Documente Academic
Documente Profesional
Documente Cultură
PROTECȚIA MEDIULUI
COORDONATOR : STUDENT:
LECTOR DR. GHITA SIMONA Bailescu Mihai
CONSTANTA
2020-2021
Cuprins
INSTALATIA DE BALAST..................................................................................................................3
Reguli de registru Bureau Veritas.......................................................................................................4
Implicarea in stabilitate......................................................................................................................6
Traseu tubulatura................................................................................................................................6
Concluzii................................................................................................................................................7
Bibliografie............................................................................................................................................8
INSTALATIA DE BALAST
Ballast pumps
Ballast pumps are to be located in the cargo pump room, or a similar
space within the cargo area not containing any source of ignition.
Pumps
At least two power driven ballast pumps are to be provided, one of which
may be driven by the propulsion unit. Sanitary and general service pumps may
be accepted as independent power ballast pumps. Bilge pumps may be used for
ballast water transfer .
Pumps
Schema 2D
Schema 3D
Implicarea in stabilitate
Traseu tubulatura
Bibliografie