THE CHOCKFAST STERNTUBE INSTALATION


FOR SERVICE ENGINEERS & MACHINERY DESIGNERS
PENTRU INGINERI DE SERVICE& PROIECTANTI MECANICI

STERNTUBE INSTALLATION WITH EPOCAST 36


INSTALARE TUB ETAMBOU CU EPOCAST 36

CUPRINS

INDEX

1.0. SternTube Installation with EPOCAST 36

1.0.
36

Montarea tuburilor etambou in EPOCAST

1.1.

Bucsele tubului etambou

1.2.

Pregatirea pentru centrare si cofrarea


bucselor tubului etambou.

1.1. Stern Frame Boss


1.2. Preparations for Alignment and Damming
of the Stern Tube Bush

1.2.1. Location of the Jacking Screws


1.2.1.1. Variant 1 (Location of Jacking Screws at
Stern Frame Boss)
1.2.1.2. Variant 2 (Location of Jacking Screws at
Stern Tube Bush)

1.2.2. Location of Fill Holes


1.2.2.1. Fill Hole / Vent Hole (Bearing Bush in

1.2.1. Pozitionarea suruburilor de ridicare


1.2.1.1. Variante Nr. 1 (Localizarea
suruburilor de ridicare la
bucsele metalice ale tubului)
1.2.1.2. Variante Nr. 2 ((Localizarea
suruburilor de ridicare la
bucsele de compozitie ale
tubului)

1.2.2. Pozitionarea gaurilor de umplere


1.2.2.1. Gaura de umplere/Gaura aerisire
Bucsele lagar in poz. orizontala
(Orizontal)
1.2.2.2. Gaura de umplere/Gaura aerisire
Bucsele lagar in poz. inclinata
1.2.3. Installation and Alignment of Stern Tube
(Inclinat)
Installation of the Forward and aft Dam
1.2.3. Instalare si Aliniere a Tubului
EEtabbouPositionieren der vorderen Abdmmung Etambou
Bearing
1.2.4.
Instalarea Lagarului de Inchidere Prova
Preparation for Pouring or Pumping of
si Pupa
1.3. chockfast
1.3.
Pregatiri pentru Turnare sau Pompare
chockfast
Check List of EPOCAST 36 Materials and
1.3.1. Tools
1.3.1. Varificati lista Materiale si Unelte
Pre-Heating and Mixing of EPOCAST 36
EPOCAST 36
Even Keel Position)
1.2.2.2. Fill Hole / Vent Hole (Bearing Bush in
Incline Position)
1.2.2.3. Fill Hole and Vent Hole using Pump

1.3.2.
1.3.3.

Pouring of EPOCAST 36 through Fill Holes

1.3.2.

Preincalzirea si Amestecul EPOCAST


36

1.3.3.

Turnarea EPOCAST 36 prin gaurile


de umplere.
1.3.4. Pomparea EPOCAST 36 prin
gaurile de umplere.

1.3.5.

Verificarea EPOCAST 36 pe timpul

Pumping of EPOCAST through Fill Holes

1.3.4. Checking of EPOCAST 36 during curing


process

1.3.6. Cure Time of EPOCAST 36


1.3.6.1 Steel Temperature
1.3.6.2 Lloyds Register requirement
1.3.7.

Final Works

procesului de tratare
1.3.6.1Timpul de tratare EPOCAST 36

1.3.6.2Temperatura Metal
1.3.7. Lucrari Finale

1.0. STERN TUBE INSTALLATION WITH


EPOCAST 36

1.0.

Due to long year experience in use and


application of our chocking system EPOCAST
36, epoxy resin chocks are preferred for Stern
Tube installations since this system saves
time and costs. Insitu machining of Stern
Frame Boss is not required at all.

INSTALARE TUB ETAMBOU CU


EPOCAST 36
Datorita experientei de-a lungul anilor in folosirea
si aplicarea sistemului nostrum chocking
EPOCAST 36 , epoxy resin chocks sunt preferate
pentru instalatiile Tubului Etambou din moment
ce acest system salveaza timp si costuri.
Prelucrarea Bucsei Pupa nu este ceruta deloc.

1.1. STERN FRAME BOSS

1.1.

The Stern Frame Boss is purchased according to


design. If necessary, the Stern Frame Boss is to
be machined and welded so that there is an
average gap of 20 - 25 mm after installation. Due to
the welding process and alignment error it may
happen that the gap is reduced on one side, and
increased on the opposite side. This will not effect
the EPOCAST 36 installation as long as the
minimum gap is at least 8 mm (Below 8 mm please
refer to manufacturer for further advise). (See
drawing No.1)

Ingrosarea Coastei Etmbou este aprovizionata


conform proiectarii. Daca e necesar Ingrosarea
Coastei Etambou va fi prelucrata si sudata astfel
incat sa fie un spatiu de aprox. 20-25 mm dupa
instalare. Datorita procesului de sudura si erorii
de aliniere se poate intampla ca spatiul sa fie
redus pe o parte, si crescut pe partea opusa.
Acest lucru nu va afecta instalarea EPOCAST
36 atat timp cat spatiul minim este cel putin 8
mm,( Sub 8 mm contactati producatorul pentru
sfaturi ulterioare) (Vezi desen Nr. 1)

1.2. PREPARATIONS FOR ALIGNMENT AND


DAMMING OF THE STERN TUBE BUSH

1.2. PREGATIRI PENTRU ALINIEREA SI


OPRIREA BUCSEI TUBULUI ETAMBOU

BUCSA PUPA

1.2.1Amplasarea Suruburilor de Reglare


1.2.1.

Location of the Jacking Screws


1.2.1.1Varianta nr.1

1.2.1.1. Alternative No. 1


The Jacking Screw holes are drilled from outside
through the Stern Frame Boss and threaded. The
number and arrangement (position) of the holes
respectively the jacking screws are determined by
the shipyard (technical Department). All these
Jacking Screws holes have to be pluged finally.

Gaurile Suruburilor de Reglare sunt facute din


afara prin Bucsa Pupa si filetate. Numarul si
aranjarea (pozitionarea) gaurilor respectiv
suruburile de reglare sunt determinate de catre
santier (Dept Tehnic). Toate aceste gauri ale
Suruburilor de Reglare trebuie sa fie astupate
la final.

H . A . S P R I N G E R
AN

I L L I N O I S

T O O L

W O R K S

G MBH
INFO 5 - 97 - 07 - EP - 36 - ST - E-D

C O M P A N Y

(See drawing no. 2)


1.2.1.2. Alternative No. 2

(Vezi desen nr.2)

1.2.1.2.

Varianta Nr. 2

In case it is not possible to drill the holes through


the stern frame boss due to material thickness, the
holes for the jacking screws can be positioned
directly in the stern tube bearing. (See drawing no.
2.2)

In caz ca nu este posibila realizarea gaurilor prin


bucsa pupa datorita grosimii materialului, gaurile
pentru suruburile de reglare pot fi amplasate
direct in lagarul tubului etambou. (Vezi desen Nr.
2.2)

1.2.2.

1.2.2

Positioning of the fill and vent holes

Pozitionarea umplerii si a
gaurilor de aerisire

1.2.2.1 Top fill holes and vent holes (horizontal


position)

1.2.2.1 Gaurile de umplere superioare si gaurile


de aerisire (pozitie orizontala)

For positioning of the fill holes from above and


positioning of the vent holes on the aft and forward
stern tube bearing consider the following:
a)
Stern frame boss on the aft side
Position the fill hole as far as possible in
the back area. Position the vent hole as
far as possible in the front area.
b)
Stern frame boss on the forward side
Position the fill hole as far as possible in
the front area. Position the vent hole as far
as possible in the back area.
Hole Diameters:
a) Fill hole : approx. 35 mm
b) Air hole : approx. 20 mm
(See drawing no. 3)

Pentru pozitionarea gaurilor de umplere de


deasupra si pozitionarea gaurilor de aerisire la
lagar tub etambou prova si pupa luati in
considerare urmatoarele:
a)
Bucsa Pupa pe partea pupa: Pozitionati
gaura de umplere pe cat de departe
posibil in zona din spate. Pozitionati gaura
de aerisire cat de departe posibil in zona
din fata.
b)
Bucsa Pupa in prova: Pozitionati gaura
de umplere cat de departe posibil in
zona din fata. Pozitionati gaura de
aerisire pe cat de departe posibil in zona
din spate. Diametru gauri:
a)Gaura de umplere : aprox. 35 mm
b) Gaura de aerisire: aprox. 20 mm
(Vezi desen Nr. 3)

1.2.2.2 Top fill holes and vent holes (declination)

1.2.2.2. Partea superioara a gaurilor de umplere


si gauri de aerisire (deviatie)

a) Stern frame boss on the aft side Position the fill


hole as far as possible in the back area. Position
the vent hole as far as possible in the front area.

Pentru pozitionarea gaurilor de umplere de


deasupra si pozitionarea gaurilor de aerisire la
lagarul pupa si prova luati in considerare
urmatoarele:
a) Bucsa Pupa: in pupa Pozitionati gaura de
umplere cat de departe posibil in zona din
spate. Pozitionati gaura de aerisire cat de
departe posibil in zona din fata.

b) Stern frame boss on the forward side Position


the fill hole as far as possible in the

b) Bucsa Pupa: in partea prova Pozitionati


gaura de umplere cat de departe posibil in
zona din spate. Pozitionati gaura de aerisire

For positioning of the fill holes from above and


positioning of the vent holes on the aft and front
stern tube bearing consider the following:

H . A . S P R I N G E R
AN

I L L I N O I S

T O O L

W O R K S

G MBH
C O M P A N Y

back area. Position the vent hole as far as


possible in the front area. Hole Diameters:
a) Fill hole : approx. 35 mm
b) Air hole : approx. 20 mm
(See drawing no.4)
1.2.2.3 Bottom fill holes and vent holes for
pumping of horizontal part
For positioning of the fill holes from the bottom side
and positioning of the vent holes on the aft and
forward stern tube bearing consider the following:
a) Stern frame boss on the aft side Position the fill
hole as far as possible in the bottom back area.
Position the vent hole as far as possible in the
upper front and aft area. Two vent holes are
advantageously for refilling.
b) Stern frame boss on the forward side Position
the fill hole as far as possible in the bottom back
area. Position the vent hole as far as possible in
the upper front area. If the vent hole respectively
fill hole is in the aft pik it is necessary to lengthen
the lines. Hole Diameters:
a) Fill hole : approx. 35 mm
b) Air hole : approx. 20 mm
(See drawing no.5)

1.2.3.

Installation and alignment of the stern


tube bearings

Before installing the stern tube bearings into the


stern frame boss it is necessary to carry out the
following work:

a) Remove grease, oil, mill scale, rust and paint


etc. from the chocking area of the stern
frame boss and the stern tube bearing.
b) If required spray Release Agent FT 36 into the
gap and make sure that the complete steel
surface of the sternframe boss and bush is
wetted.
c) Insert stern tube bearing into the stern frame
boss (See drawing no. 6)

INFO 5 - 97 - 07 - EP - 36 - ST - E-D

cat de departe posibil in zona din fata.


Diametru gauri:
a) Gaura de umplere : aprox. 35 mm
a) Gaura de aerisire: aprox. 20 mm
(Vezi desen Nr. 4)
1.2.2.3 Partea inferioara a gaurilor de umplere si
gaurile de aerisire pentru pomparea partii
orizontale
Pentru pozitionarea gaurilor de umplere din
partea inferioara si pozitionarea gaurilor de
aerisire in pupa si prova lagar tub etambou luati in
considerare urmatoarele:
a) Bucsa Pupa: in pupa Pozitionati gaura de
umplere cat de departe posibil in zona
inferioara din spate. Pozitionati gaura de
aerisire cat de departe posibil in zona
superioara prova si pupa. Doua gauri de
aerisire sunt in mod avantajos pentru
reumplere.
b)Bucsa Pupa: in prova Pozitionati gaura de
umplere cat de departe posibil in partea
inferioara din spate. Pozitionati gaura de
aerisire cat de departe posibil in zona
superioara din fata. Daca gaura de aerisire
respectiv gaura de umplere este in pik-ul
pupa este necesar sa lungiti liniile. Diametru
gauri:
a) Gaura de umplere : aprox.35mm
b) Gaura de aerisire: aprox. 20 mm
(Vezi desen Nr. 5)
1.2.3. Instalarea si alinierea lagarelor tub
etambou
Inainte de instalarea lagarelor tub etambou in
bucsa pupa este necesar sa realizati urmatoarele
lucrari:
a) Indepartati lubrifiantul, uleiul, tunderul de la
laminare, rugina si vopseaua etc. din zona
chocking a bucsei pupa si lagarul tub etambou.
b) Daca se cere pulverizati Release Agent FT 36
in locas si asigurati-va ca intreaga suprafata de
metal/otel a bucsei pupa si bucsa sa fie udate.
c) Inserati lagarul tub etambou in bucsa pupa
(Vezi desen nr.6)

H . A . S P R I N G E R
AN

I L L I N O I S

T O O L

W O R K S

GMBH
C O M P A N Y

INFO 5 - 97 - 07 - EP - 36 - ST - E-D

d) Insert active sealing (sea water and oil


resistant) in the corner between sterntube
frame boss and sterntube flange
(See drawing no. 6)
e) Afterwards align the stern tube bearings.
Please make sure that the active sealing is
fixed and cannot move during pouring or
pumping.

d) Inserati etansarea activa (apa de mare si rezistent la


ulei)
Ulei) in colt intre bucsa pupa si flansa tub etambou
(Vezi desen Nr. 6)
e) Dupa aceea aliniati lagarele tub etambou. Asigurativa ca etansarea activa este fixa si nu se poate
miscaHerstellers.
Bitte darauf
achten,
misca
pe timpul turnarii
sau pomparii.

1.2.4.

1.2.4. Pozitionarea opritorului prova si pupa

Positioning of the front and aft damming

It is necessary to carry out the following damming

Este necesar sa realizati urmatoarele masuri de oprire:

measures:
a) Insert closed cell foam rubber into the gap on
both inner sides of the bearings (See
drawing no. 7)

a) Inserati celule inchise de cauciuc spumant in locas in


ambele parti interioare ale lagarelor

b) To keep the closed cell foam rubber into place


during pouring or pumping an additional steel
ring is required. This steel ring can be tack
welded onto the stern frame boss
c) Damming of the bolt holes on the flange with
wooden plugs
d) Put the ring band tool around the flanges of the
stern tube bearing. Please make sure
that a vent pipe at 12 oclock and 2 fill pipes at
1 and 11 oclock are located.
e) Seal the sides with mastic or putty
f) Fit the riser gate on the vent hole.
Set up and seal the reservoir
(See drawing no. 8)

(Vezi desen nr.7)

b) Pentru a pastra celulele inchise de


cacacauciucMoosgummi
cauciuc la loc pe timpul turnarii sau pomparii se cere
un inel suplimentar de otel/metal.
Acest inel de metal poate fi sudat in puncte pe
bucsa pupa.
c) Oprirea gaurilor boltului pe flansa cu dopuri de lemn
mit
d) Montati cheia inelara in jurul flanselor lagarului tub
etambou
desAsigurati-va
Flansches der
etambou.
ca sunt amplasate o teava la
aerisire
ora
12 sila2ora
tevi12de umplere la ora 1 si 11.
e) Etansati partile cu mastic sau chit.
f) Montati poarta coloanei la gaura de aerisire.
Pregatiti si etansati rezervorul
(Vezi desen Nr. 8)

1.3. PREPARATORY MEASURES FOR

1.3. MASURI PREGATITOARE PENTRU

POURING RESPECTIVELY PUMPING OF


EPOCAST 36

TURNARE RESPECTIV POMPAREA EPOCAST 36

1.3.1. Check EPOCAST - Materials, pump and

1.3.1. Verificati EPOCAST - Materiale,

a)

auxiliary tools as follows:


Epoxy resin EPOCAST 36
b) Electric drilling machine
c) Mixing blade
d) Heaters for pre-heating of
EPOCAST 36
e) Pneumatic pump SP 2 or electric
spindel pump

pompa si unelte auxiliare dupa cum urmeaza:


a) Rasina epoxy EPOCAST 36
b) Masina de Gaurit Electrica
c) Pale de amestecat
d) Dispozitive de incalzire pentru pre-incalzirea
EPOCAST 36
e) Pompa pneumatica SP 2 sau pompa electrica
cu ax

H . A . S P R I N G E R
AN

I L L I N O I S

T O O L

W O R K S

G MBH
C O M P A N Y

f) Tube line with fill connection


g) Filler as reservoir at the pump tube
with connection vent holes
h) Filler as reservoir at the fill hole
i) Compressed air connection

1.3.2.

Pre-heating and mixing of EPOCAST 36

In order to obtain the correct pre-heating


temperature of EPOCAST 36 at the
corresponding steel plate temperature and gap
size follow strictly our Mixing and Pouring Guide
1.3.2 (see attached) and the below-mentioned
instructions:
a) Mark the correct gap size on the left side of the
chart and draw a horizontal line
b) Mark the correct steel plate temperature on the
top of the chart and draw a vertical line
c) Both lines cross each other
d) Continue drawing your vertical line up to the
bottom column "A"
e) You now obtain an imaginary point of
intersection. This point of intersection indicates
the perfect pre-heating temperature for
EPOCAST 36.
f) Now pre-heat the epoxy resin EPOCAST 36 up
to the determined temperature
g) Before starting the mixing process please use
protective clothing (eye shield and gloves).
h) Add all hardener to the pre-heated chocking
compound and power mix at approx. 300 -500
rpm for 2 - 3 min.
Attention: Do not immerse or pull out mixing
blade from resin can when in operation (this
can cause air entrapment)

1.3.3. Pouring of EPOCAST 36 through


from above

holes

The epoxy resin EPOCAST 36 is to be poured


through the fill holes mentioned in item no.
1.2.2.1 and 1.2.2.2 until the epoxy resin appears
on the vent holes and the level of the epoxy
resin remains constant.

INFO 5 - 97 - 07 - EP - 36 - ST - E-D

f) Teava cu conexiune pentru umplere


g) Umplerea
rezervorului pompei
conectat la gaurile de
aerisire
h) Umplerea
rezervorului la gaura
de umplere
i) Conexiune aer
comprimat
1.3.2. Pre-incalzirea si amestecarea EPOCAST 36
Pentru a obtine temperature de preincalzire
corecta a EPOCAST 36 la temperatura
corespunzatoare tablei de metal/otel si marimea
locasului respectati cu strictete Ghidul nostru
pentru Amestec si Turnare 1.3.2 (vezi atasat) si
instructiunile mai jos mentionate.
a) Marcati marimea corecta a locasului in partea
stanga a graficului si desenati o linie orizontala
b) Marcati temperatura corecta a tablei de otel
in partea superioara a graficului si desenati o
linie verticala
c) Ambele linii se intersecteaza
d) Continuati sa desenati linia dvs verticala pana
la coloana de jos A
e) Obtineti acum un punct imaginar de
intersectare. Acest punct de intersectare indica
temperatura perfecta de pre-incalzire pentru
EPOCAST 36.
f) Acum preincalziti rasina epoxy EPOCAST 36
pana la temperatura determinata.
g) Inainte de a incepe procesul de amestecfolositi imbracaminte de protectie (Viziera de
Protectie si manusi).
h) Adaugati tot intaritorul la continutul chocking
preincalzit si amestecati la aprox. 300 - 500
rpm timp de 2-3 min.
Atentie: Nu cufundati sau scoateti pala de
amestec din cutia de rasina pe timpul exploatarii!
(acest lucru poate cauza bule de aer).
1.3.3. Turnarea EPOCAST 36 prin
gauri de deasupra
Rasina epoxy EPOCAST 36 va fi turnata prin
gaurile de umplere mentionate la punctele 1.2.2.1
si 1.2.2.2 pana cand rasina epoxy apare pe
gaurile de aerisire iar nivelul rasinii epoxy ramane
constant.

H . A . S P R I N G E R
AN

I L L I N O I S

T O O L

GMBH

W O R K S

C O M P A N Y

1.3.4. Pumping of EPOCAST 36 through fill

holes from below

INFO 5 - 97 - 07 - EP - 36 - ST - E-D
1.3.4. Pomparea EPOCAST 36 prin gaurile

de umplere de mai jos

The epoxy resin EPOCAST 36 is to be pumped

Rasina epoxy EPOCAST 36 va fi pompata prin gaurile

through the fill holes until the epoxy resin


appears on the vent holes mentioned in item no.
1.2.2.3 and the level of the epoxy resin
remains constant. (See drawing no. 9)

de umplere pana cand rasina epoxy apare pe gaurile


aerisire1.2.2.3
genannte
Anschlubohrung
de aerisire
mentionate
la punctul
nr. 1.2.2.3 iar nivelul rasinii epoxy ramane constant.
(Vezi desen Nr. 9)

1.3.5.

1.3.5. Reumplerea EPOCAST 36

Refilling of EPOCAST 36

After pouring respectively pumping of EPOCAST

Dupa turnarea respectiv pomparea EPOCAST 36

36 epoxy resin is to be refilled through the


reservoir of the vent hole during the curing
process.

rasina epoxy va fi reumpluta prin rezervorul gaurii de


aerisire pe timpul procesului de tratare.

1.3.6.

1.3.6. Timpul de tratare al EPOCAST 36

Curing time of EPOCAST 36

1.3.6.1 Steel Temperature :

1.3.6.1 Temperatura otel:

< 13 C no cure

< 13 C fara tratare

14-17 C approx. 48 hours


18 - 20 C approx. 36 hours
> 20 C approx. 24 hours

1 4 - 1 7 C aprox. 48ore
1 8 - 20 C aprox. 36ore
> 20 C aprox. 24 ore

The curing process can be reduced by external

Procesul de tratare poate fi redus prin caldura externa,

heat after the first hardening of the epoxy


resin EPOCAST 36.

dupa prima intarire a rasinii epoxy EPOCAST 36

1.3.6.2 Lloyds Register Requirement

1.3.6.2 Cerinta Lloyds Register

For steel temperature below 15 the following

Pentru temperature otel sub 15 C urmatoarea.

procedure is to be carried out:

procedura va fi realizata:

1. Erect a protective shelter around the outside

1. Montati un acoperis de protectie in jurul zonei din

area of the stern tube. This protective shelter


does not have to be elaborate; canvas tarps
fastened to steel staging is acceptable.
2. Place hot air blowers inside the shelter pointed
toward the stern tube.
3. Allow the stern tube area to warm up to a
temperature of 15 - 20 C which is the ideal
temperature for EPOCAST 36. This may take

afara tubului etambou. Acest acoperis de protectie


nu trebuie sa fie complicat; sunt acceptate prelate
legate pentru acoperirea schelei metalice.
2. Amplasati ventilatoare cu aer cald in interiorul
acoperisului catre tubul etambou.
3. Permiteti zonei tubului etambou sa se incalzeasca
la o temperature de 15-20 0C ce reprezinta
temperature ideala pentru EPOCAST 36 .Acest
lucru poate dura mai multe zile.
several days.
4. In caz ca nu este posibila o preincalzire a zonei
4. In case a preheating of the chocking area is not
chocking urmati punctele a,b,c si d.
possible please follow item a, b, c and d

a) Pouring of EPOCAST 36 at ambient


temperature

a) Turnarea EPOCAST 36 la o temperatura ambianta.

H . A . S P R I N G E R
AN

I L L I N O I S

T O O L

W O R K S

G MBH
C O M P A N Y

b) After first solidification of EPOCAST 36 heating


of the chocking area with heaters to maintain the
chock temperature of 20C or higher for at least
36 hours or more until a Barcol hardness reading
of 40 is achieved
c) The temperature (20C min.) should be
measured in the resin chock in the radial
space at convenient distance along the length
of the sterntube / sternbush
d) IMPORTANT: The temperature difference
during post curing between resin chock
and steel must not exceed 10C !

1.3.7

Final works

a) Remove fill and vent connections


b) Close the fill and vent connections with
blank cover screws
c) Grind off the jacking screws at the outer
area of the stern frame boss and close with

INFO 5 - 97 - 07 - EP - 36 - ST - E-D

b) Dupa prima solidificare a EPOCAST 36


incalzirea zonei chocking cu dispozitive de
incalzire pentru a mentine temperatura chock
de 200 sau mai mare pentru cel putin 36 ore
sau mai mult pana cand se obtine o duritate
Barcol de 40 .
c) Temperatura de 20 C (min.) trebuie
masurata in resin chock in spatiul radial
la o distanta convenabila de-a lungul
lungimii tubului tambou/bucsei
d) Important : Diferenta de temperatura pe
timpul post tratarii intre resin chock si otel
nu trebuie sa depaseasca 10 C !
1.3.7 Lucrari Finale
a) Indepartati conexiunile de umplere si
aerisire
b) Inchideti conexiunile de umplere si
aerisire cu suruburi capac fals
c) Polizati suruburile de reglare la zona
exterioara a bucsei pupa si incheiati.

H . A . S P R I N G E R
I L L I N O I S

T O O L

W O R K S

G MBH
INFO 5 - 97 - 07 - EP - 36 - ST - E-D

C O M P A N Y

o
in

2,

s temperature i dieser
Temperatur

25

CO
o

CO

"? ^}

Mix the resin at


sche das GGieharz

CO
o

25

m
CM
o

30

POURING GUIDE 1.3.2

35 30

AN

CM

10

EPOC/ AST 36
MIX

15

ING Al

^9

CO

Steel / Sta

CO

CO

CM

CM

mo
i-

i-

Gap thickness (mm) between housing


and bearing bush Spaltbreite (mm)
zwischen Stevennuss und
Stevenrohrlager

VI VI

V)

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

H.A. SPRINGER GMBH


AN ILLINOIS TOOL WORKS COMPANY

S-ar putea să vă placă și