tine seama de forma pilei in sectiunea transversala( fig. 6 IV pag 68)
Kα=coefficient care tine seama de unghiul de incidenta al curentului pe pila ( fig. 6 V pag 69)
K K
Tronson h h' V Va Afl Aftot=h'+Afl
f a
CD 0.715 2.998371 0.033 1.2 1 1 1.6727872 4.671157739
P1 st 0.365 2.345864 0.066192518 1.2 1 1 1.6727872 4.018651038
P1dr 1.95 3.262414 0.351087365 1.2 1 1 1.6727872 4.935200911
1.7
P2 st 1.25 2.036875 0.435156936 1 1 2.151189 4.18806394
5
1.7
P2dr 2.13 2.792336 0.78809196 1 1 2.151189 4.943524599
5
1.1
P3 st 5.945 5.685081 1.417172757 1 1 1.6259921 7.311072618
5
1.1
P3 dr 4.56 4.877025 1.263241932 1 1 1.6259921 6.503016597
5
1.1
CS 2.625 2.329011 0.425436581 1 1 1.6259921 3.955003552
5
Cotele de fundare ale pilelor trebuie sa fie coborate sub nivelul afuierilor totale astfel:
a) La 2.5 metri sub nivelul afuierilor totale daca adancimea de fundare nu depaseste 10
metri sub fundul albiei
b) La 5 metri sub nivelul afuierilor totale daca adanimea de fundare depaseste 15 metri sub
fundul albiei
Cf,pila=Nmax,calc-h’-afl-(2.5:5m)
l = 2.5*L
L = lungimea podului
wmd wms
L=Bm+ +
Hmd Hms
0.00567918
Δz
L 60.155
l 150.39
Nmax
calc 274.85
ΔH 1
Cota tablier
Nmaxcalc+Δz+ΔH
275.8550176
a= semiaxa mare
b=semiaxa mica
a
K= = 1.5-2.0
b
Celelalte elemente:
β=7-8°
α= 120-140°
1 1
r1=( - )b
5 6
r2=ls
ls=a
li=0.5*ls
As, Ad= coeficientii corespunzator albiei stangi si albiei drepte, in functie de gradul de
ingustare δs si δd
Qbs
1.δs= Qm
+Qms
2
Qbd
2. δd= Qm
+Qmd
2
a
Dupa ce se obtin semiaxele, Bs si Bd se determina in functie de δs si δd raportul K = si
b
deci semiaxa mare a digului de dirijare. Constructia elipsei se face prin puncte, dandu-se valori
lui “x” de la “0” la “a” si calculand valori corespunzatoare lui “y”.
Y=b√ 1−¿ ¿
0.00588
δs 0 δd 4
As 0.0082 Ad 0.011
0.66592
Bs 2 Bd 0.89331
K=a/b 1.5 K=a/b 1.5
0.99888 1.33996
a 3 a 5
0.99888 1.33996
ls 3 ls 5
0.49944 0.66998
li 2 li 3
0.13318 0.17866
r1 4 r1 2
0.99888 1.33996
r2 3 r2 5
y x a b
0.665 0 0.998 0.665
0.65151 0.2 0.998 0.665
0.60925 0.4 0.998 0.665
0.53139
9 0.6 0.998 0.665
0.39757
5 0.8 0.998 0.665
0 0.998 0.998 0.665
y x a b
0.893 0 1.39 0.893
0.85522
6 0.4 1.39 0.893
0.80552
1 0.6 1.39 0.893
0.73027
2 0.8 1.39 0.893
0.45067
5 1.2 1.39 0.893
0 1.39 1.39 0.893